Does the picture change the judgement? · Essai 05
Which handover gets the crew?
A spare crew rings the Glasshouse pumps handover desk at 09:30. Intake has been waiting since eight. Return came in twenty minutes later. Which bay gets the crew?
A bay can take the crew once its signed release reaches the desk. Among eligible bays, the earliest signature takes priority. If a bay is still waiting for release, ring its supervisor.
Move the call to 09:50. The change at Intake happened seventy minutes before anyone at the desk could act on it.
The handover desk
Send the crew to Return. Ring Intake.
09:30 call · A arrival · R signed · F filed later · D dispatch. Dashed line marks the call.
Arrived 08:00. No release slip on file. No dispatch.
Arrived 08:20. Signed and filed 09:05. No dispatch.
Change the dispatch book
Suppose Return already has a crew. Intake’s slip is still in the supervisor’s pocket. Does the spare crew have anywhere to go? Each choice replays an independent call. A recommendation never enters a dispatch in the book.
Hold the spare crew. Ring Intake.
Arrived 08:00. No release slip on file. No dispatch.
Arrived 08:20. Signed and filed 09:05. Crew dispatched 09:25.
At 09:50 the same book admits Intake’s 08:40 release. Send the spare crew there. Return’s earlier dispatch still stands.
Where to put the late slip
Near the end of a shift, someone brings in a slip that belongs near its beginning. There are two sensible places to put it. The commissioning supervisor wants it under 08:40, when Intake was released. The dispatcher answering for the 09:30 call needs to see that the slip came through the door at 09:50. A record that keeps only the first time leaves the dispatcher looking remarkably obtuse.
Wallace Clark encountered an analogous difficulty in the American merchant fleet. A flag could say where a ship lay while saying little about the length of its stay. A ship-movement chart gave an older entry its proper place in time. Its legend even allowed a missing arrival or departure date to remain visible. At Glasshouse there is a further question. Who could have known about that movement when the phone rang? Clark, The Gantt Chart, pp. 111–115.
The desk’s common clock gives both bays a fixed position against the time of the call. That shared mark borrows from Edwin Hutchins’s account of how a physical arrangement can stabilise a relation we need to reason with. A late slip gains two marks when it reaches the desk, R at signing and F at filing. The job cards preserve the same entries and times. Either display can support the instruction. Moving the call tests whether the display still represents what was knowable then. Hutchins, “Material anchors for conceptual blends”.
In the opening handover, the supervisor really had signed Intake first. The clerk was justified in sending the crew to Return at 09:30. Both statements can stand in the same project history. A retrospective diagram earns its place in a handover when it lets its reader recover both.
What the replay establishes
Four possible histories for each bay and five call times give 80 constructed decisions. Every card and chart carries the same visible entries, dates and filing times. A separate calculation from the bay histories reproduced the full instruction, including whom to ring, in all 80. This checks what information each display preserves. We collected no reader responses or speed measurements.
| Reading rule | Result in 80 calls |
|---|---|
| Earliest signature among slips already filed | 80 warranted instructions in either view |
| Send to the oldest waiting arrival | 35 wrong assignments, all to a bay lacking a filed release |
| Treat every slip as available when signed | 22 changed instructions, including 16 changed crew assignments. Six change only whom to ring. |
The frequencies come from enumerating these deliberately chosen histories. The desk controls all dispatches and logs them immediately. A lost dispatch message would require another state. Release is valid for the whole shift, and a crew can serve either bay. This is a later fictional shift at Glasshouse, following the earlier handover comparison.
All 80 crew and telephone instructions
Intake arrived at 08:00 and signs at 08:40 in the signed histories. Return arrived at 08:20 and signs at 09:05. A prompt slip is filed at signing. Late filings are 09:50 and 09:55 respectively. Under “sent”, the prompt slip is followed by dispatch at 09:35 for Intake or 09:25 for Return.
The first letter gives the crew destination. Letters after the slash name the supervisors to ring. I means Intake, R means Return, and a dash means none. At an exact filing or dispatch time, the entry is already available.
| Intake / Return | 09:00 | 09:15 | 09:30 | 09:50 | 10:00 |
|---|---|---|---|---|---|
| unsigned / unsigned | – / IR | – / IR | – / IR | – / IR | – / IR |
| unsigned / prompt | – / IR | R / I | R / I | R / I | R / I |
| unsigned / late | – / IR | – / IR | – / IR | – / IR | R / I |
| unsigned / sent | – / IR | R / I | – / I | – / I | – / I |
| prompt / unsigned | I / R | I / R | I / R | I / R | I / R |
| prompt / prompt | I / R | I / – | I / – | I / – | I / – |
| prompt / late | I / R | I / R | I / R | I / R | I / – |
| prompt / sent | I / R | I / – | I / – | I / – | I / – |
| late / unsigned | – / IR | – / IR | – / IR | I / R | I / R |
| late / prompt | – / IR | R / I | R / I | I / – | I / – |
| late / late | – / IR | – / IR | – / IR | I / R | I / – |
| late / sent | – / IR | R / I | – / I | I / – | I / – |
| sent / unsigned | I / R | I / R | I / R | – / R | – / R |
| sent / prompt | I / R | I / – | I / – | R / – | R / – |
| sent / late | I / R | I / R | I / R | – / R | R / – |
| sent / sent | I / R | I / – | I / – | – / – | – / – |
Download the replay in Python · Download the ledger and all 80 decisions