Project ratings in Orange
The 2019 exploration and its later illustrated reading guide. The workbook is absent and the displayed accuracy has not been reproduced.
Public copies captured 3 October 2026 from the cited source revisions. Source dates and later corrections remain in the documents. These are selected reading materials, not a complete repository or a reproduced execution.
Read
Supporting downloads
- Project-Success-prediction-ML-LR.mov · 43.2 MB
- Project-Success-prediction.ows · 95 kB
- Storyline-for-demonstration.pdf · 44 kB · Historical script: the target is IEG Bank Performance, not project success; the source workbook is missing and the score has not been reproduced. Read the corrected walkthrough.
The downloads retain the original bytes. Notebook readers show saved cells and outputs without running them. Older model inputs may need missing data, libraries or compatible software. Public availability does not grant additional rights to underlying datasets or third-party material.