A finished tunnel needs more than permanent lining: excavation, temporary access and support, installed systems, inspections and evidence all play different roles. Smaller installation examples let us test those distinctions without pretending to engineer the whole tunnel.
Can a description of the desired result explain the work needed to achieve it?
Start with The handover game or inspect The work that must exist. Read the essay’s method & limits. The Digital Construction early essai inspects the vocabulary and project descriptions that precede work generation, keeping its Tokyo and HS2 contexts. When the work changes tests refinement, regrouping and specific handovers on the generated work. What does this measurement justify? checks whether a reading is well formed, relevant and within a supplied limit, and explains the review work left to do. What does this project link say? reads the names and directions of explicit links in a small tunnel installation model. The remaining apps explore related questions.
For the general mathematics behind shared interface states, see products, coproducts, pullbacks and pushouts in Functors for Projects. The Solway examples specify their own checks and limits.