Skip to content

The Island Reading Room

Get the books ashore while the jetty is closed.

A boat holds boxes of books beside a closed jetty. A shore path leads to a little reading room, with a seal watching from a rock.
Toy scenario

A tiny island reading room needs shelves and books. The books are on the boat; the jetty is unavailable. A low-tide inspection may offer a shore path, but a fixed pallet and hand-carried boxes need different delivery arrangements.

Follow two coordinators exchanging questions and replies. An answer becomes the other coordinator’s next input; hiding their internal exchange leaves the composed outside interface.

Explore the questions

These are authored routing policies in a finite Geometry of Interaction illustration. The policies do not learn; an inspection report must be supplied from outside. A proposed plan is not a completed or safe delivery.

Sources for this scenario

All scenarios