Learning from what we keep and reject

A review desk
that learns.

Executed synthetic experiment · 18 October 2026

A deterministic decision tree learns from authored review labels. The features and adequacy rubric were designed together. This is an inspectable mechanism test; it measures neither ChatGPT adaptation nor professional or human benefit.

64labelled briefs
1induced rule
32untouched briefs

Three grouped folds. Every case tested once per condition.

19 October 2026 · Additive post-hoc finding

What did the correction undo?

The original run tested the corrected tree only on the new decision use. Replaying its saved tree on the original exploratory use exposes four further false accepts. All four keep briefs with absent evidence: the new partition has lost a distinction that previously worked.

Held-out useBefore correctionAfter correction
Exploratory96 / 9692 / 96
Decision86 / 9688 / 96
Equally weighted two-use test182 / 192180 / 192

A post-hoc diagnostic using the existing held-out cases and saved trees, with no retraining. The combined row weights the two authored uses equally; it does not estimate deployment performance. Four cases are two substantive bundles with two presentation variants each. The original frozen inputs and results below remain unchanged.

Follow the lost distinction

In the second fold, the corrected route is clear → complete → current → keep. It no longer checks evidence or purpose on that branch. The old feedback records were retained, yet refitting changed what the rule protected. The affected exploratory cases are B12-e-pl, B12-e-po, B13-e-pl and B13-e-po.

01 · Change what the desk is doing

Same facts. Different lesson.

The team recommends keeping its delivery sequence. Should the desk keep the brief, ask for more, or reject the recommendation as submitted?

Procedure
Correct / 96
False accepts
Adequate kept
What if we simply write down the new standard?

The purpose-aware checklist is perfect by construction: its author receives the adequacy rule. This is a useful reference, not an equally informed learning competitor. Where a standard can be agreed and stated, the experiment gives no reason to prefer learned inference.

“False accept” means keeping a brief the declared standard says to query or reject. Accuracy alone can conceal this.

02 · Open a brief

Follow the actual judgement.

Change a field or select a square below. Each configuration replays a recorded held-out case; clicks do not retrain the learner.

Review docketSynthetic · no client data

Keep the current delivery sequence.

A brief recommends continuing the plan. These fields are its entire machine-readable record; no prose or documents were interpreted.

Intended use

What each procedure does

Declared adequacy

The learned tree’s actual route

Inspect the nearest history

Distance counts mismatched fields equally. All cases tied at the nearest distance vote. An exact vote tie prefers Ask, then Reject, then Keep.

✓ Agrees with standard! False accept× Other error

Every case, including the failures

Each square is one of 96 held-out briefs. Select it to see the facts and the fitted rule behind the outcome.

Inspect the complete fitted tree and its training feedback

Open training records

The evaluator is part of the lesson

Perfect imitation.
Worse judgement.

The simulated reviewer asks adequate plain briefs to be polished, but keeps polished, complete briefs with no evidence. The learner reproduces that preference on every unseen exploratory case. The separate fixed scoring rule still asks whether the brief is adequate.

96/96matches the
biased reviewer
84/96matches declared
adequacy

03 · Sources became a test

A small method, made inspectable.

Primary methods were read before construction. These are adaptations and distinctions, rather than replications of the papers.

Quinlan · Induction of Decision Trees (1986)

Concept → construction
Attribute tests selected by information gain become a visible categorical tree fitted from feedback labels.

Limit
Our unpruned, full-data variant omits ID3’s original windowing. The attributes already make the authored rule expressible; general project understanding is untested. Read: §§3–4.

Cover & Hart · Nearest Neighbor (1967)

Concept → construction
Classifying by nearby stored examples supplies an equivalent-history comparator with an explicit mismatch distance.

Limit
Equal field weights and tie voting are authored choices. The paper’s asymptotic results do not validate this tiny, categorical desk. Read: introduction and §§II–III.

Shinn et al. · Reflexion (2023)

Concept → construction
Separating action, evaluation and retained feedback helps distinguish the learner from the standard used to judge it.

Limit
This desk induces rules from labels; it does not generate verbal reflections. Reflexion’s evaluator choices and WebShop failure caution against treating any feedback loop as sufficient. Read: §3, Algorithm 1 and Appendix B.1.

Madaan et al. · Self-Refine (2023)

Concept → construction
Its feedback-and-revision loop sharpens our question: does a lesson help a different case, beyond revising the same answer?

Limit
No self-feedback or language model runs here. The changed-use test concerns transfer between cases, not Self-Refine’s within-answer process. Read: §2, Algorithm 1 and §3.

What this first essai establishes

Feedback needs a jurisdiction.

Within this constructed world, labels were enough to recover the old rule. They were not enough to determine when that rule should stop governing. Additional examples partly repaired the transfer and introduced new mistakes.

Read the boundary with the result

All 192 records are synthetic. Three folds cover the finite world, not a population of projects. Both presentation variants of a substantive bundle stay together. The standards, features and feedback were co-designed; held-out labels are withheld from fitting, not unknown to the experiment’s author.

The tree learns no language, asks no new question and estimates no calibrated confidence. The retrieval baseline uses a simple distance, not an LLM. Review time, adoption, outcomes and lasting model adaptation were not measured. The small correction batch is a single frozen choice, not a search for the best teaching curriculum.

Freeze, fold results and reproducibility

The local hash receipt was saved before fitting and scoring. It is inspectable provenance, not independent preregistration. Results below pool all three prespecified folds; the complete per-case output and trees are downloadable.

Download the script, data, protocol and freeze receipt into one directory. Run python3 experiment.py verify, then python3 experiment.py score. Python 3’s standard library is sufficient. Scoring preserves the frozen inputs and replaces the result file; timestamps change, predictions do not.