Skip to the example

Find a better trade-off together

Compare allocation along a frontier with an outward change in what is possible.

Toy scenario

Try this · assumptions · source

Try. Explore the points and the two objectives. Distinguish a better position on a frontier from improving the feasible options.

Limits. A drawn frontier. The app does not derive an optimum, establish orthogonality or prove a win-win is feasible.

Earlier example reviewed 2 October 2026. Editable source.