First essai · A railway example

Rail through
three layers.

Who and what connects to a project objective?

Keep objectives, stakeholders and scope in view while following the links between them. Then flatten the same model and see what becomes harder to read.

Reconstructed from Lawrence’s original project notebook. Read the modelling choices

Start with a question

Arrow follows the recorded link Multiple source weights

Select a record or link to read its source. Arrow direction describes the notebook’s model. A link carries no causal or probability claim.

Under the drawing

A small model.
Visible choices.

Layer membership gives each record a role. The flat view retains the records and links while removing their spatial grouping.

Read the findings and method

Read the original commentary

What a line means

The original notebook creates a directed network. This edition preserves recorded direction. Reading all connections around a record includes both incoming and outgoing links.

What a weight means

Weights are preserved as entered. Their units and scale are unspecified. Every drawn line has the same width, so a value of 10 is never presented as a stronger claim than a value of 0.9.

Corrections and unresolved choices
Current Python run and data schema
Source records