The Calva ascent
Three drawing teams divide the earthworks for an imagined railway up Great Calva, near Skiddaw House.
Eighteen drawing tiles cover six lengths of the ascent through three construction stages. Each team must own one connected package of six tiles. Every boundary puts a shared detail between teams.
A simple split by distance can separate details that change together. A split by stage moves those interfaces elsewhere. The team can compare both with a bent boundary while retaining equal package sizes.
Explore the questions
Hover over a tile for details. Click to enter.Tap a tile to enter.
Great Calva and Skiddaw House are real places. The railway, alignment, drawings, teams and mismatch probabilities are invented. The calculation counts quantity, level and gradient discrepancies across all 27 joins. One join can contribute three discrepancies. The probabilities are illustrative.