  "plain": {
    "request": "H1, H2, H3, H4, H5",
    "answer": "**R1 — Hold the 06:00 morning load.** The overnight release moves to 06:25. Against the signed timetable, that creates a 25-minute overlap on SQ14 from 06:00 to 06:25. Keep the lots separate and mark C2, “One trailer covers the move,” as unconfirmed for the revised schedule.\n\nAsk the duty auction clerk to confirm release and the haulier to confirm when SQ14 will be clear and ready, using the loading sheet. Since the morning slot still stands at 06:00–07:10, ask the move desk to arrange another suitable trailer for that slot or approve a revised timetable. The original hire covers one trailer at Bay C until 09:00. H2 clears each lot individually and gives no basis for a combined load. Log R1 against H1–H3 and H5, including the conflict, who owns the decision, and the confirmed trailer and times. Keep the hold visible until the shift has that confirmation.\n\n**R2 — Update C4 to “East Quay Auction Hall, EH-2.”** Continue the original booking and timetable, including the 05:45 overnight release. Record “East Auction Hall” as the former name and the wording on the sign documented in H4, so the next shift can match either name to EH-2. R2 supplies the evidence for the desk-card change. The current wording on the physical sign would need a site check only if the shift needs to give directions by signage."
  },
  "linked": {
    "request": "H1 H2 H3 H4 H5",
    "answer": "**R1 — Hold the one-trailer plan for confirmation.** The revised overnight release at 06:25 overlaps the signed 06:00 start for the morning landings by 25 minutes. Keep the lots separate. SQ14 is still booked at Bay C from 04:00 to 09:00, but the booking alone does not resolve the clash. H5 records the original one-trailer instruction. H2 clears each lot to travel alone.\n\nHave the duty auction clerk confirm when the overnight lot will be released and the trailer clear. Obtain the loading sheet from the haulier. Ask the move desk to agree and sign a revised timetable with separate slots, allowing for changeover. If the 06:00 start must stand, obtain confirmation of another suitable trailer before dispatch. Any proposal to combine the lots needs their quantities, usable trailer capacity and explicit clearance.\n\nEnter R1 against C2 and C3. Record both conflicting times, the outstanding decisions and who owns them. Give the next shift the confirmed slots and trailer allocation, or leave the hold visible with H1, H2, H3 and H5 attached.\n\n**R2 — Update C4 to “East Quay Auction Hall, EH-2.”** Record R2 as the authority for the display name and retain “East Auction Hall” as the former name shown in H4. The code identifies the same booked premises. No further evidence is needed to update the card. For R2, use the original timetable and booking."
  },
  "omitted": {
    "request": "H1 H2 H3 H4 H5",
    "answer": "Apply each notice independently to the original card.\n\n**R1 — Hold the 06:00 morning loading.** The overnight lots now have the trailer until 06:25. That creates a 25-minute overlap with the morning slot, 06:00–07:10. SQ14 remains booked at Bay C from 04:00 to 09:00. Mark C2, “One trailer covers the move,” as pending a revised plan. Keep C3 in force. H2 clears each load individually and gives neither the lot quantities nor the trailer’s usable capacity for a combined load. [R1, H1–H3, H5]\n\nAsk the duty auction clerk to confirm actual release and the haulier to confirm the loading sheet and whether the morning move can be retimed. A 06:25–07:35 slot would preserve the original 70 minutes and fit the hire window if the trailer is ready at 06:25. Record that slot as a proposal pending confirmation. If the original morning slot must stand, ask the move desk to arrange a second trailer and record its booking before relying on it. Enter the clash against C2 and C3, then log the agreed slots, actual release, confirming names and loading-sheet reference. [C1–C3, C5, H1–H3, H5]\n\n**R2 — Update C4 to “East Quay Auction Hall, EH-2.”** The notice supplies the new display name and H4 links the old name to the same premises code. Record the old and new names against EH-2 so the next shift can recognise the existing sign. R2 supplies enough evidence for the card edit. The original booking, times and one-trailer instruction still apply in this case. [R2, H1, H3–H5]"
  }
}