# A fictional planning vocabulary. These local classes and properties do not
# claim Digital Construction conformance or describe an actual tunnel design.
# Activity links describe plans; they do not record work as completed.

ex:Assembly a ex:Product ;
  rdfs:label "Ventilation assembly" ;
  rdfs:comment "A proposed assembly containing two fans in the fictional service bay." ;
  ex:hasPart ex:FanA, ex:FanB ;
  ex:locatedIn ex:Bay .

ex:FanA a ex:Product ;
  rdfs:label "Fan A" ;
  rdfs:comment "The product that one installation activity targets and one planned inspection concerns." .

ex:FanB a ex:Product ;
  rdfs:label "Fan B" ;
  rdfs:comment "The second fan. This small description contains no inspection or record for it; absence of a statement is not a negative fact." .

ex:Bay a ex:Place ;
  rdfs:label "Service bay" ;
  rdfs:comment "An invented tunnel work location, with no dimensions or engineering design implied." .

ex:InstallA a ex:Activity ;
  rdfs:label "Install Fan A" ;
  rdfs:comment "A planned activity, not evidence that Fan A has been installed. Naming a requirement does not schedule or supply it." ;
  ex:hasTarget ex:FanA ;
  ex:requires ex:Platform ;
  ex:assignedTo ex:Team .

ex:InstallB a ex:Activity ;
  rdfs:label "Install Fan B" ;
  rdfs:comment "A second planned installation referring to the same temporary platform. Shared reference does not establish simultaneous capacity." ;
  ex:hasTarget ex:FanB ;
  ex:requires ex:Platform ;
  ex:assignedTo ex:Team .

ex:Platform a ex:TemporaryMeans ;
  rdfs:label "Access platform" ;
  rdfs:comment "Temporary means referenced by both installation activities, distinct from the permanent ventilation assembly." .

ex:PrepareAccess a ex:Activity ;
  rdfs:label "Prepare access" ;
  rdfs:comment "A planned setup activity whose declared output is the shared platform. No access, capacity or safety check is computed." ;
  ex:plannedOutput ex:Platform ;
  ex:assignedTo ex:Team .

ex:InspectA a ex:Activity ;
  rdfs:label "Inspect Fan A" ;
  rdfs:comment "A planned inspection with an intended record. The link does not assert that the inspection happened or passed." ;
  ex:hasTarget ex:FanA ;
  ex:plannedOutput ex:RecordA .

ex:RecordA a ex:Information ;
  rdfs:label "Fan A inspection record" ;
  rdfs:comment "A placeholder for an intended record. Being about a product is different from being that product, measuring it or accepting it." ;
  ex:describes ex:FanA ;
  ex:reportedAgainst ex:Criterion .

ex:Criterion a ex:Requirement ;
  rdfs:label "Inspection criterion" ;
  rdfs:comment "A named criterion placeholder. No numeric limit, measurement, result or acceptance decision is supplied." .

ex:Team a ex:Agent ;
  rdfs:label "Installation team" ;
  rdfs:comment "A fictional role assignment; it says nothing about competence, availability or contractual authority." .

ex:Scope a ex:Information ;
  rdfs:label "Proposed scope note" ;
  rdfs:comment "An information item specifying the intended assembly, rather than a part of the assembly or proof of delivery." ;
  ex:specifies ex:Assembly .