Foray handoffs

Follow a question from the foray that closed it to the one that may take it up.

Map by family

The handoff index lists each recorded move. Browse the four families.

Handoff index

Who bears the wait?

Closed in 165 · Integrated risks and tasks
In the farm-lane trial, advance notice allows a 38-minute finish with no farmer wait. With notice only at the gate, that finish needs permission for one minute of waiting. Read the lane agreement.
Handed in to 226 · Agreeing how to work together
A future essai could ask an owner, supplier and operator to agree a service window. Who may change it, what notice can each promise, and who bears the cost if notice fails?

Can the pair deliver its alternative?

Closed in 246 · Hidden opportunities
The three parties can create 10 units together. If each pair can credibly make 8 on its own, every division of the 10 leaves some pair able to do better by leaving. Read the bargain essai.
Handed in to 226 · Agreeing how to work together
A future essai could ask whether an owner and a supplier could run a service without its operator. Who could provide the staff, grant permission and commit the resources that would make that alternative deliverable?

Does the schedule preserve the handover?

Closed in 170 · Shared Waters
The operator and receiver can each start and finish their own work. Matching handover protocols give them a joint route to completion. Mismatched protocols remove it, even when erasing the protocol labels makes a route appear. Read the Shared Waters essai.
Handed in to 110 · Processes to plans
At Gimmer Crag, give two crews the same tasks, durations and dependencies. In one version the first crew provides the release the second crew needs. In the other it sends a completion notice. Can the schedule tell which handover allows work to proceed?

Is the repair still possible with perfect information?

Closed in 180 · Wildlife co-design
Grading destroys the trace that would tell the crossing team which of four repairs to choose. All four remain physically possible. Read the wildlife essai.
Handed in to 230 · Keeping construction methods open
In 230’s bridge case, give the team a correct diagnosis in time to act. Which methods remain physically possible after the interface closes, and what is the latest point at which an alternative is still available?

Which check is worth buying next?

Closed in 410 · Bracken Vale
With independent findings, a careful fixed order that skips irrelevant checks and stops once the claim is settled matches adaptive review. In the model with dependent findings, adaptive checking can save a little. Read the Bracken Vale essai.
Handed in to 220 · Programme decision sequences
In 220’s festival rehearsal, choose whether to stop or invite another shuttle boarding batch. How should the next check change when early results alter what another batch could tell you and the extra rehearsal costs staff time?

When can two project records be compared?

Closed in 286 · What can a sector learn from its projects?
A proposed vessel trial raised the question of how to compare time records that start and finish at different events. The sector enquiry can ask what operators would share, knowing how comparability will be checked.
Handed in to 323 · Reusing project lessons
In the station handover case, what evidence would show that two past records cover the same work and measure the same interval? When can the team translate between them, and when does the evidence call for leaving one out? Read the station handover essai.

Did the duty change or disappear from the record?

Closed in 450 · Changing the organisation while it keeps working
In the fictional Winter Fleet trial, three lab bookings kept their boat assignments. One team’s active records omitted the duty to return operating conditions to the lab. The fleet still needs to restore that duty and check whether its successor can carry it out.
Handed in to 270 · Models, decisions and changing goals
In 270’s radio-maintenance case, what evidence distinguishes an omitted duty from an authorised change in how the service is delivered or what it is meant to do?

Where should one spare day go?

Closed in 425 · Risk manifolds
With one spare day and fixed risk assumptions, the immediate choice is which task should get it. Foray 425 still studies how interventions interact and how new evidence changes the risk assumptions.
Handed in to 426 · Project slack as a risk derivative
Try adding the day to each task with enough unused float. Compare the resulting finish dates and risk scores under the same assumptions.

Do these passages support a claim about delay?

Closed in 320 · Tag Concurrence Graph
Six of 22 numbered Crossrail audit findings were coded for both Interfaces and Testing and handover. The count locates passages to read for evidence of delay. Read the Crossrail essai.
Handed in to 265 · Reliable project research
Use 265’s passage-audit method to separate what the source reports from what a proposed explanation adds. Which passage supports a claim about delay, and how strongly? Read the passage audit.