Which handovers can we promise? · Essai 01
Who can install the West board?
At Fenwick Quay the new West concourse sign is ready to hang. The dispatcher has a slot for one crew. On her screen, both boards and both crews appear in one handover group.
A crew can take a board only if it signed for that package. Five different signature sheets give exactly the report on her screen. What can she promise before the slot goes?
Release the West board
One group · East and West boards · Day and Late crews
| Original sheet | Your instruction |
|---|---|
| All four signed | Send Late |
| Only West/Late blank | Send Late · unsigned |
Late can belong to this group through the East board alone. One of the five possible sheets leaves West unsigned by Late.
Make the dispatcher's report
You hold the original signatures. Change one, then compare what you know with what the dispatcher can reconstruct. She sees which boards and crews belong together. She cannot see the individual links.
| Package | Day crew | Late crew |
|---|---|---|
| East board | ||
| West board |
Group report East + West + Day + Late
5 original sheets give this report. Reading every same-group pair as signed would add West/Late to this sheet.
West/Late lookup returns blank. All compatible sheets with that answer carry West/Day’s signature. Send Day.
Start with the three signatures shown. Add West/Late. The report stays the same. Now clear both East signatures. The East board becomes a group of its own. A missing link sometimes changes the report, and sometimes disappears inside it.
The signature at the far end of the chain
Follow a finger across the starting sheet. West leads to Day, Day to East, East to Late. That is how Late got onto the same line of the dispatcher's report as West. Nobody on that walk signed a handover between its two ends.
Now add Late’s signature for West. The installer can tell those two sheets apart at a glance. The dispatcher's screen shows the same four names in both. A rule that always sends Late must give the same instruction from either screen. On one sheet it sends a crew without its acceptance.
Change what the dispatcher is allowed to promise
If the booking names Late, the dispatcher can ask for that crew’s West entry. A signature releases the booking. A blank leaves the slot on hold. The lookup protects her from an unsigned dispatch, but cannot conjure the missing acceptance.
Give her authority to send either crew. In a single group West has at least one signature, or it would stand alone. Ask exactly the same question about Late. A blank now settles something useful about Day. She can promise a signed crew before she knows which crew it will be. She still needs the lookup before she names one. Choosing Day without checking would fail on the mirror-image sheet.
What survives the merge?
Regard a signature as a link from a board to a crew. Merging the two lists along those links gives one label to each connected group. Asking afterwards which boards and crews have equal labels returns every board–crew pair inside each group. In finite sets these operations are a pushout followed by a pullback. The return trip can fill a missing corner of a rectangle.
Keeping the group label is enough to route a query to the right people. Recovering a particular signature calls for different evidence. With three crews, a “no” from Late could leave two possible signatories. The one-question guarantee depends on having exactly two eligible crews, complete records and a truthful answer about the same version of the sheet.
Five sheets, one report
Each board and crew has its own name. Each of the four entries is signed or blank. Of the sixteen sheets, five connect all four names. Four have a single blank. One is fully signed. Two signatures cannot connect four names. Each row here represents one of those five sheets.
| Only blank entry | Send Late | Check or hold | Check or switch |
|---|---|---|---|
| East/Day | Signed | Late | Late |
| East/Late | Signed | Late | Late |
| West/Day | Signed | Late | Late |
| West/Late | Unsigned | Hold | Day |
| None | Signed | Late | Late |
Across all sixteen sheets the round trip adds an entry on exactly four, the ones with three signatures. The counts describe possible records. A frequency in a real station would require data. A signature here means acceptance of a package. Crew availability, site access, installation safety and contractual authority remain separate conditions.
Download the exhaustive check (Python). Run python3 verify.py to print every sheet, its reconstructed pairs and the three dispatch outcomes for the five matching sheets.
Sources and construction
Crossrail’s Works Information required certificate registers, defined the scope of a certificate and linked it to supporting records. That distinction supplies the project question. Fenwick Quay, its boards, its two crews and the grouping report are invented. Works Information, Part 13, §13.4.3.
Brendan Fong asks what happens when a span goes through a pushout and back through a pullback. Our four-name register works through that comparison in finite sets. The missing-corner property is known as difunctionality. The dispatch rules and their exhaustive small-case check are the construction in this essai. Fong’s question · Zarrad and Gumm on difunctionality.
Codex, with Lawrence Rowland · 27 November 2026