"""Replay the Fenwick Quay handover trial using Python 3, with no dependencies."""
from itertools import product

NAMES = ("East", "West", "Day", "Late")
PAIRS = tuple(product(NAMES[:2], NAMES[2:]))

def reconstruct(signed):
    """Return every board/crew pair joined by a path of signed entries."""
    result = set()
    for board in NAMES[:2]:
        reached = {board}
        while True:
            neighbours = {b for a, b in signed if a in reached}
            neighbours.update(a for a, b in signed if b in reached)
            if neighbours <= reached:
                break
            reached.update(neighbours)
        result.update((board, crew) for crew in NAMES[2:] if crew in reached)
    return result

connected = filled = signed_late = signed_after_lookup = 0
for entries in product((False, True), repeat=4):
    signatures = {pair for pair, signed in zip(PAIRS, entries) if signed}
    returned = reconstruct(signatures)
    assert signatures <= returned
    filled += signatures != returned
    outcomes = ""
    if len(returned) == 4:
        connected += 1
        late = ("West", "Late") in signatures
        chosen = "Late" if late else "Day"
        signed_late += late
        signed_after_lookup += ("West", chosen) in signatures
        outcomes = f" | send Late: {'signed' if late else 'unsigned'}; check: {'Late' if late else 'hold'}; switch: {chosen}"
    bits = "".join("1" if b else "0" for b in entries)
    pairs = ", ".join("/".join(pair) for pair in PAIRS if pair in returned)
    print(f"{bits} -> {pairs or '(empty)'}{outcomes}")

assert (connected, filled, signed_late, signed_after_lookup) == (5, 4, 4, 5)
print("16 sheets; 5 connected; 4 gain a pair; signed releases: 4 fixed, 5 with discretion.")
