Historical source names, revisions and hashes below identify the reviewed inputs; they are not retrieval links. Maintained source and verification files.

Reviewed and adapted for the Library, 2 October 2026. Subject: Capabilities & futures.

Provenance

  • Original ID 14, p3m-capability-tool, in Project-web-apps at revision 9d9c253f9c203441be1fd301bcb9a6b976b85d4f.
  • lawrencerowland/Project-web-apps@9d9c253f9c203441be1fd301bcb9a6b976b85d4f:web_apps/p3m-capability-tool.html, SHA-256 8db9afaae6451269bd06799b7a4960ef2f744fd14b36f05cf1db43939ce71c44.
  • lawrencerowland/Project-web-apps@9d9c253f9c203441be1fd301bcb9a6b976b85d4f:tsx_apps/p3m-capability-tool.tsx, SHA-256 70248bc7d39c231fc5ea83906d7bab8b3441243b93b25bc1cc994cc471458c65.
  • The authored inventory and starting assessments are preserved in example.js: four categories, 21 subcategories and 110 individual capabilities. They are a supplied taxonomy and fictional example, not population-level maturity evidence.

Retained and corrected

Retained three-level current/future assessment, editable names, add/remove capability, parent bulk updates, expansion, search/category/gap filtering, summary counts, clear, restore example, CSV import/export, and P3M/hierarchy/workshop explanations. The previously unconnected sample-CSV function now has a visible download control. JSON save/load also fulfils the original help text’s promised format.

Stable IDs prevent duplicate-name edits/deletes from affecting the wrong row. Full CSV/JSON round-trips preserve custom rows and renamed groups; CSV supports quotes, commas, multiline names and empty fields. Imports validate before a preview and explicit replacement, with Undo. Malformed files never clear the current worksheet. The original five CSV columns remain accepted; new exports add ID, Parent ID and Type.

Counts now use individual capabilities: the source example has 110 leaves, 41 present, 98 targets, zero confirmed gaps and 58 unknown targets. Parent judgements do not inflate totals. Outside scope is explicit. Bulk changes are optional, described and undoable; ordinary parent changes preserve child detail. Filtering reveals matching branches and gives empty states.

Replaced unsupported “typical organisation” and “realistic 18-month” claims with example framing. Retained the suggested assessment-depth durations as workshop planning suggestions. The PeopleCert P3M3 source supports the distinction from formal maturity assessment; it does not validate this checklist.

Operation and checks

Native HTML/CSS/JavaScript; no framework, bundle, build step, external runtime request or storage key. Open index.html directly or serve this directory. Files are read/generated in the browser; unsaved work is lost on reload. No automatic browser persistence or authored-data upload is implemented. The original had no browser storage to migrate.

Run from the site root: node --test tests/eight-capability-models.test.cjs. Fifteen shared model tests pass, covering inventory retention, unknown/gap separation, bulk updates, stable duplicate identities, complete and legacy CSV round-trips, rejected imports, clear/restore invariants and triad cases. All five scripts across both apps pass syntax checks. Browser journeys and saved-file reopening are separate verification steps managed by the integration task; model tests alone do not establish those results or human usefulness.