Wall-building wiring diagram in the category W (labeled boxes & wiring diagrams). Drag boxes to rearrange; scroll to zoom; drag background to pan.
Tip: hold Shift while dragging to pan even when starting on a box.

Formal morphisms (f_in, f_out)

The mapping lines below tell you which wire feeds which port, matching the definition of wiring-diagram morphisms (f_in, f_out) in W.

f_prep : (SetOut ⊗ MixMortar) → Prep



      

g_finish : (Prep ⊗ LayBricks) → BuildWall



      

f_wall = g_finish → (f_prep ⊗ id_LayBricks) : (SetOut ⊗ MixMortar ⊗ LayBricks) → BuildWall



      

Diagram JSON

This is the same data structure used by the canvas renderer.