Purpose · Foray 266
When is the test enough?
At Tidewick a signed drawing can release work. A planning-room calculation can establish something equally precise, such as whether two requirements fit on the same timetable. Passing from one kind of evidence to the other takes an argument.
Ends
Decide what the planner can issue from the evidence on the desk. Sometimes a single counterexample settles the question. Sometimes a calculation rules out a large region and leaves the decision open.
Ways
Begin with a case small enough to draw. Work forwards from a rule or backwards from a surviving record. Then ask which step would still work if there were a hundred jobs, or no bound at all. The thirteenth timetable rule shows why demonstrating an obstruction and proving it is the smallest one are different jobs.
Means
Use drawing revisions, a berth diary, crew manifests and marked lengths on a pier to make the mathematical objects visible. The mathematical working and the physical comparison sit side by side. Public sources are linked at the point where they enter the argument. Its evidence page identifies the published result, the new construction or check, and the question still open.
Where this meets the rest of the collection
After the fourth-corner example, visit the dispatcher at Fenwick Quay. She faces the operational consequence of a handover summary that lost the signatures. In Can we rely on project research? the independent check itself becomes the object of inquiry.
The separation of a certificate’s scope from the evidence supporting it has a physical precedent in Crossrail’s Works Information. Tidewick and its mathematical cases are imagined. Crossrail Works Information, Part 13, §13.4.3.