GIMMER CRAG PROCESS → PLAN LAB Earlier work

EXPERIMENT 06 · OPEN BOUNDARY CONTRACTS

Connect the work.
Keep the freedoms.

Cliffside timber refuge with process-to-plan sketches
Existing Gimmer scenario emblem. Each lab makes its actual nets, resources and assumptions inspectable.

Toy scenario

The same refuge, with the awkward handovers left in.

Two work packages may need the same lift. One may release useful work before it has finished; an inspection may require rework. These examples test what reusable process descriptions must preserve when packages are combined.

Can the pieces be composed without inventing resources or hiding possible work?

A method can release a useful output before all its work is finished. Connect the pieces without forcing false waiting, inventing a resource or discarding work that its context can enable.

Finite selected work · Explicit resource ownership

KEEP THE BOUNDARY VISIBLE

An available lift is not a finished work package.

Selective handoffA preparation fragment releases a lift to assembly while independent preparation remains possible. Only the explicit handoff is connected.Release the liftAssemble refugeOther preparationNo invented all-work barrier
The enriched contract retains boundary demands and partial availability. A second construction glues the source models and checks the same reachable states and joint steps.

EXPERIMENT 05 · RETAINED

After the review,
what next?

Retain valid evidence, repeat work made stale, and distinguish possible completion from a policy that handles every modeled outcome.

Explore feedback and response →

EXPERIMENT 04 · RETAINED

One mechanism.
Many ways through.

Choose a project state and generate the bounded family of ways to complete the refuge. Keep work branches, joint resource starts, token-supply histories and schedules visible.

Generate ways to complete the refuge →

Two methods to explore further.

Explore alternative causal histories, or build the mechanism from connected parts.

EXPERIMENT 02 · RETAINED

Inspect one
causal witness.

The Causal Plan Lab follows one chosen token ancestry into a dependency graph and schedule. It checks exactly when an elementary sequence/parallel task tree preserves that witness, and exposes an N obstruction when it cannot.

Open the Causal Plan Lab

INHERITED BASELINE · BROADER GIMMER COLLECTION

Two processes.
One chosen plan.

This earlier human-steered, AI-assisted comparison supplied the starting point. It is not a higher-autonomy experiment. The comparison is presented in broader Gimmer. Its forward scheduler remains in the core collection, using the same maintained application.

Open the inherited baseline in the broader collection ↗

What the certificate means

Each certificate names its domain: a bounded observed-state response policy, a whole-family state/step construction, one witness, a selected trace’s ancestry family, or a typed port construction. A retrospective branch schedule does not certify an online concurrent policy. An exact language of sequential orders does not establish concurrent-step or timed equivalence. Search bounds and the distinction between proved and unresolved results remain visible.

This is the Petri/WBS route, FORAY-WBS-PATHS, within FORAY-PROCESSES-TO-PLANS. The broader hill/travel scenario remains outside this public slice. The boundary experiment compares finite selected-work states and joint steps; the retained feedback experiment handles review policies. Continuous operation and uncertain engineering calibration remain outside these claims. Construction methods and durations are illustrative.