Skip to content

The Tangled Triangle

Fit a control centre onto an awkward site.

A control-centre site squeezed between a canal, road and railway viaduct.
Toy scenario

A control-centre site must contend with a canal, road, railway viaduct, overhead power line and old mine passage. Plans, sections and local constraints reveal different parts of the problem.

The same site supports two enquiries: how AI interprets a brief, and whether declared local rules admit a shared candidate location.

Explore the questions

The interpretation variants are not a scored AI benchmark. The compatibility lab checks sampled locations under supplied rules, not real-site feasibility.

Sources for this scenario

All scenarios