A small ontology reading exercise
What does this project link say?
Toy scenario
A fan, its installation and a record about it are different things. Read how the links distinguish them in a Solway tunnel service bay.
Start with Fan A. The assembly has it as a part; two activities target it; an intended record describes it. Those arrows have different meanings.
All statements are supplied planning assumptions. An activity is not recorded as completed, a record is not an acceptance, and a missing link is not proof that a relationship is absent.
Select a circle or use the item menu. Drag a circle to move it; drag the background to pan. Use +, − or the mouse wheel to zoom. Re-layout changes positions only.
Arrows show assertion direction. Links touching the selected item are highlighted; read their complete predicates in the panel. Node positions are only a layout.
The supplied model
Local ex: terms make the relationships explicit. The graph displays the named project items and their links; types and literal descriptions are available in the item panel and this complete Turtle.
The explorer could not start. You can still read the complete Turtle model and the method and limits.
What follows from reading the links?
The model names products, planned activities, temporary means, agents and information. It does not generate required work or decide whether anything has been delivered. Try The work that must exist for explicit work-generation rules, or What does this measurement justify? for a separate evidence model.
The broader tunnel ontology explores a larger collection. This small exercise focuses on reading a statement and its direction.
Method, source and limits →