Essai 01 · Gimmer helicopter estimates · 17 October 2026
Evidence for the Gimmer handover
Reproduce the flight estimates
Save these three files in one folder. The challenge contains the original seven phase estimates, the mast extension, the revised service groups and a separate name-change control. The two successor agents produced byte-for-byte identical numerical results, so a single file holds both answers.
- challenge.json · original inputs and changes
- numeric-result.json · both agents’ recorded answer
- reference.py · original independent checker
Run this command from that folder with Python 3. It uses the standard library. The checker reconstructs all 17 days for each case and compares each curve, total, peak and illustrative cost with the agents’ answer.
python3 reference.py --challenge challenge.json --candidate numeric-result.json
A match prints "numeric_pass": true. Omit --candidate numeric-result.json to see the full calculation, including each service’s daily contribution. In order, the original baseline and mast extension total 41 and 43 flights, the revised cases total 47 and 51, and the separate name-change control totals 43.
Which instructions reached the successor?
The plain handover carried all six records for the agent to assess. With the revised grouping, the Semantica handover retained the phase inputs, the within-service maximum, the historical answers and the limits. It withdrew the instructions to use 41 as the current baseline and 43 as the current extension. Renaming the inspection phase kept all six records.
The negative test removed the grouping condition from the old extension instruction while retaining its link to the unchanged phase data. The filter then passed that stale instruction. These outcomes come from the original Semantica run. Recorded filter decisions.
What ran in October?
One fresh agent received each handover. Both found that the exported case had been reformatted. Its byte fingerprint had changed even though the parsed input facts still matched. The experimenters corrected the builder to retain the original bytes, then reran the saved programs and mechanism checks against the corrected packets. The agent comparison consists of the two original responses. Verification record for both agents, their output fingerprints and the seven recorded tests.
The five downloads reproduce selected files from the 17 October research record, revision 4a87e43. The challenge records the fictional Gimmer model as retrieved that day. Its historical source address now leads to a later delivery-estimates example. The download above carries the helicopter data used in this essai. Current Shared deliveries example.