The last cold room

The film archivist can keep the possibility of a cold room alive for £4,000. The builders will leave a route through the wall for the refrigeration pipes if they have a signed order by noon. At noon they close the wall. Her opposite number at the paper archive is away until one.

Both boards received the same drawing and the same balance of £6,000. Either archivist can call today’s meeting and ask for a reply. The order is on the table. Whose signature will the builder take?

The order at noon

Wall closed

£6,000 remains in contingency. The cold room is unavailable in this fit-out.

A reservation buys the pipe route only. A decision to install refrigeration and allocate the room would come later.

Change one clause in the charter

The builder accepts an order only after a duly called meeting. Film will order the route whenever its signature suffices. Paper normally chairs. If a delivery of paper records has been confirmed, Paper wants £4,000 kept for racking. Choose a diary, then change one clause while leaving the other two alone.

Decision rights

Wall closed

No answer from Paper by noon.

£6,000 remains. No paper delivery has been confirmed.

In the stacks, Paper can answer a formal call but will otherwise reply after lunch. Both signatures can be collected in time if Film may convene and require an answer. Now move Paper off site, or give it a consignment it needs to protect. The same power to sign alone does different work in those two rooms.

What the other key is for

Being told the wall is about to close is quite a meagre kind of power. In the stacks diary the first amendment lets Film open a meeting and produces an empty chair. The next gives Film a claim on a few minutes of the other archivist’s time. Paper answers yes. Two signatures prove perfectly compatible with a quick decision once someone has the right to ask, and to be answered.

The chair who returns at one creates a harder question. A formal demand cannot bring that signature back before lunch. Film’s single signature buys a future choice about cold storage, using two-thirds of the money left. Even here, whether it was worth paying for the route depends on what the archive later decides to store.

Now put the paper accession on the loading schedule. Paper needs £4,000 for racks and says so in the meeting. Under joint consent the wall closes and the board can fund the racks. Under Film’s signature the objection goes into the minutes, the route stays open, and the people receiving the paper records must find £2,000 somewhere else. A hearing and a veto have quite different consequences for the archivist standing beside the lorry.

On a morning when both archivists volunteer assent, all eight charters produce the same order. Nothing in the model awards a prize for a more elaborate constitution. Its narrow result is a question worth putting to a real one. If the second key goes missing tomorrow, whose purpose will it have been protecting?

Evidence and replay

The fixture gives Film the same preference throughout. Both boards see the same £6,000 and the same drawing. In every diary closing the wall ends this cold-room option for the current fit-out. Reserving the route spends £4,000. Paper needs £4,000 for racks only in the confirmed-delivery diary. Either side can talk informally. The builder still requires a minuted meeting, and the signature clause governs expenditure even after an objection.

Each diary fixes Paper’s availability and position
DiaryBefore noon
StacksPaper cannot call the meeting. Reachable if Film convenes, Paper assents when a reply is required.
AwayPaper can neither call nor answer before one. No delivery is confirmed.
DeliveryPaper calls the meeting and volunteers its objection to preserve money for racks.
TogetherPaper calls and volunteers assent. No delivery is confirmed.
The builder’s decision in all 32 replays
Call / answer / signStacksAwayDeliveryTogether
Paper / Invite / BothCloseCloseCloseOrder
Paper / Invite / FilmCloseCloseOrderOrder
Paper / Require / BothCloseCloseCloseOrder
Paper / Require / FilmCloseCloseOrderOrder
Either / Invite / BothCloseCloseCloseOrder
Either / Invite / FilmOrderOrderOrderOrder
Either / Require / BothOrderCloseCloseOrder
Either / Require / FilmOrderOrderOrderOrder

“Order” means the route is reserved and £2,000 remains. “Close” means the wall closes and £6,000 remains. An order in the Delivery column leaves the confirmed racks £2,000 short. Under a required reply, an absent sponsor can still be asked but cannot answer. None of these diaries comes with a probability or a valuation of the collections. Counting the orders would tell a board little about how to choose its charter.

Two accounts of Crossrail. Croft, Buck and Adams describe sequential rights to step in as different sponsors’ contingency became exposed. The arrangement addressed the possibility of a joint deadlock. A later study distinguishes the early right to request a recovery plan from the later right to act directly. By the time of that later trigger, opportunities for effective changes had narrowed. Construction-stage account, pp. 12–13 · Sponsoring a Major Project, pp. 46–47

A rival arrangement. Paolo Quattrone recounts how the rector and procurator of a Jesuit college each held a key to its cashbox. The encounter gave spending a second constituency. The archives, the money, the charter and every vote here are inventions. Quattrone, The Jesuits

Replay every choice with Python 3. The script contains the fictional inputs and checks its results before printing them. Download run.py · Download results.json