Questions through a US IT portfolio
September–October 2020 demonstration, with the later reading notes and limitations retained.
Public copies captured 3 October 2026 from the cited source revisions. Source dates and later corrections remain in the documents. These are selected reading materials, not a complete repository or a reproduced execution.
Read
- 2020 08 Oxford US Portfolio · notebook with saved outputs
- Reading the original query sheet
- Choosing a route from governance needs to information
- Reading the Health hierarchy draft
- US IT portfolio: a guide to the original walkthrough
- Graph exports and unfinished setup
- subgraph OxfordUS Portfolio · notebook with saved outputs
- FDA sub graph
- FDA sub graph 0
Supporting downloads
- 2020_09_Running_a_portfolio_from_neo4j_Rowland_1500_US_projects.pdf · 2.7 MB · Historical original; read the count, rating and currency corrections alongside it.
- Using_Neo4j_sandbox_with_the_FDA_investments.mov · 43.7 MB
- Complete_graph.cypher · 10.3 MB
- Health_sub_graph.cypher · 1.6 MB
- export.cypher0 · 59 kB
- export.cypher1 · 236 kB
- export.cypher2 · 45 kB
- export.cypher3 · 24 kB
The downloads retain the original bytes. Notebook readers show saved cells and outputs without running them. Older model inputs may need missing data, libraries or compatible software. Public availability does not grant additional rights to underlying datasets or third-party material.