Foray 236 · Essai 02 · Saltmere · 22 November 2026
Does one trailer still cover the move?
The night shift at Saltmere fish market leaves five instructions on the desk. One says, “One trailer covers the move.” The refrigerated trailer is booked and both lots have clearance to use it individually. Then the auction clerk moves the overnight release forty minutes later. Would you still pass that instruction on?
The overnight lots originally cleared at 05:45. The morning landings need chilled space at 06:00. A fifteen-minute gap becomes a 25-minute overlap when the first lot stays until 06:25. The hire still covers the morning. Whether both loads will fit is a different question. The desk has neither their quantities nor a usable combined capacity.
What the outgoing shift put in writing
One agent prepared the original handover from five fictional records before seeing either change notice. The study designer knew both notices. The outgoing agent’s full note says the one-trailer instruction “fits those separate slots”. It also linked that instruction to the hire confirmation, the signed timetable and the desk instruction. Across the five claims it supplied eight links.
We shortened its handover to the same five-line card for three fresh incoming agents, leaving out that timing explanation. One agent received the plain card and an index of the five source records. Another also saw the links and the first review flags they produced. The third saw the same information with one link removed. The one-trailer instruction had lost its connection to the signed timetable. Each agent could open any of the five records before making its decision.
Read the handover at the change of shift
Both lots need the trailer between 06:00 and 06:25.
What the filter marks for review
The instruction the filter would have passed on
With all eight links, the changed timetable flagged the instructions to use one trailer and to keep the loads separate. With the timetable link removed from the first instruction, Semantica flagged only the second. It passed “One trailer covers the move” to the next shift without a review flag. Restoring the single link brought the warning back.
A second notice tested the same handover independently. The hall’s display name changes from East Auction Hall to East Quay Auction Hall. The premises code stays EH-2, and the original timetable stands. In all three versions, the filter flagged only the card line containing the hall name and code. The shift can amend the name and keep the code.
What the incoming shifts decided
All three reopened the one-trailer instruction. Each found the 25-minute clash, kept the confirmed hire and treated the hall rename independently. The agent with the missing link still found the timing assumption. Its filter had flagged only “Keep the loads separate”, yet its handover explicitly marked the one-trailer instruction pending. It suggested moving the 70-minute morning slot to 06:25–07:35, subject to the trailer being ready and the clerk and haulier confirming the change. That proposal still needed approval before dispatch.
The missing-link reader cited the timetable in its written handover. The researcher then restored the link in the machine-readable record and reran the filter. The distinction matters for the next shift. A corrected handover helps today’s reader. Editing the link also changes what the filter will flag tomorrow.
The original map contained eight links and the incomplete one seven. Each of the three agents opened all five source records in a single round. Recording the extra link changed the warning the next shift saw. It saved no source lookups in this trial.
The practical decision is to keep the hire, hold the assurance that it covers both lots, and take the timing clash to the auction clerk and haulier. A loading sheet and usable capacity would be needed to assess a combined load. A confirmed changeover or an agreed new slot could also resolve the clash. The timetable alone cannot establish which arrangement will work.
There was one agent per version and each received both notices. The timetable still appeared as a source for the instruction to keep loads separate, so the third reader had another reason to open it. The comparison counts links, record openings and request rounds. It gives no measure of elapsed time or the cost of maintaining a larger handover.
Read the three handovers, the five decision checks and the filter replay →