Take the idea further
What is left when the work is over?
A gantry and the installation it enables belong to different descriptions of the project. The finished units are products; setting up, installing and inspecting are processes. The records are evidence, and the gantry is temporary means.
Explore product, process, means and evidence →
The rules behind the game
Physical actions, access constraints and completion obligations come directly from the essay’s model. Each inspection represents a successful inspection and its record.
Costs, hours, shift incidents and quiz scenarios are training assumptions added for the game. They are not engineering estimates. The units are deliberately generic; this is a two-unit fit-out, not a simulation of constructing the whole Solway tunnel.
You learn through choices and explanations. It does not infer new methods, certify safety or model inspection failures.