{
  "sources": {
    "H1": "QuayCold confirmed hire SQ14, one refrigerated trailer at Bay C, 04:00–09:00.",
    "H2": "Each lot was cleared to use the trailer separately. No combined quantity or usable trailer capacity is supplied.",
    "H3": "Original timetable: overnight lots 04:35–05:45; morning landings 06:00–07:10.",
    "H4": "Original display name East Auction Hall; premises code EH-2.",
    "H5": "The duty auction clerk controls lot release and the haulier holds the loading sheet. The move desk recorded the instruction that one trailer covers the move."
  },
  "claims": {
    "C1": {"label": "Trailer booking", "supports": ["H1"]},
    "C2": {"label": "Use one trailer for the move", "supports": ["H1", "H3", "H5"]},
    "C3": {"label": "Keep the two loads separate", "supports": ["H2", "H3"]},
    "C4": {"label": "Use the old display name and premises code", "supports": ["H4"]},
    "C5": {"label": "Get the release and loading information", "supports": ["H5"]}
  },
  "omitted_edge": {"claim": "C2", "support": "H3"},
  "revisions": {
    "R1": {"withdraw": "H3", "change": "Overnight lots now occupy the trailer until 06:25. The morning start stays at 06:00."},
    "R2": {"withdraw": "H4", "change": "The hall display name changes to East Quay Auction Hall. EH-2 and the two original time windows remain as before."}
  }
}
