Method and source · 21 October 2026
Read one statement at a time.
Toy scenario
A project description becomes more useful when its relationships retain their names and directions.
The small question
Fan A is a part of a proposed assembly. Installation and inspection activities target it. An intended record describes it. The common neighbour does not make these relationships interchangeable.
The Solway service-bay model uses 13 named project items. The graph shows only relationships between these items. Classes and literal descriptions remain in the item panel and complete Turtle. Select the access platform to find its two declared users and its planned setup. Select the record to distinguish an information item from the product it describes.
What the explorer does
- Each arrow is one explicit subject–predicate–object statement, pointing from subject to object. Different predicates remain separate even when endpoints coincide.
- The panel lists complete incoming and outgoing relationships. The subject snippet includes every outgoing RDF statement for the selected item, including type, label and description. Incoming statements appear under their own subjects.
- Graph and Turtle are two views of the same saved model. A standard Turtle parser generates the browser projection before publication; a check compares that projection with the source. The app does not accept or parse arbitrary uploaded Turtle.
- Fit, zoom, dragging and Re-layout affect the drawing only. Switching views preserves both selection and node positions. A native item menu and keyboard-operable graph nodes provide alternatives to pointer selection.
What these statements leave open
The vocabulary is local to this exercise. It does not claim Digital Construction ontology conformance. The model does not run an OWL reasoner, validate engineering constraints, generate required work, calculate a schedule, assess capacity or accept an installation.
Activities describe plans. A plannedOutput is not a completed output. The intended inspection record contains no measurement, result or acceptance decision. Two tasks referring to one platform do not establish that both can use it at once. The absence of an inspection link for Fan B says only that this small model supplies none.
The wider Solway graph remains a separate model. This reader is neither a replacement for it nor an additional view kept automatically in step with it.
Where it came from
This exercise refactors the Gimmer Crag Shed Ontology Explorer, formerly App21 in the broader Gimmer collection. It retains its graph/Turtle pairing, item inspection, source snippets, layout controls, zoom and direct manipulation. The mountain shelter dataset has been replaced by a small fictional tunnel installation context so the question belongs with Solway's semantic planning enquiry.
The original source is retained in the receiving repository with its source revision and content hash. The original line-based parser omitted predicate names and did not reliably locate subject snippets. The new projection uses the repository's N3 parser, retains complete predicates and verifies source correspondence. SVG nodes and a native item menu replace the pointer-only canvas selection.
Maintainer notes and provenance (Markdown) · Repository source