Where should the drawing boundaries fall?
Divide the work where it can bear the join
An imagined railway climbs through wet ground near Skiddaw House towards Great Calva. Three design packages must cover the same ground and stages of work. A tidy division into equal lengths may leave the most troublesome material transfers and gradients straddling its boundaries.
With the drawings fixed, which allocation leaves the fewest discrepancies unresolved at handover, on average? At each join the teams compare quantity, level and gradient. A single join can leave all three outstanding, even when the material totals balance across the job.
The first essai enumerates a small, exact allocation problem. Later trials can change the uncertainty, review rights, package workload and cost of reopening a drawing. The enquiry remains open to methods beyond graph partitioning or sheaves. Any claimed improvement must preserve the engineering comparisons and count the work required to achieve it.
Try the first essai. The model is a deliberate construction, not a surveyed railway proposal. Its probability assumptions are visible and replaceable; it makes no claim to use the ECCC paper's asymptotic algorithm.