Can a WBS preserve
the way work happens?

Start with what makes work possible. Generate a complete execution. Then find out whether a tree of “do these in sequence” and “do these in parallel” keeps every freedom and every constraint.

Computed in your browser Toy scenarioThree findings ↓

YOUR SELECTED EXECUTION

From possibility to a plan

Computing

What actually needs what?

An arrow follows a consumed token back to the event that produced it. It is a dependency of this chosen witness, not just a position in a task list.

Condition or materialResource handoffAdded by stage grouping
Select an event to inspect the tokens behind it.

Earliest schedule for this witness

TOY TIME UNITS

Outputs become available at completion. Every shown handoff is respected. This is the earliest schedule for the selected token-flow witness, not a global optimum over all possible witnesses.

Read the exact dependency and timing tables

WHAT THIS ATTEMPT ESTABLISHES

Three results.
One important boundary.

01 / CONSTRUCTION

Plans can be derived and replayed.

A bounded Petri model generates complete legal executions. Each chosen token-flow witness yields a dependency graph, an earliest schedule, and a testable projection.

02 / REPRESENTATION

A tree can add work-order rules.

An induced N-shaped order cannot be expressed exactly by this leaf/sequence/parallel grammar. Typed monoidal wiring and the causal DAG can retain the crossing. The restriction belongs to the elementary tree.

03 / INFORMATION

Markings do not fix ancestry.

In the token-pool case, the same transition sequence and collective markings admit two token-flow witnesses. One has an exact tree; the other contains N. A certificate must say which witness it certifies.

METHOD & EVIDENCE

A finite compiler, with inspectable limits.

The contract

The compiler maps a selected token-flow execution to its finite causal partial order. Exact tree compilation requires a bijection on event occurrences and equality of the full precedence relation. Series and parallel composition mean ordinal sum and disjoint union.

It does not establish a general functor from arbitrary processes to WBS trees. Full monoidal composition can connect selected boundary wires; a sequence of whole event blocks imposes all cross-block precedences.

Read the definitions, findings and verification record →

What the limits mean

  • Models: at most 64 places, 32 transitions and 32 events per execution; 1,500 results and 50,000 search nodes. Search limits do not establish impossibility.
  • Chosen token ancestry; no claim to a unique individual history.
  • Positive toy durations, no calendar, weather forecast or engineering calibration.
  • A WBS here means a specific Seq/Par event-block tree. Ordinary deliverable WBS hierarchies need not encode precedence.
  • Automated and agent-operated checks are separate from practitioner or human-user validation.

Grounding

Baez & Master, Open Petri Nets supplies the process/monoidal context and token-semantics boundary.

Zaguia, The Aharoni–Korman conjecture for N-free posets with no infinite antichain, Theorem 5, states the finite N-free / series-parallel characterization used here.

Inherited baseline: one plan, two possible projects ↗ · Earlier human-steered work in the broader Gimmer collection; not a higher-autonomy experiment.