A 4D cube: shadow or slice?

Projection shows the whole tesseract as a distorted shadow. A diagonal slice reveals one 3D cross-section at a time.

Wider interest
A tesseract has 16 vertices, 32 edges and 8 cubic cells. The diagonal slice is an octahedron at t = 2.
Projection mode

Drag to orbit; scroll or pinch to zoom; right-drag or two-finger drag to pan. Keyboard: focus the view, use arrows to orbit, Shift + arrows to pan, + / − to zoom, Home to reset.

If you downloaded this page and opened the local copy, your browser may block its 3D modules. Run a local server in that folder (e.g. python -m http.server 8000) and open http://localhost:8000/.

Title