Experiments Compare

Compare project modelling approaches

Toy scenario

Different ways to see the same broken crossing.

A footbridge has failed. Establish what is there, choose a way across, recover and rebuild it, then reopen the crossing. Try the shared project.

“Best for” names the strongest change of perspective demonstrated here, not a universal winner. Contained examples from the enquiries below; these judgements can change. .

An imagined broken footbridge on the Gimån, beside a railway crossing
Gimån, imagined. Place and picture.
Experiments compared through a footbridge project
ExperimentBest for…
Local to Global

building global views from local ones

Bridge trial
Changing project states

seeing why equal progress can leave different futures

Bridge trial
Project Co-design

seeing what it takes to reach a feasible design

Bridge trial
Processes to plans

seeing which alternative plans the work permits

Bridge trial

seeing what a chosen plan conceals

Bridge trial
Programme Decision Sequences

seeing when learning can still change a commitment

Bridge trial
Composing open systems

seeing why agreement can still leave a resource clash

Bridge trial
Semantic project planning

finding work absent from the finished object

Bridge trial
Composing work packages

seeing what must pass between work packages

Bridge trial
Integrated risks & tasks

seeing how another actor’s work threatens a project objective

Bridge trial
Higher-autonomy experiments

seeing what a reusable package must remember at its boundary

Bridge trial
Project Spines

checking whether claimed parallel work really is incomparable

Bridge trial
Functors for Projects

seeing what an interaction exposes and what hiding loses

Bridge trial
Knowing enough to act together

seeing which information each action owner needs

Bridge trial
Meta Project Innovation

seeing the conditions and adaptation needed before reuse

Bridge trial
Counterfactual programme steering

seeing which assumptions separate association from intervention

Bridge trial
Useful project interventions

seeing when a retained review stops covering current evidence

Bridge trial
Learning from what we keep

seeing where a correction applies and what it can break elsewhere

Bridge trial
Does the picture change the judgement?

separating information sufficiency from a claimed visual benefit

Bridge trial
A useful answer sold by the piece

specifying an inspectable answer and the boundary of its acceptance

Bridge trial
Finding and changing abstraction layers

locating the valid range of a local project abstraction

Bridge trial
Project models in use

Transferred; collection closed. Browse current enquiries.

No separate comparative result is claimed for the closed collection.

Keeping construction methods open

Not yet compared here.

Business project benchmark

Not yet compared here.

Hidden opportunities within reach

Not yet compared here.

Can we rely on project research?

Not yet compared here.

Testing an open-source PDA platform

Not yet compared here.

Where to draw the work

Not yet compared here.

What the trials establish.