Skip to content

A tunnel beneath the Solway

Find the work hidden behind a finished tunnel.

A cutaway of a tunnel beneath the Solway, with shore access and construction underground.
Toy scenario

A tunnel needs more than its permanent lining. Excavation, temporary access, support, installed systems and evidence of readiness each have a different part to play.

Use the tunnel setting and smaller installation examples to distinguish the desired result from the work, temporary means and evidence it requires.

Explore the questions

The installation examples test selected distinctions. They do not provide a complete tunnel plan, and the retained Tokyo and HS2 ontology examples are separate cases.

Sources for this scenario

All scenarios