{"architectures":[{"battery":"standard","converter":"standard","cooler":"air","id":"standard-standard-air","label":"Standard battery packs · Standard converters · Air cooling"},{"battery":"standard","converter":"standard","cooler":"liquid","id":"standard-standard-liquid","label":"Standard battery packs · Standard converters · Liquid cooling"},{"battery":"standard","converter":"efficient","cooler":"air","id":"standard-efficient-air","label":"Standard battery packs · Efficient converters · Air cooling"},{"battery":"standard","converter":"efficient","cooler":"liquid","id":"standard-efficient-liquid","label":"Standard battery packs · Efficient converters · Liquid cooling"},{"battery":"compact","converter":"standard","cooler":"air","id":"compact-standard-air","label":"Compact battery packs · Standard converters · Air cooling"},{"battery":"compact","converter":"standard","cooler":"liquid","id":"compact-standard-liquid","label":"Compact battery packs · Standard converters · Liquid cooling"},{"battery":"compact","converter":"efficient","cooler":"air","id":"compact-efficient-air","label":"Compact battery packs · Efficient converters · Air cooling"},{"battery":"compact","converter":"efficient","cooler":"liquid","id":"compact-efficient-liquid","label":"Compact battery packs · Efficient converters · Liquid cooling"}],"boundary":"Declared synthetic steady-load sizing model for an off-grid wildlife-crossing monitoring cluster. No measured wildlife or site data, animal response, transient load, electrical protection, charging, reliability, construction sequence or safety approval is modelled. Hot is a declared scenario, not an uncertainty distribution or universal worst case.","catalogueCaps":{"batteries":32,"converters":12,"coolers":20},"catalogues":{"batteries":[{"capitalGBP":320,"heatW":12,"id":"standard","name":"Standard battery packs","usableWh":1000,"volumeL":28},{"capitalGBP":600,"heatW":20,"id":"compact","name":"Compact battery packs","usableWh":1400,"volumeL":16}],"converters":[{"capitalGBP":75,"id":"standard","lossW":8,"name":"Standard converters","outputW":250,"volumeL":12},{"capitalGBP":115,"id":"efficient","lossW":3,"name":"Efficient converters","outputW":250,"volumeL":8}],"coolers":[{"capitalGBP":30,"drawW":12,"id":"air","name":"Air cooling","removalW":40,"volumeL":12},{"capitalGBP":75,"drawW":8,"id":"liquid","name":"Liquid cooling","removalW":70,"volumeL":6}]},"conditions":[{"batteryEnergyDenominator":1,"batteryEnergyNumerator":1,"batteryHeatDenominator":1,"batteryHeatNumerator":1,"coolerCapacityDenominator":1,"coolerCapacityNumerator":1,"id":"mild","name":"Mild conditions"},{"batteryEnergyDenominator":5,"batteryEnergyNumerator":4,"batteryHeatDenominator":2,"batteryHeatNumerator":3,"coolerCapacityDenominator":5,"coolerCapacityNumerator":4,"id":"hot","name":"Hot conditions"}],"default":{"condition":"hot","durationHours":8,"powerW":750},"domain":{"conditions":["mild","hot"],"durationHours":[2,4,6,8,12,16,24],"powerW":[0,250,500,750,1000,1500,2000]},"interfaces":[{"id":"energy","label":"Battery energy","requirement":"H * (P + cooler draw + converter loss)","supply":"battery count * usable pack energy","unit":"Wh"},{"id":"conversion","label":"Converter output","requirement":"P + cooler draw","supply":"converter count * output rating","unit":"W"},{"id":"cooling","label":"Heat removal","requirement":"battery heat + converter loss","supply":"cooler count * removal rating","unit":"W"}],"physicalAssumptions":{"batteryHeat":"Synthetic thermal design allowance per operating pack; not a claim that actual heat must increase whenever packs are added at a fixed load.","cabinetVolume":"Positive, additive cabinet-volume allocations in litres, including an invented allowance for each unit housing and internal spacing. These are not ground footprint, exterior cabinet dimensions, a packing calculation, or measured product volumes.","converterLoss":"Constant design allowance per operating unit, counted as both battery energy demand and heat to remove.","operation":"All selected power-support units operate throughout the declared monitoring period at a constant load. Cameras, sensors, illumination, a data link and a logger are represented by one aggregate load; their individual performance and any charging are outside this model.","usableEnergy":"Net DC energy available after cell-internal losses; converter losses and cooling electricity are accounted separately."},"provenance":{"calculation":"Actual codesign-mcdp System and cold-start solve(trace=True); exact integer module ceilings","commit":"97d6446abf48c3424cf52bace9c5d9c40bfda978","contractSha256":"d2dc8f2eb348439eea23904a6e64c26e8616902c9b1a5af19199168f38fde0d5","deterministic":true,"generatorSha256":"bc04c91b85cb763f888cc62e9251f8f41fe6a886acb6bb88a2126fa6a09f0ade","license":"MIT","licenseFile":"LICENSE.upstream","modelSha256":"a95f0bfa4d2c019443b52c82208ea70553f9115bf3e870e999f33d5f353d44db","name":"codesign-mcdp","repository":"https://github.com/cbriat/codesign-mcdp","sourceFileSha256":{"codesign/__init__.py":"03b5163e50609573876e16393930145a7faa1189ad356e5d7ff4fd02eec83ce2","codesign/antichains.py":"35def562d1d8125ae1a525909f0c0513fca702058739d620d86addb5351b23aa","codesign/composition.py":"0992b863795a2ed6cdf62fb97f2bddba19c27df06587c508e31c6ee2e9d77c2e","codesign/diagram.py":"ef808dcaf41266a9a7346fc28eae7bf76a252050f762a8a149ac51584b04e3a5","codesign/dp.py":"16102dd64fe55499d9e3e35ff1a428ddb250afe9dde9fa68bd1a43357499019d","codesign/dynamic.py":"d9f6e519f81aa917dad72977c27e00058041074cc9e6af629eab91dae0a4ce79","codesign/mcdpl.py":"9351c732f1df7949e772d5391421de4bc8cf287351c59560afcd546f757b6def","codesign/module.py":"474d47c84f0586a59ebc69ed49d829479aeef7b2494a791ab8c64a97f360fdbf","codesign/online.py":"770abde9ce80828da01c74957ad78f1bc1f39db0855d1d1c37263b7c08400ec8","codesign/online_codesign.py":"b3164bde0e9c647c43d41b1b31e3d60f13a7a3ef5ba4afa57f0aacf094d90cc2","codesign/posets.py":"bea9b5013fc21b60b9172176ed6fad124d7de15abb1a1561e6c4d1b098ebd913","codesign/primitives.py":"706e8ea07a32f64532ad2a443ea9852a820761f7f2c635c2bba9dd40c782f8c8","codesign/sequential.py":"aa76ff9cba27eeb981728e9ecbc7364a4c20e6db13f886febbef38042ddadf58","codesign/solver.py":"d334f3cc780f3f8123e1906ba97e40b75516c6c76f904db647e204c9e21f8e0b","codesign/state.py":"0f61e5f15b6ae981e51b1927e6d208b794d910e51f7cf893288f4002b85080c9","codesign/sugar.py":"22d201a89cc3a7070aaf318119507f11532d317c7f34e37b6af82909cfcfe00c","codesign/system.py":"8ab754d27a2a9e0fd8a793b90e714a4b60ec18661e408b4c096f4d0201376b63","codesign/temporal.py":"23438cb9f02bbcb4b623fa9e6083d9cc8651d044c1f23b82196cc935211868a5","codesign/uncertainty.py":"1dccb3f465de46656834cb526d988ca94896a8b82ee80591abb1f3ba8e874749","codesign/vector_dp.py":"368987c3578ac6c33de80f0a2dd1615f6c609f18b7c211619714a76f102537c0","codesign/viz.py":"f053b85e5617e7256c3d27c42c74ff98daa51f5fee3051a7c2000ecbdc850312"},"verification":"Exact model interfaces and resource sums checked after convergence; independent oracle is a separate artifact","version":"0.2.1"},"queries":[{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h2-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h2-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h4-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h4-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h6-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h6-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h8-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h8-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h12-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h12-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h16-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":16,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h16-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":24,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h24-mild","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"hot","durationHours":24,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p0-h24-hot","powerW":0,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":0,"limit":32,"satisfied":true},{"component":"converters","count":0,"limit":12,"satisfied":true},{"component":"coolers","count":0,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":1,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,0,0,0,0,0,0,0,0,0]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":0,"required":0,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":0,"converters":0,"coolers":0},"resources":{"capitalGBP":0,"volumeL":0},"values":{"coolingW":0,"drawW":0,"energyWh":0,"heatW":0,"lossW":0,"outputW":0}}}]},{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p250-h2-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":460,"provided":1000,"required":540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":40,"required":20,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":425,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":20,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,20,0,0,8,395,40],[2,1,1,1,20,40,12,8,425,52],[3,1,2,1,28,40,12,16,500,64],[4,1,2,1,28,40,12,16,500,64]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":444,"provided":1000,"required":556,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":40,"required":28,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":500,"volumeL":64},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":28,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":468,"provided":1000,"required":532,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":70,"required":20,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":470,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":20,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,20,0,0,8,395,40],[2,1,1,1,20,70,8,8,470,46],[3,1,2,1,28,70,8,16,545,58],[4,1,2,1,28,70,8,16,545,58]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":452,"provided":1000,"required":548,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":70,"required":28,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":545,"volumeL":58},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":28,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":470,"provided":1000,"required":530,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":40,"required":15,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":465,"volumeL":48},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":15,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,15,0,0,3,435,36],[2,1,1,1,15,40,12,3,465,48],[3,1,2,1,18,40,12,6,580,56],[4,1,2,1,18,40,12,6,580,56]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":464,"provided":1000,"required":536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":40,"required":18,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":580,"volumeL":56},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":18,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":478,"provided":1000,"required":522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":70,"required":15,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":510,"volumeL":42},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":15,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,15,0,0,3,435,36],[2,1,1,1,15,70,8,3,510,42],[3,1,2,1,18,70,8,6,625,50],[4,1,2,1,18,70,8,6,625,50]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":1000,"required":528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":70,"required":18,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":625,"volumeL":50},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":18,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":860,"provided":1400,"required":540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":40,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":705,"volumeL":40},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":28,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,28,0,0,8,675,28],[2,1,1,1,28,40,12,8,705,40],[3,1,2,1,36,40,12,16,780,52],[4,1,2,1,36,40,12,16,780,52]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":844,"provided":1400,"required":556,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":40,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":780,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":868,"provided":1400,"required":532,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":70,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":750,"volumeL":34},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":28,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,28,0,0,8,675,28],[2,1,1,1,28,70,8,8,750,34],[3,1,2,1,36,70,8,16,825,46],[4,1,2,1,36,70,8,16,825,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":852,"provided":1400,"required":548,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":70,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":870,"provided":1400,"required":530,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":40,"required":23,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":745,"volumeL":36},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":23,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,23,0,0,3,715,24],[2,1,1,1,23,40,12,3,745,36],[3,1,2,1,26,40,12,6,860,44],[4,1,2,1,26,40,12,6,860,44]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":864,"provided":1400,"required":536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":40,"required":26,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":860,"volumeL":44},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":878,"provided":1400,"required":522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":47,"provided":70,"required":23,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":30},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":23,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,23,0,0,3,715,24],[2,1,1,1,23,70,8,3,790,30],[3,1,2,1,26,70,8,6,905,38],[4,1,2,1,26,70,8,6,905,38]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":872,"provided":1400,"required":528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":70,"required":26,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h2-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":260,"provided":800,"required":540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":32,"required":26,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":425,"volumeL":52},"values":{"coolingW":32,"drawW":12,"energyWh":800,"heatW":26,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,26,0,0,8,395,40],[2,1,1,1,26,32,12,8,425,52],[3,1,2,1,34,32,12,16,500,64],[4,1,2,2,34,64,24,16,530,76],[5,1,2,2,34,64,24,16,530,76]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":220,"provided":800,"required":580,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":64,"required":34,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":530,"volumeL":76},"values":{"coolingW":64,"drawW":24,"energyWh":800,"heatW":34,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":268,"provided":800,"required":532,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":56,"required":26,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":470,"volumeL":46},"values":{"coolingW":56,"drawW":8,"energyWh":800,"heatW":26,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,26,0,0,8,395,40],[2,1,1,1,26,56,8,8,470,46],[3,1,2,1,34,56,8,16,545,58],[4,1,2,1,34,56,8,16,545,58]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":252,"provided":800,"required":548,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":56,"required":34,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":545,"volumeL":58},"values":{"coolingW":56,"drawW":8,"energyWh":800,"heatW":34,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":270,"provided":800,"required":530,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":32,"required":21,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":465,"volumeL":48},"values":{"coolingW":32,"drawW":12,"energyWh":800,"heatW":21,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,21,0,0,3,435,36],[2,1,1,1,21,32,12,3,465,48],[3,1,2,1,24,32,12,6,580,56],[4,1,2,1,24,32,12,6,580,56]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":800,"required":536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":32,"required":24,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":580,"volumeL":56},"values":{"coolingW":32,"drawW":12,"energyWh":800,"heatW":24,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":278,"provided":800,"required":522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":56,"required":21,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":510,"volumeL":42},"values":{"coolingW":56,"drawW":8,"energyWh":800,"heatW":21,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,21,0,0,3,435,36],[2,1,1,1,21,56,8,3,510,42],[3,1,2,1,24,56,8,6,625,50],[4,1,2,1,24,56,8,6,625,50]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":800,"required":528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":56,"required":24,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":625,"volumeL":50},"values":{"coolingW":56,"drawW":8,"energyWh":800,"heatW":24,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":556,"provided":1120,"required":564,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":64,"required":38,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":2},"resources":{"capitalGBP":735,"volumeL":52},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":38,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,38,0,0,8,675,28],[2,1,1,2,38,64,24,8,735,52],[3,1,2,2,46,64,24,16,810,64],[4,1,2,2,46,64,24,16,810,64]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":540,"provided":1120,"required":580,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":64,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":810,"volumeL":64},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":46,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":588,"provided":1120,"required":532,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":56,"required":38,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":750,"volumeL":34},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":38,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,38,0,0,8,675,28],[2,1,1,1,38,56,8,8,750,34],[3,1,2,1,46,56,8,16,825,46],[4,1,2,1,46,56,8,16,825,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":572,"provided":1120,"required":548,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":56,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":46,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":566,"provided":1120,"required":554,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":64,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":2},"resources":{"capitalGBP":775,"volumeL":48},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":33,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,33,0,0,3,715,24],[2,1,1,2,33,64,24,3,775,48],[3,1,2,2,36,64,24,6,890,56],[4,1,2,2,36,64,24,6,890,56]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":560,"provided":1120,"required":560,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":64,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":890,"volumeL":56},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":598,"provided":1120,"required":522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":56,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":30},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":33,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,33,0,0,3,715,24],[2,1,1,1,33,56,8,3,790,30],[3,1,2,1,36,56,8,6,905,38],[4,1,2,1,36,56,8,6,905,38]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":592,"provided":1120,"required":528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":56,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":4,"frontier":["compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p250-h4-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":1000,"required":1080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":40,"required":20,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":425,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":20,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,20,0,0,8,395,40],[2,2,1,1,32,40,12,8,745,80],[3,2,2,1,40,40,12,16,820,92],[4,2,2,1,40,40,12,16,820,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":2000,"required":1112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":40,"required":40,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":820,"volumeL":92},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-64,"provided":1000,"required":1064,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":70,"required":20,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":470,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":20,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,20,0,0,8,395,40],[2,2,1,1,32,70,8,8,790,74],[3,2,2,1,40,70,8,16,865,86],[4,2,2,1,40,70,8,16,865,86]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":904,"provided":2000,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":70,"required":40,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":865,"volumeL":86},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":40,"required":15,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":465,"volumeL":48},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":15,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,15,0,0,3,435,36],[2,2,1,1,27,40,12,3,785,76],[3,2,2,1,30,40,12,6,900,84],[4,2,2,1,30,40,12,6,900,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":2000,"required":1072,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":40,"required":30,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":900,"volumeL":84},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-44,"provided":1000,"required":1044,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":70,"required":15,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":510,"volumeL":42},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":15,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,15,0,0,3,435,36],[2,2,1,1,27,70,8,3,830,70],[3,2,2,1,30,70,8,6,945,78],[4,2,2,1,30,70,8,6,945,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":944,"provided":2000,"required":1056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":70,"required":30,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":320,"provided":1400,"required":1080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":40,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":705,"volumeL":40},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":28,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,28,0,0,8,675,28],[2,1,1,1,28,40,12,8,705,40],[3,1,2,1,36,40,12,16,780,52],[4,1,2,1,36,40,12,16,780,52]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":1400,"required":1112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":40,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":780,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":1400,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":70,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":750,"volumeL":34},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":28,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,28,0,0,8,675,28],[2,1,1,1,28,70,8,8,750,34],[3,1,2,1,36,70,8,16,825,46],[4,1,2,1,36,70,8,16,825,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":1400,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":70,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":340,"provided":1400,"required":1060,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":40,"required":23,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":745,"volumeL":36},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":23,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,23,0,0,3,715,24],[2,1,1,1,23,40,12,3,745,36],[3,1,2,1,26,40,12,6,860,44],[4,1,2,1,26,40,12,6,860,44]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":328,"provided":1400,"required":1072,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":40,"required":26,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":860,"volumeL":44},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":356,"provided":1400,"required":1044,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":47,"provided":70,"required":23,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":30},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":23,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,23,0,0,3,715,24],[2,1,1,1,23,70,8,3,790,30],[3,1,2,1,26,70,8,6,905,38],[4,1,2,1,26,70,8,6,905,38]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":1400,"required":1056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":70,"required":26,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":4,"frontier":["compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h4-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":1600,"required":1128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":64,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":775,"volumeL":92},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,44,0,0,8,715,68],[2,2,1,2,44,64,24,8,775,92],[3,2,2,2,52,64,24,16,850,104],[4,2,2,2,52,64,24,16,850,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":440,"provided":1600,"required":1160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":64,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":850,"volumeL":104},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":52,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":536,"provided":1600,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":56,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":74},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,44,0,0,8,715,68],[2,2,1,1,44,56,8,8,790,74],[3,2,2,1,52,56,8,16,865,86],[4,2,2,1,52,56,8,16,865,86]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":504,"provided":1600,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":56,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":865,"volumeL":86},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":52,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":492,"provided":1600,"required":1108,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":64,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":815,"volumeL":88},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,39,0,0,3,755,64],[2,2,1,2,39,64,24,3,815,88],[3,2,2,2,42,64,24,6,930,96],[4,2,2,2,42,64,24,6,930,96]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":1600,"required":1120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":64,"required":42,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":930,"volumeL":96},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":42,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":556,"provided":1600,"required":1044,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":56,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":830,"volumeL":70},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,39,0,0,3,755,64],[2,2,1,1,39,56,8,3,830,70],[3,2,2,1,42,56,8,6,945,78],[4,2,2,1,42,56,8,6,945,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":1600,"required":1056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":56,"required":42,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":42,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-8,"provided":1120,"required":1128,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":64,"required":38,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":2},"resources":{"capitalGBP":735,"volumeL":52},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":38,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,38,0,0,8,675,28],[2,1,1,2,38,64,24,8,735,52],[3,2,2,2,76,64,24,16,1410,80],[4,2,2,3,76,96,36,16,1440,92],[5,2,2,3,76,96,36,16,1440,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1032,"provided":2240,"required":1208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":96,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":3},"resources":{"capitalGBP":1440,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":56,"provided":1120,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":56,"required":38,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":750,"volumeL":34},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":38,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,38,0,0,8,675,28],[2,1,1,1,38,56,8,8,750,34],[3,1,2,1,46,56,8,16,825,46],[4,1,2,1,46,56,8,16,825,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":1120,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":56,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":46,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":12,"provided":1120,"required":1108,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":64,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":2},"resources":{"capitalGBP":775,"volumeL":48},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":33,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,33,0,0,3,715,24],[2,1,1,2,33,64,24,3,775,48],[3,1,2,2,36,64,24,6,890,56],[4,1,2,2,36,64,24,6,890,56]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":1120,"required":1120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":64,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":890,"volumeL":56},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":76,"provided":1120,"required":1044,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":56,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":30},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":33,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,1,0,33,0,0,3,715,24],[2,1,1,1,33,56,8,3,790,30],[3,1,2,1,36,56,8,6,905,38],[4,1,2,1,36,56,8,6,905,38]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":1120,"required":1056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":56,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h6-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":380,"provided":2000,"required":1620,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":40,"required":32,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":745,"volumeL":80},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":32,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,32,0,0,8,715,68],[2,2,1,1,32,40,12,8,745,80],[3,2,2,1,40,40,12,16,820,92],[4,2,2,1,40,40,12,16,820,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":332,"provided":2000,"required":1668,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":40,"required":40,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":820,"volumeL":92},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":404,"provided":2000,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":70,"required":32,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":74},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":32,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,32,0,0,8,715,68],[2,2,1,1,32,70,8,8,790,74],[3,2,2,1,40,70,8,16,865,86],[4,2,2,1,40,70,8,16,865,86]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":356,"provided":2000,"required":1644,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":70,"required":40,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":865,"volumeL":86},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":410,"provided":2000,"required":1590,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":40,"required":27,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":785,"volumeL":76},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":27,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,27,0,0,3,755,64],[2,2,1,1,27,40,12,3,785,76],[3,2,2,1,30,40,12,6,900,84],[4,2,2,1,30,40,12,6,900,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":392,"provided":2000,"required":1608,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":500,"required":262,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":40,"required":30,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":900,"volumeL":84},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":434,"provided":2000,"required":1566,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":70,"required":27,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":830,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":27,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,27,0,0,3,755,64],[2,2,1,1,27,70,8,3,830,70],[3,2,2,1,30,70,8,6,945,78],[4,2,2,1,30,70,8,6,945,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":416,"provided":2000,"required":1584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":70,"required":30,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1108,"provided":2800,"required":1692,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":80,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1335,"volumeL":68},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":48,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,48,0,0,8,1275,44],[2,2,1,2,48,80,24,8,1335,68],[3,2,2,2,56,80,24,16,1410,80],[4,2,2,2,56,80,24,16,1410,80]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1060,"provided":2800,"required":1740,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1410,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1204,"provided":2800,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":70,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":1350,"volumeL":50},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":48,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,48,0,0,8,1275,44],[2,2,1,1,48,70,8,8,1350,50],[3,2,2,1,56,70,8,16,1425,62],[4,2,2,1,56,70,8,16,1425,62]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1156,"provided":2800,"required":1644,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1425,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1138,"provided":2800,"required":1662,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":80,"required":43,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1375,"volumeL":64},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":43,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,43,0,0,3,1315,40],[2,2,1,2,43,80,24,3,1375,64],[3,2,2,2,46,80,24,6,1490,72],[4,2,2,2,46,80,24,6,1490,72]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1120,"provided":2800,"required":1680,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":80,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1490,"volumeL":72},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1234,"provided":2800,"required":1566,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":70,"required":43,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":1390,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":43,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,43,0,0,3,1315,40],[2,2,1,1,43,70,8,3,1390,46],[3,2,2,1,46,70,8,6,1505,54],[4,2,2,1,46,70,8,6,1505,54]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1216,"provided":2800,"required":1584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":70,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1505,"volumeL":54},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h6-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-92,"provided":1600,"required":1692,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":64,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":775,"volumeL":92},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,44,0,0,8,715,68],[2,2,1,2,44,64,24,8,775,92],[3,3,2,2,70,64,24,16,1170,132],[4,3,2,3,70,96,36,16,1200,144],[5,3,2,3,70,96,36,16,1200,144]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":588,"provided":2400,"required":1812,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":96,"required":70,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":3},"resources":{"capitalGBP":1200,"volumeL":144},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":70,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":4,"provided":1600,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":56,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":74},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,44,0,0,8,715,68],[2,2,1,1,44,56,8,8,790,74],[3,2,2,1,52,56,8,16,865,86],[4,3,2,1,70,56,8,16,1185,114],[5,3,2,2,70,112,16,16,1260,120],[6,3,2,2,70,112,16,16,1260,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":708,"provided":2400,"required":1692,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":112,"required":70,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1260,"volumeL":120},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":70,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-62,"provided":1600,"required":1662,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":64,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":815,"volumeL":88},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,39,0,0,3,755,64],[2,2,1,2,39,64,24,3,815,88],[3,3,2,2,60,64,24,6,1250,124],[4,3,2,2,60,64,24,6,1250,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":720,"provided":2400,"required":1680,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":64,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1250,"volumeL":124},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":60,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":34,"provided":1600,"required":1566,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":56,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":830,"volumeL":70},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,39,0,0,3,755,64],[2,2,1,1,39,56,8,3,830,70],[3,2,2,1,42,56,8,6,945,78],[4,2,2,1,42,56,8,6,945,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":1600,"required":1584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":56,"required":42,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":42,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":476,"provided":2240,"required":1764,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":96,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":3},"resources":{"capitalGBP":1365,"volumeL":80},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,68,0,0,8,1275,44],[2,2,1,3,68,96,36,8,1365,80],[3,2,2,3,76,96,36,16,1440,92],[4,2,2,3,76,96,36,16,1440,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":428,"provided":2240,"required":1812,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":96,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":3},"resources":{"capitalGBP":1440,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":596,"provided":2240,"required":1644,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":112,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1425,"volumeL":56},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,68,0,0,8,1275,44],[2,2,1,2,68,112,16,8,1425,56],[3,2,2,2,76,112,16,16,1500,68],[4,2,2,2,76,112,16,16,1500,68]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":548,"provided":2240,"required":1692,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":112,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1500,"volumeL":68},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":578,"provided":2240,"required":1662,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":64,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1375,"volumeL":64},"values":{"coolingW":64,"drawW":24,"energyWh":2240,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,63,0,0,3,1315,40],[2,2,1,2,63,64,24,3,1375,64],[3,2,2,2,66,64,24,6,1490,72],[4,2,2,3,66,96,36,6,1520,84],[5,2,2,3,66,96,36,6,1520,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":488,"provided":2240,"required":1752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":96,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":3},"resources":{"capitalGBP":1520,"volumeL":84},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":66,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":626,"provided":2240,"required":1614,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":112,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1465,"volumeL":52},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,63,0,0,3,1315,40],[2,2,1,2,63,112,16,3,1465,52],[3,2,2,2,66,112,16,6,1580,60],[4,2,2,2,66,112,16,6,1580,60]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":2240,"required":1632,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":112,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1580,"volumeL":60},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":66,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h8-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-160,"provided":2000,"required":2160,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":40,"required":32,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":745,"volumeL":80},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":32,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,32,0,0,8,715,68],[2,3,1,1,44,40,12,8,1065,108],[3,3,2,2,52,80,24,16,1170,132],[4,3,2,2,52,80,24,16,1170,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":3000,"required":2320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":80,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1170,"volumeL":132},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":52,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-128,"provided":2000,"required":2128,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":70,"required":32,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":790,"volumeL":74},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":32,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,32,0,0,8,715,68],[2,3,1,1,44,70,8,8,1110,102],[3,3,2,1,52,70,8,16,1185,114],[4,3,2,1,52,70,8,16,1185,114]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":3000,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":70,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":1185,"volumeL":114},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":52,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-120,"provided":2000,"required":2120,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":40,"required":27,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":785,"volumeL":76},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":27,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,27,0,0,3,755,64],[2,3,1,1,39,40,12,3,1105,104],[3,3,2,1,42,40,12,6,1220,112],[4,3,2,2,42,80,24,6,1250,124],[5,3,2,2,42,80,24,6,1250,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":760,"provided":3000,"required":2240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":80,"required":42,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1250,"volumeL":124},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":42,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-88,"provided":2000,"required":2088,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":70,"required":27,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":830,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":27,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,27,0,0,3,755,64],[2,3,1,1,39,70,8,3,1150,98],[3,3,2,1,42,70,8,6,1265,106],[4,3,2,1,42,70,8,6,1265,106]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":3000,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":70,"required":42,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":1265,"volumeL":106},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":42,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":2800,"required":2256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":80,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1335,"volumeL":68},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":48,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,48,0,0,8,1275,44],[2,2,1,2,48,80,24,8,1335,68],[3,2,2,2,56,80,24,16,1410,80],[4,2,2,2,56,80,24,16,1410,80]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":2800,"required":2320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1410,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":672,"provided":2800,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":70,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":1350,"volumeL":50},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":48,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,48,0,0,8,1275,44],[2,2,1,1,48,70,8,8,1350,50],[3,2,2,1,56,70,8,16,1425,62],[4,2,2,1,56,70,8,16,1425,62]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":2800,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1425,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":584,"provided":2800,"required":2216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":80,"required":43,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1375,"volumeL":64},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":43,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,43,0,0,3,1315,40],[2,2,1,2,43,80,24,3,1375,64],[3,2,2,2,46,80,24,6,1490,72],[4,2,2,2,46,80,24,6,1490,72]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":560,"provided":2800,"required":2240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":80,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1490,"volumeL":72},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":2800,"required":2088,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":70,"required":43,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":1},"resources":{"capitalGBP":1390,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":43,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,43,0,0,3,1315,40],[2,2,1,1,43,70,8,3,1390,46],[3,2,2,1,46,70,8,6,1505,54],[4,2,2,1,46,70,8,6,1505,54]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":688,"provided":2800,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":70,"required":46,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1505,"volumeL":54},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-efficient-liquid"],"id":"p250-h8-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":2400,"required":2256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":64,"required":62,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1095,"volumeL":120},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":62,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,62,0,0,8,1035,96],[2,3,1,2,62,64,24,8,1095,120],[3,3,2,2,70,64,24,16,1170,132],[4,3,2,3,70,96,36,16,1200,144],[5,4,2,3,88,96,36,16,1520,172],[6,4,2,3,88,96,36,16,1520,172]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":784,"provided":3200,"required":2416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":96,"required":88,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":1520,"volumeL":172},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":88,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":2400,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":112,"required":62,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1185,"volumeL":108},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":62,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,62,0,0,8,1035,96],[2,3,1,2,62,112,16,8,1185,108],[3,3,2,2,70,112,16,16,1260,120],[4,3,2,2,70,112,16,16,1260,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":2400,"required":2256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":112,"required":70,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1260,"volumeL":120},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":70,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":184,"provided":2400,"required":2216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":64,"required":57,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1135,"volumeL":116},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":57,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,57,0,0,3,1075,92],[2,3,1,2,57,64,24,3,1135,116],[3,3,2,2,60,64,24,6,1250,124],[4,3,2,2,60,64,24,6,1250,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":2400,"required":2240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":64,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1250,"volumeL":124},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":60,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":2400,"required":2152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":112,"required":57,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1225,"volumeL":104},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":57,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,57,0,0,3,1075,92],[2,3,1,2,57,112,16,3,1225,104],[3,3,2,2,60,112,16,6,1340,112],[4,3,2,2,60,112,16,6,1340,112]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":224,"provided":2400,"required":2176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":112,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1340,"volumeL":112},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":60,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":2240,"required":2352,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":96,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":3},"resources":{"capitalGBP":1365,"volumeL":80},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,68,0,0,8,1275,44],[2,2,1,3,68,96,36,8,1365,80],[3,3,2,3,106,96,36,16,2040,108],[4,3,2,4,106,128,48,16,2070,120],[5,3,2,4,106,128,48,16,2070,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":3360,"required":2512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":500,"required":298,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":128,"required":106,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":4},"resources":{"capitalGBP":2070,"volumeL":120},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":106,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":2240,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":112,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1425,"volumeL":56},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,68,0,0,8,1275,44],[2,2,1,2,68,112,16,8,1425,56],[3,2,2,2,76,112,16,16,1500,68],[4,3,2,2,106,112,16,16,2100,84],[5,3,2,2,106,112,16,16,2100,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1104,"provided":3360,"required":2256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":112,"required":106,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2100,"volumeL":84},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":106,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":2240,"required":2216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":64,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1375,"volumeL":64},"values":{"coolingW":64,"drawW":24,"energyWh":2240,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,63,0,0,3,1315,40],[2,2,1,2,63,64,24,3,1375,64],[3,2,2,2,66,64,24,6,1490,72],[4,2,2,3,66,96,36,6,1520,84],[5,3,2,3,96,96,36,6,2120,100],[6,3,2,3,96,96,36,6,2120,100]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1024,"provided":3360,"required":2336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":96,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":3},"resources":{"capitalGBP":2120,"volumeL":100},"values":{"coolingW":96,"drawW":36,"energyWh":3360,"heatW":96,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":88,"provided":2240,"required":2152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":112,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":1,"coolers":2},"resources":{"capitalGBP":1465,"volumeL":52},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,1,0,63,0,0,3,1315,40],[2,2,1,2,63,112,16,3,1465,52],[3,2,2,2,66,112,16,6,1580,60],[4,2,2,2,66,112,16,6,1580,60]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":2240,"required":2176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":112,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1580,"volumeL":60},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":66,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p250-h12-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-384,"provided":3000,"required":3384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":80,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1095,"volumeL":120},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,44,0,0,8,1035,96],[2,4,1,2,56,80,24,8,1415,148],[3,4,2,2,64,80,24,16,1490,160],[4,4,2,2,64,80,24,16,1490,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":4000,"required":3480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":80,"required":64,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1490,"volumeL":160},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":64,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-192,"provided":3000,"required":3192,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":70,"required":44,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1110,"volumeL":102},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":44,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,44,0,0,8,1035,96],[2,4,1,1,56,70,8,8,1430,130],[3,4,2,1,64,70,8,16,1505,142],[4,4,2,1,64,70,8,16,1505,142]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":4000,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":70,"required":64,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":1},"resources":{"capitalGBP":1505,"volumeL":142},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":64,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-180,"provided":3000,"required":3180,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":250,"required":262,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":40,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1105,"volumeL":104},"values":{"coolingW":40,"drawW":12,"energyWh":3000,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,39,0,0,3,1075,92],[2,4,1,1,51,40,12,3,1425,132],[3,4,2,2,54,80,24,6,1570,152],[4,4,2,2,54,80,24,6,1570,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":4000,"required":3360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":80,"required":54,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1570,"volumeL":152},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":54,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-132,"provided":3000,"required":3132,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":70,"required":39,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1150,"volumeL":98},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":39,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,39,0,0,3,1075,92],[2,4,1,1,51,70,8,3,1470,126],[3,4,2,1,54,70,8,6,1585,134],[4,4,2,1,54,70,8,6,1585,134]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":832,"provided":4000,"required":3168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":70,"required":54,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":1},"resources":{"capitalGBP":1585,"volumeL":134},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":54,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":816,"provided":4200,"required":3384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":80,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1935,"volumeL":84},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,68,0,0,8,1875,60],[2,3,1,2,68,80,24,8,1935,84],[3,3,2,2,76,80,24,16,2010,96],[4,3,2,2,76,80,24,16,2010,96]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":720,"provided":4200,"required":3480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":80,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2010,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1008,"provided":4200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":70,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1950,"volumeL":66},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,68,0,0,8,1875,60],[2,3,1,1,68,70,8,8,1950,66],[3,3,2,1,76,70,8,16,2025,78],[4,3,2,2,76,140,16,16,2100,84],[5,3,2,2,76,140,16,16,2100,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":816,"provided":4200,"required":3384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":140,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2100,"volumeL":84},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":876,"provided":4200,"required":3324,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":80,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1975,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,63,0,0,3,1915,56],[2,3,1,2,63,80,24,3,1975,80],[3,3,2,2,66,80,24,6,2090,88],[4,3,2,2,66,80,24,6,2090,88]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":840,"provided":4200,"required":3360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":80,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2090,"volumeL":88},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1068,"provided":4200,"required":3132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":70,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1990,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,63,0,0,3,1915,56],[2,3,1,1,63,70,8,3,1990,62],[3,3,2,1,66,70,8,6,2105,70],[4,3,2,1,66,70,8,6,2105,70]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1032,"provided":4200,"required":3168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":70,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":2105,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p250-h12-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-328,"provided":3200,"required":3528,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":96,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":3},"resources":{"capitalGBP":1445,"volumeL":160},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":80,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,80,0,0,8,1355,124],[2,4,1,3,80,96,36,8,1445,160],[3,5,2,3,106,96,36,16,1840,200],[4,5,2,4,106,128,48,16,1870,212],[5,5,2,4,106,128,48,16,1870,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":4000,"required":3768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":500,"required":298,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":128,"required":106,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":4},"resources":{"capitalGBP":1870,"volumeL":212},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":106,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-88,"provided":3200,"required":3288,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":112,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":2},"resources":{"capitalGBP":1505,"volumeL":136},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":80,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,80,0,0,8,1355,124],[2,4,1,2,80,112,16,8,1505,136],[3,5,2,2,106,112,16,16,1900,176],[4,5,2,2,106,112,16,16,1900,176]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":4000,"required":3384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":112,"required":106,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1900,"volumeL":176},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":106,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-268,"provided":3200,"required":3468,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":96,"required":75,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":3},"resources":{"capitalGBP":1485,"volumeL":156},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":75,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,75,0,0,3,1395,120],[2,4,1,3,75,96,36,3,1485,156],[3,5,2,3,96,96,36,6,1920,192],[4,5,2,3,96,96,36,6,1920,192]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":496,"provided":4000,"required":3504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":96,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":3},"resources":{"capitalGBP":1920,"volumeL":192},"values":{"coolingW":96,"drawW":36,"energyWh":4000,"heatW":96,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-28,"provided":3200,"required":3228,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":112,"required":75,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":2},"resources":{"capitalGBP":1545,"volumeL":132},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":75,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,75,0,0,3,1395,120],[2,4,1,2,75,112,16,3,1545,132],[3,5,2,2,96,112,16,6,1980,168],[4,5,2,2,96,112,16,6,1980,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":736,"provided":4000,"required":3264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":112,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1980,"volumeL":168},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":96,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-312,"provided":3360,"required":3672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":250,"required":298,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":128,"required":98,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":4},"resources":{"capitalGBP":1995,"volumeL":108},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":98,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,98,0,0,8,1875,60],[2,3,1,4,98,128,48,8,1995,108],[3,4,2,4,136,128,48,16,2670,136],[4,4,2,5,136,160,60,16,2700,148],[5,4,2,5,136,160,60,16,2700,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":568,"provided":4480,"required":3912,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":500,"required":310,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":160,"required":136,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":5},"resources":{"capitalGBP":2700,"volumeL":148},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":136,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":3360,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":112,"required":98,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":2025,"volumeL":72},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":98,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,98,0,0,8,1875,60],[2,3,1,2,98,112,16,8,2025,72],[3,3,2,2,106,112,16,16,2100,84],[4,4,2,2,136,112,16,16,2700,100],[5,4,2,3,136,168,24,16,2775,106],[6,4,2,3,136,168,24,16,2775,106]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1000,"provided":4480,"required":3480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":168,"required":136,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2775,"volumeL":106},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":136,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-108,"provided":3360,"required":3468,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":96,"required":93,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":3},"resources":{"capitalGBP":2005,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":3360,"heatW":93,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,93,0,0,3,1915,56],[2,3,1,3,93,96,36,3,2005,92],[3,4,2,3,126,96,36,6,2720,116],[4,4,2,4,126,128,48,6,2750,128],[5,4,2,4,126,128,48,6,2750,128]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":832,"provided":4480,"required":3648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":500,"required":298,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":128,"required":126,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":4},"resources":{"capitalGBP":2750,"volumeL":128},"values":{"coolingW":128,"drawW":48,"energyWh":4480,"heatW":126,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":132,"provided":3360,"required":3228,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":112,"required":93,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":2065,"volumeL":68},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":93,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,93,0,0,3,1915,56],[2,3,1,2,93,112,16,3,2065,68],[3,3,2,2,96,112,16,6,2180,76],[4,3,2,2,96,112,16,6,2180,76]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":3360,"required":3264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":112,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2180,"volumeL":76},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":96,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h16-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":4000,"required":4512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":2},"resources":{"capitalGBP":1415,"volumeL":148},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":56,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,56,0,0,8,1355,124],[2,5,1,2,68,80,24,8,1735,176],[3,5,2,2,76,80,24,16,1810,188],[4,5,2,2,76,80,24,16,1810,188]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":360,"provided":5000,"required":4640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":80,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1810,"volumeL":188},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-256,"provided":4000,"required":4256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":1},"resources":{"capitalGBP":1430,"volumeL":130},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":56,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,56,0,0,8,1355,124],[2,5,1,1,68,70,8,8,1750,158],[3,5,2,1,76,70,8,16,1825,170],[4,5,2,2,76,140,16,16,1900,176],[5,5,2,2,76,140,16,16,1900,176]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":488,"provided":5000,"required":4512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":140,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1900,"volumeL":176},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":76,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-432,"provided":4000,"required":4432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":80,"required":51,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":2},"resources":{"capitalGBP":1455,"volumeL":144},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":51,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,51,0,0,3,1395,120],[2,5,1,2,63,80,24,3,1775,172],[3,5,2,2,66,80,24,6,1890,180],[4,5,2,2,66,80,24,6,1890,180]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":5000,"required":4480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":80,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1890,"volumeL":180},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":66,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-176,"provided":4000,"required":4176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":70,"required":51,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":1},"resources":{"capitalGBP":1470,"volumeL":126},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":51,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,51,0,0,3,1395,120],[2,5,1,1,63,70,8,3,1790,154],[3,5,2,1,66,70,8,6,1905,162],[4,5,2,1,66,70,8,6,1905,162]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":5000,"required":4224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":500,"required":258,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":70,"required":66,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":1},"resources":{"capitalGBP":1905,"volumeL":162},"values":{"coolingW":70,"drawW":8,"energyWh":5000,"heatW":66,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-312,"provided":4200,"required":4512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":80,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1935,"volumeL":84},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,68,0,0,8,1875,60],[2,3,1,2,68,80,24,8,1935,84],[3,4,2,2,96,80,24,16,2610,112],[4,4,2,3,96,120,36,16,2640,124],[5,4,2,3,96,120,36,16,2640,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":5600,"required":4832,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":120,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2640,"volumeL":124},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":96,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-56,"provided":4200,"required":4256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":70,"required":68,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1950,"volumeL":66},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":68,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,68,0,0,8,1875,60],[2,3,1,1,68,70,8,8,1950,66],[3,4,2,1,96,70,8,16,2625,94],[4,4,2,2,96,140,16,16,2700,100],[5,4,2,2,96,140,16,16,2700,100]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1088,"provided":5600,"required":4512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":140,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":2700,"volumeL":100},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":96,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-232,"provided":4200,"required":4432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":80,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":2},"resources":{"capitalGBP":1975,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,63,0,0,3,1915,56],[2,3,1,2,63,80,24,3,1975,80],[3,4,2,2,86,80,24,6,2690,104],[4,4,2,3,86,120,36,6,2720,116],[5,4,2,3,86,120,36,6,2720,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":5600,"required":4672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":120,"required":86,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2720,"volumeL":116},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":86,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":4200,"required":4176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":250,"required":258,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":70,"required":63,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":1,"coolers":1},"resources":{"capitalGBP":1990,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":63,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,1,0,63,0,0,3,1915,56],[2,3,1,1,63,70,8,3,1990,62],[3,3,2,1,66,70,8,6,2105,70],[4,4,2,1,86,70,8,6,2705,86],[5,4,2,2,86,140,16,6,2780,92],[6,4,2,2,86,140,16,6,2780,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1248,"provided":5600,"required":4352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":140,"required":86,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":2780,"volumeL":92},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":86,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":16,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p250-h16-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-896,"provided":4000,"required":4896,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":250,"required":298,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":128,"required":98,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":4},"resources":{"capitalGBP":1795,"volumeL":200},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":98,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,98,0,0,8,1675,152],[2,6,1,4,116,128,48,8,2115,228],[3,7,2,4,142,128,48,16,2510,268],[4,7,2,5,142,160,60,16,2540,280],[5,7,2,5,142,160,60,16,2540,280]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":5600,"required":5216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":500,"required":310,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":160,"required":142,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":5},"resources":{"capitalGBP":2540,"volumeL":280},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":142,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-384,"provided":4000,"required":4384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":112,"required":98,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":2},"resources":{"capitalGBP":1825,"volumeL":164},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":98,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,98,0,0,8,1675,152],[2,6,1,2,116,112,16,8,2145,192],[3,6,2,3,124,168,24,16,2295,210],[4,6,2,3,124,168,24,16,2295,210]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":4800,"required":4640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":168,"required":124,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":2,"coolers":3},"resources":{"capitalGBP":2295,"volumeL":210},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":124,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-624,"provided":4000,"required":4624,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":96,"required":93,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":3},"resources":{"capitalGBP":1805,"volumeL":184},"values":{"coolingW":96,"drawW":36,"energyWh":4000,"heatW":93,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,93,0,0,3,1715,148],[2,6,1,3,111,96,36,3,2125,212],[3,6,2,4,114,128,48,6,2270,232],[4,7,2,4,132,128,48,6,2590,260],[5,7,2,5,132,160,60,6,2620,272],[6,7,2,5,132,160,60,6,2620,272]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":5600,"required":5056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":500,"required":310,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":5},"resources":{"capitalGBP":2620,"volumeL":272},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":132,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-304,"provided":4000,"required":4304,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":112,"required":93,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":2},"resources":{"capitalGBP":1865,"volumeL":160},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":93,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,93,0,0,3,1715,148],[2,6,1,2,111,112,16,3,2185,188],[3,6,2,2,114,112,16,6,2300,196],[4,6,2,3,114,168,24,6,2375,202],[5,6,2,3,114,168,24,6,2375,202]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":320,"provided":4800,"required":4480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":168,"required":114,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":2,"coolers":3},"resources":{"capitalGBP":2375,"volumeL":202},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":114,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-416,"provided":4480,"required":4896,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":250,"required":298,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":128,"required":128,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":4},"resources":{"capitalGBP":2595,"volumeL":124},"values":{"coolingW":128,"drawW":48,"energyWh":4480,"heatW":128,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,128,0,0,8,2475,76],[2,4,1,4,128,128,48,8,2595,124],[3,5,2,4,166,128,48,16,3270,152],[4,5,2,6,166,192,72,16,3330,176],[5,5,2,6,166,192,72,16,3330,176]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":5600,"required":5408,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":500,"required":322,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":192,"required":166,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":6},"resources":{"capitalGBP":3330,"volumeL":176},"values":{"coolingW":192,"drawW":72,"energyWh":5600,"heatW":166,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-32,"provided":4480,"required":4512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":168,"required":128,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":3},"resources":{"capitalGBP":2700,"volumeL":94},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":128,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,128,0,0,8,2475,76],[2,4,1,3,128,168,24,8,2700,94],[3,5,2,3,166,168,24,16,3375,122],[4,5,2,3,166,168,24,16,3375,122]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":960,"provided":5600,"required":4640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":168,"required":166,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":3},"resources":{"capitalGBP":3375,"volumeL":122},"values":{"coolingW":168,"drawW":24,"energyWh":5600,"heatW":166,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":4480,"required":4816,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":250,"required":298,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":128,"required":123,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":4},"resources":{"capitalGBP":2635,"volumeL":120},"values":{"coolingW":128,"drawW":48,"energyWh":4480,"heatW":123,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,123,0,0,3,2515,72],[2,4,1,4,123,128,48,3,2635,120],[3,5,2,4,156,128,48,6,3350,144],[4,5,2,5,156,160,60,6,3380,156],[5,5,2,5,156,160,60,6,3380,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":5600,"required":5056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":500,"required":310,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":160,"required":156,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":5},"resources":{"capitalGBP":3380,"volumeL":156},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":156,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":4480,"required":4432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":168,"required":123,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":1,"coolers":3},"resources":{"capitalGBP":2740,"volumeL":90},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":123,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,1,0,123,0,0,3,2515,72],[2,4,1,3,123,168,24,3,2740,90],[3,4,2,3,126,168,24,6,2855,98],[4,4,2,3,126,168,24,6,2855,98]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":4480,"required":4480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":168,"required":126,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2855,"volumeL":98},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":126,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":24,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h24-mild","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":6000,"required":6768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":80,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":2},"resources":{"capitalGBP":2055,"volumeL":204},"values":{"coolingW":80,"drawW":24,"energyWh":6000,"heatW":80,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,80,0,0,8,1995,180],[2,7,1,2,92,80,24,8,2375,232],[3,7,2,3,100,120,36,16,2480,256],[4,8,2,3,112,120,36,16,2800,284],[5,8,2,3,112,120,36,16,2800,284]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":752,"provided":8000,"required":7248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":2800,"volumeL":284},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":112,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-576,"provided":6000,"required":6576,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":140,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":2},"resources":{"capitalGBP":2145,"volumeL":192},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":80,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,80,0,0,8,1995,180],[2,7,1,2,92,140,16,8,2465,220],[3,7,2,2,100,140,16,16,2540,232],[4,7,2,2,100,140,16,16,2540,232]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":7000,"required":6768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":140,"required":100,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":2},"resources":{"capitalGBP":2540,"volumeL":232},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":100,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-648,"provided":6000,"required":6648,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":80,"required":75,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":2},"resources":{"capitalGBP":2095,"volumeL":200},"values":{"coolingW":80,"drawW":24,"energyWh":6000,"heatW":75,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,75,0,0,3,2035,176],[2,7,1,2,87,80,24,3,2415,228],[3,7,2,3,90,120,36,6,2560,248],[4,8,2,3,102,120,36,6,2880,276],[5,8,2,3,102,120,36,6,2880,276]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":992,"provided":8000,"required":7008,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":500,"required":286,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":120,"required":102,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":2880,"volumeL":276},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":102,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-456,"provided":6000,"required":6456,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":65,"provided":140,"required":75,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":2},"resources":{"capitalGBP":2185,"volumeL":188},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":75,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,75,0,0,3,2035,176],[2,7,1,2,87,140,16,3,2505,216],[3,7,2,2,90,140,16,6,2620,224],[4,7,2,2,90,140,16,6,2620,224]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":7000,"required":6528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":140,"required":90,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":2},"resources":{"capitalGBP":2620,"volumeL":224},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":90,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-56,"provided":7000,"required":7056,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":120,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":3},"resources":{"capitalGBP":3165,"volumeL":128},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":108,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,108,0,0,8,3075,92],[2,5,1,3,108,120,36,8,3165,128],[3,6,2,3,136,120,36,16,3840,156],[4,6,2,4,136,160,48,16,3870,168],[5,6,2,4,136,160,48,16,3870,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":864,"provided":8400,"required":7536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":500,"required":298,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":160,"required":136,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":3870,"volumeL":168},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":136,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":424,"provided":7000,"required":6576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":140,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":2},"resources":{"capitalGBP":3225,"volumeL":104},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":108,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,108,0,0,8,3075,92],[2,5,1,2,108,140,16,8,3225,104],[3,5,2,2,116,140,16,16,3300,116],[4,5,2,2,116,140,16,16,3300,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":7000,"required":6768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":140,"required":116,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":3300,"volumeL":116},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":116,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":7000,"required":6936,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":250,"required":286,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":120,"required":103,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":3},"resources":{"capitalGBP":3205,"volumeL":124},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":103,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,103,0,0,3,3115,88],[2,5,1,3,103,120,36,3,3205,124],[3,5,2,3,106,120,36,6,3320,132],[4,6,2,3,126,120,36,6,3920,148],[5,6,2,4,126,160,48,6,3950,160],[6,6,2,4,126,160,48,6,3950,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1104,"provided":8400,"required":7296,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":500,"required":298,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":160,"required":126,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":3950,"volumeL":160},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":126,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":7000,"required":6456,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":250,"required":266,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":140,"required":103,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":1,"coolers":2},"resources":{"capitalGBP":3265,"volumeL":100},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":103,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,1,0,103,0,0,3,3115,88],[2,5,1,2,103,140,16,3,3265,100],[3,5,2,2,106,140,16,6,3380,108],[4,5,2,2,106,140,16,6,3380,108]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":7000,"required":6528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":500,"required":266,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":140,"required":106,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":3380,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":106,"lossW":6,"outputW":500}}}]},{"condition":"hot","durationHours":24,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p250-h24-hot","powerW":250,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1232,"provided":6400,"required":7632,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":250,"required":310,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":1,"coolers":5},"resources":{"capitalGBP":2785,"volumeL":296},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":152,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,1,0,152,0,0,8,2635,236],[2,8,1,5,152,160,60,8,2785,296],[3,10,2,5,196,160,60,16,3500,364],[4,10,2,7,196,224,84,16,3560,388],[5,11,2,7,214,224,84,16,3880,416],[6,11,2,7,214,224,84,16,3880,416]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":400,"provided":8800,"required":8400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":500,"required":334,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":224,"required":214,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":2,"coolers":7},"resources":{"capitalGBP":3880,"volumeL":416},"values":{"coolingW":224,"drawW":84,"energyWh":8800,"heatW":214,"lossW":16,"outputW":500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-368,"provided":6400,"required":6768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":168,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":1,"coolers":3},"resources":{"capitalGBP":2860,"volumeL":254},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":152,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,1,0,152,0,0,8,2635,236],[2,8,1,3,152,168,24,8,2860,254],[3,9,2,3,178,168,24,16,3255,294],[4,9,2,4,178,224,32,16,3330,300],[5,9,2,4,178,224,32,16,3330,300]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":7200,"required":7152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":500,"required":282,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":224,"required":178,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":2,"coolers":4},"resources":{"capitalGBP":3330,"volumeL":300},"values":{"coolingW":224,"drawW":32,"energyWh":7200,"heatW":178,"lossW":16,"outputW":500}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1112,"provided":6400,"required":7512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":250,"required":310,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":160,"required":147,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":1,"coolers":5},"resources":{"capitalGBP":2825,"volumeL":292},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":147,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,1,0,147,0,0,3,2675,232],[2,8,1,5,147,160,60,3,2825,292],[3,10,2,5,186,160,60,6,3580,356],[4,10,2,6,186,192,72,6,3610,368],[5,10,2,6,186,192,72,6,3610,368]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":8000,"required":7872,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":500,"required":322,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":192,"required":186,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":2,"coolers":6},"resources":{"capitalGBP":3610,"volumeL":368},"values":{"coolingW":192,"drawW":72,"energyWh":8000,"heatW":186,"lossW":6,"outputW":500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-248,"provided":6400,"required":6648,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":250,"required":274,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":168,"required":147,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":1,"coolers":3},"resources":{"capitalGBP":2900,"volumeL":250},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":147,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,1,0,147,0,0,3,2675,232],[2,8,1,3,147,168,24,3,2900,250],[3,9,2,3,168,168,24,6,3335,286],[4,9,2,3,168,168,24,6,3335,286]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":7200,"required":6720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":500,"required":274,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":168,"required":168,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":2,"coolers":3},"resources":{"capitalGBP":3335,"volumeL":286},"values":{"coolingW":168,"drawW":24,"energyWh":7200,"heatW":168,"lossW":6,"outputW":500}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1200,"provided":6720,"required":7920,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":250,"required":322,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":192,"required":188,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":6},"resources":{"capitalGBP":3855,"volumeL":180},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":188,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,188,0,0,8,3675,108],[2,6,1,6,188,192,72,8,3855,180],[3,8,2,6,256,192,72,16,5130,224],[4,8,2,8,256,256,96,16,5190,248],[5,8,2,8,256,256,96,16,5190,248]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":8960,"required":8688,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":500,"required":346,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":256,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":2,"coolers":8},"resources":{"capitalGBP":5190,"volumeL":248},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":256,"lossW":16,"outputW":500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":6720,"required":6960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":250,"required":282,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":224,"required":188,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":4},"resources":{"capitalGBP":3975,"volumeL":132},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":188,"lossW":8,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,188,0,0,8,3675,108],[2,6,1,4,188,224,32,8,3975,132],[3,7,2,4,226,224,32,16,4650,160],[4,7,2,5,226,280,40,16,4725,166],[5,7,2,5,226,280,40,16,4725,166]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":496,"provided":7840,"required":7344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":500,"required":290,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":280,"required":226,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":5},"resources":{"capitalGBP":4725,"volumeL":166},"values":{"coolingW":280,"drawW":40,"energyWh":7840,"heatW":226,"lossW":16,"outputW":500}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1080,"provided":6720,"required":7800,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":250,"required":322,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":192,"required":183,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":6},"resources":{"capitalGBP":3895,"volumeL":176},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":183,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,183,0,0,3,3715,104],[2,6,1,6,183,192,72,3,3895,176],[3,7,2,6,216,192,72,6,4610,200],[4,8,2,7,246,224,84,6,5240,228],[5,8,2,8,246,256,96,6,5270,240],[6,8,2,8,246,256,96,6,5270,240]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":512,"provided":8960,"required":8448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":500,"required":346,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":256,"required":246,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":2,"coolers":8},"resources":{"capitalGBP":5270,"volumeL":240},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":246,"lossW":6,"outputW":500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":2,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-120,"provided":6720,"required":6840,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":250,"required":282,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":41,"provided":224,"required":183,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":1,"coolers":4},"resources":{"capitalGBP":4015,"volumeL":128},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":183,"lossW":3,"outputW":250}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,1,0,183,0,0,3,3715,104],[2,6,1,4,183,224,32,3,4015,128],[3,7,2,4,216,224,32,6,4730,152],[4,7,2,4,216,224,32,6,4730,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":7840,"required":6912,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":500,"required":282,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":224,"required":216,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":2,"coolers":4},"resources":{"capitalGBP":4730,"volumeL":152},"values":{"coolingW":224,"drawW":32,"energyWh":7840,"heatW":216,"lossW":6,"outputW":500}}}]},{"condition":"mild","durationHours":2,"frontier":["compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p500-h2-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-56,"provided":1000,"required":1056,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":40,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":500,"volumeL":64},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":28,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,28,0,0,16,470,52],[2,2,2,1,40,40,12,16,820,92],[3,2,3,1,48,40,12,24,895,104],[4,2,3,2,48,80,24,24,925,116],[5,2,3,2,48,80,24,24,925,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":904,"provided":2000,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":80,"required":48,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":925,"volumeL":116},"values":{"coolingW":80,"drawW":24,"energyWh":2000,"heatW":48,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":70,"required":28,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":545,"volumeL":58},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":28,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,28,0,0,16,470,52],[2,2,2,1,40,70,8,16,865,86],[3,2,3,1,48,70,8,24,940,98],[4,2,3,1,48,70,8,24,940,98]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":936,"provided":2000,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":70,"required":48,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":940,"volumeL":98},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":48,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":40,"required":18,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":580,"volumeL":56},"values":{"coolingW":40,"drawW":12,"energyWh":1000,"heatW":18,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,18,0,0,6,550,44],[2,2,2,1,30,40,12,6,900,84],[3,2,3,1,33,40,12,9,1015,92],[4,2,3,1,33,40,12,9,1015,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":958,"provided":2000,"required":1042,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":750,"required":512,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":40,"required":33,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1015,"volumeL":92},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":33,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-28,"provided":1000,"required":1028,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":70,"required":18,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":625,"volumeL":50},"values":{"coolingW":70,"drawW":8,"energyWh":1000,"heatW":18,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,18,0,0,6,550,44],[2,2,2,1,30,70,8,6,945,78],[3,2,3,1,33,70,8,9,1060,86],[4,2,3,1,33,70,8,9,1060,86]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":966,"provided":2000,"required":1034,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":70,"required":33,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1060,"volumeL":86},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":33,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":1400,"required":1056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":40,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":780,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,36,0,0,16,750,40],[2,1,2,1,36,40,12,16,780,52],[3,1,3,1,44,40,12,24,855,64],[4,1,3,2,44,80,24,24,885,76],[5,1,3,2,44,80,24,24,885,76]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":1400,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":80,"required":44,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":2},"resources":{"capitalGBP":885,"volumeL":76},"values":{"coolingW":80,"drawW":24,"energyWh":1400,"heatW":44,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":1400,"required":1048,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":70,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":36,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,36,0,0,16,750,40],[2,1,2,1,36,70,8,16,825,46],[3,1,3,1,44,70,8,24,900,58],[4,1,3,1,44,70,8,24,900,58]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":1400,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":70,"required":44,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":1},"resources":{"capitalGBP":900,"volumeL":58},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":44,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":364,"provided":1400,"required":1036,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":40,"required":26,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":860,"volumeL":44},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,26,0,0,6,830,32],[2,1,2,1,26,40,12,6,860,44],[3,1,3,1,29,40,12,9,975,52],[4,1,3,1,29,40,12,9,975,52]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":358,"provided":1400,"required":1042,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":750,"required":512,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":40,"required":29,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":1},"resources":{"capitalGBP":975,"volumeL":52},"values":{"coolingW":40,"drawW":12,"energyWh":1400,"heatW":29,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":372,"provided":1400,"required":1028,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":70,"required":26,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":26,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,26,0,0,6,830,32],[2,1,2,1,26,70,8,6,905,38],[3,1,3,1,29,70,8,9,1020,46],[4,1,3,1,29,70,8,9,1020,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":366,"provided":1400,"required":1034,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":41,"provided":70,"required":29,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":1},"resources":{"capitalGBP":1020,"volumeL":46},"values":{"coolingW":70,"drawW":8,"energyWh":1400,"heatW":29,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":2,"frontier":["compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h2-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":1600,"required":1080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":64,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":850,"volumeL":104},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":52,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,52,0,0,16,790,80],[2,2,2,2,52,64,24,16,850,104],[3,2,3,2,60,64,24,24,925,116],[4,2,3,2,60,64,24,24,925,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":504,"provided":1600,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":64,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":925,"volumeL":116},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":60,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":552,"provided":1600,"required":1048,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":56,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":865,"volumeL":86},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":52,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,52,0,0,16,790,80],[2,2,2,1,52,56,8,16,865,86],[3,2,3,1,60,56,8,24,940,98],[4,2,3,2,60,112,16,24,1015,104],[5,2,3,2,60,112,16,24,1015,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":1600,"required":1080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":112,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1015,"volumeL":104},"values":{"coolingW":112,"drawW":16,"energyWh":1600,"heatW":60,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":540,"provided":1600,"required":1060,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":64,"required":42,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":930,"volumeL":96},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":42,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,42,0,0,6,870,72],[2,2,2,2,42,64,24,6,930,96],[3,2,3,2,45,64,24,9,1045,104],[4,2,3,2,45,64,24,9,1045,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":534,"provided":1600,"required":1066,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":64,"required":45,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1045,"volumeL":104},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":45,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":572,"provided":1600,"required":1028,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":56,"required":42,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":42,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,42,0,0,6,870,72],[2,2,2,1,42,56,8,6,945,78],[3,2,3,1,45,56,8,9,1060,86],[4,2,3,1,45,56,8,9,1060,86]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":566,"provided":1600,"required":1034,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":56,"required":45,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1060,"volumeL":86},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":45,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":1120,"required":1080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":64,"required":46,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":810,"volumeL":64},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":46,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,46,0,0,16,750,40],[2,1,2,2,46,64,24,16,810,64],[3,1,3,2,54,64,24,24,885,76],[4,1,3,2,54,64,24,24,885,76]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":1120,"required":1096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":64,"required":54,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":2},"resources":{"capitalGBP":885,"volumeL":76},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":54,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":1120,"required":1048,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":56,"required":46,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":825,"volumeL":46},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":46,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,46,0,0,16,750,40],[2,1,2,1,46,56,8,16,825,46],[3,1,3,1,54,56,8,24,900,58],[4,1,3,1,54,56,8,24,900,58]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":56,"provided":1120,"required":1064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":56,"required":54,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":1},"resources":{"capitalGBP":900,"volumeL":58},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":54,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":60,"provided":1120,"required":1060,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":64,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":2},"resources":{"capitalGBP":890,"volumeL":56},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,36,0,0,6,830,32],[2,1,2,2,36,64,24,6,890,56],[3,1,3,2,39,64,24,9,1005,64],[4,1,3,2,39,64,24,9,1005,64]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":54,"provided":1120,"required":1066,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":64,"required":39,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":2},"resources":{"capitalGBP":1005,"volumeL":64},"values":{"coolingW":64,"drawW":24,"energyWh":1120,"heatW":39,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":1,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":92,"provided":1120,"required":1028,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":56,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":1,"converters":2,"coolers":1},"resources":{"capitalGBP":905,"volumeL":38},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":36,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,1,2,0,36,0,0,6,830,32],[2,1,2,1,36,56,8,6,905,38],[3,1,3,1,39,56,8,9,1020,46],[4,1,3,1,39,56,8,9,1020,46]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":86,"provided":1120,"required":1034,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":56,"required":39,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":1,"converters":3,"coolers":1},"resources":{"capitalGBP":1020,"volumeL":46},"values":{"coolingW":56,"drawW":8,"energyWh":1120,"heatW":39,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h4-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":2000,"required":2112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":40,"required":40,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":820,"volumeL":92},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,40,0,0,16,790,80],[2,3,2,1,52,40,12,16,1140,120],[3,3,3,2,60,80,24,24,1245,144],[4,3,3,2,60,80,24,24,1245,144]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":3000,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":80,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1245,"volumeL":144},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":60,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-96,"provided":2000,"required":2096,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":70,"required":40,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":865,"volumeL":86},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":40,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,40,0,0,16,790,80],[2,3,2,1,52,70,8,16,1185,114],[3,3,3,1,60,70,8,24,1260,126],[4,3,3,1,60,70,8,24,1260,126]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":872,"provided":3000,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":70,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":1260,"volumeL":126},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":60,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":500,"required":512,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":40,"required":30,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":900,"volumeL":84},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,30,0,0,6,870,72],[2,3,2,1,42,40,12,6,1220,112],[3,3,3,2,45,80,24,9,1365,132],[4,3,3,2,45,80,24,9,1365,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":868,"provided":3000,"required":2132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":80,"required":45,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1365,"volumeL":132},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":45,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":70,"required":30,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":945,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":30,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,30,0,0,6,870,72],[2,3,2,1,42,70,8,6,1265,106],[3,3,3,1,45,70,8,9,1380,114],[4,3,3,1,45,70,8,9,1380,114]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":932,"provided":3000,"required":2068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":70,"required":45,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":1380,"volumeL":114},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":45,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":2800,"required":2160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1410,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,56,0,0,16,1350,56],[2,2,2,2,56,80,24,16,1410,80],[3,2,3,2,64,80,24,24,1485,92],[4,2,3,2,64,80,24,24,1485,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":2800,"required":2192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":80,"required":64,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1485,"volumeL":92},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":64,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":2800,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1425,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":56,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,56,0,0,16,1350,56],[2,2,2,1,56,70,8,16,1425,62],[3,2,3,1,64,70,8,24,1500,74],[4,2,3,1,64,70,8,24,1500,74]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":672,"provided":2800,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":70,"required":64,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1500,"volumeL":74},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":64,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":2800,"required":2120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":80,"required":46,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1490,"volumeL":72},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,46,0,0,6,1430,48],[2,2,2,2,46,80,24,6,1490,72],[3,2,3,2,49,80,24,9,1605,80],[4,2,3,2,49,80,24,9,1605,80]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":668,"provided":2800,"required":2132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":80,"required":49,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1605,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":49,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":744,"provided":2800,"required":2056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":70,"required":46,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":1},"resources":{"capitalGBP":1505,"volumeL":54},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":46,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,46,0,0,6,1430,48],[2,2,2,1,46,70,8,6,1505,54],[3,2,3,1,49,70,8,9,1620,62],[4,2,3,1,49,70,8,9,1620,62]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":732,"provided":2800,"required":2068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":70,"required":49,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1620,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":49,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h4-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":2400,"required":2208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":96,"required":70,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":3},"resources":{"capitalGBP":1200,"volumeL":144},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":70,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,70,0,0,16,1110,108],[2,3,2,3,70,96,36,16,1200,144],[3,3,3,3,78,96,36,24,1275,156],[4,3,3,3,78,96,36,24,1275,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":2400,"required":2240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":96,"required":78,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":3},"resources":{"capitalGBP":1275,"volumeL":156},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":78,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":2400,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":112,"required":70,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1260,"volumeL":120},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":70,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,70,0,0,16,1110,108],[2,3,2,2,70,112,16,16,1260,120],[3,3,3,2,78,112,16,24,1335,132],[4,3,3,2,78,112,16,24,1335,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":240,"provided":2400,"required":2160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":112,"required":78,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1335,"volumeL":132},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":78,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":280,"provided":2400,"required":2120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":64,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1250,"volumeL":124},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":60,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,60,0,0,6,1190,100],[2,3,2,2,60,64,24,6,1250,124],[3,3,3,2,63,64,24,9,1365,132],[4,3,3,2,63,64,24,9,1365,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":268,"provided":2400,"required":2132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":64,"required":63,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1365,"volumeL":132},"values":{"coolingW":64,"drawW":24,"energyWh":2400,"heatW":63,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":312,"provided":2400,"required":2088,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":112,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1340,"volumeL":112},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":60,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,60,0,0,6,1190,100],[2,3,2,2,60,112,16,6,1340,112],[3,3,3,2,63,112,16,9,1455,120],[4,3,3,2,63,112,16,9,1455,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":300,"provided":2400,"required":2100,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":112,"required":63,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1455,"volumeL":120},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":63,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":32,"provided":2240,"required":2208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":96,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":3},"resources":{"capitalGBP":1440,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,76,0,0,16,1350,56],[2,2,2,3,76,96,36,16,1440,92],[3,2,3,3,84,96,36,24,1515,104],[4,2,3,3,84,96,36,24,1515,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":2240,"required":2240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":96,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":3},"resources":{"capitalGBP":1515,"volumeL":104},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":112,"provided":2240,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":112,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1500,"volumeL":68},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,76,0,0,16,1350,56],[2,2,2,2,76,112,16,16,1500,68],[3,2,3,2,84,112,16,24,1575,80],[4,2,3,2,84,112,16,24,1575,80]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":2240,"required":2160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":112,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1575,"volumeL":80},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":2240,"required":2168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":96,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":3},"resources":{"capitalGBP":1520,"volumeL":84},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,66,0,0,6,1430,48],[2,2,2,3,66,96,36,6,1520,84],[3,2,3,3,69,96,36,9,1635,92],[4,2,3,3,69,96,36,9,1635,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":60,"provided":2240,"required":2180,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":96,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":3},"resources":{"capitalGBP":1635,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":69,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":152,"provided":2240,"required":2088,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":112,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":2,"coolers":2},"resources":{"capitalGBP":1580,"volumeL":60},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,2,0,66,0,0,6,1430,48],[2,2,2,2,66,112,16,6,1580,60],[3,2,3,2,69,112,16,9,1695,68],[4,2,3,2,69,112,16,9,1695,68]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":140,"provided":2240,"required":2100,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":112,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1695,"volumeL":68},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":69,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h6-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":3000,"required":3240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":80,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1170,"volumeL":132},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":52,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,52,0,0,16,1110,108],[2,4,2,2,64,80,24,16,1490,160],[3,4,3,2,72,80,24,24,1565,172],[4,4,3,2,72,80,24,24,1565,172]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":4000,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1565,"volumeL":172},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":72,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-144,"provided":3000,"required":3144,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":70,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":1185,"volumeL":114},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":52,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,52,0,0,16,1110,108],[2,4,2,1,64,70,8,16,1505,142],[3,4,3,1,72,70,8,24,1580,154],[4,4,3,2,72,140,16,24,1655,160],[5,4,3,2,72,140,16,24,1655,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":760,"provided":4000,"required":3240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1655,"volumeL":160},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":72,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-180,"provided":3000,"required":3180,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":80,"required":42,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":1250,"volumeL":124},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":42,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,42,0,0,6,1190,100],[2,4,2,2,54,80,24,6,1570,152],[3,4,3,2,57,80,24,9,1685,160],[4,4,3,2,57,80,24,9,1685,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":802,"provided":4000,"required":3198,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":80,"required":57,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1685,"volumeL":160},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":57,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-84,"provided":3000,"required":3084,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":70,"required":42,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":1265,"volumeL":106},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":42,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,42,0,0,6,1190,100],[2,4,2,1,54,70,8,6,1585,134],[3,4,3,1,57,70,8,9,1700,142],[4,4,3,1,57,70,8,9,1700,142]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":898,"provided":4000,"required":3102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":70,"required":57,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":1},"resources":{"capitalGBP":1700,"volumeL":142},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":57,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":960,"provided":4200,"required":3240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":80,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2010,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,76,0,0,16,1950,72],[2,3,2,2,76,80,24,16,2010,96],[3,3,3,2,84,80,24,24,2085,108],[4,3,3,3,84,120,36,24,2115,120],[5,3,3,3,84,120,36,24,2115,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":840,"provided":4200,"required":3360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":3},"resources":{"capitalGBP":2115,"volumeL":120},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1008,"provided":4200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":140,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2100,"volumeL":84},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,76,0,0,16,1950,72],[2,3,2,2,76,140,16,16,2100,84],[3,3,3,2,84,140,16,24,2175,96],[4,3,3,2,84,140,16,24,2175,96]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":960,"provided":4200,"required":3240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2175,"volumeL":96},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1020,"provided":4200,"required":3180,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":80,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2090,"volumeL":88},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,66,0,0,6,2030,64],[2,3,2,2,66,80,24,6,2090,88],[3,3,3,2,69,80,24,9,2205,96],[4,3,3,2,69,80,24,9,2205,96]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1002,"provided":4200,"required":3198,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":80,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2205,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":69,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1116,"provided":4200,"required":3084,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":70,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":2105,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,66,0,0,6,2030,64],[2,3,2,1,66,70,8,6,2105,70],[3,3,3,1,69,70,8,9,2220,78],[4,3,3,1,69,70,8,9,2220,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1098,"provided":4200,"required":3102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":2220,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":69,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h6-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":3200,"required":3312,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":96,"required":88,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":1520,"volumeL":172},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":88,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,88,0,0,16,1430,136],[2,4,2,3,88,96,36,16,1520,172],[3,5,3,3,114,96,36,24,1915,212],[4,5,3,4,114,128,48,24,1945,224],[5,5,3,4,114,128,48,24,1945,224]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":568,"provided":4000,"required":3432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":128,"required":114,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":4},"resources":{"capitalGBP":1945,"volumeL":224},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":114,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":3200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":112,"required":88,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1580,"volumeL":148},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":88,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,88,0,0,16,1430,136],[2,4,2,2,88,112,16,16,1580,148],[3,4,3,2,96,112,16,24,1655,160],[4,5,3,2,114,112,16,24,1975,188],[5,5,3,3,114,168,24,24,2050,194],[6,5,3,3,114,168,24,24,2050,194]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":4000,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":168,"required":114,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":2050,"volumeL":194},"values":{"coolingW":168,"drawW":24,"energyWh":4000,"heatW":114,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-52,"provided":3200,"required":3252,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":96,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":1600,"volumeL":164},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":78,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,78,0,0,6,1510,128],[2,4,2,3,78,96,36,6,1600,164],[3,5,3,3,99,96,36,9,2035,200],[4,5,3,4,99,128,48,9,2065,212],[5,5,3,4,99,128,48,9,2065,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":658,"provided":4000,"required":3342,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":128,"required":99,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":4},"resources":{"capitalGBP":2065,"volumeL":212},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":99,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":68,"provided":3200,"required":3132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":112,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1660,"volumeL":140},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":78,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,78,0,0,6,1510,128],[2,4,2,2,78,112,16,6,1660,140],[3,4,3,2,81,112,16,9,1775,148],[4,4,3,2,81,112,16,9,1775,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":50,"provided":3200,"required":3150,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":112,"required":81,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1775,"volumeL":148},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":81,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-24,"provided":3360,"required":3384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":128,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":4},"resources":{"capitalGBP":2070,"volumeL":120},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":106,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,106,0,0,16,1950,72],[2,3,2,4,106,128,48,16,2070,120],[3,4,3,4,144,128,48,24,2745,148],[4,4,3,5,144,160,60,24,2775,160],[5,4,3,5,144,160,60,24,2775,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":976,"provided":4480,"required":3504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":750,"required":560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":160,"required":144,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":5},"resources":{"capitalGBP":2775,"volumeL":160},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":144,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":168,"provided":3360,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":112,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2100,"volumeL":84},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":106,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,106,0,0,16,1950,72],[2,3,2,2,106,112,16,16,2100,84],[3,3,3,2,114,112,16,24,2175,96],[4,3,3,3,114,168,24,24,2250,102],[5,3,3,3,114,168,24,24,2250,102]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":3360,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":168,"required":114,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":3},"resources":{"capitalGBP":2250,"volumeL":102},"values":{"coolingW":168,"drawW":24,"energyWh":3360,"heatW":114,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":108,"provided":3360,"required":3252,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":96,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":3},"resources":{"capitalGBP":2120,"volumeL":100},"values":{"coolingW":96,"drawW":36,"energyWh":3360,"heatW":96,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,96,0,0,6,2030,64],[2,3,2,3,96,96,36,6,2120,100],[3,3,3,3,99,96,36,9,2235,108],[4,3,3,4,99,128,48,9,2265,120],[5,3,3,4,99,128,48,9,2265,120]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":18,"provided":3360,"required":3342,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":128,"required":99,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":4},"resources":{"capitalGBP":2265,"volumeL":120},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":99,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":228,"provided":3360,"required":3132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":112,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2180,"volumeL":76},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":96,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,96,0,0,6,2030,64],[2,3,2,2,96,112,16,6,2180,76],[3,3,3,2,99,112,16,9,2295,84],[4,3,3,2,99,112,16,9,2295,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":210,"provided":3360,"required":3150,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":112,"required":99,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2295,"volumeL":84},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":99,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p500-h8-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-320,"provided":4000,"required":4320,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":80,"required":64,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1490,"volumeL":160},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":64,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,64,0,0,16,1430,136],[2,5,2,2,76,80,24,16,1810,188],[3,5,3,2,84,80,24,24,1885,200],[4,5,3,3,84,120,36,24,1915,212],[5,5,3,3,84,120,36,24,1915,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":5000,"required":4480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":1915,"volumeL":212},"values":{"coolingW":120,"drawW":36,"energyWh":5000,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-192,"provided":4000,"required":4192,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":70,"required":64,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":1},"resources":{"capitalGBP":1505,"volumeL":142},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":64,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,64,0,0,16,1430,136],[2,5,2,1,76,70,8,16,1825,170],[3,5,3,2,84,140,16,24,1975,188],[4,5,3,2,84,140,16,24,1975,188]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":5000,"required":4320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":1975,"volumeL":188},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":84,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":4000,"required":4240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":80,"required":54,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":2},"resources":{"capitalGBP":1570,"volumeL":152},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":54,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,54,0,0,6,1510,128],[2,5,2,2,66,80,24,6,1890,180],[3,5,3,2,69,80,24,9,2005,188],[4,5,3,2,69,80,24,9,2005,188]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":736,"provided":5000,"required":4264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":80,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":2005,"volumeL":188},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":69,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":4000,"required":4112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":70,"required":54,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":1},"resources":{"capitalGBP":1585,"volumeL":134},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":54,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,54,0,0,6,1510,128],[2,5,2,1,66,70,8,6,1905,162],[3,5,3,1,69,70,8,9,2020,170],[4,5,3,1,69,70,8,9,2020,170]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":864,"provided":5000,"required":4136,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":1},"resources":{"capitalGBP":2020,"volumeL":170},"values":{"coolingW":70,"drawW":8,"energyWh":5000,"heatW":69,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-120,"provided":4200,"required":4320,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":80,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2010,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,76,0,0,16,1950,72],[2,3,2,2,76,80,24,16,2010,96],[3,4,3,2,104,80,24,24,2685,124],[4,4,3,3,104,120,36,24,2715,136],[5,4,3,3,104,120,36,24,2715,136]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1120,"provided":5600,"required":4480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":120,"required":104,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2715,"volumeL":136},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":104,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-56,"provided":4200,"required":4256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":140,"required":76,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2100,"volumeL":84},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":76,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,76,0,0,16,1950,72],[2,3,2,2,76,140,16,16,2100,84],[3,4,3,2,104,140,16,24,2775,112],[4,4,3,2,104,140,16,24,2775,112]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1280,"provided":5600,"required":4320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":140,"required":104,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":2775,"volumeL":112},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":104,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-40,"provided":4200,"required":4240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":80,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":2},"resources":{"capitalGBP":2090,"volumeL":88},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,66,0,0,6,2030,64],[2,3,2,2,66,80,24,6,2090,88],[3,4,3,2,89,80,24,9,2805,112],[4,4,3,3,89,120,36,9,2835,124],[5,4,3,3,89,120,36,9,2835,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1240,"provided":5600,"required":4360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":120,"required":89,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2835,"volumeL":124},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":89,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":88,"provided":4200,"required":4112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":500,"required":508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":70,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":2,"coolers":1},"resources":{"capitalGBP":2105,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":66,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,2,0,66,0,0,6,2030,64],[2,3,2,1,66,70,8,6,2105,70],[3,3,3,1,69,70,8,9,2220,78],[4,3,3,1,69,70,8,9,2220,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":4200,"required":4136,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":750,"required":508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":2220,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":69,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h8-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":4000,"required":4512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":128,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":4},"resources":{"capitalGBP":1870,"volumeL":212},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":106,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,106,0,0,16,1750,164],[2,6,2,4,124,128,48,16,2190,240],[3,6,3,4,132,128,48,24,2265,252],[4,6,3,5,132,160,60,24,2295,264],[5,6,3,5,132,160,60,24,2295,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":4800,"required":4672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":750,"required":560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":5},"resources":{"capitalGBP":2295,"volumeL":264},"values":{"coolingW":160,"drawW":60,"energyWh":4800,"heatW":132,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-256,"provided":4000,"required":4256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":112,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1900,"volumeL":176},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":106,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,106,0,0,16,1750,164],[2,6,2,2,124,112,16,16,2220,204],[3,6,3,3,132,168,24,24,2370,222],[4,6,3,3,132,168,24,24,2370,222]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":416,"provided":4800,"required":4384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":168,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2370,"volumeL":222},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":132,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":4000,"required":4336,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":96,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":3},"resources":{"capitalGBP":1920,"volumeL":192},"values":{"coolingW":96,"drawW":36,"energyWh":4000,"heatW":96,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,96,0,0,6,1830,156],[2,6,2,3,114,96,36,6,2240,220],[3,6,3,4,117,128,48,9,2385,240],[4,6,3,4,117,128,48,9,2385,240]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":4800,"required":4456,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":128,"required":117,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":2385,"volumeL":240},"values":{"coolingW":128,"drawW":48,"energyWh":4800,"heatW":117,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-176,"provided":4000,"required":4176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":112,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":1980,"volumeL":168},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":96,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,96,0,0,6,1830,156],[2,6,2,2,114,112,16,6,2300,196],[3,6,3,3,117,168,24,9,2490,210],[4,6,3,3,117,168,24,9,2490,210]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":536,"provided":4800,"required":4264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":51,"provided":168,"required":117,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2490,"volumeL":210},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":117,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-128,"provided":4480,"required":4608,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":500,"required":560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":160,"required":136,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":5},"resources":{"capitalGBP":2700,"volumeL":148},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":136,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,136,0,0,16,2550,88],[2,4,2,5,136,160,60,16,2700,148],[3,5,3,5,174,160,60,24,3375,176],[4,5,3,6,174,192,72,24,3405,188],[5,5,3,6,174,192,72,24,3405,188]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":832,"provided":5600,"required":4768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":750,"required":572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":192,"required":174,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":6},"resources":{"capitalGBP":3405,"volumeL":188},"values":{"coolingW":192,"drawW":72,"energyWh":5600,"heatW":174,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":4480,"required":4320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":168,"required":136,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2775,"volumeL":106},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":136,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,136,0,0,16,2550,88],[2,4,2,3,136,168,24,16,2775,106],[3,4,3,3,144,168,24,24,2850,118],[4,4,3,3,144,168,24,24,2850,118]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":4480,"required":4384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":168,"required":144,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2850,"volumeL":118},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":144,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":4480,"required":4432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":128,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":4},"resources":{"capitalGBP":2750,"volumeL":128},"values":{"coolingW":128,"drawW":48,"energyWh":4480,"heatW":126,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,126,0,0,6,2630,80],[2,4,2,4,126,128,48,6,2750,128],[3,4,3,4,129,128,48,9,2865,136],[4,4,3,5,129,160,60,9,2895,148],[5,5,3,5,159,160,60,9,3495,164],[6,5,3,5,159,160,60,9,3495,164]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1048,"provided":5600,"required":4552,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":750,"required":560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":160,"required":159,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":5},"resources":{"capitalGBP":3495,"volumeL":164},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":159,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":240,"provided":4480,"required":4240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":168,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":2,"coolers":3},"resources":{"capitalGBP":2855,"volumeL":98},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":126,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,2,0,126,0,0,6,2630,80],[2,4,2,3,126,168,24,6,2855,98],[3,4,3,3,129,168,24,9,2970,106],[4,4,3,3,129,168,24,9,2970,106]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":216,"provided":4480,"required":4264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":168,"required":129,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2970,"volumeL":106},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":129,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h12-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-624,"provided":6000,"required":6624,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":120,"required":88,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":3},"resources":{"capitalGBP":2160,"volumeL":228},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":88,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,88,0,0,16,2070,192],[2,7,2,3,100,120,36,16,2480,256],[3,7,3,3,108,120,36,24,2555,268],[4,7,3,3,108,120,36,24,2555,268]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":280,"provided":7000,"required":6720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":120,"required":108,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":3},"resources":{"capitalGBP":2555,"volumeL":268},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":108,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-384,"provided":6000,"required":6384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":140,"required":88,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":2},"resources":{"capitalGBP":2220,"volumeL":204},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":88,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,88,0,0,16,2070,192],[2,7,2,2,100,140,16,16,2540,232],[3,7,3,2,108,140,16,24,2615,244],[4,7,3,2,108,140,16,24,2615,244]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":7000,"required":6480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":140,"required":108,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":2},"resources":{"capitalGBP":2615,"volumeL":244},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":108,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-360,"provided":6000,"required":6360,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":80,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":2},"resources":{"capitalGBP":2210,"volumeL":208},"values":{"coolingW":80,"drawW":24,"energyWh":6000,"heatW":78,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,78,0,0,6,2150,184],[2,7,2,2,90,80,24,6,2530,236],[3,7,3,3,93,120,36,9,2675,256],[4,7,3,3,93,120,36,9,2675,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":460,"provided":7000,"required":6540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":120,"required":93,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":3},"resources":{"capitalGBP":2675,"volumeL":256},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":93,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-264,"provided":6000,"required":6264,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":62,"provided":140,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":2},"resources":{"capitalGBP":2300,"volumeL":196},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":78,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,78,0,0,6,2150,184],[2,7,2,2,90,140,16,6,2620,224],[3,7,3,2,93,140,16,9,2735,232],[4,7,3,2,93,140,16,9,2735,232]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":700,"provided":7000,"required":6300,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":47,"provided":140,"required":93,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":2},"resources":{"capitalGBP":2735,"volumeL":232},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":93,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":376,"provided":7000,"required":6624,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":120,"required":116,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":3},"resources":{"capitalGBP":3240,"volumeL":140},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":116,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,116,0,0,16,3150,104],[2,5,2,3,116,120,36,16,3240,140],[3,5,3,3,124,120,36,24,3315,152],[4,5,3,4,124,160,48,24,3345,164],[5,5,3,4,124,160,48,24,3345,164]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":136,"provided":7000,"required":6864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":160,"required":124,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":4},"resources":{"capitalGBP":3345,"volumeL":164},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":124,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":140,"required":116,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":3300,"volumeL":116},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":116,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,116,0,0,16,3150,104],[2,5,2,2,116,140,16,16,3300,116],[3,5,3,2,124,140,16,24,3375,128],[4,5,3,2,124,140,16,24,3375,128]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":7000,"required":6480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":140,"required":124,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":3375,"volumeL":128},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":124,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":496,"provided":7000,"required":6504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":120,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":3},"resources":{"capitalGBP":3320,"volumeL":132},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":106,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,106,0,0,6,3230,96],[2,5,2,3,106,120,36,6,3320,132],[3,5,3,3,109,120,36,9,3435,140],[4,5,3,3,109,120,36,9,3435,140]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":460,"provided":7000,"required":6540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":120,"required":109,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":3435,"volumeL":140},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":109,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":736,"provided":7000,"required":6264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":140,"required":106,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":2,"coolers":2},"resources":{"capitalGBP":3380,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":106,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,2,0,106,0,0,6,3230,96],[2,5,2,2,106,140,16,6,3380,108],[3,5,3,2,109,140,16,9,3495,116],[4,5,3,2,109,140,16,9,3495,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":700,"provided":7000,"required":6300,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":140,"required":109,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":3495,"volumeL":116},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":109,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h12-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":6400,"required":6912,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":500,"required":560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":160,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":5},"resources":{"capitalGBP":2860,"volumeL":308},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":160,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,160,0,0,16,2710,248],[2,8,2,5,160,160,60,16,2860,308],[3,9,3,5,186,160,60,24,3255,348],[4,9,3,6,186,192,72,24,3285,360],[5,9,3,6,186,192,72,24,3285,360]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":7200,"required":7152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":750,"required":572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":192,"required":186,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":6},"resources":{"capitalGBP":3285,"volumeL":360},"values":{"coolingW":192,"drawW":72,"energyWh":7200,"heatW":186,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":6400,"required":6480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":168,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":2935,"volumeL":266},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":160,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,160,0,0,16,2710,248],[2,8,2,3,160,168,24,16,2935,266],[3,9,3,3,186,168,24,24,3330,306],[4,9,3,4,186,224,32,24,3405,312],[5,9,3,4,186,224,32,24,3405,312]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":7200,"required":6672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":750,"required":532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":224,"required":186,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":4},"resources":{"capitalGBP":3405,"volumeL":312},"values":{"coolingW":224,"drawW":32,"energyWh":7200,"heatW":186,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-392,"provided":6400,"required":6792,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":500,"required":560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":160,"required":150,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":5},"resources":{"capitalGBP":2940,"volumeL":300},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":150,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,150,0,0,6,2790,240],[2,8,2,5,150,160,60,6,2940,300],[3,9,3,5,171,160,60,9,3375,336],[4,9,3,6,171,192,72,9,3405,348],[5,9,3,6,171,192,72,9,3405,348]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":228,"provided":7200,"required":6972,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":750,"required":572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":192,"required":171,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":6},"resources":{"capitalGBP":3405,"volumeL":348},"values":{"coolingW":192,"drawW":72,"energyWh":7200,"heatW":171,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":6400,"required":6360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":168,"required":150,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":3015,"volumeL":258},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":150,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,150,0,0,6,2790,240],[2,8,2,3,150,168,24,6,3015,258],[3,8,3,3,153,168,24,9,3130,266],[4,8,3,3,153,168,24,9,3130,266]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":4,"provided":6400,"required":6396,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":168,"required":153,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":3,"coolers":3},"resources":{"capitalGBP":3130,"volumeL":266},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":153,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-480,"provided":6720,"required":7200,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":500,"required":584,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":224,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":7},"resources":{"capitalGBP":3960,"volumeL":204},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,196,0,0,16,3750,120],[2,6,2,7,196,224,84,16,3960,204],[3,7,3,7,234,224,84,24,4635,232],[4,7,3,8,234,256,96,24,4665,244],[5,7,3,8,234,256,96,24,4665,244]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":400,"provided":7840,"required":7440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":750,"required":596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":256,"required":234,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":8},"resources":{"capitalGBP":4665,"volumeL":244},"values":{"coolingW":256,"drawW":96,"energyWh":7840,"heatW":234,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":6720,"required":6576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":500,"required":532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":224,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":4050,"volumeL":144},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,196,0,0,16,3750,120],[2,6,2,4,196,224,32,16,4050,144],[3,6,3,4,204,224,32,24,4125,156],[4,6,3,4,204,224,32,24,4125,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":6720,"required":6672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":750,"required":532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":224,"required":204,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":4125,"volumeL":156},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":204,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-216,"provided":6720,"required":6936,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":500,"required":572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":192,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":6},"resources":{"capitalGBP":4010,"volumeL":184},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,186,0,0,6,3830,112],[2,6,2,6,186,192,72,6,4010,184],[3,7,3,6,219,192,72,9,4725,208],[4,7,3,7,219,224,84,9,4755,220],[5,7,3,7,219,224,84,9,4755,220]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":724,"provided":7840,"required":7116,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":750,"required":584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":224,"required":219,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":7},"resources":{"capitalGBP":4755,"volumeL":220},"values":{"coolingW":224,"drawW":84,"energyWh":7840,"heatW":219,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":6720,"required":6456,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":500,"required":532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":224,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":4130,"volumeL":136},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,186,0,0,6,3830,112],[2,6,2,4,186,224,32,6,4130,136],[3,6,3,4,189,224,32,9,4245,144],[4,6,3,4,189,224,32,9,4245,144]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":228,"provided":6720,"required":6492,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":750,"required":532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":224,"required":189,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":4245,"volumeL":144},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":189,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p500-h16-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-832,"provided":8000,"required":8832,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":2800,"volumeL":284},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":112,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,112,0,0,16,2710,248],[2,9,2,3,124,120,36,16,3120,312],[3,9,3,4,132,160,48,24,3225,336],[4,10,3,4,144,160,48,24,3545,364],[5,10,3,4,144,160,48,24,3545,364]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":10000,"required":9152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":160,"required":144,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":3,"coolers":4},"resources":{"capitalGBP":3545,"volumeL":364},"values":{"coolingW":160,"drawW":48,"energyWh":10000,"heatW":144,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":8000,"required":8512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":140,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":2},"resources":{"capitalGBP":2860,"volumeL":260},"values":{"coolingW":140,"drawW":16,"energyWh":8000,"heatW":112,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,112,0,0,16,2710,248],[2,9,2,2,124,140,16,16,3180,288],[3,9,3,2,132,140,16,24,3255,300],[4,9,3,2,132,140,16,24,3255,300]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":360,"provided":9000,"required":8640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":2},"resources":{"capitalGBP":3255,"volumeL":300},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":132,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-672,"provided":8000,"required":8672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":500,"required":536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":120,"required":102,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":3},"resources":{"capitalGBP":2880,"volumeL":276},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":102,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,102,0,0,6,2790,240],[2,9,2,3,114,120,36,6,3200,304],[3,9,3,3,117,120,36,9,3315,312],[4,9,3,3,117,120,36,9,3315,312]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":280,"provided":9000,"required":8720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":750,"required":536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":120,"required":117,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":3},"resources":{"capitalGBP":3315,"volumeL":312},"values":{"coolingW":120,"drawW":36,"energyWh":9000,"heatW":117,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-352,"provided":8000,"required":8352,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":140,"required":102,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":2},"resources":{"capitalGBP":2940,"volumeL":252},"values":{"coolingW":140,"drawW":16,"energyWh":8000,"heatW":102,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,102,0,0,6,2790,240],[2,9,2,2,114,140,16,6,3260,280],[3,9,3,2,117,140,16,9,3375,288],[4,9,3,2,117,140,16,9,3375,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":600,"provided":9000,"required":8400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":140,"required":117,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":2},"resources":{"capitalGBP":3375,"volumeL":288},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":117,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-624,"provided":8400,"required":9024,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":160,"required":136,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":3870,"volumeL":168},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":136,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,136,0,0,16,3750,120],[2,6,2,4,136,160,48,16,3870,168],[3,7,3,4,164,160,48,24,4545,196],[4,7,3,5,164,200,60,24,4575,208],[5,7,3,5,164,200,60,24,4575,208]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":9800,"required":9344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":750,"required":560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":200,"required":164,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":5},"resources":{"capitalGBP":4575,"volumeL":208},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":164,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":8400,"required":8512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":140,"required":136,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":2},"resources":{"capitalGBP":3900,"volumeL":132},"values":{"coolingW":140,"drawW":16,"energyWh":8400,"heatW":136,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,136,0,0,16,3750,120],[2,6,2,2,136,140,16,16,3900,132],[3,7,3,2,164,140,16,24,4575,160],[4,7,3,3,164,210,24,24,4650,166],[5,7,3,3,164,210,24,24,4650,166]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1032,"provided":9800,"required":8768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":210,"required":164,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":3},"resources":{"capitalGBP":4650,"volumeL":166},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":164,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-464,"provided":8400,"required":8864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":160,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":4},"resources":{"capitalGBP":3950,"volumeL":160},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":126,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,126,0,0,6,3830,112],[2,6,2,4,126,160,48,6,3950,160],[3,7,3,4,149,160,48,9,4665,184],[4,7,3,4,149,160,48,9,4665,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":9800,"required":8912,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":160,"required":149,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":3,"coolers":4},"resources":{"capitalGBP":4665,"volumeL":184},"values":{"coolingW":160,"drawW":48,"energyWh":9800,"heatW":149,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":8400,"required":8352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":500,"required":516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":140,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":2,"coolers":2},"resources":{"capitalGBP":3980,"volumeL":124},"values":{"coolingW":140,"drawW":16,"energyWh":8400,"heatW":126,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,2,0,126,0,0,6,3830,112],[2,6,2,2,126,140,16,6,3980,124],[3,6,3,2,129,140,16,9,4095,132],[4,6,3,2,129,140,16,9,4095,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":8400,"required":8400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":750,"required":516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":140,"required":129,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":3,"coolers":2},"resources":{"capitalGBP":4095,"volumeL":132},"values":{"coolingW":140,"drawW":16,"energyWh":8400,"heatW":129,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":16,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p500-h16-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1600,"provided":8000,"required":9600,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":500,"required":584,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":224,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":2,"coolers":7},"resources":{"capitalGBP":3560,"volumeL":388},"values":{"coolingW":224,"drawW":84,"energyWh":8000,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,2,0,196,0,0,16,3350,304],[2,11,2,7,214,224,84,16,3880,416],[3,12,3,7,240,224,84,24,4275,456],[4,13,3,8,258,256,96,24,4625,496],[5,13,3,9,258,288,108,24,4655,508],[6,13,3,9,258,288,108,24,4655,508]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":10400,"required":10112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":750,"required":608,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":288,"required":258,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":3,"coolers":9},"resources":{"capitalGBP":4655,"volumeL":508},"values":{"coolingW":288,"drawW":108,"energyWh":10400,"heatW":258,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":8000,"required":8768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":500,"required":532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":224,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":2,"coolers":4},"resources":{"capitalGBP":3650,"volumeL":328},"values":{"coolingW":224,"drawW":32,"energyWh":8000,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,2,0,196,0,0,16,3350,304],[2,11,2,4,214,224,32,16,3970,356],[3,11,3,4,222,224,32,24,4045,368],[4,12,3,4,240,224,32,24,4365,396],[5,12,3,5,240,280,40,24,4440,402],[6,12,3,5,240,280,40,24,4440,402]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":576,"provided":9600,"required":9024,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":750,"required":540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":280,"required":240,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":3,"coolers":5},"resources":{"capitalGBP":4440,"volumeL":402},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":240,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1248,"provided":8000,"required":9248,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":500,"required":572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":192,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":2,"coolers":6},"resources":{"capitalGBP":3610,"volumeL":368},"values":{"coolingW":192,"drawW":72,"energyWh":8000,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,2,0,186,0,0,6,3430,296],[2,11,2,6,204,192,72,6,3930,396],[3,12,3,7,225,224,84,9,4395,444],[4,12,3,8,225,256,96,9,4425,456],[5,13,3,8,243,256,96,9,4745,484],[6,13,3,8,243,256,96,9,4745,484]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":720,"provided":10400,"required":9680,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":750,"required":596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":256,"required":243,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":3,"coolers":8},"resources":{"capitalGBP":4745,"volumeL":484},"values":{"coolingW":256,"drawW":96,"energyWh":10400,"heatW":243,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-608,"provided":8000,"required":8608,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":500,"required":532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":224,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":2,"coolers":4},"resources":{"capitalGBP":3730,"volumeL":320},"values":{"coolingW":224,"drawW":32,"energyWh":8000,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,2,0,186,0,0,6,3430,296],[2,11,2,4,204,224,32,6,4050,348],[3,11,3,4,207,224,32,9,4165,356],[4,11,3,4,207,224,32,9,4165,356]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":8800,"required":8656,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":750,"required":532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":224,"required":207,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":3,"coolers":4},"resources":{"capitalGBP":4165,"volumeL":356},"values":{"coolingW":224,"drawW":32,"energyWh":8800,"heatW":207,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-832,"provided":8960,"required":9792,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":500,"required":596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":256,"required":256,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":8},"resources":{"capitalGBP":5190,"volumeL":248},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":256,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,256,0,0,16,4950,152],[2,8,2,8,256,256,96,16,5190,248],[3,9,3,8,294,256,96,24,5865,276],[4,9,3,10,294,320,120,24,5925,300],[5,10,3,10,324,320,120,24,6525,316],[6,10,3,11,324,352,132,24,6555,328],[7,10,3,11,324,352,132,24,6555,328]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":11200,"required":10496,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":750,"required":632,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":352,"required":324,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":3,"coolers":11},"resources":{"capitalGBP":6555,"volumeL":328},"values":{"coolingW":352,"drawW":132,"energyWh":11200,"heatW":324,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":8960,"required":8896,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":500,"required":540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":5},"resources":{"capitalGBP":5325,"volumeL":182},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":256,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,256,0,0,16,4950,152],[2,8,2,5,256,280,40,16,5325,182],[3,8,3,5,264,280,40,24,5400,194],[4,9,3,5,294,280,40,24,6000,210],[5,9,3,6,294,336,48,24,6075,216],[6,9,3,6,294,336,48,24,6075,216]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":10080,"required":9152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":336,"required":294,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":6},"resources":{"capitalGBP":6075,"volumeL":216},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":294,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-672,"provided":8960,"required":9632,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":500,"required":596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":256,"required":246,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":8},"resources":{"capitalGBP":5270,"volumeL":240},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":246,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,246,0,0,6,5030,144],[2,8,2,8,246,256,96,6,5270,240],[3,9,3,8,279,256,96,9,5985,264],[4,9,3,9,279,288,108,9,6015,276],[5,9,3,9,279,288,108,9,6015,276]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":10080,"required":9872,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":750,"required":608,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":288,"required":279,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":3,"coolers":9},"resources":{"capitalGBP":6015,"volumeL":276},"values":{"coolingW":288,"drawW":108,"energyWh":10080,"heatW":279,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":224,"provided":8960,"required":8736,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":500,"required":540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":280,"required":246,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":2,"coolers":5},"resources":{"capitalGBP":5405,"volumeL":174},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":246,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,2,0,246,0,0,6,5030,144],[2,8,2,5,246,280,40,6,5405,174],[3,8,3,5,249,280,40,9,5520,182],[4,8,3,5,249,280,40,9,5520,182]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":176,"provided":8960,"required":8784,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":750,"required":540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":280,"required":249,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":3,"coolers":5},"resources":{"capitalGBP":5520,"volumeL":182},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":249,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":24,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h24-mild","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1536,"provided":12000,"required":13536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":160,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":2,"coolers":4},"resources":{"capitalGBP":4110,"volumeL":408},"values":{"coolingW":160,"drawW":48,"energyWh":12000,"heatW":160,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,2,0,160,0,0,16,3990,360],[2,13,2,4,172,160,48,16,4430,436],[3,14,3,5,192,200,60,24,4855,488],[4,15,3,5,204,200,60,24,5175,516],[5,15,3,6,204,240,72,24,5205,528],[6,15,3,6,204,240,72,24,5205,528]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":696,"provided":15000,"required":14304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":750,"required":572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":240,"required":204,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":3,"coolers":6},"resources":{"capitalGBP":5205,"volumeL":528},"values":{"coolingW":240,"drawW":72,"energyWh":15000,"heatW":204,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-960,"provided":12000,"required":12960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":210,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":2,"coolers":3},"resources":{"capitalGBP":4215,"volumeL":378},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":160,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,2,0,160,0,0,16,3990,360],[2,13,2,3,172,210,24,16,4535,406],[3,13,3,3,180,210,24,24,4610,418],[4,14,3,3,192,210,24,24,4930,446],[5,14,3,3,192,210,24,24,4930,446]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":14000,"required":13152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":210,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":3,"coolers":3},"resources":{"capitalGBP":4930,"volumeL":446},"values":{"coolingW":210,"drawW":24,"energyWh":14000,"heatW":192,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1296,"provided":12000,"required":13296,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":160,"required":150,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":2,"coolers":4},"resources":{"capitalGBP":4190,"volumeL":400},"values":{"coolingW":160,"drawW":48,"energyWh":12000,"heatW":150,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,2,0,150,0,0,6,4070,352],[2,13,2,4,162,160,48,6,4510,428],[3,14,3,5,177,200,60,9,4975,476],[4,14,3,5,177,200,60,9,4975,476]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":14000,"required":13656,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":750,"required":560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":200,"required":177,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":3,"coolers":5},"resources":{"capitalGBP":4975,"volumeL":476},"values":{"coolingW":200,"drawW":60,"energyWh":14000,"heatW":177,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-720,"provided":12000,"required":12720,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":210,"required":150,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":2,"coolers":3},"resources":{"capitalGBP":4295,"volumeL":370},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":150,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,2,0,150,0,0,6,4070,352],[2,13,2,3,162,210,24,6,4615,398],[3,13,3,3,165,210,24,9,4730,406],[4,13,3,3,165,210,24,9,4730,406]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":13000,"required":12792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":210,"required":165,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":3,"coolers":3},"resources":{"capitalGBP":4730,"volumeL":406},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":165,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1224,"provided":12600,"required":13824,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":500,"required":560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":200,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":2,"coolers":5},"resources":{"capitalGBP":5700,"volumeL":228},"values":{"coolingW":200,"drawW":60,"energyWh":12600,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,2,0,196,0,0,16,5550,168],[2,9,2,5,196,200,60,16,5700,228],[3,10,3,5,224,200,60,24,6375,256],[4,11,3,6,244,240,72,24,7005,284],[5,11,3,7,244,280,84,24,7035,296],[6,11,3,7,244,280,84,24,7035,296]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":15400,"required":14592,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":750,"required":584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":280,"required":244,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":3,"coolers":7},"resources":{"capitalGBP":7035,"volumeL":296},"values":{"coolingW":280,"drawW":84,"energyWh":15400,"heatW":244,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-360,"provided":12600,"required":12960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":210,"required":196,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":2,"coolers":3},"resources":{"capitalGBP":5775,"volumeL":186},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":196,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,2,0,196,0,0,16,5550,168],[2,9,2,3,196,210,24,16,5775,186],[3,10,3,3,224,210,24,24,6450,214],[4,10,3,4,224,280,32,24,6525,220],[5,10,3,4,224,280,32,24,6525,220]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":14000,"required":13344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":750,"required":532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":280,"required":224,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":3,"coolers":4},"resources":{"capitalGBP":6525,"volumeL":220},"values":{"coolingW":280,"drawW":32,"energyWh":14000,"heatW":224,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-984,"provided":12600,"required":13584,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":500,"required":560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":200,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":2,"coolers":5},"resources":{"capitalGBP":5780,"volumeL":220},"values":{"coolingW":200,"drawW":60,"energyWh":12600,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,2,0,186,0,0,6,5630,160],[2,9,2,5,186,200,60,6,5780,220],[3,10,3,5,209,200,60,9,6495,244],[4,10,3,6,209,240,72,9,6525,256],[5,10,3,6,209,240,72,9,6525,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":56,"provided":14000,"required":13944,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":750,"required":572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":240,"required":209,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":3,"coolers":6},"resources":{"capitalGBP":6525,"volumeL":256},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":209,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-120,"provided":12600,"required":12720,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":500,"required":524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":210,"required":186,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":2,"coolers":3},"resources":{"capitalGBP":5855,"volumeL":178},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":186,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,2,0,186,0,0,6,5630,160],[2,9,2,3,186,210,24,6,5855,178],[3,10,3,3,209,210,24,9,6570,202],[4,10,3,3,209,210,24,9,6570,202]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1208,"provided":14000,"required":12792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":750,"required":524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":210,"required":209,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":3,"coolers":3},"resources":{"capitalGBP":6570,"volumeL":202},"values":{"coolingW":210,"drawW":24,"energyWh":14000,"heatW":209,"lossW":9,"outputW":750}}}]},{"condition":"hot","durationHours":24,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p500-h24-hot","powerW":500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":21,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2976,"provided":12000,"required":14976,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":500,"required":608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":288,"required":286,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":2,"coolers":9},"resources":{"capitalGBP":5220,"volumeL":552},"values":{"coolingW":288,"drawW":108,"energyWh":12000,"heatW":286,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,2,0,286,0,0,16,4950,444],[2,16,2,9,304,288,108,16,5540,580],[3,19,3,10,366,320,120,24,6605,688],[4,20,3,12,384,384,144,24,6985,740],[5,21,3,12,402,384,144,24,7305,768],[6,21,3,13,402,416,156,24,7335,780],[7,21,3,13,402,416,156,24,7335,780]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":16800,"required":16320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":94,"provided":750,"required":656,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":416,"required":402,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":21,"converters":3,"coolers":13},"resources":{"capitalGBP":7335,"volumeL":780},"values":{"coolingW":416,"drawW":156,"energyWh":16800,"heatW":402,"lossW":24,"outputW":750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1536,"provided":12000,"required":13536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":336,"required":286,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":2,"coolers":6},"resources":{"capitalGBP":5400,"volumeL":480},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":286,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,2,0,286,0,0,16,4950,444],[2,16,2,6,304,336,48,16,5720,508],[3,17,3,6,330,336,48,24,6115,548],[4,18,3,6,348,336,48,24,6435,576],[5,18,3,7,348,392,56,24,6510,582],[6,18,3,7,348,392,56,24,6510,582]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":14400,"required":13920,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":750,"required":556,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":392,"required":348,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":3,"coolers":7},"resources":{"capitalGBP":6510,"volumeL":582},"values":{"coolingW":392,"drawW":56,"energyWh":14400,"heatW":348,"lossW":24,"outputW":750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2736,"provided":12000,"required":14736,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":500,"required":608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":288,"required":276,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":2,"coolers":9},"resources":{"capitalGBP":5300,"volumeL":544},"values":{"coolingW":288,"drawW":108,"energyWh":12000,"heatW":276,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,2,0,276,0,0,6,5030,436],[2,16,2,9,294,288,108,6,5620,572],[3,19,3,10,351,320,120,9,6725,676],[4,19,3,11,351,352,132,9,6755,688],[5,20,3,11,369,352,132,9,7075,716],[6,20,3,12,369,384,144,9,7105,728],[7,20,3,12,369,384,144,9,7105,728]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":328,"provided":16000,"required":15672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":750,"required":644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":384,"required":369,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":3,"coolers":12},"resources":{"capitalGBP":7105,"volumeL":728},"values":{"coolingW":384,"drawW":144,"energyWh":16000,"heatW":369,"lossW":9,"outputW":750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1104,"provided":12000,"required":13104,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":500,"required":540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":280,"required":276,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":2,"coolers":5},"resources":{"capitalGBP":5405,"volumeL":466},"values":{"coolingW":280,"drawW":40,"energyWh":12000,"heatW":276,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,2,0,276,0,0,6,5030,436],[2,16,2,5,294,280,40,6,5725,494],[3,17,3,6,315,336,48,9,6235,536],[4,17,3,6,315,336,48,9,6235,536]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":13600,"required":13368,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":750,"required":548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":336,"required":315,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":3,"coolers":6},"resources":{"capitalGBP":6235,"volumeL":536},"values":{"coolingW":336,"drawW":48,"energyWh":13600,"heatW":315,"lossW":9,"outputW":750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3232,"provided":12320,"required":15552,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":500,"required":632,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":352,"required":346,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":2,"coolers":11},"resources":{"capitalGBP":7080,"volumeL":332},"values":{"coolingW":352,"drawW":132,"energyWh":12320,"heatW":346,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,2,0,346,0,0,16,6750,200],[2,12,2,11,376,352,132,16,7680,348],[3,14,3,12,444,384,144,24,8985,404],[4,15,3,14,474,448,168,24,9645,444],[5,15,3,15,474,480,180,24,9675,456],[6,16,3,15,504,480,180,24,10275,472],[7,16,3,16,504,512,192,24,10305,484],[8,16,3,16,504,512,192,24,10305,484]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":736,"provided":17920,"required":17184,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":750,"required":692,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":512,"required":504,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":3,"coolers":16},"resources":{"capitalGBP":10305,"volumeL":484},"values":{"coolingW":512,"drawW":192,"energyWh":17920,"heatW":504,"lossW":24,"outputW":750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1408,"provided":12320,"required":13728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":500,"required":556,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":392,"required":346,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":2,"coolers":7},"resources":{"capitalGBP":7275,"volumeL":242},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":346,"lossW":16,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,2,0,346,0,0,16,6750,200],[2,12,2,7,376,392,56,16,7875,258],[3,13,3,7,414,392,56,24,8550,286],[4,13,3,8,414,448,64,24,8625,292],[5,13,3,8,414,448,64,24,8625,292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":448,"provided":14560,"required":14112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":750,"required":564,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":448,"required":414,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":3,"coolers":8},"resources":{"capitalGBP":8625,"volumeL":292},"values":{"coolingW":448,"drawW":64,"energyWh":14560,"heatW":414,"lossW":24,"outputW":750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2992,"provided":12320,"required":15312,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":500,"required":632,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":352,"required":336,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":2,"coolers":11},"resources":{"capitalGBP":7160,"volumeL":324},"values":{"coolingW":352,"drawW":132,"energyWh":12320,"heatW":336,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,2,0,336,0,0,6,6830,192],[2,11,2,11,336,352,132,6,7160,324],[3,14,3,11,429,352,132,9,9075,380],[4,14,3,14,429,448,168,9,9165,416],[5,15,3,14,459,448,168,9,9765,432],[6,15,3,15,459,480,180,9,9795,444],[7,15,3,15,459,480,180,9,9795,444]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":16800,"required":16536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":70,"provided":750,"required":680,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":480,"required":459,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":3,"coolers":15},"resources":{"capitalGBP":9795,"volumeL":444},"values":{"coolingW":480,"drawW":180,"energyWh":16800,"heatW":459,"lossW":9,"outputW":750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":3,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-976,"provided":12320,"required":13296,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":500,"required":548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":336,"required":336,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":2,"coolers":6},"resources":{"capitalGBP":7280,"volumeL":228},"values":{"coolingW":336,"drawW":48,"energyWh":12320,"heatW":336,"lossW":6,"outputW":500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,2,0,336,0,0,6,6830,192],[2,11,2,6,336,336,48,6,7280,228],[3,12,3,6,369,336,48,9,7995,252],[4,12,3,7,369,392,56,9,8070,258],[5,13,3,7,399,392,56,9,8670,274],[6,13,3,8,399,448,64,9,8745,280],[7,13,3,8,399,448,64,9,8745,280]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":14560,"required":13752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":750,"required":564,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":448,"required":399,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":3,"coolers":8},"resources":{"capitalGBP":8745,"volumeL":280},"values":{"coolingW":448,"drawW":64,"energyWh":14560,"heatW":399,"lossW":9,"outputW":750}}}]},{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p750-h2-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":404,"provided":2000,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":80,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":925,"volumeL":116},"values":{"coolingW":80,"drawW":24,"energyWh":2000,"heatW":48,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,48,0,0,24,865,92],[2,2,3,2,48,80,24,24,925,116],[3,2,4,2,56,80,24,32,1000,128],[4,2,4,2,56,80,24,32,1000,128]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":388,"provided":2000,"required":1612,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1000,"volumeL":128},"values":{"coolingW":80,"drawW":24,"energyWh":2000,"heatW":56,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":436,"provided":2000,"required":1564,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":70,"required":48,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":940,"volumeL":98},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":48,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,48,0,0,24,865,92],[2,2,3,1,48,70,8,24,940,98],[3,2,4,1,56,70,8,32,1015,110],[4,2,4,1,56,70,8,32,1015,110]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":420,"provided":2000,"required":1580,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1000,"required":758,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1015,"volumeL":110},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":56,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":458,"provided":2000,"required":1542,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":750,"required":762,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":40,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1015,"volumeL":92},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":33,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,33,0,0,9,985,80],[2,2,3,1,33,40,12,9,1015,92],[3,2,4,1,36,40,12,12,1130,100],[4,2,4,1,36,40,12,12,1130,100]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":452,"provided":2000,"required":1548,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":238,"provided":1000,"required":762,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":40,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1130,"volumeL":100},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":36,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":466,"provided":2000,"required":1534,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":70,"required":33,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1060,"volumeL":86},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":33,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,33,0,0,9,985,80],[2,2,3,1,33,70,8,9,1060,86],[3,2,4,1,36,70,8,12,1175,94],[4,2,4,1,36,70,8,12,1175,94]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":460,"provided":2000,"required":1540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1000,"required":758,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":70,"required":36,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1175,"volumeL":94},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":36,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1204,"provided":2800,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":80,"required":64,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1485,"volumeL":92},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":64,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,64,0,0,24,1425,68],[2,2,3,2,64,80,24,24,1485,92],[3,2,4,2,72,80,24,32,1560,104],[4,2,4,2,72,80,24,32,1560,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1188,"provided":2800,"required":1612,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1560,"volumeL":104},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":72,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1236,"provided":2800,"required":1564,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":70,"required":64,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1500,"volumeL":74},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":64,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,64,0,0,24,1425,68],[2,2,3,1,64,70,8,24,1500,74],[3,2,4,1,72,70,8,32,1575,86],[4,2,4,2,72,140,16,32,1650,92],[5,2,4,2,72,140,16,32,1650,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1204,"provided":2800,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1650,"volumeL":92},"values":{"coolingW":140,"drawW":16,"energyWh":2800,"heatW":72,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1234,"provided":2800,"required":1566,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":80,"required":49,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1605,"volumeL":80},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":49,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,49,0,0,9,1545,56],[2,2,3,2,49,80,24,9,1605,80],[3,2,4,2,52,80,24,12,1720,88],[4,2,4,2,52,80,24,12,1720,88]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1228,"provided":2800,"required":1572,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":80,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1720,"volumeL":88},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":52,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1266,"provided":2800,"required":1534,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":70,"required":49,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1620,"volumeL":62},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":49,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,49,0,0,9,1545,56],[2,2,3,1,49,70,8,9,1620,62],[3,2,4,1,52,70,8,12,1735,70],[4,2,4,1,52,70,8,12,1735,70]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1260,"provided":2800,"required":1540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1000,"required":758,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":70,"required":52,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1735,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":52,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h2-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":4,"provided":1600,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":64,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":925,"volumeL":116},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":60,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,60,0,0,24,865,92],[2,2,3,2,60,64,24,24,925,116],[3,2,4,2,68,64,24,32,1000,128],[4,3,4,3,86,96,36,32,1350,168],[5,3,4,3,86,96,36,32,1350,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":764,"provided":2400,"required":1636,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":96,"required":86,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":1350,"volumeL":168},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":86,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":20,"provided":1600,"required":1580,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":112,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1015,"volumeL":104},"values":{"coolingW":112,"drawW":16,"energyWh":1600,"heatW":60,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,60,0,0,24,865,92],[2,2,3,2,60,112,16,24,1015,104],[3,2,4,2,68,112,16,32,1090,116],[4,2,4,2,68,112,16,32,1090,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":4,"provided":1600,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":112,"required":68,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1090,"volumeL":116},"values":{"coolingW":112,"drawW":16,"energyWh":1600,"heatW":68,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":34,"provided":1600,"required":1566,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":64,"required":45,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1045,"volumeL":104},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":45,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,45,0,0,9,985,80],[2,2,3,2,45,64,24,9,1045,104],[3,2,4,2,48,64,24,12,1160,112],[4,2,4,2,48,64,24,12,1160,112]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":28,"provided":1600,"required":1572,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":64,"required":48,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1160,"volumeL":112},"values":{"coolingW":64,"drawW":24,"energyWh":1600,"heatW":48,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":66,"provided":1600,"required":1534,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":56,"required":45,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":1},"resources":{"capitalGBP":1060,"volumeL":86},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":45,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,45,0,0,9,985,80],[2,2,3,1,45,56,8,9,1060,86],[3,2,4,1,48,56,8,12,1175,94],[4,2,4,1,48,56,8,12,1175,94]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":60,"provided":1600,"required":1540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1000,"required":758,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":56,"required":48,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1175,"volumeL":94},"values":{"coolingW":56,"drawW":8,"energyWh":1600,"heatW":48,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":620,"provided":2240,"required":1620,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":96,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":3},"resources":{"capitalGBP":1515,"volumeL":104},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,84,0,0,24,1425,68],[2,2,3,3,84,96,36,24,1515,104],[3,2,4,3,92,96,36,32,1590,116],[4,2,4,3,92,96,36,32,1590,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":604,"provided":2240,"required":1636,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":96,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":3},"resources":{"capitalGBP":1590,"volumeL":116},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":660,"provided":2240,"required":1580,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":112,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1575,"volumeL":80},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,84,0,0,24,1425,68],[2,2,3,2,84,112,16,24,1575,80],[3,2,4,2,92,112,16,32,1650,92],[4,2,4,2,92,112,16,32,1650,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":644,"provided":2240,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":112,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1650,"volumeL":92},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":650,"provided":2240,"required":1590,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":96,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":3},"resources":{"capitalGBP":1635,"volumeL":92},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,69,0,0,9,1545,56],[2,2,3,3,69,96,36,9,1635,92],[3,2,4,3,72,96,36,12,1750,100],[4,2,4,3,72,96,36,12,1750,100]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":644,"provided":2240,"required":1596,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":96,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":3},"resources":{"capitalGBP":1750,"volumeL":100},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":72,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":690,"provided":2240,"required":1550,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":112,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":3,"coolers":2},"resources":{"capitalGBP":1695,"volumeL":68},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,3,0,69,0,0,9,1545,56],[2,2,3,2,69,112,16,9,1695,68],[3,2,4,2,72,112,16,12,1810,76],[4,2,4,2,72,112,16,12,1810,76]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":684,"provided":2240,"required":1556,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":112,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1810,"volumeL":76},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":72,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p750-h4-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-192,"provided":3000,"required":3192,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":80,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1245,"volumeL":144},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":60,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,60,0,0,24,1185,120],[2,4,3,2,72,80,24,24,1565,172],[3,4,4,2,80,80,24,32,1640,184],[4,4,4,2,80,80,24,32,1640,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":4000,"required":3224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":80,"required":80,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1640,"volumeL":184},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":80,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-128,"provided":3000,"required":3128,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":70,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":1260,"volumeL":126},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":60,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,60,0,0,24,1185,120],[2,4,3,1,72,70,8,24,1580,154],[3,4,4,2,80,140,16,32,1730,172],[4,4,4,2,80,140,16,32,1730,172]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":4000,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":140,"required":80,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1730,"volumeL":172},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":80,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-132,"provided":3000,"required":3132,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":80,"required":45,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":1365,"volumeL":132},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":45,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,45,0,0,9,1305,108],[2,4,3,2,57,80,24,9,1685,160],[3,4,4,2,60,80,24,12,1800,168],[4,4,4,2,60,80,24,12,1800,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":856,"provided":4000,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":80,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1800,"volumeL":168},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":60,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-68,"provided":3000,"required":3068,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":70,"required":45,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":1380,"volumeL":114},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":45,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,45,0,0,9,1305,108],[2,4,3,1,57,70,8,9,1700,142],[3,4,4,1,60,70,8,12,1815,150],[4,4,4,1,60,70,8,12,1815,150]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":920,"provided":4000,"required":3080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1000,"required":758,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":70,"required":60,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":1},"resources":{"capitalGBP":1815,"volumeL":150},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":60,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":960,"provided":4200,"required":3240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":3},"resources":{"capitalGBP":2115,"volumeL":120},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,84,0,0,24,2025,84],[2,3,3,3,84,120,36,24,2115,120],[3,3,4,3,92,120,36,32,2190,132],[4,3,4,3,92,120,36,32,2190,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":4200,"required":3272,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":120,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":2190,"volumeL":132},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1040,"provided":4200,"required":3160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2175,"volumeL":96},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,84,0,0,24,2025,84],[2,3,3,2,84,140,16,24,2175,96],[3,3,4,2,92,140,16,32,2250,108],[4,3,4,2,92,140,16,32,2250,108]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1008,"provided":4200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":140,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2250,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1068,"provided":4200,"required":3132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":80,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2205,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,69,0,0,9,2145,72],[2,3,3,2,69,80,24,9,2205,96],[3,3,4,2,72,80,24,12,2320,104],[4,3,4,2,72,80,24,12,2320,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1056,"provided":4200,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2320,"volumeL":104},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":72,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1132,"provided":4200,"required":3068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":1},"resources":{"capitalGBP":2220,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":4200,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,69,0,0,9,2145,72],[2,3,3,1,69,70,8,9,2220,78],[3,3,4,1,72,70,8,12,2335,86],[4,3,4,2,72,140,16,12,2410,92],[5,3,4,2,72,140,16,12,2410,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1088,"provided":4200,"required":3112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2410,"volumeL":92},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":72,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h4-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-40,"provided":3200,"required":3240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":96,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":1595,"volumeL":184},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":96,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,96,0,0,24,1505,148],[2,4,3,3,96,96,36,24,1595,184],[3,5,4,3,122,96,36,32,1990,224],[4,5,4,4,122,128,48,32,2020,236],[5,5,4,4,122,128,48,32,2020,236]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":4000,"required":3320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":128,"required":122,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":2020,"volumeL":236},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":122,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":3200,"required":3160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":112,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1655,"volumeL":160},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":96,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,96,0,0,24,1505,148],[2,4,3,2,96,112,16,24,1655,160],[3,4,4,2,104,112,16,32,1730,172],[4,4,4,2,104,112,16,32,1730,172]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":3200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":112,"required":104,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1730,"volumeL":172},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":104,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":20,"provided":3200,"required":3180,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":96,"required":81,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":1715,"volumeL":172},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":81,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,81,0,0,9,1625,136],[2,4,3,3,81,96,36,9,1715,172],[3,4,4,3,84,96,36,12,1830,180],[4,4,4,3,84,96,36,12,1830,180]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":3200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":96,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":3},"resources":{"capitalGBP":1830,"volumeL":180},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":84,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":100,"provided":3200,"required":3100,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":112,"required":81,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":1775,"volumeL":148},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":81,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,81,0,0,9,1625,136],[2,4,3,2,81,112,16,9,1775,148],[3,4,4,2,84,112,16,12,1890,156],[4,4,4,2,84,112,16,12,1890,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":88,"provided":3200,"required":3112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":112,"required":84,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1890,"volumeL":156},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":84,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":3360,"required":3288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":128,"required":114,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":4},"resources":{"capitalGBP":2145,"volumeL":132},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":114,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,114,0,0,24,2025,84],[2,3,3,4,114,128,48,24,2145,132],[3,3,4,4,122,128,48,32,2220,144],[4,3,4,4,122,128,48,32,2220,144]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":3360,"required":3320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":128,"required":122,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":4},"resources":{"capitalGBP":2220,"volumeL":144},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":122,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":168,"provided":3360,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":168,"required":114,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":3},"resources":{"capitalGBP":2250,"volumeL":102},"values":{"coolingW":168,"drawW":24,"energyWh":3360,"heatW":114,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,114,0,0,24,2025,84],[2,3,3,3,114,168,24,24,2250,102],[3,3,4,3,122,168,24,32,2325,114],[4,3,4,3,122,168,24,32,2325,114]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":136,"provided":3360,"required":3224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":168,"required":122,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":2325,"volumeL":114},"values":{"coolingW":168,"drawW":24,"energyWh":3360,"heatW":122,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":132,"provided":3360,"required":3228,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":128,"required":99,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":4},"resources":{"capitalGBP":2265,"volumeL":120},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":99,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,99,0,0,9,2145,72],[2,3,3,4,99,128,48,9,2265,120],[3,3,4,4,102,128,48,12,2380,128],[4,3,4,4,102,128,48,12,2380,128]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":120,"provided":3360,"required":3240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":128,"required":102,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":4},"resources":{"capitalGBP":2380,"volumeL":128},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":102,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":260,"provided":3360,"required":3100,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":112,"required":99,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":3,"coolers":2},"resources":{"capitalGBP":2295,"volumeL":84},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":99,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,3,0,99,0,0,9,2145,72],[2,3,3,2,99,112,16,9,2295,84],[3,3,4,2,102,112,16,12,2410,92],[4,3,4,2,102,112,16,12,2410,92]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":3360,"required":3112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":112,"required":102,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2410,"volumeL":92},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":102,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h6-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":140,"provided":5000,"required":4860,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":1915,"volumeL":212},"values":{"coolingW":120,"drawW":36,"energyWh":5000,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,84,0,0,24,1825,176],[2,5,3,3,84,120,36,24,1915,212],[3,5,4,3,92,120,36,32,1990,224],[4,5,4,3,92,120,36,32,1990,224]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":92,"provided":5000,"required":4908,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":120,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":3},"resources":{"capitalGBP":1990,"volumeL":224},"values":{"coolingW":120,"drawW":36,"energyWh":5000,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":260,"provided":5000,"required":4740,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":1975,"volumeL":188},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":84,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,84,0,0,24,1825,176],[2,5,3,2,84,140,16,24,1975,188],[3,5,4,2,92,140,16,32,2050,200],[4,5,4,2,92,140,16,32,2050,200]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":212,"provided":5000,"required":4788,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":140,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":2050,"volumeL":200},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":92,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":302,"provided":5000,"required":4698,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":80,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":2005,"volumeL":188},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,69,0,0,9,1945,164],[2,5,3,2,69,80,24,9,2005,188],[3,5,4,2,72,80,24,12,2120,196],[4,5,4,2,72,80,24,12,2120,196]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":284,"provided":5000,"required":4716,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":2120,"volumeL":196},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":72,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":398,"provided":5000,"required":4602,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":750,"required":758,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":1},"resources":{"capitalGBP":2020,"volumeL":170},"values":{"coolingW":70,"drawW":8,"energyWh":5000,"heatW":69,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,69,0,0,9,1945,164],[2,5,3,1,69,70,8,9,2020,170],[3,5,4,1,72,70,8,12,2135,178],[4,5,4,2,72,140,16,12,2210,184],[5,5,4,2,72,140,16,12,2210,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":332,"provided":5000,"required":4668,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":2210,"volumeL":184},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":72,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":740,"provided":5600,"required":4860,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":120,"required":104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2715,"volumeL":136},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":104,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,104,0,0,24,2625,100],[2,4,3,3,104,120,36,24,2715,136],[3,4,4,3,112,120,36,32,2790,148],[4,4,4,3,112,120,36,32,2790,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":692,"provided":5600,"required":4908,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":3},"resources":{"capitalGBP":2790,"volumeL":148},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":112,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":860,"provided":5600,"required":4740,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":140,"required":104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":2775,"volumeL":112},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":104,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,104,0,0,24,2625,100],[2,4,3,2,104,140,16,24,2775,112],[3,4,4,2,112,140,16,32,2850,124],[4,4,4,2,112,140,16,32,2850,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":812,"provided":5600,"required":4788,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":140,"required":112,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":2850,"volumeL":124},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":112,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":830,"provided":5600,"required":4770,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":120,"required":89,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":3},"resources":{"capitalGBP":2835,"volumeL":124},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":89,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,89,0,0,9,2745,88],[2,4,3,3,89,120,36,9,2835,124],[3,4,4,3,92,120,36,12,2950,132],[4,4,4,3,92,120,36,12,2950,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":812,"provided":5600,"required":4788,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":120,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":3},"resources":{"capitalGBP":2950,"volumeL":132},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":92,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":950,"provided":5600,"required":4650,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":51,"provided":140,"required":89,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":3,"coolers":2},"resources":{"capitalGBP":2895,"volumeL":100},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":89,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,3,0,89,0,0,9,2745,88],[2,4,3,2,89,140,16,9,2895,100],[3,4,4,2,92,140,16,12,3010,108],[4,4,4,2,92,140,16,12,3010,108]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":932,"provided":5600,"required":4668,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":140,"required":92,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":3010,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":92,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h6-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-204,"provided":4800,"required":5004,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":5},"resources":{"capitalGBP":2295,"volumeL":264},"values":{"coolingW":160,"drawW":60,"energyWh":4800,"heatW":132,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,132,0,0,24,2145,204],[2,6,3,5,132,160,60,24,2295,264],[3,7,4,5,158,160,60,32,2690,304],[4,7,4,5,158,160,60,32,2690,304]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":548,"provided":5600,"required":5052,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1000,"required":810,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":160,"required":158,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":5},"resources":{"capitalGBP":2690,"volumeL":304},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":158,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":12,"provided":4800,"required":4788,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":168,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2370,"volumeL":222},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":132,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,132,0,0,24,2145,204],[2,6,3,3,132,168,24,24,2370,222],[3,6,4,3,140,168,24,32,2445,234],[4,7,4,3,158,168,24,32,2765,262],[5,7,4,3,158,168,24,32,2765,262]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":764,"provided":5600,"required":4836,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":168,"required":158,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":3},"resources":{"capitalGBP":2765,"volumeL":262},"values":{"coolingW":168,"drawW":24,"energyWh":5600,"heatW":158,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-42,"provided":4800,"required":4842,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":128,"required":117,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":2385,"volumeL":240},"values":{"coolingW":128,"drawW":48,"energyWh":4800,"heatW":117,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,117,0,0,9,2265,192],[2,6,3,4,117,128,48,9,2385,240],[3,7,4,4,138,128,48,12,2820,276],[4,7,4,5,138,160,60,12,2850,288],[5,7,4,5,138,160,60,12,2850,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":668,"provided":5600,"required":4932,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1000,"required":810,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":160,"required":138,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":5},"resources":{"capitalGBP":2850,"volumeL":288},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":138,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":102,"provided":4800,"required":4698,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":51,"provided":168,"required":117,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2490,"volumeL":210},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":117,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,117,0,0,9,2265,192],[2,6,3,3,117,168,24,9,2490,210],[3,6,4,3,120,168,24,12,2605,218],[4,6,4,3,120,168,24,12,2605,218]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":84,"provided":4800,"required":4716,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":168,"required":120,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":4,"coolers":3},"resources":{"capitalGBP":2605,"volumeL":218},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":120,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":524,"provided":5600,"required":5076,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":192,"required":174,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":6},"resources":{"capitalGBP":3405,"volumeL":188},"values":{"coolingW":192,"drawW":72,"energyWh":5600,"heatW":174,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,174,0,0,24,3225,116],[2,5,3,6,174,192,72,24,3405,188],[3,5,4,6,182,192,72,32,3480,200],[4,5,4,6,182,192,72,32,3480,200]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":476,"provided":5600,"required":5124,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":192,"required":182,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":6},"resources":{"capitalGBP":3480,"volumeL":200},"values":{"coolingW":192,"drawW":72,"energyWh":5600,"heatW":182,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":764,"provided":5600,"required":4836,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":224,"required":174,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":4},"resources":{"capitalGBP":3525,"volumeL":140},"values":{"coolingW":224,"drawW":32,"energyWh":5600,"heatW":174,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,174,0,0,24,3225,116],[2,5,3,4,174,224,32,24,3525,140],[3,5,4,4,182,224,32,32,3600,152],[4,5,4,4,182,224,32,32,3600,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":716,"provided":5600,"required":4884,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":224,"required":182,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":3600,"volumeL":152},"values":{"coolingW":224,"drawW":32,"energyWh":5600,"heatW":182,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":686,"provided":5600,"required":4914,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":160,"required":159,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":5},"resources":{"capitalGBP":3495,"volumeL":164},"values":{"coolingW":160,"drawW":60,"energyWh":5600,"heatW":159,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,159,0,0,9,3345,104],[2,5,3,5,159,160,60,9,3495,164],[3,5,4,5,162,160,60,12,3610,172],[4,5,4,6,162,192,72,12,3640,184],[5,5,4,6,162,192,72,12,3640,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":596,"provided":5600,"required":5004,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":192,"required":162,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":6},"resources":{"capitalGBP":3640,"volumeL":184},"values":{"coolingW":192,"drawW":72,"energyWh":5600,"heatW":162,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":902,"provided":5600,"required":4698,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":168,"required":159,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":3570,"volumeL":122},"values":{"coolingW":168,"drawW":24,"energyWh":5600,"heatW":159,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,159,0,0,9,3345,104],[2,5,3,3,159,168,24,9,3570,122],[3,5,4,3,162,168,24,12,3685,130],[4,5,4,3,162,168,24,12,3685,130]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":884,"provided":5600,"required":4716,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":168,"required":162,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":3},"resources":{"capitalGBP":3685,"volumeL":130},"values":{"coolingW":168,"drawW":24,"energyWh":5600,"heatW":162,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h8-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-480,"provided":6000,"required":6480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":120,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2235,"volumeL":240},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":96,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,96,0,0,24,2145,204],[2,7,3,3,108,120,36,24,2555,268],[3,7,4,3,116,120,36,32,2630,280],[4,7,4,3,116,120,36,32,2630,280]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":7000,"required":6544,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":120,"required":116,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":3},"resources":{"capitalGBP":2630,"volumeL":280},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":116,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-320,"provided":6000,"required":6320,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":140,"required":96,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":2},"resources":{"capitalGBP":2295,"volumeL":216},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":96,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,96,0,0,24,2145,204],[2,7,3,2,108,140,16,24,2615,244],[3,7,4,2,116,140,16,32,2690,256],[4,7,4,2,116,140,16,32,2690,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":140,"required":116,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":2},"resources":{"capitalGBP":2690,"volumeL":256},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":116,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-360,"provided":6000,"required":6360,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":120,"required":81,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":3},"resources":{"capitalGBP":2355,"volumeL":228},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":81,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,81,0,0,9,2265,192],[2,7,3,3,93,120,36,9,2675,256],[3,7,4,3,96,120,36,12,2790,264],[4,7,4,3,96,120,36,12,2790,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":120,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":3},"resources":{"capitalGBP":2790,"volumeL":264},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":96,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-200,"provided":6000,"required":6200,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":59,"provided":140,"required":81,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":2},"resources":{"capitalGBP":2415,"volumeL":204},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":81,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,81,0,0,9,2265,192],[2,7,3,2,93,140,16,9,2735,232],[3,7,4,2,96,140,16,12,2850,240],[4,7,4,2,96,140,16,12,2850,240]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":7000,"required":6224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":140,"required":96,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":2},"resources":{"capitalGBP":2850,"volumeL":240},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":96,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":424,"provided":7000,"required":6576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":160,"required":124,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":4},"resources":{"capitalGBP":3345,"volumeL":164},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":124,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,124,0,0,24,3225,116],[2,5,3,4,124,160,48,24,3345,164],[3,5,4,4,132,160,48,32,3420,176],[4,5,4,4,132,160,48,32,3420,176]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":360,"provided":7000,"required":6640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":3420,"volumeL":176},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":132,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":7000,"required":6320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":140,"required":124,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":3375,"volumeL":128},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":124,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,124,0,0,24,3225,116],[2,5,3,2,124,140,16,24,3375,128],[3,5,4,2,132,140,16,32,3450,140],[4,5,4,2,132,140,16,32,3450,140]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":3450,"volumeL":140},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":132,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":7000,"required":6360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":120,"required":109,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":3},"resources":{"capitalGBP":3435,"volumeL":140},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":109,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,109,0,0,9,3345,104],[2,5,3,3,109,120,36,9,3435,140],[3,5,4,3,112,120,36,12,3550,148],[4,5,4,3,112,120,36,12,3550,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1000,"required":786,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":3},"resources":{"capitalGBP":3550,"volumeL":148},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":112,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":7000,"required":6200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":140,"required":109,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":3,"coolers":2},"resources":{"capitalGBP":3495,"volumeL":116},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":109,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,3,0,109,0,0,9,3345,104],[2,5,3,2,109,140,16,9,3495,116],[3,5,4,2,112,140,16,12,3610,124],[4,5,4,2,112,140,16,12,3610,124]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":7000,"required":6224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":140,"required":112,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":3610,"volumeL":124},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":112,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h8-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-368,"provided":6400,"required":6768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":192,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":3,"coolers":6},"resources":{"capitalGBP":2965,"volumeL":332},"values":{"coolingW":192,"drawW":72,"energyWh":6400,"heatW":168,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,3,0,168,0,0,24,2785,260],[2,8,3,6,168,192,72,24,2965,332],[3,9,4,6,194,192,72,32,3360,372],[4,9,4,7,194,224,84,32,3390,384],[5,9,4,7,194,224,84,32,3390,384]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":7200,"required":6928,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1000,"required":834,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":224,"required":194,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":7},"resources":{"capitalGBP":3390,"volumeL":384},"values":{"coolingW":224,"drawW":84,"energyWh":7200,"heatW":194,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":6400,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":168,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":3,"coolers":3},"resources":{"capitalGBP":3010,"volumeL":278},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":168,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,3,0,168,0,0,24,2785,260],[2,8,3,3,168,168,24,24,3010,278],[3,8,4,3,176,168,24,32,3085,290],[4,9,4,4,194,224,32,32,3480,324],[5,9,4,4,194,224,32,32,3480,324]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":688,"provided":7200,"required":6512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":224,"required":194,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":4},"resources":{"capitalGBP":3480,"volumeL":324},"values":{"coolingW":224,"drawW":32,"energyWh":7200,"heatW":194,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-152,"provided":6400,"required":6552,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":160,"required":153,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":3,"coolers":5},"resources":{"capitalGBP":3055,"volumeL":308},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":153,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,3,0,153,0,0,9,2905,248],[2,8,3,5,153,160,60,9,3055,308],[3,9,4,5,174,160,60,12,3490,344],[4,9,4,6,174,192,72,12,3520,356],[5,9,4,6,174,192,72,12,3520,356]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":7200,"required":6672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":192,"required":174,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":6},"resources":{"capitalGBP":3520,"volumeL":356},"values":{"coolingW":192,"drawW":72,"energyWh":7200,"heatW":174,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":136,"provided":6400,"required":6264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":168,"required":153,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":3,"coolers":3},"resources":{"capitalGBP":3130,"volumeL":266},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":153,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,3,0,153,0,0,9,2905,248],[2,8,3,3,153,168,24,9,3130,266],[3,8,4,3,156,168,24,12,3245,274],[4,8,4,3,156,168,24,12,3245,274]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":112,"provided":6400,"required":6288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":168,"required":156,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":4,"coolers":3},"resources":{"capitalGBP":3245,"volumeL":274},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":156,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-144,"provided":6720,"required":6864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":750,"required":834,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":224,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":7},"resources":{"capitalGBP":4035,"volumeL":216},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":204,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,204,0,0,24,3825,132],[2,6,3,7,204,224,84,24,4035,216],[3,7,4,7,242,224,84,32,4710,244],[4,7,4,8,242,256,96,32,4740,256],[5,7,4,8,242,256,96,32,4740,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":816,"provided":7840,"required":7024,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1000,"required":846,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":256,"required":242,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":8},"resources":{"capitalGBP":4740,"volumeL":256},"values":{"coolingW":256,"drawW":96,"energyWh":7840,"heatW":242,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":6720,"required":6448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":224,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":4125,"volumeL":156},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":204,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,204,0,0,24,3825,132],[2,6,3,4,204,224,32,24,4125,156],[3,6,4,4,212,224,32,32,4200,168],[4,6,4,4,212,224,32,32,4200,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":6720,"required":6512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":224,"required":212,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4200,"volumeL":168},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":212,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":6720,"required":6648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":192,"required":189,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":6},"resources":{"capitalGBP":4125,"volumeL":192},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":189,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,189,0,0,9,3945,120],[2,6,3,6,189,192,72,9,4125,192],[3,6,4,6,192,192,72,12,4240,200],[4,6,4,6,192,192,72,12,4240,200]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":6720,"required":6672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":192,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":4,"coolers":6},"resources":{"capitalGBP":4240,"volumeL":200},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":192,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":392,"provided":6720,"required":6328,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":224,"required":189,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":3,"coolers":4},"resources":{"capitalGBP":4245,"volumeL":144},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":189,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,3,0,189,0,0,9,3945,120],[2,6,3,4,189,224,32,9,4245,144],[3,6,4,4,192,224,32,12,4360,152],[4,6,4,4,192,224,32,12,4360,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":6720,"required":6352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":224,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4360,"volumeL":152},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":192,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h12-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-864,"provided":9000,"required":9864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":4},"resources":{"capitalGBP":3225,"volumeL":336},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":132,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,132,0,0,24,3105,288],[2,10,3,4,144,160,48,24,3545,364],[3,10,4,4,152,160,48,32,3620,376],[4,10,4,4,152,160,48,32,3620,376]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":10000,"required":9960,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":4},"resources":{"capitalGBP":3620,"volumeL":376},"values":{"coolingW":160,"drawW":48,"energyWh":10000,"heatW":152,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-480,"provided":9000,"required":9480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":2},"resources":{"capitalGBP":3255,"volumeL":300},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":132,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,132,0,0,24,3105,288],[2,10,3,2,144,140,16,24,3575,328],[3,10,4,3,152,210,24,32,3725,346],[4,10,4,3,152,210,24,32,3725,346]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":328,"provided":10000,"required":9672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":58,"provided":210,"required":152,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":3},"resources":{"capitalGBP":3725,"volumeL":346},"values":{"coolingW":210,"drawW":24,"energyWh":10000,"heatW":152,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-540,"provided":9000,"required":9540,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":750,"required":786,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":120,"required":117,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":3},"resources":{"capitalGBP":3315,"volumeL":312},"values":{"coolingW":120,"drawW":36,"energyWh":9000,"heatW":117,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,117,0,0,9,3225,276],[2,10,3,3,129,120,36,9,3635,340],[3,10,4,4,132,160,48,12,3780,360],[4,10,4,4,132,160,48,12,3780,360]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":280,"provided":10000,"required":9720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":4},"resources":{"capitalGBP":3780,"volumeL":360},"values":{"coolingW":160,"drawW":48,"energyWh":10000,"heatW":132,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-300,"provided":9000,"required":9300,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":750,"required":766,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":140,"required":117,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":2},"resources":{"capitalGBP":3375,"volumeL":288},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":117,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,117,0,0,9,3225,276],[2,10,3,2,129,140,16,9,3695,316],[3,10,4,2,132,140,16,12,3810,324],[4,10,4,2,132,140,16,12,3810,324]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":664,"provided":10000,"required":9336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1000,"required":766,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":2},"resources":{"capitalGBP":3810,"volumeL":324},"values":{"coolingW":140,"drawW":16,"energyWh":10000,"heatW":132,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-208,"provided":9800,"required":10008,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":200,"required":164,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":3,"coolers":5},"resources":{"capitalGBP":4575,"volumeL":208},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":164,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,3,0,164,0,0,24,4425,148],[2,7,3,5,164,200,60,24,4575,208],[3,8,4,5,192,200,60,32,5250,236],[4,8,4,5,192,200,60,32,5250,236]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1096,"provided":11200,"required":10104,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1000,"required":810,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":200,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":4,"coolers":5},"resources":{"capitalGBP":5250,"volumeL":236},"values":{"coolingW":200,"drawW":60,"energyWh":11200,"heatW":192,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":224,"provided":9800,"required":9576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":210,"required":164,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":3,"coolers":3},"resources":{"capitalGBP":4650,"volumeL":166},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":164,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,3,0,164,0,0,24,4425,148],[2,7,3,3,164,210,24,24,4650,166],[3,7,4,3,172,210,24,32,4725,178],[4,7,4,3,172,210,24,32,4725,178]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":9800,"required":9672,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":210,"required":172,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":3},"resources":{"capitalGBP":4725,"volumeL":178},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":172,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":116,"provided":9800,"required":9684,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":160,"required":149,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":3,"coolers":4},"resources":{"capitalGBP":4665,"volumeL":184},"values":{"coolingW":160,"drawW":48,"energyWh":9800,"heatW":149,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,3,0,149,0,0,9,4545,136],[2,7,3,4,149,160,48,9,4665,184],[3,7,4,4,152,160,48,12,4780,192],[4,7,4,4,152,160,48,12,4780,192]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":9800,"required":9720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":4},"resources":{"capitalGBP":4780,"volumeL":192},"values":{"coolingW":160,"drawW":48,"energyWh":9800,"heatW":152,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":404,"provided":9800,"required":9396,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":61,"provided":210,"required":149,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":3,"coolers":3},"resources":{"capitalGBP":4770,"volumeL":154},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":149,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,3,0,149,0,0,9,4545,136],[2,7,3,3,149,210,24,9,4770,154],[3,7,4,3,152,210,24,12,4885,162],[4,7,4,3,152,210,24,12,4885,162]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":9800,"required":9432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":58,"provided":210,"required":152,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":4,"coolers":3},"resources":{"capitalGBP":4885,"volumeL":162},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":152,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h12-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-840,"provided":9600,"required":10440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":750,"required":846,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":256,"required":240,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":8},"resources":{"capitalGBP":4305,"volumeL":468},"values":{"coolingW":256,"drawW":96,"energyWh":9600,"heatW":240,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,240,0,0,24,4065,372],[2,12,3,8,240,256,96,24,4305,468],[3,14,4,8,284,256,96,32,5020,536],[4,14,4,9,284,288,108,32,5050,548],[5,14,4,9,284,288,108,32,5050,548]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":11200,"required":10680,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":1000,"required":858,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":288,"required":284,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":9},"resources":{"capitalGBP":5050,"volumeL":548},"values":{"coolingW":288,"drawW":108,"energyWh":11200,"heatW":284,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-168,"provided":9600,"required":9768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":750,"required":790,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":280,"required":240,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":5},"resources":{"capitalGBP":4440,"volumeL":402},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":240,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,240,0,0,24,4065,372],[2,12,3,5,240,280,40,24,4440,402],[3,13,4,5,266,280,40,32,4835,442],[4,13,4,5,266,280,40,32,4835,442]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":536,"provided":10400,"required":9864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1000,"required":790,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":280,"required":266,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":4,"coolers":5},"resources":{"capitalGBP":4835,"volumeL":442},"values":{"coolingW":280,"drawW":40,"energyWh":10400,"heatW":266,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-660,"provided":9600,"required":10260,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":750,"required":846,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":256,"required":225,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":8},"resources":{"capitalGBP":4425,"volumeL":456},"values":{"coolingW":256,"drawW":96,"energyWh":9600,"heatW":225,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,225,0,0,9,4185,360],[2,12,3,8,225,256,96,9,4425,456],[3,13,4,8,246,256,96,12,4860,492],[4,13,4,8,246,256,96,12,4860,492]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":104,"provided":10400,"required":10296,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1000,"required":846,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":256,"required":246,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":4,"coolers":8},"resources":{"capitalGBP":4860,"volumeL":492},"values":{"coolingW":256,"drawW":96,"energyWh":10400,"heatW":246,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":12,"provided":9600,"required":9588,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":750,"required":790,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":280,"required":225,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":5},"resources":{"capitalGBP":4560,"volumeL":390},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":225,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,225,0,0,9,4185,360],[2,12,3,5,225,280,40,9,4560,390],[3,12,4,5,228,280,40,12,4675,398],[4,13,4,5,246,280,40,12,4995,426],[5,13,4,5,246,280,40,12,4995,426]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":10400,"required":9624,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1000,"required":790,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":280,"required":246,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":4,"coolers":5},"resources":{"capitalGBP":4995,"volumeL":426},"values":{"coolingW":280,"drawW":40,"energyWh":10400,"heatW":246,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-648,"provided":10080,"required":10728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":750,"required":870,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":320,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":10},"resources":{"capitalGBP":5925,"volumeL":300},"values":{"coolingW":320,"drawW":120,"energyWh":10080,"heatW":294,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,294,0,0,24,5625,180],[2,9,3,10,294,320,120,24,5925,300],[3,10,4,10,332,320,120,32,6600,328],[4,10,4,11,332,352,132,32,6630,340],[5,10,4,11,332,352,132,32,6630,340]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":11200,"required":10968,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1000,"required":882,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":352,"required":332,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":11},"resources":{"capitalGBP":6630,"volumeL":340},"values":{"coolingW":352,"drawW":132,"energyWh":11200,"heatW":332,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":216,"provided":10080,"required":9864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":336,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":6},"resources":{"capitalGBP":6075,"volumeL":216},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":294,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,294,0,0,24,5625,180],[2,9,3,6,294,336,48,24,6075,216],[3,9,4,6,302,336,48,32,6150,228],[4,9,4,6,302,336,48,32,6150,228]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":120,"provided":10080,"required":9960,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":336,"required":302,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":6},"resources":{"capitalGBP":6150,"volumeL":228},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":302,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-324,"provided":10080,"required":10404,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":750,"required":858,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":288,"required":279,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":9},"resources":{"capitalGBP":6015,"volumeL":276},"values":{"coolingW":288,"drawW":108,"energyWh":10080,"heatW":279,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,279,0,0,9,5745,168],[2,9,3,9,279,288,108,9,6015,276],[3,10,4,9,312,288,108,12,6730,300],[4,10,4,10,312,320,120,12,6760,312],[5,10,4,10,312,320,120,12,6760,312]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":11200,"required":10584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1000,"required":870,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":320,"required":312,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":10},"resources":{"capitalGBP":6760,"volumeL":312},"values":{"coolingW":320,"drawW":120,"energyWh":11200,"heatW":312,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":492,"provided":10080,"required":9588,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":750,"required":790,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":280,"required":279,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":5},"resources":{"capitalGBP":6120,"volumeL":198},"values":{"coolingW":280,"drawW":40,"energyWh":10080,"heatW":279,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,279,0,0,9,5745,168],[2,9,3,5,279,280,40,9,6120,198],[3,9,4,5,282,280,40,12,6235,206],[4,9,4,6,282,336,48,12,6310,212],[5,9,4,6,282,336,48,12,6310,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":360,"provided":10080,"required":9720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":336,"required":282,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":6},"resources":{"capitalGBP":6310,"volumeL":212},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":282,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p750-h16-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":12000,"required":13344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":200,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":5},"resources":{"capitalGBP":4215,"volumeL":432},"values":{"coolingW":200,"drawW":60,"energyWh":12000,"heatW":168,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,168,0,0,24,4065,372],[2,13,3,5,180,200,60,24,4535,460],[3,14,4,5,200,200,60,32,4930,500],[4,14,4,5,200,200,60,32,4930,500]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":14000,"required":13472,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1000,"required":810,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":200,"required":200,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":5},"resources":{"capitalGBP":4930,"volumeL":500},"values":{"coolingW":200,"drawW":60,"energyWh":14000,"heatW":200,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":12000,"required":12768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":210,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":3},"resources":{"capitalGBP":4290,"volumeL":390},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":168,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,168,0,0,24,4065,372],[2,13,3,3,180,210,24,24,4610,418],[3,13,4,3,188,210,24,32,4685,430],[4,13,4,3,188,210,24,32,4685,430]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":104,"provided":13000,"required":12896,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":210,"required":188,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":4,"coolers":3},"resources":{"capitalGBP":4685,"volumeL":430},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":188,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-912,"provided":12000,"required":12912,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":160,"required":153,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":4},"resources":{"capitalGBP":4305,"volumeL":408},"values":{"coolingW":160,"drawW":48,"energyWh":12000,"heatW":153,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,153,0,0,9,4185,360],[2,13,3,4,165,160,48,9,4625,436],[3,13,4,5,168,200,60,12,4770,456],[4,14,4,5,180,200,60,12,5090,484],[5,14,4,5,180,200,60,12,5090,484]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":14000,"required":13152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1000,"required":810,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":200,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":5},"resources":{"capitalGBP":5090,"volumeL":484},"values":{"coolingW":200,"drawW":60,"energyWh":14000,"heatW":180,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-528,"provided":12000,"required":12528,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":57,"provided":210,"required":153,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":3,"coolers":3},"resources":{"capitalGBP":4410,"volumeL":378},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":153,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,3,0,153,0,0,9,4185,360],[2,13,3,3,165,210,24,9,4730,406],[3,13,4,3,168,210,24,12,4845,414],[4,13,4,3,168,210,24,12,4845,414]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":424,"provided":13000,"required":12576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":210,"required":168,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":4,"coolers":3},"resources":{"capitalGBP":4845,"volumeL":414},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":168,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-936,"provided":12600,"required":13536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":240,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":6},"resources":{"capitalGBP":5805,"volumeL":252},"values":{"coolingW":240,"drawW":72,"energyWh":12600,"heatW":204,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,204,0,0,24,5625,180],[2,9,3,6,204,240,72,24,5805,252],[3,10,4,6,232,240,72,32,6480,280],[4,10,4,6,232,240,72,32,6480,280]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":14000,"required":13664,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":240,"required":232,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":6},"resources":{"capitalGBP":6480,"volumeL":280},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":232,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-168,"provided":12600,"required":12768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":210,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":3},"resources":{"capitalGBP":5850,"volumeL":198},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":204,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,204,0,0,24,5625,180],[2,9,3,3,204,210,24,24,5850,198],[3,10,4,3,232,210,24,32,6525,226],[4,10,4,4,232,280,32,32,6600,232],[5,10,4,4,232,280,32,32,6600,232]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":976,"provided":14000,"required":13024,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":280,"required":232,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":4},"resources":{"capitalGBP":6600,"volumeL":232},"values":{"coolingW":280,"drawW":32,"energyWh":14000,"heatW":232,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-504,"provided":12600,"required":13104,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":750,"required":810,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":200,"required":189,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":5},"resources":{"capitalGBP":5895,"volumeL":228},"values":{"coolingW":200,"drawW":60,"energyWh":12600,"heatW":189,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,189,0,0,9,5745,168],[2,9,3,5,189,200,60,9,5895,228],[3,10,4,5,212,200,60,12,6610,252],[4,10,4,6,212,240,72,12,6640,264],[5,10,4,6,212,240,72,12,6640,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":14000,"required":13344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":240,"required":212,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":4,"coolers":6},"resources":{"capitalGBP":6640,"volumeL":264},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":212,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":12600,"required":12528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":750,"required":774,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":210,"required":189,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":3,"coolers":3},"resources":{"capitalGBP":5970,"volumeL":186},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":189,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,3,0,189,0,0,9,5745,168],[2,9,3,3,189,210,24,9,5970,186],[3,9,4,3,192,210,24,12,6085,194],[4,9,4,3,192,210,24,12,6085,194]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":12600,"required":12576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1000,"required":774,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":210,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":4,"coolers":3},"resources":{"capitalGBP":6085,"volumeL":194},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":192,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":16,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h16-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2304,"provided":12000,"required":14304,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":750,"required":870,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":320,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":3,"coolers":10},"resources":{"capitalGBP":5325,"volumeL":576},"values":{"coolingW":320,"drawW":120,"energyWh":12000,"heatW":294,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,3,0,294,0,0,24,5025,456],[2,16,3,10,312,320,120,24,5645,604],[3,18,4,10,356,320,120,32,6360,672],[4,19,4,12,374,384,144,32,6740,724],[5,19,4,12,374,384,144,32,6740,724]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":15200,"required":14816,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1000,"required":894,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":384,"required":374,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":4,"coolers":12},"resources":{"capitalGBP":6740,"volumeL":724},"values":{"coolingW":384,"drawW":144,"energyWh":15200,"heatW":374,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1152,"provided":12000,"required":13152,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":750,"required":798,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":336,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":3,"coolers":6},"resources":{"capitalGBP":5475,"volumeL":492},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":294,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,3,0,294,0,0,24,5025,456],[2,16,3,6,312,336,48,24,5795,520],[3,17,4,6,338,336,48,32,6190,560],[4,17,4,7,338,392,56,32,6265,566],[5,17,4,7,338,392,56,32,6265,566]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":13600,"required":13408,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1000,"required":806,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":392,"required":338,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":4,"coolers":7},"resources":{"capitalGBP":6265,"volumeL":566},"values":{"coolingW":392,"drawW":56,"energyWh":13600,"heatW":338,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1872,"provided":12000,"required":13872,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":750,"required":858,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":288,"required":279,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":3,"coolers":9},"resources":{"capitalGBP":5415,"volumeL":552},"values":{"coolingW":288,"drawW":108,"energyWh":12000,"heatW":279,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,3,0,279,0,0,9,5145,444],[2,16,3,9,297,288,108,9,5735,580],[3,18,4,10,336,320,120,12,6520,656],[4,18,4,11,336,352,132,12,6550,668],[5,18,4,11,336,352,132,12,6550,668]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":14400,"required":14304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1000,"required":882,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":352,"required":336,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":4,"coolers":11},"resources":{"capitalGBP":6550,"volumeL":668},"values":{"coolingW":352,"drawW":132,"energyWh":14400,"heatW":336,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-784,"provided":12000,"required":12784,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":750,"required":790,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":280,"required":279,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":3,"coolers":5},"resources":{"capitalGBP":5520,"volumeL":474},"values":{"coolingW":280,"drawW":40,"energyWh":12000,"heatW":279,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,3,0,279,0,0,9,5145,444],[2,16,3,5,297,280,40,9,5840,502],[3,16,4,6,300,336,48,12,6030,516],[4,17,4,6,318,336,48,12,6350,544],[5,17,4,6,318,336,48,12,6350,544]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":13600,"required":12960,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1000,"required":798,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":336,"required":318,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":4,"coolers":6},"resources":{"capitalGBP":6350,"volumeL":544},"values":{"coolingW":336,"drawW":48,"energyWh":13600,"heatW":318,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2368,"provided":12320,"required":14688,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":750,"required":894,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":384,"required":354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":3,"coolers":12},"resources":{"capitalGBP":7185,"volumeL":356},"values":{"coolingW":384,"drawW":144,"energyWh":12320,"heatW":354,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,3,0,354,0,0,24,6825,212],[2,12,3,12,384,384,144,24,7785,372],[3,14,4,12,452,384,144,32,9060,416],[4,14,4,15,452,480,180,32,9150,452],[5,14,4,15,452,480,180,32,9150,452]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":15680,"required":15392,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":70,"provided":1000,"required":930,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":480,"required":452,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":15},"resources":{"capitalGBP":9150,"volumeL":452},"values":{"coolingW":480,"drawW":180,"energyWh":15680,"heatW":452,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-960,"provided":12320,"required":13280,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":750,"required":806,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":392,"required":354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":3,"coolers":7},"resources":{"capitalGBP":7350,"volumeL":254},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":354,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,3,0,354,0,0,24,6825,212],[2,12,3,7,384,392,56,24,7950,270],[3,12,4,7,392,392,56,32,8025,282],[4,12,4,7,392,392,56,32,8025,282]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":32,"provided":13440,"required":13408,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1000,"required":806,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":392,"required":392,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":4,"coolers":7},"resources":{"capitalGBP":8025,"volumeL":282},"values":{"coolingW":392,"drawW":56,"energyWh":13440,"heatW":392,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1936,"provided":12320,"required":14256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":750,"required":882,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":352,"required":339,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":3,"coolers":11},"resources":{"capitalGBP":7275,"volumeL":332},"values":{"coolingW":352,"drawW":132,"energyWh":12320,"heatW":339,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,3,0,339,0,0,9,6945,200],[2,11,3,11,339,352,132,9,7275,332],[3,13,4,11,402,352,132,12,8590,372],[4,13,4,13,402,416,156,12,8650,396],[5,14,4,13,432,416,156,12,9250,412],[6,14,4,14,432,448,168,12,9280,424],[7,14,4,14,432,448,168,12,9280,424]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":15680,"required":14880,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1000,"required":918,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":448,"required":432,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":14},"resources":{"capitalGBP":9280,"volumeL":424},"values":{"coolingW":448,"drawW":168,"energyWh":15680,"heatW":432,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-720,"provided":12320,"required":13040,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":750,"required":806,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":53,"provided":392,"required":339,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":3,"coolers":7},"resources":{"capitalGBP":7470,"volumeL":242},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":339,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,3,0,339,0,0,9,6945,200],[2,11,3,7,339,392,56,9,7470,242],[3,12,4,7,372,392,56,12,8185,266],[4,12,4,7,372,392,56,12,8185,266]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":13440,"required":13088,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1000,"required":806,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":392,"required":372,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":4,"coolers":7},"resources":{"capitalGBP":8185,"volumeL":266},"values":{"coolingW":392,"drawW":56,"energyWh":13440,"heatW":372,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":24,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p750-h24-mild","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":22,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2304,"provided":18000,"required":20304,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":240,"required":240,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":3,"coolers":6},"resources":{"capitalGBP":6165,"volumeL":612},"values":{"coolingW":240,"drawW":72,"energyWh":18000,"heatW":240,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,3,0,240,0,0,24,5985,540],[2,19,3,6,252,240,72,24,6485,640],[3,21,4,7,284,280,84,32,7230,720],[4,21,4,8,284,320,96,32,7260,732],[5,22,4,8,296,320,96,32,7580,760],[6,22,4,8,296,320,96,32,7580,760]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":928,"provided":22000,"required":21072,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1000,"required":846,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":320,"required":296,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":22,"converters":4,"coolers":8},"resources":{"capitalGBP":7580,"volumeL":760},"values":{"coolingW":320,"drawW":96,"energyWh":22000,"heatW":296,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":18000,"required":19344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":280,"required":240,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":3,"coolers":4},"resources":{"capitalGBP":6285,"volumeL":564},"values":{"coolingW":280,"drawW":32,"energyWh":18000,"heatW":240,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,3,0,240,0,0,24,5985,540],[2,19,3,4,252,280,32,24,6605,592],[3,20,4,4,272,280,32,32,7000,632],[4,20,4,4,272,280,32,32,7000,632]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":464,"provided":20000,"required":19536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":4,"coolers":4},"resources":{"capitalGBP":7000,"volumeL":632},"values":{"coolingW":280,"drawW":32,"energyWh":20000,"heatW":272,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":21,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1944,"provided":18000,"required":19944,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":750,"required":822,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":240,"required":225,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":3,"coolers":6},"resources":{"capitalGBP":6285,"volumeL":600},"values":{"coolingW":240,"drawW":72,"energyWh":18000,"heatW":225,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,3,0,225,0,0,9,6105,528],[2,19,3,6,237,240,72,9,6605,628],[3,20,4,6,252,240,72,12,7040,664],[4,21,4,7,264,280,84,12,7390,704],[5,21,4,7,264,280,84,12,7390,704]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":696,"provided":21000,"required":20304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1000,"required":834,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":21,"converters":4,"coolers":7},"resources":{"capitalGBP":7390,"volumeL":704},"values":{"coolingW":280,"drawW":84,"energyWh":21000,"heatW":264,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-984,"provided":18000,"required":18984,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":280,"required":225,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":3,"coolers":4},"resources":{"capitalGBP":6405,"volumeL":552},"values":{"coolingW":280,"drawW":32,"energyWh":18000,"heatW":225,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,3,0,225,0,0,9,6105,528],[2,19,3,4,237,280,32,9,6725,580],[3,19,4,4,240,280,32,12,6840,588],[4,20,4,4,252,280,32,12,7160,616],[5,20,4,4,252,280,32,12,7160,616]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":944,"provided":20000,"required":19056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1000,"required":782,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":280,"required":252,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":4,"coolers":4},"resources":{"capitalGBP":7160,"volumeL":616},"values":{"coolingW":280,"drawW":32,"energyWh":20000,"heatW":252,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2680,"provided":18200,"required":20880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":750,"required":846,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":320,"required":284,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":3,"coolers":8},"resources":{"capitalGBP":8265,"volumeL":340},"values":{"coolingW":320,"drawW":96,"energyWh":18200,"heatW":284,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,3,0,284,0,0,24,8025,244],[2,14,3,8,304,320,96,24,8865,356],[3,15,4,8,332,320,96,32,9540,384],[4,16,4,9,352,360,108,32,10170,412],[5,16,4,9,352,360,108,32,10170,412]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1040,"provided":22400,"required":21360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":1000,"required":858,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":360,"required":352,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":4,"coolers":9},"resources":{"capitalGBP":10170,"volumeL":412},"values":{"coolingW":360,"drawW":108,"energyWh":22400,"heatW":352,"lossW":32,"outputW":1000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1336,"provided":18200,"required":19536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":750,"required":790,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":66,"provided":350,"required":284,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":3,"coolers":5},"resources":{"capitalGBP":8400,"volumeL":274},"values":{"coolingW":350,"drawW":40,"energyWh":18200,"heatW":284,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,3,0,284,0,0,24,8025,244],[2,14,3,5,304,350,40,24,9000,290],[3,14,4,5,312,350,40,32,9075,302],[4,15,4,5,332,350,40,32,9675,318],[5,15,4,5,332,350,40,32,9675,318]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1272,"provided":21000,"required":19728,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1000,"required":790,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":350,"required":332,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":4,"coolers":5},"resources":{"capitalGBP":9675,"volumeL":318},"values":{"coolingW":350,"drawW":40,"energyWh":21000,"heatW":332,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2032,"provided":18200,"required":20232,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":750,"required":834,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":280,"required":269,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":3,"coolers":7},"resources":{"capitalGBP":8355,"volumeL":316},"values":{"coolingW":280,"drawW":84,"energyWh":18200,"heatW":269,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,3,0,269,0,0,9,8145,232],[2,14,3,7,289,280,84,9,8955,332],[3,15,4,8,312,320,96,12,9700,368],[4,15,4,8,312,320,96,12,9700,368]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":408,"provided":21000,"required":20592,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1000,"required":846,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":320,"required":312,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":4,"coolers":8},"resources":{"capitalGBP":9700,"volumeL":368},"values":{"coolingW":320,"drawW":96,"energyWh":21000,"heatW":312,"lossW":12,"outputW":1000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-784,"provided":18200,"required":18984,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":750,"required":782,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":280,"required":269,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":3,"coolers":4},"resources":{"capitalGBP":8445,"volumeL":256},"values":{"coolingW":280,"drawW":32,"energyWh":18200,"heatW":269,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,3,0,269,0,0,9,8145,232],[2,14,3,4,289,280,32,9,9045,272],[3,14,4,5,292,350,40,12,9235,286],[4,14,4,5,292,350,40,12,9235,286]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":19600,"required":19248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1000,"required":790,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":58,"provided":350,"required":292,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":4,"coolers":5},"resources":{"capitalGBP":9235,"volumeL":286},"values":{"coolingW":350,"drawW":40,"energyWh":19600,"heatW":292,"lossW":12,"outputW":1000}}}]},{"condition":"hot","durationHours":24,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p750-h24-hot","powerW":750,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":30,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":18,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4208,"provided":18400,"required":22608,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":750,"required":918,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":448,"required":438,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":3,"coolers":14},"resources":{"capitalGBP":8005,"volumeL":848},"values":{"coolingW":448,"drawW":168,"energyWh":18400,"heatW":438,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,3,0,438,0,0,24,7585,680],[2,24,3,14,456,448,168,24,8325,876],[3,29,4,15,554,480,180,32,10030,1040],[4,29,4,18,554,576,216,32,10120,1076],[5,30,4,18,572,576,216,32,10440,1104],[6,30,4,18,572,576,216,32,10440,1104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":24000,"required":23952,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":34,"provided":1000,"required":966,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":576,"required":572,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":30,"converters":4,"coolers":18},"resources":{"capitalGBP":10440,"volumeL":1104},"values":{"coolingW":576,"drawW":216,"energyWh":24000,"heatW":572,"lossW":32,"outputW":1000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1712,"provided":18400,"required":20112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":750,"required":814,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":448,"required":438,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":3,"coolers":8},"resources":{"capitalGBP":8185,"volumeL":728},"values":{"coolingW":448,"drawW":64,"energyWh":18400,"heatW":438,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,3,0,438,0,0,24,7585,680],[2,24,3,8,456,448,64,24,8505,756],[3,26,4,9,500,504,72,32,9295,830],[4,26,4,9,500,504,72,32,9295,830]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":20800,"required":20496,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":504,"required":500,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":4,"coolers":9},"resources":{"capitalGBP":9295,"volumeL":830},"values":{"coolingW":504,"drawW":72,"energyWh":20800,"heatW":500,"lossW":32,"outputW":1000}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":29,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":17,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3848,"provided":18400,"required":22248,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":750,"required":918,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":448,"required":423,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":3,"coolers":14},"resources":{"capitalGBP":8125,"volumeL":836},"values":{"coolingW":448,"drawW":168,"energyWh":18400,"heatW":423,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,3,0,423,0,0,9,7705,668],[2,23,3,14,423,448,168,9,8125,836],[3,28,4,14,516,448,168,12,9840,984],[4,28,4,17,516,544,204,12,9930,1020],[5,29,4,17,534,544,204,12,10250,1048],[6,29,4,17,534,544,204,12,10250,1048]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":23200,"required":23184,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":46,"provided":1000,"required":954,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":544,"required":534,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":29,"converters":4,"coolers":17},"resources":{"capitalGBP":10250,"volumeL":1048},"values":{"coolingW":544,"drawW":204,"energyWh":23200,"heatW":534,"lossW":12,"outputW":1000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1352,"provided":18400,"required":19752,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":750,"required":814,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":448,"required":423,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":3,"coolers":8},"resources":{"capitalGBP":8305,"volumeL":716},"values":{"coolingW":448,"drawW":64,"energyWh":18400,"heatW":423,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,3,0,423,0,0,9,7705,668],[2,23,3,8,423,448,64,9,8305,716],[3,25,4,8,462,448,64,12,9060,780],[4,25,4,9,462,504,72,12,9135,786],[5,26,4,9,480,504,72,12,9455,814],[6,26,4,9,480,504,72,12,9455,814]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":784,"provided":20800,"required":20016,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1000,"required":822,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":504,"required":480,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":4,"coolers":9},"resources":{"capitalGBP":9455,"volumeL":814},"values":{"coolingW":504,"drawW":72,"energyWh":20800,"heatW":480,"lossW":12,"outputW":1000}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":23,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4432,"provided":19040,"required":23472,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-204,"provided":750,"required":954,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":544,"required":534,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":3,"coolers":17},"resources":{"capitalGBP":10935,"volumeL":512},"values":{"coolingW":544,"drawW":204,"energyWh":19040,"heatW":534,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,3,0,534,0,0,24,10425,308],[2,17,3,17,534,544,204,24,10935,512],[3,21,4,17,662,544,204,32,13410,588],[4,22,4,21,692,672,252,32,14130,652],[5,23,5,22,730,704,264,40,14835,692],[6,23,5,23,730,736,276,40,14865,704],[7,23,5,23,730,736,276,40,14865,704]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":176,"provided":25760,"required":25584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":1250,"required":1026,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":736,"required":730,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":23,"converters":5,"coolers":23},"resources":{"capitalGBP":14865,"volumeL":704},"values":{"coolingW":736,"drawW":276,"energyWh":25760,"heatW":730,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1456,"provided":19040,"required":20496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":750,"required":830,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":560,"required":534,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":3,"coolers":10},"resources":{"capitalGBP":11175,"volumeL":368},"values":{"coolingW":560,"drawW":80,"energyWh":19040,"heatW":534,"lossW":24,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,3,0,534,0,0,24,10425,308],[2,17,3,10,534,560,80,24,11175,368],[3,19,4,10,602,560,80,32,12450,412],[4,19,4,11,602,616,88,32,12525,418],[5,19,4,11,602,616,88,32,12525,418]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":400,"provided":21280,"required":20880,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":1000,"required":838,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":616,"required":602,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":4,"coolers":11},"resources":{"capitalGBP":12525,"volumeL":418},"values":{"coolingW":616,"drawW":88,"energyWh":21280,"heatW":602,"lossW":32,"outputW":1000}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":23,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":9,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4072,"provided":19040,"required":23112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-204,"provided":750,"required":954,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":544,"required":519,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":3,"coolers":17},"resources":{"capitalGBP":11055,"volumeL":500},"values":{"coolingW":544,"drawW":204,"energyWh":19040,"heatW":519,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,3,0,519,0,0,9,10545,296],[2,17,3,17,519,544,204,9,11055,500],[3,21,4,17,642,544,204,12,13570,572],[4,21,4,21,642,672,252,12,13690,620],[5,22,5,21,675,672,252,15,14405,644],[6,22,5,22,675,704,264,15,14435,656],[7,23,5,22,705,704,264,15,15035,672],[8,23,5,23,705,736,276,15,15065,684],[9,23,5,23,705,736,276,15,15065,684]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":25760,"required":24984,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":1250,"required":1026,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":736,"required":705,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":23,"converters":5,"coolers":23},"resources":{"capitalGBP":15065,"volumeL":684},"values":{"coolingW":736,"drawW":276,"energyWh":25760,"heatW":705,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":4,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1096,"provided":19040,"required":20136,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":750,"required":830,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":41,"provided":560,"required":519,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":3,"coolers":10},"resources":{"capitalGBP":11295,"volumeL":356},"values":{"coolingW":560,"drawW":80,"energyWh":19040,"heatW":519,"lossW":9,"outputW":750}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,3,0,519,0,0,9,10545,296],[2,17,3,10,519,560,80,9,11295,356],[3,18,4,10,552,560,80,12,12010,380],[4,19,4,10,582,560,80,12,12610,396],[5,19,4,11,582,616,88,12,12685,402],[6,19,4,11,582,616,88,12,12685,402]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":880,"provided":21280,"required":20400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":1000,"required":838,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":616,"required":582,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":4,"coolers":11},"resources":{"capitalGBP":12685,"volumeL":402},"values":{"coolingW":616,"drawW":88,"energyWh":21280,"heatW":582,"lossW":12,"outputW":1000}}}]},{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p1000-h2-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":2000,"required":2112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":80,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1000,"volumeL":128},"values":{"coolingW":80,"drawW":24,"energyWh":2000,"heatW":56,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,56,0,0,32,940,104],[2,3,4,2,68,80,24,32,1320,156],[3,3,5,2,76,80,24,40,1395,168],[4,3,5,2,76,80,24,40,1395,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":872,"provided":3000,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":80,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":1395,"volumeL":168},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":76,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":2000,"required":2080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":1000,"required":1008,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":70,"required":56,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1015,"volumeL":110},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":56,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,56,0,0,32,940,104],[2,3,4,1,68,70,8,32,1335,138],[3,3,5,1,76,70,8,40,1410,150],[4,3,5,2,76,140,16,40,1485,156],[5,3,5,2,76,140,16,40,1485,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":3000,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":140,"required":76,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":1485,"volumeL":156},"values":{"coolingW":140,"drawW":16,"energyWh":3000,"heatW":76,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-12,"provided":1000,"required":1012,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":40,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1130,"volumeL":100},"values":{"coolingW":40,"drawW":12,"energyWh":2000,"heatW":36,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,36,0,0,12,1100,88],[2,3,4,1,48,40,12,12,1450,128],[3,3,5,2,51,80,24,15,1595,148],[4,3,5,2,51,80,24,15,1595,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":922,"provided":3000,"required":2078,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":80,"required":51,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":1595,"volumeL":148},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":51,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-40,"provided":2000,"required":2040,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":1000,"required":1008,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":70,"required":36,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1175,"volumeL":94},"values":{"coolingW":70,"drawW":8,"energyWh":2000,"heatW":36,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,36,0,0,12,1100,88],[2,3,4,1,48,70,8,12,1495,122],[3,3,5,1,51,70,8,15,1610,130],[4,3,5,1,51,70,8,15,1610,130]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":954,"provided":3000,"required":2046,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1250,"required":1008,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":70,"required":51,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":1},"resources":{"capitalGBP":1610,"volumeL":130},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":51,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":688,"provided":2800,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1560,"volumeL":104},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":72,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,72,0,0,32,1500,80],[2,2,4,2,72,80,24,32,1560,104],[3,2,5,2,80,80,24,40,1635,116],[4,2,5,2,80,80,24,40,1635,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":672,"provided":2800,"required":2128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":80,"required":80,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":2},"resources":{"capitalGBP":1635,"volumeL":116},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":80,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":2800,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1650,"volumeL":92},"values":{"coolingW":140,"drawW":16,"energyWh":2800,"heatW":72,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,72,0,0,32,1500,80],[2,2,4,2,72,140,16,32,1650,92],[3,2,5,2,80,140,16,40,1725,104],[4,2,5,2,80,140,16,40,1725,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":688,"provided":2800,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":140,"required":80,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":2},"resources":{"capitalGBP":1725,"volumeL":104},"values":{"coolingW":140,"drawW":16,"energyWh":2800,"heatW":80,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":728,"provided":2800,"required":2072,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":80,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1720,"volumeL":88},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":52,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,52,0,0,12,1660,64],[2,2,4,2,52,80,24,12,1720,88],[3,2,5,2,55,80,24,15,1835,96],[4,2,5,2,55,80,24,15,1835,96]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":722,"provided":2800,"required":2078,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":80,"required":55,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":2},"resources":{"capitalGBP":1835,"volumeL":96},"values":{"coolingW":80,"drawW":24,"energyWh":2800,"heatW":55,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":760,"provided":2800,"required":2040,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":1000,"required":1008,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":70,"required":52,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":1},"resources":{"capitalGBP":1735,"volumeL":70},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":52,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,52,0,0,12,1660,64],[2,2,4,1,52,70,8,12,1735,70],[3,2,5,1,55,70,8,15,1850,78],[4,2,5,1,55,70,8,15,1850,78]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":754,"provided":2800,"required":2046,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1250,"required":1008,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":70,"required":55,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":1},"resources":{"capitalGBP":1850,"volumeL":78},"values":{"coolingW":70,"drawW":8,"energyWh":2800,"heatW":55,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h2-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":2400,"required":2136,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":96,"required":86,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":1350,"volumeL":168},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":86,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,86,0,0,32,1260,132],[2,3,4,3,86,96,36,32,1350,168],[3,3,5,3,94,96,36,40,1425,180],[4,3,5,3,94,96,36,40,1425,180]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":2400,"required":2152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":96,"required":94,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":3},"resources":{"capitalGBP":1425,"volumeL":180},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":94,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":2400,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":112,"required":86,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":1410,"volumeL":144},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":86,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,86,0,0,32,1260,132],[2,3,4,2,86,112,16,32,1410,144],[3,3,5,2,94,112,16,40,1485,156],[4,3,5,2,94,112,16,40,1485,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":2400,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":112,"required":94,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":1485,"volumeL":156},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":94,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":2400,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":96,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":1510,"volumeL":152},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":66,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,66,0,0,12,1420,116],[2,3,4,3,66,96,36,12,1510,152],[3,3,5,3,69,96,36,15,1625,160],[4,3,5,3,69,96,36,15,1625,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":298,"provided":2400,"required":2102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":96,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":3},"resources":{"capitalGBP":1625,"volumeL":160},"values":{"coolingW":96,"drawW":36,"energyWh":2400,"heatW":69,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":2400,"required":2056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":112,"required":66,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":1570,"volumeL":128},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":66,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,66,0,0,12,1420,116],[2,3,4,2,66,112,16,12,1570,128],[3,3,5,2,69,112,16,15,1685,136],[4,3,5,2,69,112,16,15,1685,136]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":338,"provided":2400,"required":2062,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":112,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":1685,"volumeL":136},"values":{"coolingW":112,"drawW":16,"energyWh":2400,"heatW":69,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":104,"provided":2240,"required":2136,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":96,"required":92,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":3},"resources":{"capitalGBP":1590,"volumeL":116},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":92,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,92,0,0,32,1500,80],[2,2,4,3,92,96,36,32,1590,116],[3,2,5,3,100,96,36,40,1665,128],[4,2,5,4,100,128,48,40,1695,140],[5,2,5,4,100,128,48,40,1695,140]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":2240,"required":2176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":128,"required":100,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":4},"resources":{"capitalGBP":1695,"volumeL":140},"values":{"coolingW":128,"drawW":48,"energyWh":2240,"heatW":100,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":2240,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":112,"required":92,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1650,"volumeL":92},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":92,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,92,0,0,32,1500,80],[2,2,4,2,92,112,16,32,1650,92],[3,2,5,2,100,112,16,40,1725,104],[4,2,5,2,100,112,16,40,1725,104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":2240,"required":2112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":112,"required":100,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":2},"resources":{"capitalGBP":1725,"volumeL":104},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":100,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":2240,"required":2096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":96,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":3},"resources":{"capitalGBP":1750,"volumeL":100},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":72,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,72,0,0,12,1660,64],[2,2,4,3,72,96,36,12,1750,100],[3,2,5,3,75,96,36,15,1865,108],[4,2,5,3,75,96,36,15,1865,108]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":138,"provided":2240,"required":2102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":96,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":3},"resources":{"capitalGBP":1865,"volumeL":108},"values":{"coolingW":96,"drawW":36,"energyWh":2240,"heatW":75,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":2,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":184,"provided":2240,"required":2056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":112,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":2,"converters":4,"coolers":2},"resources":{"capitalGBP":1810,"volumeL":76},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":72,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,2,4,0,72,0,0,12,1660,64],[2,2,4,2,72,112,16,12,1810,76],[3,2,5,2,75,112,16,15,1925,84],[4,2,5,2,75,112,16,15,1925,84]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":178,"provided":2240,"required":2062,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":112,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":2,"converters":5,"coolers":2},"resources":{"capitalGBP":1925,"volumeL":84},"values":{"coolingW":112,"drawW":16,"energyWh":2240,"heatW":75,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p1000-h4-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":4000,"required":4224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":80,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1640,"volumeL":184},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":80,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,80,0,0,32,1580,160],[2,5,4,2,92,80,24,32,1960,212],[3,5,5,3,100,120,36,40,2065,236],[4,5,5,3,100,120,36,40,2065,236]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":696,"provided":5000,"required":4304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":120,"required":100,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":3},"resources":{"capitalGBP":2065,"volumeL":236},"values":{"coolingW":120,"drawW":36,"energyWh":5000,"heatW":100,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-192,"provided":4000,"required":4192,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":140,"required":80,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1730,"volumeL":172},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":80,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,80,0,0,32,1580,160],[2,5,4,2,92,140,16,32,2050,200],[3,5,5,2,100,140,16,40,2125,212],[4,5,5,2,100,140,16,40,2125,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":776,"provided":5000,"required":4224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":140,"required":100,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":2},"resources":{"capitalGBP":2125,"volumeL":212},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":100,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-144,"provided":4000,"required":4144,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":80,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":2},"resources":{"capitalGBP":1800,"volumeL":168},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":60,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,60,0,0,12,1740,144],[2,5,4,2,72,80,24,12,2120,196],[3,5,5,2,75,80,24,15,2235,204],[4,5,5,2,75,80,24,15,2235,204]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":844,"provided":5000,"required":4156,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":80,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":2},"resources":{"capitalGBP":2235,"volumeL":204},"values":{"coolingW":80,"drawW":24,"energyWh":5000,"heatW":75,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":4000,"required":4080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":1000,"required":1008,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":70,"required":60,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":1},"resources":{"capitalGBP":1815,"volumeL":150},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":60,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,60,0,0,12,1740,144],[2,5,4,1,72,70,8,12,2135,178],[3,5,5,2,75,140,16,15,2325,192],[4,5,5,2,75,140,16,15,2325,192]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":876,"provided":5000,"required":4124,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":65,"provided":140,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":2},"resources":{"capitalGBP":2325,"volumeL":192},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":75,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-72,"provided":4200,"required":4272,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":120,"required":92,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":3},"resources":{"capitalGBP":2190,"volumeL":132},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":92,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,92,0,0,32,2100,96],[2,3,4,3,92,120,36,32,2190,132],[3,4,5,3,120,120,36,40,2865,160],[4,4,5,3,120,120,36,40,2865,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1296,"provided":5600,"required":4304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":120,"required":120,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":3},"resources":{"capitalGBP":2865,"volumeL":160},"values":{"coolingW":120,"drawW":36,"energyWh":5600,"heatW":120,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":4200,"required":4192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":140,"required":92,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2250,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":92,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,92,0,0,32,2100,96],[2,3,4,2,92,140,16,32,2250,108],[3,3,5,2,100,140,16,40,2325,120],[4,4,5,2,120,140,16,40,2925,136],[5,4,5,2,120,140,16,40,2925,136]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1376,"provided":5600,"required":4224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":140,"required":120,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":2},"resources":{"capitalGBP":2925,"volumeL":136},"values":{"coolingW":140,"drawW":16,"energyWh":5600,"heatW":120,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":56,"provided":4200,"required":4144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2320,"volumeL":104},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":72,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,72,0,0,12,2260,80],[2,3,4,2,72,80,24,12,2320,104],[3,3,5,2,75,80,24,15,2435,112],[4,3,5,2,75,80,24,15,2435,112]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":44,"provided":4200,"required":4156,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":80,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":2435,"volumeL":112},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":75,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":88,"provided":4200,"required":4112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":4,"coolers":2},"resources":{"capitalGBP":2410,"volumeL":92},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":72,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,4,0,72,0,0,12,2260,80],[2,3,4,2,72,140,16,12,2410,92],[3,3,5,2,75,140,16,15,2525,100],[4,3,5,2,75,140,16,15,2525,100]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":76,"provided":4200,"required":4124,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":65,"provided":140,"required":75,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":5,"coolers":2},"resources":{"capitalGBP":2525,"volumeL":100},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":75,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h4-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-320,"provided":4000,"required":4320,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":128,"required":122,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":2020,"volumeL":236},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":122,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,122,0,0,32,1900,188],[2,6,4,4,140,128,48,32,2340,264],[3,6,5,5,148,160,60,40,2445,288],[4,6,5,5,148,160,60,40,2445,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":400,"provided":4800,"required":4400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1250,"required":1060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":160,"required":148,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":5},"resources":{"capitalGBP":2445,"volumeL":288},"values":{"coolingW":160,"drawW":60,"energyWh":4800,"heatW":148,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":4000,"required":4224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":168,"required":122,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":3},"resources":{"capitalGBP":2125,"volumeL":206},"values":{"coolingW":168,"drawW":24,"energyWh":4000,"heatW":122,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,122,0,0,32,1900,188],[2,6,4,3,140,168,24,32,2445,234],[3,6,5,3,148,168,24,40,2520,246],[4,6,5,3,148,168,24,40,2520,246]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":4800,"required":4256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":168,"required":148,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":3},"resources":{"capitalGBP":2520,"volumeL":246},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":148,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":4000,"required":4240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":128,"required":102,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":2180,"volumeL":220},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":102,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,102,0,0,12,2060,172],[2,6,4,4,120,128,48,12,2500,248],[3,6,5,4,123,128,48,15,2615,256],[4,6,5,4,123,128,48,15,2615,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":548,"provided":4800,"required":4252,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":128,"required":123,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":4},"resources":{"capitalGBP":2615,"volumeL":256},"values":{"coolingW":128,"drawW":48,"energyWh":4800,"heatW":123,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-112,"provided":4000,"required":4112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":112,"required":102,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":2210,"volumeL":184},"values":{"coolingW":112,"drawW":16,"energyWh":4000,"heatW":102,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,102,0,0,12,2060,172],[2,6,4,2,120,112,16,12,2530,212],[3,6,5,3,123,168,24,15,2720,226],[4,6,5,3,123,168,24,15,2720,226]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":644,"provided":4800,"required":4156,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":168,"required":123,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":3},"resources":{"capitalGBP":2720,"volumeL":226},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":123,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":112,"provided":4480,"required":4368,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":5},"resources":{"capitalGBP":2850,"volumeL":172},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":152,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,152,0,0,32,2700,112],[2,4,4,5,152,160,60,32,2850,172],[3,4,5,5,160,160,60,40,2925,184],[4,4,5,5,160,160,60,40,2925,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":4480,"required":4400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1250,"required":1060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":160,"required":160,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":5},"resources":{"capitalGBP":2925,"volumeL":184},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":160,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":256,"provided":4480,"required":4224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":168,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":3},"resources":{"capitalGBP":2925,"volumeL":130},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":152,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,152,0,0,32,2700,112],[2,4,4,3,152,168,24,32,2925,130],[3,4,5,3,160,168,24,40,3000,142],[4,4,5,3,160,168,24,40,3000,142]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":224,"provided":4480,"required":4256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":168,"required":160,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":3},"resources":{"capitalGBP":3000,"volumeL":142},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":160,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":4480,"required":4288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":5},"resources":{"capitalGBP":3010,"volumeL":156},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":132,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,132,0,0,12,2860,96],[2,4,4,5,132,160,60,12,3010,156],[3,4,5,5,135,160,60,15,3125,164],[4,4,5,5,135,160,60,15,3125,164]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":180,"provided":4480,"required":4300,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1250,"required":1060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":160,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":5},"resources":{"capitalGBP":3125,"volumeL":164},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":135,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":4480,"required":4144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":168,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":4,"coolers":3},"resources":{"capitalGBP":3085,"volumeL":114},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":132,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,4,0,132,0,0,12,2860,96],[2,4,4,3,132,168,24,12,3085,114],[3,4,5,3,135,168,24,15,3200,122],[4,4,5,3,135,168,24,15,3200,122]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":324,"provided":4480,"required":4156,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":168,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":5,"coolers":3},"resources":{"capitalGBP":3200,"volumeL":122},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":135,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h6-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-408,"provided":6000,"required":6408,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":120,"required":104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":3},"resources":{"capitalGBP":2310,"volumeL":252},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":104,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,104,0,0,32,2220,216],[2,7,4,3,116,120,36,32,2630,280],[3,7,5,3,124,120,36,40,2705,292],[4,7,5,4,124,160,48,40,2735,304],[5,7,5,4,124,160,48,40,2735,304]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":7000,"required":6528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":160,"required":124,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":4},"resources":{"capitalGBP":2735,"volumeL":304},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":124,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-288,"provided":6000,"required":6288,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":140,"required":104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":2},"resources":{"capitalGBP":2370,"volumeL":228},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":104,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,104,0,0,32,2220,216],[2,7,4,2,116,140,16,32,2690,256],[3,7,5,2,124,140,16,40,2765,268],[4,7,5,2,124,140,16,40,2765,268]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":664,"provided":7000,"required":6336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":140,"required":124,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":2},"resources":{"capitalGBP":2765,"volumeL":268},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":124,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-288,"provided":6000,"required":6288,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":3},"resources":{"capitalGBP":2470,"volumeL":236},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":84,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,84,0,0,12,2380,200],[2,7,4,3,96,120,36,12,2790,264],[3,7,5,3,99,120,36,15,2905,272],[4,7,5,3,99,120,36,15,2905,272]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":694,"provided":7000,"required":6306,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":120,"required":99,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":3},"resources":{"capitalGBP":2905,"volumeL":272},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":99,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-168,"provided":6000,"required":6168,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":2},"resources":{"capitalGBP":2530,"volumeL":212},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":84,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,84,0,0,12,2380,200],[2,7,4,2,96,140,16,12,2850,240],[3,7,5,2,99,140,16,15,2965,248],[4,7,5,2,99,140,16,15,2965,248]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":814,"provided":7000,"required":6186,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":41,"provided":140,"required":99,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":2},"resources":{"capitalGBP":2965,"volumeL":248},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":99,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":7000,"required":6480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":4},"resources":{"capitalGBP":3420,"volumeL":176},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":132,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,132,0,0,32,3300,128],[2,5,4,4,132,160,48,32,3420,176],[3,5,5,4,140,160,48,40,3495,188],[4,5,5,4,140,160,48,40,3495,188]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":7000,"required":6528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":160,"required":140,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":4},"resources":{"capitalGBP":3495,"volumeL":188},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":140,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":7000,"required":6288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":3450,"volumeL":140},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":132,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,132,0,0,32,3300,128],[2,5,4,2,132,140,16,32,3450,140],[3,5,5,2,140,140,16,40,3525,152],[4,5,5,2,140,140,16,40,3525,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":664,"provided":7000,"required":6336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":140,"required":140,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":2},"resources":{"capitalGBP":3525,"volumeL":152},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":140,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":7000,"required":6288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":3},"resources":{"capitalGBP":3550,"volumeL":148},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":112,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,112,0,0,12,3460,112],[2,5,4,3,112,120,36,12,3550,148],[3,5,5,3,115,120,36,15,3665,156],[4,5,5,3,115,120,36,15,3665,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":694,"provided":7000,"required":6306,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1250,"required":1036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":120,"required":115,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":3},"resources":{"capitalGBP":3665,"volumeL":156},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":115,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":832,"provided":7000,"required":6168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":140,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":4,"coolers":2},"resources":{"capitalGBP":3610,"volumeL":124},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":112,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,4,0,112,0,0,12,3460,112],[2,5,4,2,112,140,16,12,3610,124],[3,5,5,2,115,140,16,15,3725,132],[4,5,5,2,115,140,16,15,3725,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":814,"provided":7000,"required":6186,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":140,"required":115,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":5,"coolers":2},"resources":{"capitalGBP":3725,"volumeL":132},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":115,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h6-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":6400,"required":6624,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":192,"required":176,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":6},"resources":{"capitalGBP":3040,"volumeL":344},"values":{"coolingW":192,"drawW":72,"energyWh":6400,"heatW":176,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,176,0,0,32,2860,272],[2,8,4,6,176,192,72,32,3040,344],[3,9,5,6,202,192,72,40,3435,384],[4,9,5,7,202,224,84,40,3465,396],[5,9,5,7,202,224,84,40,3465,396]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":7200,"required":6744,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1250,"required":1084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":224,"required":202,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":7},"resources":{"capitalGBP":3465,"volumeL":396},"values":{"coolingW":224,"drawW":84,"energyWh":7200,"heatW":202,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":6400,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":224,"required":176,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":4},"resources":{"capitalGBP":3160,"volumeL":296},"values":{"coolingW":224,"drawW":32,"energyWh":6400,"heatW":176,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,176,0,0,32,2860,272],[2,8,4,4,176,224,32,32,3160,296],[3,8,5,4,184,224,32,40,3235,308],[4,9,5,4,202,224,32,40,3555,336],[5,9,5,4,202,224,32,40,3555,336]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":7200,"required":6432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":224,"required":202,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":4},"resources":{"capitalGBP":3555,"volumeL":336},"values":{"coolingW":224,"drawW":32,"energyWh":7200,"heatW":202,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-32,"provided":6400,"required":6432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":160,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":5},"resources":{"capitalGBP":3170,"volumeL":316},"values":{"coolingW":160,"drawW":60,"energyWh":6400,"heatW":156,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,156,0,0,12,3020,256],[2,8,4,5,156,160,60,12,3170,316],[3,9,5,5,177,160,60,15,3605,352],[4,9,5,6,177,192,72,15,3635,364],[5,9,5,6,177,192,72,15,3635,364]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":678,"provided":7200,"required":6522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":192,"required":177,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":6},"resources":{"capitalGBP":3635,"volumeL":364},"values":{"coolingW":192,"drawW":72,"energyWh":7200,"heatW":177,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":184,"provided":6400,"required":6216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":168,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":3},"resources":{"capitalGBP":3245,"volumeL":274},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":156,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,156,0,0,12,3020,256],[2,8,4,3,156,168,24,12,3245,274],[3,8,5,3,159,168,24,15,3360,282],[4,8,5,3,159,168,24,15,3360,282]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":166,"provided":6400,"required":6234,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":168,"required":159,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":5,"coolers":3},"resources":{"capitalGBP":3360,"volumeL":282},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":159,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":6720,"required":6696,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1000,"required":1084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":224,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":7},"resources":{"capitalGBP":4110,"volumeL":228},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,212,0,0,32,3900,144],[2,6,4,7,212,224,84,32,4110,228],[3,6,5,7,220,224,84,40,4185,240],[4,7,5,7,250,224,84,40,4785,256],[5,7,5,8,250,256,96,40,4815,268],[6,7,5,8,250,256,96,40,4815,268]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1024,"provided":7840,"required":6816,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":256,"required":250,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":8},"resources":{"capitalGBP":4815,"volumeL":268},"values":{"coolingW":256,"drawW":96,"energyWh":7840,"heatW":250,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":6720,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":224,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4200,"volumeL":168},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,212,0,0,32,3900,144],[2,6,4,4,212,224,32,32,4200,168],[3,6,5,4,220,224,32,40,4275,180],[4,6,5,4,220,224,32,40,4275,180]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":6720,"required":6432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":224,"required":220,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":4},"resources":{"capitalGBP":4275,"volumeL":180},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":220,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":216,"provided":6720,"required":6504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":192,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":6},"resources":{"capitalGBP":4240,"volumeL":200},"values":{"coolingW":192,"drawW":72,"energyWh":6720,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,192,0,0,12,4060,128],[2,6,4,6,192,192,72,12,4240,200],[3,6,5,6,195,192,72,15,4355,208],[4,6,5,7,195,224,84,15,4385,220],[5,6,5,7,195,224,84,15,4385,220]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":126,"provided":6720,"required":6594,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1250,"required":1084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":224,"required":195,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":7},"resources":{"capitalGBP":4385,"volumeL":220},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":195,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":6720,"required":6264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":224,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4360,"volumeL":152},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,192,0,0,12,4060,128],[2,6,4,4,192,224,32,12,4360,152],[3,6,5,4,195,224,32,15,4475,160],[4,6,5,4,195,224,32,15,4475,160]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":438,"provided":6720,"required":6282,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":224,"required":195,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":4},"resources":{"capitalGBP":4475,"volumeL":160},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":195,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p1000-h8-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-640,"provided":8000,"required":8640,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":160,"required":128,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":4},"resources":{"capitalGBP":2980,"volumeL":320},"values":{"coolingW":160,"drawW":48,"energyWh":8000,"heatW":128,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,128,0,0,32,2860,272],[2,9,4,4,140,160,48,32,3300,348],[3,9,5,4,148,160,48,40,3375,360],[4,9,5,4,148,160,48,40,3375,360]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":296,"provided":9000,"required":8704,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":160,"required":148,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":4},"resources":{"capitalGBP":3375,"volumeL":360},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":148,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-384,"provided":8000,"required":8384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":140,"required":128,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":2},"resources":{"capitalGBP":3010,"volumeL":284},"values":{"coolingW":140,"drawW":16,"energyWh":8000,"heatW":128,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,128,0,0,32,2860,272],[2,9,4,2,140,140,16,32,3330,312],[3,9,5,2,148,140,16,40,3405,324],[4,9,5,3,148,210,24,40,3480,330],[5,9,5,3,148,210,24,40,3480,330]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":488,"provided":9000,"required":8512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":62,"provided":210,"required":148,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":3},"resources":{"capitalGBP":3480,"volumeL":330},"values":{"coolingW":210,"drawW":24,"energyWh":9000,"heatW":148,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-384,"provided":8000,"required":8384,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1000,"required":1036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":120,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":3},"resources":{"capitalGBP":3110,"volumeL":292},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":108,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,108,0,0,12,3020,256],[2,9,4,3,120,120,36,12,3430,320],[3,9,5,3,123,120,36,15,3545,328],[4,9,5,4,123,160,48,15,3575,340],[5,9,5,4,123,160,48,15,3575,340]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":496,"provided":9000,"required":8504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":160,"required":123,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":4},"resources":{"capitalGBP":3575,"volumeL":340},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":123,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":8000,"required":8224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":140,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":2},"resources":{"capitalGBP":3170,"volumeL":268},"values":{"coolingW":140,"drawW":16,"energyWh":8000,"heatW":108,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,108,0,0,12,3020,256],[2,9,4,2,120,140,16,12,3490,296],[3,9,5,2,123,140,16,15,3605,304],[4,9,5,2,123,140,16,15,3605,304]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":752,"provided":9000,"required":8248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":140,"required":123,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":2},"resources":{"capitalGBP":3605,"volumeL":304},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":123,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":8400,"required":8640,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4020,"volumeL":192},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":152,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,152,0,0,32,3900,144],[2,6,4,4,152,160,48,32,4020,192],[3,7,5,4,180,160,48,40,4695,220],[4,7,5,5,180,200,60,40,4725,232],[5,7,5,5,180,200,60,40,4725,232]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1000,"provided":9800,"required":8800,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1250,"required":1060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":200,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":5},"resources":{"capitalGBP":4725,"volumeL":232},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":180,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-48,"provided":8400,"required":8448,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":58,"provided":210,"required":152,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":3},"resources":{"capitalGBP":4125,"volumeL":162},"values":{"coolingW":210,"drawW":24,"energyWh":8400,"heatW":152,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,152,0,0,32,3900,144],[2,6,4,3,152,210,24,32,4125,162],[3,7,5,3,180,210,24,40,4800,190],[4,7,5,3,180,210,24,40,4800,190]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1288,"provided":9800,"required":8512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":210,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":3},"resources":{"capitalGBP":4800,"volumeL":190},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":180,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":8400,"required":8480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":4},"resources":{"capitalGBP":4180,"volumeL":176},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":132,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,132,0,0,12,4060,128],[2,6,4,4,132,160,48,12,4180,176],[3,7,5,4,155,160,48,15,4895,200],[4,7,5,4,155,160,48,15,4895,200]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1296,"provided":9800,"required":8504,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":160,"required":155,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":5,"coolers":4},"resources":{"capitalGBP":4895,"volumeL":200},"values":{"coolingW":160,"drawW":48,"energyWh":9800,"heatW":155,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":176,"provided":8400,"required":8224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1000,"required":1016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":4,"coolers":2},"resources":{"capitalGBP":4210,"volumeL":140},"values":{"coolingW":140,"drawW":16,"energyWh":8400,"heatW":132,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,4,0,132,0,0,12,4060,128],[2,6,4,2,132,140,16,12,4210,140],[3,6,5,2,135,140,16,15,4325,148],[4,6,5,2,135,140,16,15,4325,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":152,"provided":8400,"required":8248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1250,"required":1016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":140,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":5,"coolers":2},"resources":{"capitalGBP":4325,"volumeL":148},"values":{"coolingW":140,"drawW":16,"energyWh":8400,"heatW":135,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h8-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-928,"provided":8000,"required":8928,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1000,"required":1084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":224,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":4,"coolers":7},"resources":{"capitalGBP":3710,"volumeL":412},"values":{"coolingW":224,"drawW":84,"energyWh":8000,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,4,0,212,0,0,32,3500,328],[2,11,4,7,230,224,84,32,4030,440],[3,12,5,8,256,256,96,40,4455,492],[4,12,5,8,256,256,96,40,4455,492]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":512,"provided":9600,"required":9088,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":256,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":5,"coolers":8},"resources":{"capitalGBP":4455,"volumeL":492},"values":{"coolingW":256,"drawW":96,"energyWh":9600,"heatW":256,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":8000,"required":8512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":224,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":4,"coolers":4},"resources":{"capitalGBP":3800,"volumeL":352},"values":{"coolingW":224,"drawW":32,"energyWh":8000,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,4,0,212,0,0,32,3500,328],[2,11,4,4,230,224,32,32,4120,380],[3,11,5,5,238,280,40,40,4270,398],[4,11,5,5,238,280,40,40,4270,398]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":8800,"required":8640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1250,"required":1040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":280,"required":238,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":5,"coolers":5},"resources":{"capitalGBP":4270,"volumeL":398},"values":{"coolingW":280,"drawW":40,"energyWh":8800,"heatW":238,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-672,"provided":8000,"required":8672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":192,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":4,"coolers":6},"resources":{"capitalGBP":3840,"volumeL":384},"values":{"coolingW":192,"drawW":72,"energyWh":8000,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,4,0,192,0,0,12,3660,312],[2,11,4,6,210,192,72,12,4160,412],[3,11,5,7,213,224,84,15,4305,432],[4,11,5,7,213,224,84,15,4305,432]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":8800,"required":8792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1250,"required":1084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":224,"required":213,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":5,"coolers":7},"resources":{"capitalGBP":4305,"volumeL":432},"values":{"coolingW":224,"drawW":84,"energyWh":8800,"heatW":213,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-352,"provided":8000,"required":8352,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":224,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":4,"coolers":4},"resources":{"capitalGBP":3960,"volumeL":336},"values":{"coolingW":224,"drawW":32,"energyWh":8000,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,4,0,192,0,0,12,3660,312],[2,11,4,4,210,224,32,12,4280,364],[3,11,5,4,213,224,32,15,4395,372],[4,11,5,4,213,224,32,15,4395,372]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":424,"provided":8800,"required":8376,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":224,"required":213,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":5,"coolers":4},"resources":{"capitalGBP":4395,"volumeL":372},"values":{"coolingW":224,"drawW":32,"energyWh":8800,"heatW":213,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-160,"provided":8960,"required":9120,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1000,"required":1108,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":288,"required":272,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":9},"resources":{"capitalGBP":5370,"volumeL":284},"values":{"coolingW":288,"drawW":108,"energyWh":8960,"heatW":272,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,272,0,0,32,5100,176],[2,8,4,9,272,288,108,32,5370,284],[3,9,5,9,310,288,108,40,6045,312],[4,9,5,10,310,320,120,40,6075,324],[5,9,5,10,310,320,120,40,6075,324]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":10080,"required":9280,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1250,"required":1120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":320,"required":310,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":10},"resources":{"capitalGBP":6075,"volumeL":324},"values":{"coolingW":320,"drawW":120,"energyWh":10080,"heatW":310,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":8960,"required":8576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1000,"required":1040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":5},"resources":{"capitalGBP":5475,"volumeL":206},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":272,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,272,0,0,32,5100,176],[2,8,4,5,272,280,40,32,5475,206],[3,8,5,5,280,280,40,40,5550,218],[4,8,5,5,280,280,40,40,5550,218]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":320,"provided":8960,"required":8640,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1250,"required":1040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":280,"required":280,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":5,"coolers":5},"resources":{"capitalGBP":5550,"volumeL":218},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":280,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":8960,"required":8864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1000,"required":1096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":256,"required":252,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":8},"resources":{"capitalGBP":5500,"volumeL":256},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":252,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,252,0,0,12,5260,160],[2,8,4,8,252,256,96,12,5500,256],[3,8,5,8,255,256,96,15,5615,264],[4,8,5,8,255,256,96,15,5615,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":8960,"required":8888,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":256,"required":255,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":5,"coolers":8},"resources":{"capitalGBP":5615,"volumeL":264},"values":{"coolingW":256,"drawW":96,"energyWh":8960,"heatW":255,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":8960,"required":8416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1000,"required":1040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":280,"required":252,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":4,"coolers":5},"resources":{"capitalGBP":5635,"volumeL":190},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":252,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,4,0,252,0,0,12,5260,160],[2,8,4,5,252,280,40,12,5635,190],[3,8,5,5,255,280,40,15,5750,198],[4,8,5,5,255,280,40,15,5750,198]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":8960,"required":8440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1250,"required":1040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":280,"required":255,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":5,"coolers":5},"resources":{"capitalGBP":5750,"volumeL":198},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":255,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p1000-h12-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1104,"provided":12000,"required":13104,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":200,"required":176,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":5},"resources":{"capitalGBP":4290,"volumeL":444},"values":{"coolingW":200,"drawW":60,"energyWh":12000,"heatW":176,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,176,0,0,32,4140,384],[2,13,4,5,188,200,60,32,4610,472],[3,14,5,5,208,200,60,40,5005,512],[4,14,5,6,208,240,72,40,5035,524],[5,14,5,6,208,240,72,40,5035,524]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":14000,"required":13344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":240,"required":208,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":5,"coolers":6},"resources":{"capitalGBP":5035,"volumeL":524},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":208,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-672,"provided":12000,"required":12672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":210,"required":176,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":3},"resources":{"capitalGBP":4365,"volumeL":402},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":176,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,176,0,0,32,4140,384],[2,13,4,3,188,210,24,32,4685,430],[3,13,5,3,196,210,24,40,4760,442],[4,13,5,3,196,210,24,40,4760,442]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":13000,"required":12768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":210,"required":196,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":3},"resources":{"capitalGBP":4760,"volumeL":442},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":196,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-720,"provided":12000,"required":12720,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":160,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":4},"resources":{"capitalGBP":4420,"volumeL":416},"values":{"coolingW":160,"drawW":48,"energyWh":12000,"heatW":156,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,156,0,0,12,4300,368],[2,13,4,4,168,160,48,12,4740,444],[3,13,5,5,171,200,60,15,4885,464],[4,13,5,5,171,200,60,15,4885,464]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":100,"provided":13000,"required":12900,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1250,"required":1060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":200,"required":171,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":5},"resources":{"capitalGBP":4885,"volumeL":464},"values":{"coolingW":200,"drawW":60,"energyWh":13000,"heatW":171,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-432,"provided":12000,"required":12432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":210,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":3},"resources":{"capitalGBP":4525,"volumeL":386},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":156,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,156,0,0,12,4300,368],[2,13,4,3,168,210,24,12,4845,414],[3,13,5,3,171,210,24,15,4960,422],[4,13,5,3,171,210,24,15,4960,422]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":532,"provided":13000,"required":12468,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":210,"required":171,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":3},"resources":{"capitalGBP":4960,"volumeL":422},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":171,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-648,"provided":12600,"required":13248,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":240,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":4,"coolers":6},"resources":{"capitalGBP":5880,"volumeL":264},"values":{"coolingW":240,"drawW":72,"energyWh":12600,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,4,0,212,0,0,32,5700,192],[2,9,4,6,212,240,72,32,5880,264],[3,10,5,6,240,240,72,40,6555,292],[4,10,5,6,240,240,72,40,6555,292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":14000,"required":13344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":240,"required":240,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":5,"coolers":6},"resources":{"capitalGBP":6555,"volumeL":292},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":240,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-168,"provided":12600,"required":12768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":280,"required":212,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":4,"coolers":4},"resources":{"capitalGBP":6000,"volumeL":216},"values":{"coolingW":280,"drawW":32,"energyWh":12600,"heatW":212,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,4,0,212,0,0,32,5700,192],[2,9,4,4,212,280,32,32,6000,216],[3,10,5,4,240,280,32,40,6675,244],[4,10,5,4,240,280,32,40,6675,244]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1136,"provided":14000,"required":12864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":280,"required":240,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":5,"coolers":4},"resources":{"capitalGBP":6675,"volumeL":244},"values":{"coolingW":280,"drawW":32,"energyWh":14000,"heatW":240,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-264,"provided":12600,"required":12864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1000,"required":1060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":200,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":4,"coolers":5},"resources":{"capitalGBP":6010,"volumeL":236},"values":{"coolingW":200,"drawW":60,"energyWh":12600,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,4,0,192,0,0,12,5860,176],[2,9,4,5,192,200,60,12,6010,236],[3,10,5,5,215,200,60,15,6725,260],[4,10,5,6,215,240,72,15,6755,272],[5,10,5,6,215,240,72,15,6755,272]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":956,"provided":14000,"required":13044,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":240,"required":215,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":5,"coolers":6},"resources":{"capitalGBP":6755,"volumeL":272},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":215,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":168,"provided":12600,"required":12432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":210,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":4,"coolers":3},"resources":{"capitalGBP":6085,"volumeL":194},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":192,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,4,0,192,0,0,12,5860,176],[2,9,4,3,192,210,24,12,6085,194],[3,9,5,3,195,210,24,15,6200,202],[4,9,5,3,195,210,24,15,6200,202]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":132,"provided":12600,"required":12468,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1250,"required":1024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":210,"required":195,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":5,"coolers":3},"resources":{"capitalGBP":6200,"volumeL":202},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":195,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h12-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1824,"provided":12000,"required":13824,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1000,"required":1120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":320,"required":302,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":10},"resources":{"capitalGBP":5400,"volumeL":588},"values":{"coolingW":320,"drawW":120,"energyWh":12000,"heatW":302,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,302,0,0,32,5100,468],[2,16,4,10,320,320,120,32,5720,616],[3,18,5,10,364,320,120,40,6435,684],[4,18,5,12,364,384,144,40,6495,708],[5,18,5,12,364,384,144,40,6495,708]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":14400,"required":14208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1250,"required":1144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":384,"required":364,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":12},"resources":{"capitalGBP":6495,"volumeL":708},"values":{"coolingW":384,"drawW":144,"energyWh":14400,"heatW":364,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-960,"provided":12000,"required":12960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":336,"required":302,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":6},"resources":{"capitalGBP":5550,"volumeL":504},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":302,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,302,0,0,32,5100,468],[2,16,4,6,320,336,48,32,5870,532],[3,17,5,6,346,336,48,40,6265,572],[4,17,5,7,346,392,56,40,6340,578],[5,17,5,7,346,392,56,40,6340,578]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":448,"provided":13600,"required":13152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1250,"required":1056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":392,"required":346,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":5,"coolers":7},"resources":{"capitalGBP":6340,"volumeL":578},"values":{"coolingW":392,"drawW":56,"energyWh":13600,"heatW":346,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1440,"provided":12000,"required":13440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1000,"required":1108,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":288,"required":282,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":9},"resources":{"capitalGBP":5530,"volumeL":560},"values":{"coolingW":288,"drawW":108,"energyWh":12000,"heatW":282,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,282,0,0,12,5260,452],[2,16,4,9,300,288,108,12,5850,588],[3,17,5,10,321,320,120,15,6315,636],[4,18,5,11,339,352,132,15,6665,676],[5,18,5,11,339,352,132,15,6665,676]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":636,"provided":14400,"required":13764,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1250,"required":1132,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":352,"required":339,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":11},"resources":{"capitalGBP":6665,"volumeL":676},"values":{"coolingW":352,"drawW":132,"energyWh":14400,"heatW":339,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-720,"provided":12000,"required":12720,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":336,"required":282,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":6},"resources":{"capitalGBP":5710,"volumeL":488},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":282,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,282,0,0,12,5260,452],[2,16,4,6,300,336,48,12,6030,516],[3,16,5,6,303,336,48,15,6145,524],[4,16,5,6,303,336,48,15,6145,524]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":44,"provided":12800,"required":12756,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":336,"required":303,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":5,"coolers":6},"resources":{"capitalGBP":6145,"volumeL":524},"values":{"coolingW":336,"drawW":48,"energyWh":12800,"heatW":303,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1792,"provided":12320,"required":14112,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1000,"required":1144,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":384,"required":362,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":4,"coolers":12},"resources":{"capitalGBP":7260,"volumeL":368},"values":{"coolingW":384,"drawW":144,"energyWh":12320,"heatW":362,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,4,0,362,0,0,32,6900,224],[2,12,4,12,392,384,144,32,7860,384],[3,13,5,13,430,416,156,40,8565,424],[4,13,5,14,430,448,168,40,8595,436],[5,13,5,14,430,448,168,40,8595,436]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":14560,"required":14496,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1250,"required":1168,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":448,"required":430,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":14},"resources":{"capitalGBP":8595,"volumeL":436},"values":{"coolingW":448,"drawW":168,"energyWh":14560,"heatW":430,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-736,"provided":12320,"required":13056,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1000,"required":1056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":392,"required":362,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":4,"coolers":7},"resources":{"capitalGBP":7425,"volumeL":266},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":362,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,4,0,362,0,0,32,6900,224],[2,12,4,7,392,392,56,32,8025,282],[3,12,5,7,400,392,56,40,8100,294],[4,12,5,8,400,448,64,40,8175,300],[5,12,5,8,400,448,64,40,8175,300]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":13440,"required":13248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":1250,"required":1064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":448,"required":400,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":5,"coolers":8},"resources":{"capitalGBP":8175,"volumeL":300},"values":{"coolingW":448,"drawW":64,"energyWh":13440,"heatW":400,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1408,"provided":12320,"required":13728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":1000,"required":1132,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":352,"required":342,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":4,"coolers":11},"resources":{"capitalGBP":7390,"volumeL":340},"values":{"coolingW":352,"drawW":132,"energyWh":12320,"heatW":342,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,4,0,342,0,0,12,7060,208],[2,11,4,11,342,352,132,12,7390,340],[3,13,5,11,405,352,132,15,8705,380],[4,13,5,13,405,416,156,15,8765,404],[5,13,5,13,405,416,156,15,8765,404]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":508,"provided":14560,"required":14052,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":94,"provided":1250,"required":1156,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":416,"required":405,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":13},"resources":{"capitalGBP":8765,"volumeL":404},"values":{"coolingW":416,"drawW":156,"energyWh":14560,"heatW":405,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-496,"provided":12320,"required":12816,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1000,"required":1056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":392,"required":342,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":4,"coolers":7},"resources":{"capitalGBP":7585,"volumeL":250},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":342,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,4,0,342,0,0,12,7060,208],[2,11,4,7,342,392,56,12,7585,250],[3,12,5,7,375,392,56,15,8300,274],[4,12,5,7,375,392,56,15,8300,274]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":588,"provided":13440,"required":12852,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1250,"required":1056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":392,"required":375,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":5,"coolers":7},"resources":{"capitalGBP":8300,"volumeL":274},"values":{"coolingW":392,"drawW":56,"energyWh":13440,"heatW":375,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p1000-h16-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1664,"provided":16000,"required":17664,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":240,"required":224,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":4,"coolers":6},"resources":{"capitalGBP":5600,"volumeL":568},"values":{"coolingW":240,"drawW":72,"energyWh":16000,"heatW":224,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,4,0,224,0,0,32,5420,496],[2,17,4,6,236,240,72,32,5920,596],[3,18,5,6,256,240,72,40,6315,636],[4,18,5,7,256,280,84,40,6345,648],[5,18,5,7,256,280,84,40,6345,648]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":18000,"required":17984,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1250,"required":1084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":7},"resources":{"capitalGBP":6345,"volumeL":648},"values":{"coolingW":280,"drawW":84,"energyWh":18000,"heatW":256,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1024,"provided":16000,"required":17024,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":280,"required":224,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":4,"coolers":4},"resources":{"capitalGBP":5720,"volumeL":520},"values":{"coolingW":280,"drawW":32,"energyWh":16000,"heatW":224,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,4,0,224,0,0,32,5420,496],[2,17,4,4,236,280,32,32,6040,548],[3,18,5,4,256,280,32,40,6435,588],[4,18,5,4,256,280,32,40,6435,588]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":18000,"required":17152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":4},"resources":{"capitalGBP":6435,"volumeL":588},"values":{"coolingW":280,"drawW":32,"energyWh":18000,"heatW":256,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":16000,"required":17344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":240,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":4,"coolers":6},"resources":{"capitalGBP":5760,"volumeL":552},"values":{"coolingW":240,"drawW":72,"energyWh":16000,"heatW":204,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,4,0,204,0,0,12,5580,480],[2,17,4,6,216,240,72,12,6080,580],[3,18,5,6,231,240,72,15,6515,616],[4,18,5,6,231,240,72,15,6515,616]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":18000,"required":17392,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":240,"required":231,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":6},"resources":{"capitalGBP":6515,"volumeL":616},"values":{"coolingW":240,"drawW":72,"energyWh":18000,"heatW":231,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-576,"provided":16000,"required":16576,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1000,"required":1024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":210,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":4,"coolers":3},"resources":{"capitalGBP":5805,"volumeL":498},"values":{"coolingW":210,"drawW":24,"energyWh":16000,"heatW":204,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,4,0,204,0,0,12,5580,480],[2,17,4,3,216,210,24,12,6125,526],[3,17,5,4,219,280,32,15,6315,540],[4,17,5,4,219,280,32,15,6315,540]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":17000,"required":16752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":61,"provided":280,"required":219,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":5,"coolers":4},"resources":{"capitalGBP":6315,"volumeL":540},"values":{"coolingW":280,"drawW":32,"energyWh":17000,"heatW":219,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1056,"provided":16800,"required":17856,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1000,"required":1084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":7},"resources":{"capitalGBP":7710,"volumeL":324},"values":{"coolingW":280,"drawW":84,"energyWh":16800,"heatW":272,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,272,0,0,32,7500,240],[2,12,4,7,272,280,84,32,7710,324],[3,13,5,7,300,280,84,40,8385,352],[4,13,5,8,300,320,96,40,8415,364],[5,13,5,8,300,320,96,40,8415,364]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":18200,"required":18176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":320,"required":300,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":8},"resources":{"capitalGBP":8415,"volumeL":364},"values":{"coolingW":320,"drawW":96,"energyWh":18200,"heatW":300,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":16800,"required":17024,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":4},"resources":{"capitalGBP":7800,"volumeL":264},"values":{"coolingW":280,"drawW":32,"energyWh":16800,"heatW":272,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,272,0,0,32,7500,240],[2,12,4,4,272,280,32,32,7800,264],[3,13,5,4,300,280,32,40,8475,292],[4,13,5,5,300,350,40,40,8550,298],[5,13,5,5,300,350,40,40,8550,298]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":920,"provided":18200,"required":17280,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1250,"required":1040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":350,"required":300,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":5},"resources":{"capitalGBP":8550,"volumeL":298},"values":{"coolingW":350,"drawW":40,"energyWh":18200,"heatW":300,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-736,"provided":16800,"required":17536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1000,"required":1084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":280,"required":252,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":7},"resources":{"capitalGBP":7870,"volumeL":308},"values":{"coolingW":280,"drawW":84,"energyWh":16800,"heatW":252,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,252,0,0,12,7660,224],[2,12,4,7,252,280,84,12,7870,308],[3,13,5,7,275,280,84,15,8585,332],[4,13,5,7,275,280,84,15,8585,332]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":18200,"required":17584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1250,"required":1084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":280,"required":275,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":5,"coolers":7},"resources":{"capitalGBP":8585,"volumeL":332},"values":{"coolingW":280,"drawW":84,"energyWh":18200,"heatW":275,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":16800,"required":16704,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1000,"required":1032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":280,"required":252,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":4,"coolers":4},"resources":{"capitalGBP":7960,"volumeL":248},"values":{"coolingW":280,"drawW":32,"energyWh":16800,"heatW":252,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,4,0,252,0,0,12,7660,224],[2,12,4,4,252,280,32,12,7960,248],[3,12,5,4,255,280,32,15,8075,256],[4,12,5,4,255,280,32,15,8075,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":16800,"required":16752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1250,"required":1032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":280,"required":255,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":5,"coolers":4},"resources":{"capitalGBP":8075,"volumeL":256},"values":{"coolingW":280,"drawW":32,"energyWh":16800,"heatW":255,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":16,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h16-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3008,"provided":16000,"required":19008,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-156,"provided":1000,"required":1156,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":416,"required":392,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":4,"coolers":13},"resources":{"capitalGBP":7090,"volumeL":764},"values":{"coolingW":416,"drawW":156,"energyWh":16000,"heatW":392,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,4,0,392,0,0,32,6700,608],[2,21,4,13,410,416,156,32,7410,792],[3,24,5,13,472,416,156,40,8445,888],[4,24,5,15,472,480,180,40,8505,912],[5,25,5,15,490,480,180,40,8825,940],[6,25,5,16,490,512,192,40,8855,952],[7,25,5,16,490,512,192,40,8855,952]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":20000,"required":19712,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":1250,"required":1192,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":512,"required":490,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":5,"coolers":16},"resources":{"capitalGBP":8855,"volumeL":952},"values":{"coolingW":512,"drawW":192,"energyWh":20000,"heatW":490,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":23,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1408,"provided":16000,"required":17408,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1000,"required":1056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":392,"required":392,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":4,"coolers":7},"resources":{"capitalGBP":7225,"volumeL":650},"values":{"coolingW":392,"drawW":56,"energyWh":16000,"heatW":392,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,4,0,392,0,0,32,6700,608],[2,21,4,7,410,392,56,32,7545,678],[3,22,5,8,436,448,64,40,8015,724],[4,23,5,8,454,448,64,40,8335,752],[5,23,5,9,454,504,72,40,8410,758],[6,23,5,9,454,504,72,40,8410,758]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":18400,"required":17792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":504,"required":454,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":23,"converters":5,"coolers":9},"resources":{"capitalGBP":8410,"volumeL":758},"values":{"coolingW":504,"drawW":72,"energyWh":18400,"heatW":454,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2496,"provided":16000,"required":18496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1000,"required":1144,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":384,"required":372,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":4,"coolers":12},"resources":{"capitalGBP":7220,"volumeL":736},"values":{"coolingW":384,"drawW":144,"energyWh":16000,"heatW":372,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,4,0,372,0,0,12,6860,592],[2,21,4,12,390,384,144,12,7540,764],[3,24,5,13,447,416,156,15,8645,868],[4,24,5,14,447,448,168,15,8675,880],[5,24,5,14,447,448,168,15,8675,880]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":19200,"required":18928,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1250,"required":1168,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":448,"required":447,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":5,"coolers":14},"resources":{"capitalGBP":8675,"volumeL":880},"values":{"coolingW":448,"drawW":168,"energyWh":19200,"heatW":447,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":22,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1088,"provided":16000,"required":17088,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1000,"required":1056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":392,"required":372,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":4,"coolers":7},"resources":{"capitalGBP":7385,"volumeL":634},"values":{"coolingW":392,"drawW":56,"energyWh":16000,"heatW":372,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,4,0,372,0,0,12,6860,592],[2,21,4,7,390,392,56,12,7705,662],[3,22,5,7,411,392,56,15,8140,698],[4,22,5,8,411,448,64,15,8215,704],[5,22,5,8,411,448,64,15,8215,704]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":17600,"required":17264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":1250,"required":1064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":37,"provided":448,"required":411,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":22,"converters":5,"coolers":8},"resources":{"capitalGBP":8215,"volumeL":704},"values":{"coolingW":448,"drawW":64,"energyWh":17600,"heatW":411,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":20,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2784,"provided":16800,"required":19584,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-192,"provided":1000,"required":1192,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":512,"required":482,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":16},"resources":{"capitalGBP":9780,"volumeL":480},"values":{"coolingW":512,"drawW":192,"energyWh":16800,"heatW":482,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,482,0,0,32,9300,288],[2,15,4,16,482,512,192,32,9780,480],[3,18,5,16,580,512,192,40,11655,540],[4,18,5,19,580,608,228,40,11745,576],[5,19,5,19,610,608,228,40,12345,592],[6,19,5,20,610,640,240,40,12375,604],[7,19,5,20,610,640,240,40,12375,604]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":21280,"required":20480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":10,"provided":1250,"required":1240,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":640,"required":610,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":5,"coolers":20},"resources":{"capitalGBP":12375,"volumeL":604},"values":{"coolingW":640,"drawW":240,"energyWh":21280,"heatW":610,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-864,"provided":16800,"required":17664,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":504,"required":482,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":9},"resources":{"capitalGBP":9975,"volumeL":342},"values":{"coolingW":504,"drawW":72,"energyWh":16800,"heatW":482,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,482,0,0,32,9300,288],[2,15,4,9,482,504,72,32,9975,342],[3,16,5,9,520,504,72,40,10650,370],[4,16,5,10,520,560,80,40,10725,376],[5,16,5,10,520,560,80,40,10725,376]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":17920,"required":17920,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":170,"provided":1250,"required":1080,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":560,"required":520,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":5,"coolers":10},"resources":{"capitalGBP":10725,"volumeL":376},"values":{"coolingW":560,"drawW":80,"energyWh":17920,"heatW":520,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":18,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2272,"provided":16800,"required":19072,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-180,"provided":1000,"required":1180,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":480,"required":462,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":15},"resources":{"capitalGBP":9910,"volumeL":452},"values":{"coolingW":480,"drawW":180,"energyWh":16800,"heatW":462,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,462,0,0,12,9460,272],[2,15,4,15,462,480,180,12,9910,452],[3,18,5,15,555,480,180,15,11825,508],[4,18,5,18,555,576,216,15,11915,544],[5,18,5,18,555,576,216,15,11915,544]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":464,"provided":20160,"required":19696,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":34,"provided":1250,"required":1216,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":576,"required":555,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":5,"coolers":18},"resources":{"capitalGBP":11915,"volumeL":544},"values":{"coolingW":576,"drawW":216,"energyWh":20160,"heatW":555,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-544,"provided":16800,"required":17344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1000,"required":1072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":504,"required":462,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":4,"coolers":9},"resources":{"capitalGBP":10135,"volumeL":326},"values":{"coolingW":504,"drawW":72,"energyWh":16800,"heatW":462,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,4,0,462,0,0,12,9460,272],[2,15,4,9,462,504,72,12,10135,326],[3,16,5,9,495,504,72,15,10850,350],[4,16,5,9,495,504,72,15,10850,350]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":17920,"required":17392,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1250,"required":1072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":504,"required":495,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":5,"coolers":9},"resources":{"capitalGBP":10850,"volumeL":350},"values":{"coolingW":504,"drawW":72,"energyWh":17920,"heatW":495,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":24,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h24-mild","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":28,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3072,"provided":24000,"required":27072,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1000,"required":1096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":320,"required":320,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":4,"coolers":8},"resources":{"capitalGBP":8220,"volumeL":816},"values":{"coolingW":320,"drawW":96,"energyWh":24000,"heatW":320,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,4,0,320,0,0,32,7980,720],[2,25,4,8,332,320,96,32,8540,844],[3,28,5,9,376,360,108,40,9605,952],[4,28,5,10,376,400,120,40,9635,964],[5,28,5,10,376,400,120,40,9635,964]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":28000,"required":27840,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1250,"required":1120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":400,"required":376,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":28,"converters":5,"coolers":10},"resources":{"capitalGBP":9635,"volumeL":964},"values":{"coolingW":400,"drawW":120,"energyWh":28000,"heatW":376,"lossW":40,"outputW":1250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1728,"provided":24000,"required":25728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1000,"required":1040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":350,"required":320,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":4,"coolers":5},"resources":{"capitalGBP":8355,"volumeL":750},"values":{"coolingW":350,"drawW":40,"energyWh":24000,"heatW":320,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,4,0,320,0,0,32,7980,720],[2,25,4,5,332,350,40,32,8675,778],[3,26,5,5,352,350,40,40,9070,818],[4,26,5,6,352,420,48,40,9145,824],[5,27,5,6,364,420,48,40,9465,852],[6,27,5,6,364,420,48,40,9465,852]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":27000,"required":26112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":420,"required":364,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":5,"coolers":6},"resources":{"capitalGBP":9465,"volumeL":852},"values":{"coolingW":420,"drawW":48,"energyWh":27000,"heatW":364,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2592,"provided":24000,"required":26592,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1000,"required":1096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":320,"required":300,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":4,"coolers":8},"resources":{"capitalGBP":8380,"volumeL":800},"values":{"coolingW":320,"drawW":96,"energyWh":24000,"heatW":300,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,4,0,300,0,0,12,8140,704],[2,25,4,8,312,320,96,12,8700,828],[3,27,5,8,339,320,96,15,9455,892],[4,27,5,9,339,360,108,15,9485,904],[5,27,5,9,339,360,108,15,9485,904]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":27000,"required":26952,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":1250,"required":1108,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":360,"required":339,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":5,"coolers":9},"resources":{"capitalGBP":9485,"volumeL":904},"values":{"coolingW":360,"drawW":108,"energyWh":27000,"heatW":339,"lossW":15,"outputW":1250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1248,"provided":24000,"required":25248,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1000,"required":1040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":350,"required":300,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":4,"coolers":5},"resources":{"capitalGBP":8515,"volumeL":734},"values":{"coolingW":350,"drawW":40,"energyWh":24000,"heatW":300,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,4,0,300,0,0,12,8140,704],[2,25,4,5,312,350,40,12,8835,762],[3,26,5,5,327,350,40,15,9270,798],[4,26,5,5,327,350,40,15,9270,798]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":26000,"required":25320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1250,"required":1040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":350,"required":327,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":5,"coolers":5},"resources":{"capitalGBP":9270,"volumeL":798},"values":{"coolingW":350,"drawW":40,"energyWh":26000,"heatW":327,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":21,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2448,"provided":25200,"required":27648,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1000,"required":1120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":400,"required":392,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":4,"coolers":10},"resources":{"capitalGBP":11400,"volumeL":456},"values":{"coolingW":400,"drawW":120,"energyWh":25200,"heatW":392,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,4,0,392,0,0,32,11100,336],[2,18,4,10,392,400,120,32,11400,456],[3,20,5,10,440,400,120,40,12675,500],[4,20,5,11,440,440,132,40,12705,512],[5,21,5,11,460,440,132,40,13305,528],[6,21,5,12,460,480,144,40,13335,540],[7,21,5,12,460,480,144,40,13335,540]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":984,"provided":29400,"required":28416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1250,"required":1144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":480,"required":460,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":21,"converters":5,"coolers":12},"resources":{"capitalGBP":13335,"volumeL":540},"values":{"coolingW":480,"drawW":144,"energyWh":29400,"heatW":460,"lossW":40,"outputW":1250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-720,"provided":25200,"required":25920,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":420,"required":392,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":4,"coolers":6},"resources":{"capitalGBP":11550,"volumeL":372},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":392,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,4,0,392,0,0,32,11100,336],[2,18,4,6,392,420,48,32,11550,372],[3,19,5,6,420,420,48,40,12225,400],[4,19,5,6,420,420,48,40,12225,400]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":488,"provided":26600,"required":26112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":420,"required":420,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":5,"coolers":6},"resources":{"capitalGBP":12225,"volumeL":400},"values":{"coolingW":420,"drawW":48,"energyWh":26600,"heatW":420,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1968,"provided":25200,"required":27168,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1000,"required":1120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":400,"required":372,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":4,"coolers":10},"resources":{"capitalGBP":11560,"volumeL":440},"values":{"coolingW":400,"drawW":120,"energyWh":25200,"heatW":372,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,4,0,372,0,0,12,11260,320],[2,18,4,10,372,400,120,12,11560,440],[3,20,5,10,415,400,120,15,12875,480],[4,20,5,11,415,440,132,15,12905,492],[5,20,5,11,415,440,132,15,12905,492]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":28000,"required":27528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1250,"required":1132,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":440,"required":415,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":5,"coolers":11},"resources":{"capitalGBP":12905,"volumeL":492},"values":{"coolingW":440,"drawW":132,"energyWh":28000,"heatW":415,"lossW":15,"outputW":1250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":25200,"required":25440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1000,"required":1048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":420,"required":372,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":4,"coolers":6},"resources":{"capitalGBP":11710,"volumeL":356},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":372,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,4,0,372,0,0,12,11260,320],[2,18,4,6,372,420,48,12,11710,356],[3,19,5,6,395,420,48,15,12425,380],[4,19,5,6,395,420,48,15,12425,380]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1088,"provided":26600,"required":25512,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1250,"required":1048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":420,"required":395,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":5,"coolers":6},"resources":{"capitalGBP":12425,"volumeL":380},"values":{"coolingW":420,"drawW":48,"energyWh":26600,"heatW":395,"lossW":15,"outputW":1250}}}]},{"condition":"hot","durationHours":24,"frontier":["compact-standard-liquid","compact-efficient-liquid"],"id":"p1000-h24-hot","powerW":1000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":41,"limit":32,"satisfied":false},{"component":"converters","count":6,"limit":12,"satisfied":true},{"component":"coolers","count":25,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5952,"provided":24000,"required":29952,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-216,"provided":1000,"required":1216,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":576,"required":572,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":4,"coolers":18},"resources":{"capitalGBP":10440,"volumeL":1104},"values":{"coolingW":576,"drawW":216,"energyWh":24000,"heatW":572,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,4,0,572,0,0,32,9900,888],[2,31,4,18,590,576,216,32,10760,1132],[3,38,5,19,724,608,228,40,13105,1352],[4,39,5,23,742,736,276,40,13545,1428],[5,40,6,24,768,768,288,48,13970,1480],[6,41,6,24,786,768,288,48,14290,1508],[7,41,6,25,786,800,300,48,14320,1520],[8,41,6,25,786,800,300,48,14320,1520]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":448,"provided":32800,"required":32352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":200,"provided":1500,"required":1300,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":800,"required":786,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":41,"converters":6,"coolers":25},"resources":{"capitalGBP":14320,"volumeL":1520},"values":{"coolingW":800,"drawW":300,"energyWh":32800,"heatW":786,"lossW":48,"outputW":1500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":35,"limit":32,"satisfied":false},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2880,"provided":24000,"required":26880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":1000,"required":1088,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":616,"required":572,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":4,"coolers":11},"resources":{"capitalGBP":10725,"volumeL":954},"values":{"coolingW":616,"drawW":88,"energyWh":24000,"heatW":572,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,4,0,572,0,0,32,9900,888],[2,31,4,11,590,616,88,32,11045,982],[3,34,5,11,652,616,88,40,12080,1078],[4,34,5,12,652,672,96,40,12155,1084],[5,35,5,12,670,672,96,40,12475,1112],[6,35,5,12,670,672,96,40,12475,1112]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":736,"provided":28000,"required":27264,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":672,"required":670,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":35,"converters":5,"coolers":12},"resources":{"capitalGBP":12475,"volumeL":1112},"values":{"coolingW":672,"drawW":96,"energyWh":28000,"heatW":670,"lossW":40,"outputW":1250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":39,"limit":32,"satisfied":false},{"component":"converters","count":6,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5472,"provided":24000,"required":29472,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-216,"provided":1000,"required":1216,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":576,"required":552,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":4,"coolers":18},"resources":{"capitalGBP":10600,"volumeL":1088},"values":{"coolingW":576,"drawW":216,"energyWh":24000,"heatW":552,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,4,0,552,0,0,12,10060,872],[2,31,4,18,570,576,216,12,10920,1116],[3,37,5,18,681,576,216,15,12955,1292],[4,37,5,22,681,704,264,15,13075,1340],[5,39,6,22,720,704,264,18,13830,1404],[6,39,6,23,720,736,276,18,13860,1416],[7,39,6,23,720,736,276,18,13860,1416]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":31200,"required":31056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":1500,"required":1276,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":736,"required":720,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":39,"converters":6,"coolers":23},"resources":{"capitalGBP":13860,"volumeL":1416},"values":{"coolingW":736,"drawW":276,"energyWh":31200,"heatW":720,"lossW":18,"outputW":1500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":34,"limit":32,"satisfied":false},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2208,"provided":24000,"required":26208,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":1000,"required":1080,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":560,"required":552,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":4,"coolers":10},"resources":{"capitalGBP":10810,"volumeL":932},"values":{"coolingW":560,"drawW":80,"energyWh":24000,"heatW":552,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,4,0,552,0,0,12,10060,872],[2,31,4,10,570,560,80,12,11130,960],[3,33,5,11,609,616,88,15,11960,1030],[4,34,5,11,627,616,88,15,12280,1058],[5,34,5,12,627,672,96,15,12355,1064],[6,34,5,12,627,672,96,15,12355,1064]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":536,"provided":27200,"required":26664,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1250,"required":1096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":672,"required":627,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":34,"converters":5,"coolers":12},"resources":{"capitalGBP":12355,"volumeL":1064},"values":{"coolingW":672,"drawW":96,"energyWh":27200,"heatW":627,"lossW":15,"outputW":1250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":31,"limit":32,"satisfied":true},{"component":"converters","count":6,"limit":12,"satisfied":true},{"component":"coolers","count":31,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":9,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-6464,"provided":24640,"required":31104,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-264,"provided":1000,"required":1264,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":704,"required":692,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":4,"coolers":22},"resources":{"capitalGBP":14160,"volumeL":664},"values":{"coolingW":704,"drawW":264,"energyWh":24640,"heatW":692,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,4,0,692,0,0,32,13500,400],[2,23,4,22,722,704,264,32,14760,680],[3,28,6,23,888,736,276,48,17940,796],[4,29,6,28,918,896,336,48,18690,872],[5,30,6,29,948,928,348,48,19320,900],[6,30,6,30,948,960,360,48,19350,912],[7,31,6,30,978,960,360,48,19950,928],[8,31,6,31,978,992,372,48,19980,940],[9,31,6,31,978,992,372,48,19980,940]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":34720,"required":34080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":128,"provided":1500,"required":1372,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":992,"required":978,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":31,"converters":6,"coolers":31},"resources":{"capitalGBP":19980,"volumeL":940},"values":{"coolingW":992,"drawW":372,"energyWh":34720,"heatW":978,"lossW":48,"outputW":1500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2624,"provided":24640,"required":27264,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-104,"provided":1000,"required":1104,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":728,"required":692,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":4,"coolers":13},"resources":{"capitalGBP":14475,"volumeL":478},"values":{"coolingW":728,"drawW":104,"energyWh":24640,"heatW":692,"lossW":32,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,4,0,692,0,0,32,13500,400],[2,23,4,13,722,728,104,32,15075,494],[3,25,5,13,790,728,104,40,16350,538],[4,25,5,15,790,840,120,40,16500,550],[5,25,5,15,790,840,120,40,16500,550]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":28000,"required":27840,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1250,"required":1120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":840,"required":790,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":5,"coolers":15},"resources":{"capitalGBP":16500,"volumeL":550},"values":{"coolingW":840,"drawW":120,"energyWh":28000,"heatW":790,"lossW":40,"outputW":1250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":30,"limit":32,"satisfied":true},{"component":"converters","count":6,"limit":12,"satisfied":true},{"component":"coolers","count":29,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":9,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5696,"provided":24640,"required":30336,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-252,"provided":1000,"required":1252,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":672,"required":672,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":4,"coolers":21},"resources":{"capitalGBP":14290,"volumeL":636},"values":{"coolingW":672,"drawW":252,"energyWh":24640,"heatW":672,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,4,0,672,0,0,12,13660,384],[2,22,4,21,672,672,252,12,14290,636],[3,28,6,21,858,672,252,18,18120,748],[4,28,6,27,858,864,324,18,18300,820],[5,29,6,27,888,864,324,18,18900,836],[6,29,6,28,888,896,336,18,18930,848],[7,30,6,28,918,896,336,18,19530,864],[8,30,6,29,918,928,348,18,19560,876],[9,30,6,29,918,928,348,18,19560,876]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":816,"provided":33600,"required":32784,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":152,"provided":1500,"required":1348,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":928,"required":918,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":30,"converters":6,"coolers":29},"resources":{"capitalGBP":19560,"volumeL":876},"values":{"coolingW":928,"drawW":348,"energyWh":33600,"heatW":918,"lossW":18,"outputW":1500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":5,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1952,"provided":24640,"required":26592,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1000,"required":1096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":672,"required":672,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":4,"coolers":12},"resources":{"capitalGBP":14560,"volumeL":456},"values":{"coolingW":672,"drawW":96,"energyWh":24640,"heatW":672,"lossW":12,"outputW":1000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,4,0,672,0,0,12,13660,384],[2,22,4,12,672,672,96,12,14560,456],[3,24,5,12,735,672,96,15,15875,496],[4,24,5,14,735,784,112,15,16025,508],[5,25,5,14,765,784,112,15,16625,524],[6,25,5,14,765,784,112,15,16625,524]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":952,"provided":28000,"required":27048,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":138,"provided":1250,"required":1112,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":784,"required":765,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":5,"coolers":14},"resources":{"capitalGBP":16625,"volumeL":524},"values":{"coolingW":784,"drawW":112,"energyWh":28000,"heatW":765,"lossW":15,"outputW":1250}}}]},{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p1500-h2-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-168,"provided":3000,"required":3168,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":3},"resources":{"capitalGBP":1500,"volumeL":192},"values":{"coolingW":120,"drawW":36,"energyWh":3000,"heatW":84,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,84,0,0,48,1410,156],[2,4,6,3,96,120,36,48,1820,220],[3,4,7,3,104,120,36,56,1895,232],[4,4,7,3,104,120,36,56,1895,232]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":816,"provided":4000,"required":3184,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1750,"required":1536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":120,"required":104,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":3},"resources":{"capitalGBP":1895,"volumeL":232},"values":{"coolingW":120,"drawW":36,"energyWh":4000,"heatW":104,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-128,"provided":3000,"required":3128,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":1560,"volumeL":168},"values":{"coolingW":140,"drawW":16,"energyWh":3000,"heatW":84,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,84,0,0,48,1410,156],[2,4,6,2,96,140,16,48,1880,196],[3,4,7,2,104,140,16,56,1955,208],[4,4,7,2,104,140,16,56,1955,208]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":856,"provided":4000,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":140,"required":104,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":2},"resources":{"capitalGBP":1955,"volumeL":208},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":104,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-84,"provided":3000,"required":3084,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":80,"required":54,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":1710,"volumeL":156},"values":{"coolingW":80,"drawW":24,"energyWh":3000,"heatW":54,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,54,0,0,18,1650,132],[2,4,6,2,66,80,24,18,2030,184],[3,4,7,2,69,80,24,21,2145,192],[4,4,7,2,69,80,24,21,2145,192]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":910,"provided":4000,"required":3090,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":80,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":2},"resources":{"capitalGBP":2145,"volumeL":192},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":69,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":1,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-52,"provided":3000,"required":3052,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-8,"provided":1500,"required":1508,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":70,"required":54,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":1},"resources":{"capitalGBP":1725,"volumeL":138},"values":{"coolingW":70,"drawW":8,"energyWh":3000,"heatW":54,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,54,0,0,18,1650,132],[2,4,6,1,66,70,8,18,2045,166],[3,4,7,1,69,70,8,21,2160,174],[4,4,7,1,69,70,8,21,2160,174]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":942,"provided":4000,"required":3058,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":242,"provided":1750,"required":1508,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":70,"required":69,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":1},"resources":{"capitalGBP":2160,"volumeL":174},"values":{"coolingW":70,"drawW":8,"energyWh":4000,"heatW":69,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1032,"provided":4200,"required":3168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":120,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":3},"resources":{"capitalGBP":2340,"volumeL":156},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":108,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,108,0,0,48,2250,120],[2,3,6,3,108,120,36,48,2340,156],[3,3,7,3,116,120,36,56,2415,168],[4,3,7,3,116,120,36,56,2415,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1016,"provided":4200,"required":3184,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1750,"required":1536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":120,"required":116,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":3},"resources":{"capitalGBP":2415,"volumeL":168},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":116,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1072,"provided":4200,"required":3128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":140,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":2400,"volumeL":132},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":108,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,108,0,0,48,2250,120],[2,3,6,2,108,140,16,48,2400,132],[3,3,7,2,116,140,16,56,2475,144],[4,3,7,2,116,140,16,56,2475,144]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1056,"provided":4200,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":140,"required":116,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":2},"resources":{"capitalGBP":2475,"volumeL":144},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":116,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1116,"provided":4200,"required":3084,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":80,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":2550,"volumeL":120},"values":{"coolingW":80,"drawW":24,"energyWh":4200,"heatW":78,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,78,0,0,18,2490,96],[2,3,6,2,78,80,24,18,2550,120],[3,3,7,2,81,80,24,21,2665,128],[4,3,7,3,81,120,36,21,2695,140],[5,3,7,3,81,120,36,21,2695,140]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1086,"provided":4200,"required":3114,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1750,"required":1536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":120,"required":81,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":3},"resources":{"capitalGBP":2695,"volumeL":140},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":81,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":1132,"provided":4200,"required":3068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":62,"provided":140,"required":78,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":2640,"volumeL":108},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":78,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,78,0,0,18,2490,96],[2,3,6,2,78,140,16,18,2640,108],[3,3,7,2,81,140,16,21,2755,116],[4,3,7,2,81,140,16,21,2755,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1126,"provided":4200,"required":3074,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":59,"provided":140,"required":81,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":2},"resources":{"capitalGBP":2755,"volumeL":116},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":81,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h2-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":3200,"required":3192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":128,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":6,"coolers":4},"resources":{"capitalGBP":1850,"volumeL":232},"values":{"coolingW":128,"drawW":48,"energyWh":3200,"heatW":120,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,6,0,120,0,0,48,1730,184],[2,4,6,4,120,128,48,48,1850,232],[3,4,7,4,128,128,48,56,1925,244],[4,5,7,4,146,128,48,56,2245,272],[5,5,7,5,146,160,60,56,2275,284],[6,5,7,5,146,160,60,56,2275,284]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":4000,"required":3232,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":160,"required":146,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":7,"coolers":5},"resources":{"capitalGBP":2275,"volumeL":284},"values":{"coolingW":160,"drawW":60,"energyWh":4000,"heatW":146,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":56,"provided":3200,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":168,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":6,"coolers":3},"resources":{"capitalGBP":1955,"volumeL":202},"values":{"coolingW":168,"drawW":24,"energyWh":3200,"heatW":120,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,6,0,120,0,0,48,1730,184],[2,4,6,3,120,168,24,48,1955,202],[3,4,7,3,128,168,24,56,2030,214],[4,4,7,3,128,168,24,56,2030,214]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":3200,"required":3160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":168,"required":128,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":3},"resources":{"capitalGBP":2030,"volumeL":214},"values":{"coolingW":168,"drawW":24,"energyWh":3200,"heatW":128,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":92,"provided":3200,"required":3108,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":96,"required":90,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":6,"coolers":3},"resources":{"capitalGBP":2060,"volumeL":196},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":90,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,6,0,90,0,0,18,1970,160],[2,4,6,3,90,96,36,18,2060,196],[3,4,7,3,93,96,36,21,2175,204],[4,4,7,3,93,96,36,21,2175,204]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":86,"provided":3200,"required":3114,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1750,"required":1536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":96,"required":93,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":3},"resources":{"capitalGBP":2175,"volumeL":204},"values":{"coolingW":96,"drawW":36,"energyWh":3200,"heatW":93,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":132,"provided":3200,"required":3068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":112,"required":90,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":6,"coolers":2},"resources":{"capitalGBP":2120,"volumeL":172},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":90,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,6,0,90,0,0,18,1970,160],[2,4,6,2,90,112,16,18,2120,172],[3,4,7,2,93,112,16,21,2235,180],[4,4,7,2,93,112,16,21,2235,180]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":126,"provided":3200,"required":3074,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":112,"required":93,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":7,"coolers":2},"resources":{"capitalGBP":2235,"volumeL":180},"values":{"coolingW":112,"drawW":16,"energyWh":3200,"heatW":93,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":3360,"required":3216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1500,"required":1560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":160,"required":138,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":5},"resources":{"capitalGBP":2400,"volumeL":180},"values":{"coolingW":160,"drawW":60,"energyWh":3360,"heatW":138,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,138,0,0,48,2250,120],[2,3,6,5,138,160,60,48,2400,180],[3,3,7,5,146,160,60,56,2475,192],[4,3,7,5,146,160,60,56,2475,192]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":3360,"required":3232,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":160,"required":146,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":5},"resources":{"capitalGBP":2475,"volumeL":192},"values":{"coolingW":160,"drawW":60,"energyWh":3360,"heatW":146,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":216,"provided":3360,"required":3144,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":168,"required":138,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":3},"resources":{"capitalGBP":2475,"volumeL":138},"values":{"coolingW":168,"drawW":24,"energyWh":3360,"heatW":138,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,138,0,0,48,2250,120],[2,3,6,3,138,168,24,48,2475,138],[3,3,7,3,146,168,24,56,2550,150],[4,3,7,3,146,168,24,56,2550,150]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":200,"provided":3360,"required":3160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":168,"required":146,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":3},"resources":{"capitalGBP":2550,"volumeL":150},"values":{"coolingW":168,"drawW":24,"energyWh":3360,"heatW":146,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":228,"provided":3360,"required":3132,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":128,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":4},"resources":{"capitalGBP":2610,"volumeL":144},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":108,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,108,0,0,18,2490,96],[2,3,6,4,108,128,48,18,2610,144],[3,3,7,4,111,128,48,21,2725,152],[4,3,7,4,111,128,48,21,2725,152]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":222,"provided":3360,"required":3138,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":128,"required":111,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":4},"resources":{"capitalGBP":2725,"volumeL":152},"values":{"coolingW":128,"drawW":48,"energyWh":3360,"heatW":111,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":292,"provided":3360,"required":3068,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":112,"required":108,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":6,"coolers":2},"resources":{"capitalGBP":2640,"volumeL":108},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":108,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,6,0,108,0,0,18,2490,96],[2,3,6,2,108,112,16,18,2640,108],[3,3,7,2,111,112,16,21,2755,116],[4,3,7,2,111,112,16,21,2755,116]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":286,"provided":3360,"required":3074,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":112,"required":111,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":7,"coolers":2},"resources":{"capitalGBP":2755,"volumeL":116},"values":{"coolingW":112,"drawW":16,"energyWh":3360,"heatW":111,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h4-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":6000,"required":6336,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":120,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":3},"resources":{"capitalGBP":2460,"volumeL":276},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":120,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,120,0,0,48,2370,240],[2,7,6,3,132,120,36,48,2780,304],[3,7,7,4,140,160,48,56,2885,328],[4,7,7,4,140,160,48,56,2885,328]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":584,"provided":7000,"required":6416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":160,"required":140,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":4},"resources":{"capitalGBP":2885,"volumeL":328},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":140,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-256,"provided":6000,"required":6256,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":140,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":2},"resources":{"capitalGBP":2520,"volumeL":252},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":120,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,120,0,0,48,2370,240],[2,7,6,2,132,140,16,48,2840,280],[3,7,7,2,140,140,16,56,2915,292],[4,7,7,2,140,140,16,56,2915,292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":7000,"required":6288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":140,"required":140,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":2},"resources":{"capitalGBP":2915,"volumeL":292},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":140,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-216,"provided":6000,"required":6216,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":120,"required":90,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":3},"resources":{"capitalGBP":2700,"volumeL":252},"values":{"coolingW":120,"drawW":36,"energyWh":6000,"heatW":90,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,90,0,0,18,2610,216],[2,7,6,3,102,120,36,18,3020,280],[3,7,7,3,105,120,36,21,3135,288],[4,7,7,3,105,120,36,21,3135,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":772,"provided":7000,"required":6228,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":1750,"required":1536,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":120,"required":105,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":3},"resources":{"capitalGBP":3135,"volumeL":288},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":105,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-136,"provided":6000,"required":6136,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":140,"required":90,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":2},"resources":{"capitalGBP":2760,"volumeL":228},"values":{"coolingW":140,"drawW":16,"energyWh":6000,"heatW":90,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,90,0,0,18,2610,216],[2,7,6,2,102,140,16,18,3080,256],[3,7,7,2,105,140,16,21,3195,264],[4,7,7,2,105,140,16,21,3195,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":852,"provided":7000,"required":6148,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":35,"provided":140,"required":105,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":2},"resources":{"capitalGBP":3195,"volumeL":264},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":105,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":7000,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":160,"required":148,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":6,"coolers":4},"resources":{"capitalGBP":3570,"volumeL":200},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":148,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,6,0,148,0,0,48,3450,152],[2,5,6,4,148,160,48,48,3570,200],[3,5,7,4,156,160,48,56,3645,212],[4,5,7,4,156,160,48,56,3645,212]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":584,"provided":7000,"required":6416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":160,"required":156,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":7,"coolers":4},"resources":{"capitalGBP":3645,"volumeL":212},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":156,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":712,"provided":7000,"required":6288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":62,"provided":210,"required":148,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":6,"coolers":3},"resources":{"capitalGBP":3675,"volumeL":170},"values":{"coolingW":210,"drawW":24,"energyWh":7000,"heatW":148,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,6,0,148,0,0,48,3450,152],[2,5,6,3,148,210,24,48,3675,170],[3,5,7,3,156,210,24,56,3750,182],[4,5,7,3,156,210,24,56,3750,182]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":680,"provided":7000,"required":6320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":210,"required":156,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":7,"coolers":3},"resources":{"capitalGBP":3750,"volumeL":182},"values":{"coolingW":210,"drawW":24,"energyWh":7000,"heatW":156,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":784,"provided":7000,"required":6216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":1500,"required":1536,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":120,"required":118,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":6,"coolers":3},"resources":{"capitalGBP":3780,"volumeL":164},"values":{"coolingW":120,"drawW":36,"energyWh":7000,"heatW":118,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,6,0,118,0,0,18,3690,128],[2,5,6,3,118,120,36,18,3780,164],[3,5,7,3,121,120,36,21,3895,172],[4,5,7,4,121,160,48,21,3925,184],[5,5,7,4,121,160,48,21,3925,184]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":724,"provided":7000,"required":6276,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":160,"required":121,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":7,"coolers":4},"resources":{"capitalGBP":3925,"volumeL":184},"values":{"coolingW":160,"drawW":48,"energyWh":7000,"heatW":121,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":864,"provided":7000,"required":6136,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":140,"required":118,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":6,"coolers":2},"resources":{"capitalGBP":3840,"volumeL":140},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":118,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,6,0,118,0,0,18,3690,128],[2,5,6,2,118,140,16,18,3840,140],[3,5,7,2,121,140,16,21,3955,148],[4,5,7,2,121,140,16,21,3955,148]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":852,"provided":7000,"required":6148,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":1750,"required":1516,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":140,"required":121,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":7,"coolers":2},"resources":{"capitalGBP":3955,"volumeL":148},"values":{"coolingW":140,"drawW":16,"energyWh":7000,"heatW":121,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h4-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":6400,"required":6480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":192,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":6,"coolers":6},"resources":{"capitalGBP":3190,"volumeL":368},"values":{"coolingW":192,"drawW":72,"energyWh":6400,"heatW":192,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,6,0,192,0,0,48,3010,296],[2,8,6,6,192,192,72,48,3190,368],[3,9,7,6,218,192,72,56,3585,408],[4,9,7,7,218,224,84,56,3615,420],[5,9,7,7,218,224,84,56,3615,420]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":7200,"required":6560,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1750,"required":1584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":224,"required":218,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":7,"coolers":7},"resources":{"capitalGBP":3615,"volumeL":420},"values":{"coolingW":224,"drawW":84,"energyWh":7200,"heatW":218,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":6400,"required":6320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":224,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":6,"coolers":4},"resources":{"capitalGBP":3310,"volumeL":320},"values":{"coolingW":224,"drawW":32,"energyWh":6400,"heatW":192,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,6,0,192,0,0,48,3010,296],[2,8,6,4,192,224,32,48,3310,320],[3,8,7,4,200,224,32,56,3385,332],[4,8,7,4,200,224,32,56,3385,332]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":6400,"required":6352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1750,"required":1532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":224,"required":200,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":7,"coolers":4},"resources":{"capitalGBP":3385,"volumeL":332},"values":{"coolingW":224,"drawW":32,"energyWh":6400,"heatW":200,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":6400,"required":6360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":192,"required":162,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":6,"coolers":6},"resources":{"capitalGBP":3430,"volumeL":344},"values":{"coolingW":192,"drawW":72,"energyWh":6400,"heatW":162,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,6,0,162,0,0,18,3250,272],[2,8,6,6,162,192,72,18,3430,344],[3,8,7,6,165,192,72,21,3545,352],[4,8,7,6,165,192,72,21,3545,352]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":28,"provided":6400,"required":6372,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":192,"required":165,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":7,"coolers":6},"resources":{"capitalGBP":3545,"volumeL":352},"values":{"coolingW":192,"drawW":72,"energyWh":6400,"heatW":165,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":6400,"required":6168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":168,"required":162,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":6,"coolers":3},"resources":{"capitalGBP":3475,"volumeL":290},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":162,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,6,0,162,0,0,18,3250,272],[2,8,6,3,162,168,24,18,3475,290],[3,8,7,3,165,168,24,21,3590,298],[4,8,7,3,165,168,24,21,3590,298]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":220,"provided":6400,"required":6180,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":168,"required":165,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":7,"coolers":3},"resources":{"capitalGBP":3590,"volumeL":298},"values":{"coolingW":168,"drawW":24,"energyWh":6400,"heatW":165,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":6720,"required":6576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1500,"required":1596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":256,"required":228,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":8},"resources":{"capitalGBP":4290,"volumeL":264},"values":{"coolingW":256,"drawW":96,"energyWh":6720,"heatW":228,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,228,0,0,48,4050,168],[2,6,6,8,228,256,96,48,4290,264],[3,6,7,8,236,256,96,56,4365,276],[4,6,7,8,236,256,96,56,4365,276]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":112,"provided":6720,"required":6608,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1750,"required":1596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":256,"required":236,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":7,"coolers":8},"resources":{"capitalGBP":4365,"volumeL":276},"values":{"coolingW":256,"drawW":96,"energyWh":6720,"heatW":236,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":6720,"required":6352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":280,"required":228,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":5},"resources":{"capitalGBP":4425,"volumeL":198},"values":{"coolingW":280,"drawW":40,"energyWh":6720,"heatW":228,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,228,0,0,48,4050,168],[2,6,6,5,228,280,40,48,4425,198],[3,6,7,5,236,280,40,56,4500,210],[4,6,7,5,236,280,40,56,4500,210]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":6720,"required":6384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":280,"required":236,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":7,"coolers":5},"resources":{"capitalGBP":4500,"volumeL":210},"values":{"coolingW":280,"drawW":40,"energyWh":6720,"heatW":236,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":312,"provided":6720,"required":6408,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1500,"required":1584,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":224,"required":198,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":7},"resources":{"capitalGBP":4500,"volumeL":228},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":198,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,198,0,0,18,4290,144],[2,6,6,7,198,224,84,18,4500,228],[3,6,7,7,201,224,84,21,4615,236],[4,6,7,7,201,224,84,21,4615,236]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":300,"provided":6720,"required":6420,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1750,"required":1584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":224,"required":201,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":7,"coolers":7},"resources":{"capitalGBP":4615,"volumeL":236},"values":{"coolingW":224,"drawW":84,"energyWh":6720,"heatW":201,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":6720,"required":6200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":224,"required":198,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":6,"coolers":4},"resources":{"capitalGBP":4590,"volumeL":168},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":198,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,6,0,198,0,0,18,4290,144],[2,6,6,4,198,224,32,18,4590,168],[3,6,7,4,201,224,32,21,4705,176],[4,6,7,4,201,224,32,21,4705,176]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":508,"provided":6720,"required":6212,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1750,"required":1532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":224,"required":201,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":7,"coolers":4},"resources":{"capitalGBP":4705,"volumeL":176},"values":{"coolingW":224,"drawW":32,"energyWh":6720,"heatW":201,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h6-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-576,"provided":9000,"required":9576,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":160,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":4},"resources":{"capitalGBP":3450,"volumeL":372},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":156,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,156,0,0,48,3330,324],[2,10,6,4,168,160,48,48,3770,400],[3,10,7,5,176,200,60,56,3875,424],[4,10,7,5,176,200,60,56,3875,424]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":10000,"required":9696,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":200,"required":176,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":5},"resources":{"capitalGBP":3875,"volumeL":424},"values":{"coolingW":200,"drawW":60,"energyWh":10000,"heatW":176,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-432,"provided":9000,"required":9432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":210,"required":156,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":3},"resources":{"capitalGBP":3555,"volumeL":342},"values":{"coolingW":210,"drawW":24,"energyWh":9000,"heatW":156,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,156,0,0,48,3330,324],[2,10,6,3,168,210,24,48,3875,370],[3,10,7,3,176,210,24,56,3950,382],[4,10,7,3,176,210,24,56,3950,382]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":520,"provided":10000,"required":9480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":210,"required":176,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":3},"resources":{"capitalGBP":3950,"volumeL":382},"values":{"coolingW":210,"drawW":24,"energyWh":10000,"heatW":176,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-396,"provided":9000,"required":9396,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":160,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":4},"resources":{"capitalGBP":3690,"volumeL":348},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":126,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,126,0,0,18,3570,300],[2,10,6,4,138,160,48,18,4010,376],[3,10,7,4,141,160,48,21,4125,384],[4,10,7,4,141,160,48,21,4125,384]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":586,"provided":10000,"required":9414,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":160,"required":141,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":4},"resources":{"capitalGBP":4125,"volumeL":384},"values":{"coolingW":160,"drawW":48,"energyWh":10000,"heatW":141,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-204,"provided":9000,"required":9204,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":1500,"required":1516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":140,"required":126,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":2},"resources":{"capitalGBP":3720,"volumeL":312},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":126,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,126,0,0,18,3570,300],[2,10,6,2,138,140,16,18,4040,340],[3,10,7,2,141,140,16,21,4155,348],[4,10,7,3,141,210,24,21,4230,354],[5,10,7,3,141,210,24,21,4230,354]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":730,"provided":10000,"required":9270,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":69,"provided":210,"required":141,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":3},"resources":{"capitalGBP":4230,"volumeL":354},"values":{"coolingW":210,"drawW":24,"energyWh":10000,"heatW":141,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":152,"provided":9800,"required":9648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1500,"required":1560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":200,"required":188,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":6,"coolers":5},"resources":{"capitalGBP":4800,"volumeL":244},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":188,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,6,0,188,0,0,48,4650,184],[2,7,6,5,188,200,60,48,4800,244],[3,7,7,5,196,200,60,56,4875,256],[4,7,7,5,196,200,60,56,4875,256]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":104,"provided":9800,"required":9696,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":200,"required":196,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":5},"resources":{"capitalGBP":4875,"volumeL":256},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":196,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":9800,"required":9432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":210,"required":188,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":6,"coolers":3},"resources":{"capitalGBP":4875,"volumeL":202},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":188,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,6,0,188,0,0,48,4650,184],[2,7,6,3,188,210,24,48,4875,202],[3,7,7,3,196,210,24,56,4950,214],[4,7,7,3,196,210,24,56,4950,214]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":320,"provided":9800,"required":9480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":210,"required":196,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":3},"resources":{"capitalGBP":4950,"volumeL":214},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":196,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":404,"provided":9800,"required":9396,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":160,"required":158,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":6,"coolers":4},"resources":{"capitalGBP":5010,"volumeL":208},"values":{"coolingW":160,"drawW":48,"energyWh":9800,"heatW":158,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,6,0,158,0,0,18,4890,160],[2,7,6,4,158,160,48,18,5010,208],[3,7,7,4,161,160,48,21,5125,216],[4,7,7,5,161,200,60,21,5155,228],[5,7,7,5,161,200,60,21,5155,228]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":314,"provided":9800,"required":9486,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":200,"required":161,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":5},"resources":{"capitalGBP":5155,"volumeL":228},"values":{"coolingW":200,"drawW":60,"energyWh":9800,"heatW":161,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":548,"provided":9800,"required":9252,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":210,"required":158,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":7,"converters":6,"coolers":3},"resources":{"capitalGBP":5115,"volumeL":178},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":158,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,7,6,0,158,0,0,18,4890,160],[2,7,6,3,158,210,24,18,5115,178],[3,7,7,3,161,210,24,21,5230,186],[4,7,7,3,161,210,24,21,5230,186]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":530,"provided":9800,"required":9270,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":210,"required":161,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":7,"coolers":3},"resources":{"capitalGBP":5230,"volumeL":186},"values":{"coolingW":210,"drawW":24,"energyWh":9800,"heatW":161,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h6-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":9600,"required":9936,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1500,"required":1608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":288,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":9},"resources":{"capitalGBP":4560,"volumeL":516},"values":{"coolingW":288,"drawW":108,"energyWh":9600,"heatW":264,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,264,0,0,48,4290,408],[2,12,6,9,264,288,108,48,4560,516],[3,13,7,9,290,288,108,56,4955,556],[4,13,7,10,290,320,120,56,4985,568],[5,13,7,10,290,320,120,56,4985,568]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":344,"provided":10400,"required":10056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1750,"required":1620,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":320,"required":290,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":10},"resources":{"capitalGBP":4985,"volumeL":568},"values":{"coolingW":320,"drawW":120,"energyWh":10400,"heatW":290,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":9600,"required":9528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":5},"resources":{"capitalGBP":4665,"volumeL":438},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":264,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,264,0,0,48,4290,408],[2,12,6,5,264,280,40,48,4665,438],[3,12,7,5,272,280,40,56,4740,450],[4,12,7,5,272,280,40,56,4740,450]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":9600,"required":9576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":7,"coolers":5},"resources":{"capitalGBP":4740,"volumeL":450},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":272,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-84,"provided":9600,"required":9684,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1500,"required":1596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":256,"required":234,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":8},"resources":{"capitalGBP":4770,"volumeL":480},"values":{"coolingW":256,"drawW":96,"energyWh":9600,"heatW":234,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,234,0,0,18,4530,384],[2,12,6,8,234,256,96,18,4770,480],[3,13,7,8,255,256,96,21,5205,516],[4,13,7,8,255,256,96,21,5205,516]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":698,"provided":10400,"required":9702,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1750,"required":1596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":256,"required":255,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":8},"resources":{"capitalGBP":5205,"volumeL":516},"values":{"coolingW":256,"drawW":96,"energyWh":10400,"heatW":255,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":252,"provided":9600,"required":9348,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":280,"required":234,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":5},"resources":{"capitalGBP":4905,"volumeL":414},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":234,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,234,0,0,18,4530,384],[2,12,6,5,234,280,40,18,4905,414],[3,12,7,5,237,280,40,21,5020,422],[4,12,7,5,237,280,40,21,5020,422]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":234,"provided":9600,"required":9366,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":280,"required":237,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":7,"coolers":5},"resources":{"capitalGBP":5020,"volumeL":422},"values":{"coolingW":280,"drawW":40,"energyWh":9600,"heatW":237,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":10080,"required":10008,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1500,"required":1620,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":320,"required":318,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":10},"resources":{"capitalGBP":6150,"volumeL":336},"values":{"coolingW":320,"drawW":120,"energyWh":10080,"heatW":318,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,318,0,0,48,5850,216],[2,9,6,10,318,320,120,48,6150,336],[3,9,7,10,326,320,120,56,6225,348],[4,9,7,11,326,352,132,56,6255,360],[5,10,7,11,356,352,132,56,6855,376],[6,10,7,12,356,384,144,56,6885,388],[7,10,7,12,356,384,144,56,6885,388]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1000,"provided":11200,"required":10200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1750,"required":1644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":384,"required":356,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":12},"resources":{"capitalGBP":6885,"volumeL":388},"values":{"coolingW":384,"drawW":144,"energyWh":11200,"heatW":356,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":504,"provided":10080,"required":9576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":336,"required":318,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":6},"resources":{"capitalGBP":6300,"volumeL":252},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":318,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,318,0,0,48,5850,216],[2,9,6,6,318,336,48,48,6300,252],[3,9,7,6,326,336,48,56,6375,264],[4,9,7,6,326,336,48,56,6375,264]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":10080,"required":9624,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":336,"required":326,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":7,"coolers":6},"resources":{"capitalGBP":6375,"volumeL":264},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":326,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":324,"provided":10080,"required":9756,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1500,"required":1608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":288,"required":288,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":9},"resources":{"capitalGBP":6360,"volumeL":300},"values":{"coolingW":288,"drawW":108,"energyWh":10080,"heatW":288,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,288,0,0,18,6090,192],[2,9,6,9,288,288,108,18,6360,300],[3,9,7,9,291,288,108,21,6475,308],[4,9,7,10,291,320,120,21,6505,320],[5,9,7,10,291,320,120,21,6505,320]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":234,"provided":10080,"required":9846,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1750,"required":1620,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":320,"required":291,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":7,"coolers":10},"resources":{"capitalGBP":6505,"volumeL":320},"values":{"coolingW":320,"drawW":120,"energyWh":10080,"heatW":291,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":684,"provided":10080,"required":9396,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":336,"required":288,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":6},"resources":{"capitalGBP":6540,"volumeL":228},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":288,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,288,0,0,18,6090,192],[2,9,6,6,288,336,48,18,6540,228],[3,9,7,6,291,336,48,21,6655,236],[4,9,7,6,291,336,48,21,6655,236]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":666,"provided":10080,"required":9414,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":336,"required":291,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":7,"coolers":6},"resources":{"capitalGBP":6655,"volumeL":236},"values":{"coolingW":336,"drawW":48,"energyWh":10080,"heatW":291,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p1500-h8-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-864,"provided":12000,"required":12864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1500,"required":1560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":200,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":5},"resources":{"capitalGBP":4440,"volumeL":468},"values":{"coolingW":200,"drawW":60,"energyWh":12000,"heatW":192,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,192,0,0,48,4290,408],[2,13,6,5,204,200,60,48,4760,496],[3,13,7,6,212,240,72,56,4865,520],[4,14,7,6,224,240,72,56,5185,548],[5,14,7,6,224,240,72,56,5185,548]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":976,"provided":14000,"required":13024,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":240,"required":224,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":7,"coolers":6},"resources":{"capitalGBP":5185,"volumeL":548},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":224,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-576,"provided":12000,"required":12576,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":210,"required":192,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":3},"resources":{"capitalGBP":4515,"volumeL":426},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":192,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,192,0,0,48,4290,408],[2,13,6,3,204,210,24,48,4835,454],[3,13,7,3,212,210,24,56,4910,466],[4,13,7,4,212,280,32,56,4985,472],[5,13,7,4,212,280,32,56,4985,472]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":296,"provided":13000,"required":12704,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1750,"required":1532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":280,"required":212,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":4},"resources":{"capitalGBP":4985,"volumeL":472},"values":{"coolingW":280,"drawW":32,"energyWh":13000,"heatW":212,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-624,"provided":12000,"required":12624,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1500,"required":1560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":200,"required":162,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":5},"resources":{"capitalGBP":4680,"volumeL":444},"values":{"coolingW":200,"drawW":60,"energyWh":12000,"heatW":162,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,162,0,0,18,4530,384],[2,13,6,5,174,200,60,18,5000,472],[3,13,7,5,177,200,60,21,5115,480],[4,13,7,5,177,200,60,21,5115,480]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":13000,"required":12648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":1750,"required":1560,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":200,"required":177,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":5},"resources":{"capitalGBP":5115,"volumeL":480},"values":{"coolingW":200,"drawW":60,"energyWh":13000,"heatW":177,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":12000,"required":12336,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":210,"required":162,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":6,"coolers":3},"resources":{"capitalGBP":4755,"volumeL":402},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":162,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,6,0,162,0,0,18,4530,384],[2,13,6,3,174,210,24,18,5075,430],[3,13,7,3,177,210,24,21,5190,438],[4,13,7,3,177,210,24,21,5190,438]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":13000,"required":12360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":210,"required":177,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":3},"resources":{"capitalGBP":5190,"volumeL":438},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":177,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-360,"provided":12600,"required":12960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":240,"required":228,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":6},"resources":{"capitalGBP":6030,"volumeL":288},"values":{"coolingW":240,"drawW":72,"energyWh":12600,"heatW":228,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,228,0,0,48,5850,216],[2,9,6,6,228,240,72,48,6030,288],[3,10,7,6,256,240,72,56,6705,316],[4,10,7,7,256,280,84,56,6735,328],[5,10,7,7,256,280,84,56,6735,328]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":880,"provided":14000,"required":13120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1750,"required":1584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":7},"resources":{"capitalGBP":6735,"volumeL":328},"values":{"coolingW":280,"drawW":84,"energyWh":14000,"heatW":256,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-40,"provided":12600,"required":12640,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":280,"required":228,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":4},"resources":{"capitalGBP":6150,"volumeL":240},"values":{"coolingW":280,"drawW":32,"energyWh":12600,"heatW":228,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,228,0,0,48,5850,216],[2,9,6,4,228,280,32,48,6150,240],[3,10,7,4,256,280,32,56,6825,268],[4,10,7,4,256,280,32,56,6825,268]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1296,"provided":14000,"required":12704,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1750,"required":1532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":4},"resources":{"capitalGBP":6825,"volumeL":268},"values":{"coolingW":280,"drawW":32,"energyWh":14000,"heatW":256,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-24,"provided":12600,"required":12624,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":1500,"required":1560,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":200,"required":198,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":5},"resources":{"capitalGBP":6240,"volumeL":252},"values":{"coolingW":200,"drawW":60,"energyWh":12600,"heatW":198,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,198,0,0,18,6090,192],[2,9,6,5,198,200,60,18,6240,252],[3,10,7,5,221,200,60,21,6955,276],[4,10,7,6,221,240,72,21,6985,288],[5,10,7,6,221,240,72,21,6985,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1256,"provided":14000,"required":12744,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":240,"required":221,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":7,"coolers":6},"resources":{"capitalGBP":6985,"volumeL":288},"values":{"coolingW":240,"drawW":72,"energyWh":14000,"heatW":221,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":12600,"required":12336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":1500,"required":1524,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":210,"required":198,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":6,"coolers":3},"resources":{"capitalGBP":6315,"volumeL":210},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":198,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,6,0,198,0,0,18,6090,192],[2,9,6,3,198,210,24,18,6315,210],[3,9,7,3,201,210,24,21,6430,218],[4,9,7,3,201,210,24,21,6430,218]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":240,"provided":12600,"required":12360,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":1750,"required":1524,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":210,"required":201,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":7,"coolers":3},"resources":{"capitalGBP":6430,"volumeL":218},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":201,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-standard-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h8-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":12000,"required":13344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1500,"required":1620,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":320,"required":318,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":6,"coolers":10},"resources":{"capitalGBP":5550,"volumeL":612},"values":{"coolingW":320,"drawW":120,"energyWh":12000,"heatW":318,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,6,0,318,0,0,48,5250,492],[2,16,6,10,336,320,120,48,5870,640],[3,17,7,11,362,352,132,56,6295,692],[4,17,7,12,362,384,144,56,6325,704],[5,17,7,12,362,384,144,56,6325,704]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":13600,"required":13600,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1750,"required":1644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":384,"required":362,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":7,"coolers":12},"resources":{"capitalGBP":6325,"volumeL":704},"values":{"coolingW":384,"drawW":144,"energyWh":13600,"heatW":362,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":12000,"required":12768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":336,"required":318,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":6,"coolers":6},"resources":{"capitalGBP":5700,"volumeL":528},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":318,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,6,0,318,0,0,48,5250,492],[2,16,6,6,336,336,48,48,6020,556],[3,16,7,6,344,336,48,56,6095,568],[4,17,7,7,362,392,56,56,6490,602],[5,17,7,7,362,392,56,56,6490,602]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":13600,"required":12896,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1750,"required":1556,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":392,"required":362,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":7,"coolers":7},"resources":{"capitalGBP":6490,"volumeL":602},"values":{"coolingW":392,"drawW":56,"energyWh":13600,"heatW":362,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1008,"provided":12000,"required":13008,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1500,"required":1608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":288,"required":288,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":6,"coolers":9},"resources":{"capitalGBP":5760,"volumeL":576},"values":{"coolingW":288,"drawW":108,"energyWh":12000,"heatW":288,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,6,0,288,0,0,18,5490,468],[2,16,6,9,306,288,108,18,6080,604],[3,17,7,10,327,320,120,21,6545,652],[4,17,7,11,327,352,132,21,6575,664],[5,17,7,11,327,352,132,21,6575,664]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":376,"provided":13600,"required":13224,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1750,"required":1632,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":352,"required":327,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":7,"coolers":11},"resources":{"capitalGBP":6575,"volumeL":664},"values":{"coolingW":352,"drawW":132,"energyWh":13600,"heatW":327,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-528,"provided":12000,"required":12528,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":336,"required":288,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":6,"coolers":6},"resources":{"capitalGBP":5940,"volumeL":504},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":288,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,6,0,288,0,0,18,5490,468],[2,16,6,6,306,336,48,18,6260,532],[3,16,7,6,309,336,48,21,6375,540],[4,16,7,6,309,336,48,21,6375,540]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":12800,"required":12552,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":336,"required":309,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":7,"coolers":6},"resources":{"capitalGBP":6375,"volumeL":540},"values":{"coolingW":336,"drawW":48,"energyWh":12800,"heatW":309,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1216,"provided":12320,"required":13536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1500,"required":1644,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":384,"required":378,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":6,"coolers":12},"resources":{"capitalGBP":7410,"volumeL":392},"values":{"coolingW":384,"drawW":144,"energyWh":12320,"heatW":378,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,6,0,378,0,0,48,7050,248],[2,12,6,12,408,384,144,48,8010,408],[3,13,7,13,446,416,156,56,8715,448],[4,13,7,14,446,448,168,56,8745,460],[5,13,7,14,446,448,168,56,8745,460]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":14560,"required":13792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1750,"required":1668,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":448,"required":446,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":7,"coolers":14},"resources":{"capitalGBP":8745,"volumeL":460},"values":{"coolingW":448,"drawW":168,"energyWh":14560,"heatW":446,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-512,"provided":12320,"required":12832,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1500,"required":1556,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":392,"required":378,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":6,"coolers":7},"resources":{"capitalGBP":7575,"volumeL":290},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":378,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,6,0,378,0,0,48,7050,248],[2,12,6,7,408,392,56,48,8175,306],[3,12,7,8,416,448,64,56,8325,324],[4,12,7,8,416,448,64,56,8325,324]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":13440,"required":12960,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":1750,"required":1564,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":448,"required":416,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":7,"coolers":8},"resources":{"capitalGBP":8325,"volumeL":324},"values":{"coolingW":448,"drawW":64,"energyWh":13440,"heatW":416,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-880,"provided":12320,"required":13200,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":1500,"required":1632,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":352,"required":348,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":6,"coolers":11},"resources":{"capitalGBP":7620,"volumeL":356},"values":{"coolingW":352,"drawW":132,"energyWh":12320,"heatW":348,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,6,0,348,0,0,18,7290,224],[2,11,6,11,348,352,132,18,7620,356],[3,12,7,11,381,352,132,21,8335,380],[4,12,7,12,381,384,144,21,8365,392],[5,12,7,12,381,384,144,21,8365,392]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":120,"provided":13440,"required":13320,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1750,"required":1644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":384,"required":381,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":7,"coolers":12},"resources":{"capitalGBP":8365,"volumeL":392},"values":{"coolingW":384,"drawW":144,"energyWh":13440,"heatW":381,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-272,"provided":12320,"required":12592,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1500,"required":1556,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":392,"required":348,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":6,"coolers":7},"resources":{"capitalGBP":7815,"volumeL":266},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":348,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,6,0,348,0,0,18,7290,224],[2,11,6,7,348,392,56,18,7815,266],[3,12,7,7,381,392,56,21,8530,290],[4,12,7,7,381,392,56,21,8530,290]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":824,"provided":13440,"required":12616,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1750,"required":1556,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":392,"required":381,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":7,"coolers":7},"resources":{"capitalGBP":8530,"volumeL":290},"values":{"coolingW":392,"drawW":56,"energyWh":13440,"heatW":381,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-standard-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h12-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1584,"provided":18000,"required":19584,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1500,"required":1584,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":7},"resources":{"capitalGBP":6420,"volumeL":660},"values":{"coolingW":280,"drawW":84,"energyWh":18000,"heatW":264,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,264,0,0,48,6210,576],[2,19,6,7,276,280,84,48,6740,688],[3,20,7,7,296,280,84,56,7135,728],[4,20,7,8,296,320,96,56,7165,740],[5,20,7,8,296,320,96,56,7165,740]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":176,"provided":20000,"required":19824,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1750,"required":1596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":320,"required":296,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":7,"coolers":8},"resources":{"capitalGBP":7165,"volumeL":740},"values":{"coolingW":320,"drawW":96,"energyWh":20000,"heatW":296,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-960,"provided":18000,"required":18960,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":4},"resources":{"capitalGBP":6510,"volumeL":600},"values":{"coolingW":280,"drawW":32,"energyWh":18000,"heatW":264,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,264,0,0,48,6210,576],[2,19,6,4,276,280,32,48,6830,628],[3,19,7,4,284,280,32,56,6905,640],[4,20,7,5,296,350,40,56,7300,674],[5,20,7,5,296,350,40,56,7300,674]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":848,"provided":20000,"required":19152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":350,"required":296,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":7,"coolers":5},"resources":{"capitalGBP":7300,"volumeL":674},"values":{"coolingW":350,"drawW":40,"energyWh":20000,"heatW":296,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1080,"provided":18000,"required":19080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":240,"required":234,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":6},"resources":{"capitalGBP":6630,"volumeL":624},"values":{"coolingW":240,"drawW":72,"energyWh":18000,"heatW":234,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,234,0,0,18,6450,552],[2,19,6,6,246,240,72,18,6950,652],[3,20,7,7,261,280,84,21,7415,700],[4,20,7,7,261,280,84,21,7415,700]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":740,"provided":20000,"required":19260,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":1750,"required":1584,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":280,"required":261,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":7,"coolers":7},"resources":{"capitalGBP":7415,"volumeL":700},"values":{"coolingW":280,"drawW":84,"energyWh":20000,"heatW":261,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-600,"provided":18000,"required":18600,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":280,"required":234,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":4},"resources":{"capitalGBP":6750,"volumeL":576},"values":{"coolingW":280,"drawW":32,"energyWh":18000,"heatW":234,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,234,0,0,18,6450,552],[2,19,6,4,246,280,32,18,7070,604],[3,19,7,4,249,280,32,21,7185,612],[4,19,7,4,249,280,32,21,7185,612]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":364,"provided":19000,"required":18636,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":1750,"required":1532,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":280,"required":249,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":7,"coolers":4},"resources":{"capitalGBP":7185,"volumeL":612},"values":{"coolingW":280,"drawW":32,"energyWh":19000,"heatW":249,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1528,"provided":18200,"required":19728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1500,"required":1596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":320,"required":308,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":6,"coolers":8},"resources":{"capitalGBP":8490,"volumeL":376},"values":{"coolingW":320,"drawW":96,"energyWh":18200,"heatW":308,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,6,0,308,0,0,48,8250,280],[2,14,6,8,328,320,96,48,9090,392],[3,15,7,9,356,360,108,56,9795,432],[4,15,7,9,356,360,108,56,9795,432]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1032,"provided":21000,"required":19968,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":1750,"required":1608,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":360,"required":356,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":7,"coolers":9},"resources":{"capitalGBP":9795,"volumeL":432},"values":{"coolingW":360,"drawW":108,"energyWh":21000,"heatW":356,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-856,"provided":18200,"required":19056,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":350,"required":308,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":6,"coolers":5},"resources":{"capitalGBP":8625,"volumeL":310},"values":{"coolingW":350,"drawW":40,"energyWh":18200,"heatW":308,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,6,0,308,0,0,48,8250,280],[2,14,6,5,328,350,40,48,9225,326],[3,14,7,5,336,350,40,56,9300,338],[4,14,7,5,336,350,40,56,9300,338]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":448,"provided":19600,"required":19152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":350,"required":336,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":7,"coolers":5},"resources":{"capitalGBP":9300,"volumeL":338},"values":{"coolingW":350,"drawW":40,"energyWh":19600,"heatW":336,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1024,"provided":18200,"required":19224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":1500,"required":1584,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":280,"required":278,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":6,"coolers":7},"resources":{"capitalGBP":8700,"volumeL":340},"values":{"coolingW":280,"drawW":84,"energyWh":18200,"heatW":278,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,6,0,278,0,0,18,8490,256],[2,14,6,7,298,280,84,18,9300,356],[3,14,7,8,301,320,96,21,9445,376],[4,14,7,8,301,320,96,21,9445,376]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":196,"provided":19600,"required":19404,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1750,"required":1596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":320,"required":301,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":7,"coolers":8},"resources":{"capitalGBP":9445,"volumeL":376},"values":{"coolingW":320,"drawW":96,"energyWh":19600,"heatW":301,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":14,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-400,"provided":18200,"required":18600,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":1500,"required":1532,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":280,"required":278,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":13,"converters":6,"coolers":4},"resources":{"capitalGBP":8790,"volumeL":280},"values":{"coolingW":280,"drawW":32,"energyWh":18200,"heatW":278,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,13,6,0,278,0,0,18,8490,256],[2,14,6,4,298,280,32,18,9390,296],[3,14,7,5,301,350,40,21,9580,310],[4,14,7,5,301,350,40,21,9580,310]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":868,"provided":19600,"required":18732,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":350,"required":301,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":14,"converters":7,"coolers":5},"resources":{"capitalGBP":9580,"volumeL":310},"values":{"coolingW":350,"drawW":40,"energyWh":19600,"heatW":301,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-efficient-liquid","compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h12-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":17,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2336,"provided":18400,"required":20736,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-180,"provided":1500,"required":1680,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":480,"required":462,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":6,"coolers":15},"resources":{"capitalGBP":8260,"volumeL":896},"values":{"coolingW":480,"drawW":180,"energyWh":18400,"heatW":462,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,6,0,462,0,0,48,7810,716],[2,24,6,15,480,480,180,48,8580,924],[3,26,7,15,524,480,180,56,9295,992],[4,27,7,17,542,544,204,56,9675,1044],[5,27,7,17,542,544,204,56,9675,1044]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":21600,"required":21120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":46,"provided":1750,"required":1704,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":544,"required":542,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":7,"coolers":17},"resources":{"capitalGBP":9675,"volumeL":1044},"values":{"coolingW":544,"drawW":204,"energyWh":21600,"heatW":542,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1040,"provided":18400,"required":19440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":504,"required":462,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":6,"coolers":9},"resources":{"capitalGBP":8485,"volumeL":770},"values":{"coolingW":504,"drawW":72,"energyWh":18400,"heatW":462,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,6,0,462,0,0,48,7810,716],[2,24,6,9,480,504,72,48,8805,798],[3,25,7,9,506,504,72,56,9200,838],[4,25,7,10,506,560,80,56,9275,844],[5,25,7,10,506,560,80,56,9275,844]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":20000,"required":19632,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":170,"provided":1750,"required":1580,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":560,"required":506,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":7,"coolers":10},"resources":{"capitalGBP":9275,"volumeL":844},"values":{"coolingW":560,"drawW":80,"energyWh":20000,"heatW":506,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1832,"provided":18400,"required":20232,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":1500,"required":1668,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":448,"required":432,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":6,"coolers":14},"resources":{"capitalGBP":8470,"volumeL":860},"values":{"coolingW":448,"drawW":168,"energyWh":18400,"heatW":432,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,6,0,432,0,0,18,8050,692],[2,23,6,14,432,448,168,18,8470,860],[3,26,7,14,489,448,168,21,9545,952],[4,26,7,16,489,512,192,21,9605,976],[5,26,7,16,489,512,192,21,9605,976]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":244,"provided":20800,"required":20556,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":1750,"required":1692,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":512,"required":489,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":7,"coolers":16},"resources":{"capitalGBP":9605,"volumeL":976},"values":{"coolingW":512,"drawW":192,"energyWh":20800,"heatW":489,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-584,"provided":18400,"required":18984,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":1500,"required":1564,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":448,"required":432,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":6,"coolers":8},"resources":{"capitalGBP":8650,"volumeL":740},"values":{"coolingW":448,"drawW":64,"energyWh":18400,"heatW":432,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,6,0,432,0,0,18,8050,692],[2,23,6,8,432,448,64,18,8650,740],[3,24,7,8,453,448,64,21,9085,776],[4,24,7,9,453,504,72,21,9160,782],[5,24,7,9,453,504,72,21,9160,782]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":84,"provided":19200,"required":19116,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":51,"provided":504,"required":453,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":7,"coolers":9},"resources":{"capitalGBP":9160,"volumeL":782},"values":{"coolingW":504,"drawW":72,"energyWh":19200,"heatW":453,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2128,"provided":19040,"required":21168,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-216,"provided":1500,"required":1716,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":576,"required":558,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":6,"coolers":18},"resources":{"capitalGBP":11190,"volumeL":560},"values":{"coolingW":576,"drawW":216,"energyWh":19040,"heatW":558,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,6,0,558,0,0,48,10650,344],[2,17,6,18,558,576,216,48,11190,560],[3,19,7,18,626,576,216,56,12465,604],[4,19,7,20,626,640,240,56,12525,628],[5,20,7,20,656,640,240,56,13125,644],[6,20,7,21,656,672,252,56,13155,656],[7,20,8,21,664,672,252,64,13230,668],[8,20,8,21,664,672,252,64,13230,668]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":608,"provided":22400,"required":21792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":248,"provided":2000,"required":1752,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":672,"required":664,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":8,"coolers":21},"resources":{"capitalGBP":13230,"volumeL":668},"values":{"coolingW":672,"drawW":252,"energyWh":22400,"heatW":664,"lossW":64,"outputW":2000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-496,"provided":19040,"required":19536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":1500,"required":1580,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":560,"required":558,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":6,"coolers":10},"resources":{"capitalGBP":11400,"volumeL":404},"values":{"coolingW":560,"drawW":80,"energyWh":19040,"heatW":558,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,6,0,558,0,0,48,10650,344],[2,17,6,10,558,560,80,48,11400,404],[3,18,7,10,596,560,80,56,12075,432],[4,18,7,11,596,616,88,56,12150,438],[5,18,7,11,596,616,88,56,12150,438]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":432,"provided":20160,"required":19728,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":1750,"required":1588,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":616,"required":596,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":7,"coolers":11},"resources":{"capitalGBP":12150,"volumeL":438},"values":{"coolingW":616,"drawW":88,"energyWh":20160,"heatW":596,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":19,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1624,"provided":19040,"required":20664,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-204,"provided":1500,"required":1704,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":544,"required":528,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":6,"coolers":17},"resources":{"capitalGBP":11400,"volumeL":524},"values":{"coolingW":544,"drawW":204,"energyWh":19040,"heatW":528,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,6,0,528,0,0,18,10890,320],[2,17,6,17,528,544,204,18,11400,524],[3,19,7,17,591,544,204,21,12715,564],[4,19,7,19,591,608,228,21,12775,588],[5,19,7,19,591,608,228,21,12775,588]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":292,"provided":21280,"required":20988,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":22,"provided":1750,"required":1728,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":608,"required":591,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":7,"coolers":19},"resources":{"capitalGBP":12775,"volumeL":588},"values":{"coolingW":608,"drawW":228,"energyWh":21280,"heatW":591,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-136,"provided":19040,"required":19176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":1500,"required":1580,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":560,"required":528,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":17,"converters":6,"coolers":10},"resources":{"capitalGBP":11640,"volumeL":380},"values":{"coolingW":560,"drawW":80,"energyWh":19040,"heatW":528,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,17,6,0,528,0,0,18,10890,320],[2,17,6,10,528,560,80,18,11640,380],[3,18,7,10,561,560,80,21,12355,404],[4,18,7,11,561,616,88,21,12430,410],[5,18,7,11,561,616,88,21,12430,410]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":852,"provided":20160,"required":19308,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":1750,"required":1588,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":616,"required":561,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":7,"coolers":11},"resources":{"capitalGBP":12430,"volumeL":410},"values":{"coolingW":616,"drawW":88,"energyWh":20160,"heatW":561,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":16,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p1500-h16-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2496,"provided":24000,"required":26496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":1500,"required":1608,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":360,"required":336,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":6,"coolers":9},"resources":{"capitalGBP":8400,"volumeL":852},"values":{"coolingW":360,"drawW":108,"energyWh":24000,"heatW":336,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,6,0,336,0,0,48,8130,744],[2,25,6,9,348,360,108,48,8720,880],[3,27,7,9,380,360,108,56,9435,948],[4,27,7,10,380,400,120,56,9465,960],[5,27,7,10,380,400,120,56,9465,960]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":184,"provided":27000,"required":26816,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":1750,"required":1620,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":400,"required":380,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":7,"coolers":10},"resources":{"capitalGBP":9465,"volumeL":960},"values":{"coolingW":400,"drawW":120,"energyWh":27000,"heatW":380,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1408,"provided":24000,"required":25408,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":350,"required":336,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":6,"coolers":5},"resources":{"capitalGBP":8505,"volumeL":774},"values":{"coolingW":350,"drawW":40,"energyWh":24000,"heatW":336,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,6,0,336,0,0,48,8130,744],[2,25,6,5,348,350,40,48,8825,802],[3,26,7,5,368,350,40,56,9220,842],[4,26,7,6,368,420,48,56,9295,848],[5,26,7,6,368,420,48,56,9295,848]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":26000,"required":25664,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":420,"required":368,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":7,"coolers":6},"resources":{"capitalGBP":9295,"volumeL":848},"values":{"coolingW":420,"drawW":48,"energyWh":26000,"heatW":368,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1824,"provided":24000,"required":25824,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":1500,"required":1596,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":320,"required":306,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":6,"coolers":8},"resources":{"capitalGBP":8610,"volumeL":816},"values":{"coolingW":320,"drawW":96,"energyWh":24000,"heatW":306,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,6,0,306,0,0,18,8370,720],[2,25,6,8,318,320,96,18,8930,844],[3,26,7,8,333,320,96,21,9365,880],[4,26,7,9,333,360,108,21,9395,892],[5,27,7,9,345,360,108,21,9715,920],[6,27,7,9,345,360,108,21,9715,920]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":936,"provided":27000,"required":26064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":1750,"required":1608,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":360,"required":345,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":7,"coolers":9},"resources":{"capitalGBP":9715,"volumeL":920},"values":{"coolingW":360,"drawW":108,"energyWh":27000,"heatW":345,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-928,"provided":24000,"required":24928,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":1500,"required":1540,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":350,"required":306,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":6,"coolers":5},"resources":{"capitalGBP":8745,"volumeL":750},"values":{"coolingW":350,"drawW":40,"energyWh":24000,"heatW":306,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,6,0,306,0,0,18,8370,720],[2,25,6,5,318,350,40,18,9065,778],[3,25,7,5,321,350,40,21,9180,786],[4,25,7,5,321,350,40,21,9180,786]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":25000,"required":24976,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":1750,"required":1540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":350,"required":321,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":7,"coolers":5},"resources":{"capitalGBP":9180,"volumeL":786},"values":{"coolingW":350,"drawW":40,"energyWh":25000,"heatW":321,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":20,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1680,"provided":25200,"required":26880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":1500,"required":1632,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":440,"required":408,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":11},"resources":{"capitalGBP":11580,"volumeL":492},"values":{"coolingW":440,"drawW":132,"energyWh":25200,"heatW":408,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,408,0,0,48,11250,360],[2,18,6,11,408,440,132,48,11580,492],[3,20,7,11,456,440,132,56,12855,536],[4,20,7,12,456,480,144,56,12885,548],[5,20,7,12,456,480,144,56,12885,548]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":28000,"required":27200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1750,"required":1644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":480,"required":456,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":20,"converters":7,"coolers":12},"resources":{"capitalGBP":12885,"volumeL":548},"values":{"coolingW":480,"drawW":144,"energyWh":28000,"heatW":456,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-336,"provided":25200,"required":25536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":420,"required":408,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":6},"resources":{"capitalGBP":11700,"volumeL":396},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":408,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,408,0,0,48,11250,360],[2,18,6,6,408,420,48,48,11700,396],[3,19,7,6,436,420,48,56,12375,424],[4,19,7,7,436,490,56,56,12450,430],[5,19,7,7,436,490,56,56,12450,430]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":808,"provided":26600,"required":25792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1750,"required":1556,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":490,"required":436,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":7,"coolers":7},"resources":{"capitalGBP":12450,"volumeL":430},"values":{"coolingW":490,"drawW":56,"energyWh":26600,"heatW":436,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1008,"provided":25200,"required":26208,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1500,"required":1620,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":400,"required":378,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":10},"resources":{"capitalGBP":11790,"volumeL":456},"values":{"coolingW":400,"drawW":120,"energyWh":25200,"heatW":378,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,378,0,0,18,11490,336],[2,18,6,10,378,400,120,18,11790,456],[3,19,7,10,401,400,120,21,12505,480],[4,19,7,11,401,440,132,21,12535,492],[5,19,7,11,401,440,132,21,12535,492]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":152,"provided":26600,"required":26448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":1750,"required":1632,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":440,"required":401,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":7,"coolers":11},"resources":{"capitalGBP":12535,"volumeL":492},"values":{"coolingW":440,"drawW":132,"energyWh":26600,"heatW":401,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":25200,"required":25056,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":1500,"required":1548,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":420,"required":378,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":6,"coolers":6},"resources":{"capitalGBP":11940,"volumeL":372},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":378,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,6,0,378,0,0,18,11490,336],[2,18,6,6,378,420,48,18,11940,372],[3,18,7,6,381,420,48,21,12055,380],[4,18,7,6,381,420,48,21,12055,380]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":25200,"required":25104,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":1750,"required":1548,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":420,"required":381,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":7,"coolers":6},"resources":{"capitalGBP":12055,"volumeL":380},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":381,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":16,"frontier":["compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h16-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":37,"limit":32,"satisfied":false},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4416,"provided":24000,"required":28416,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-228,"provided":1500,"required":1728,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":608,"required":588,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":6,"coolers":19},"resources":{"capitalGBP":10620,"volumeL":1140},"values":{"coolingW":608,"drawW":228,"energyWh":24000,"heatW":588,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,6,0,588,0,0,48,10050,912],[2,31,6,19,606,608,228,48,10940,1168],[3,36,7,19,704,608,228,56,12615,1320],[4,36,7,22,704,704,264,56,12705,1356],[5,37,8,22,730,704,264,64,13100,1396],[6,37,8,23,730,736,276,64,13130,1408],[7,37,8,23,730,736,276,64,13130,1408]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":160,"provided":29600,"required":29440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":2000,"required":1776,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":736,"required":730,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":37,"converters":8,"coolers":23},"resources":{"capitalGBP":13130,"volumeL":1408},"values":{"coolingW":736,"drawW":276,"energyWh":29600,"heatW":730,"lossW":64,"outputW":2000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":34,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2176,"provided":24000,"required":26176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":1500,"required":1588,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":616,"required":588,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":6,"coolers":11},"resources":{"capitalGBP":10875,"volumeL":978},"values":{"coolingW":616,"drawW":88,"energyWh":24000,"heatW":588,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,6,0,588,0,0,48,10050,912],[2,31,6,11,606,616,88,48,11195,1006],[3,33,7,11,650,616,88,56,11910,1074],[4,33,7,12,650,672,96,56,11985,1080],[5,34,7,12,668,672,96,56,12305,1108],[6,34,7,12,668,672,96,56,12305,1108]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":27200,"required":26432,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":1750,"required":1596,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":672,"required":668,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":34,"converters":7,"coolers":12},"resources":{"capitalGBP":12305,"volumeL":1108},"values":{"coolingW":672,"drawW":96,"energyWh":27200,"heatW":668,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":36,"limit":32,"satisfied":false},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3744,"provided":24000,"required":27744,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-216,"provided":1500,"required":1716,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":576,"required":558,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":6,"coolers":18},"resources":{"capitalGBP":10830,"volumeL":1104},"values":{"coolingW":576,"drawW":216,"energyWh":24000,"heatW":558,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,6,0,558,0,0,18,10290,888],[2,31,6,18,576,576,216,18,11150,1132],[3,35,7,18,651,576,216,21,12545,1252],[4,35,7,21,651,672,252,21,12635,1288],[5,36,8,21,672,672,252,24,13070,1324],[6,36,8,21,672,672,252,24,13070,1324]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":28800,"required":28416,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":248,"provided":2000,"required":1752,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":672,"required":672,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":36,"converters":8,"coolers":21},"resources":{"capitalGBP":13070,"volumeL":1324},"values":{"coolingW":672,"drawW":252,"energyWh":28800,"heatW":672,"lossW":24,"outputW":2000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":33,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1568,"provided":24000,"required":25568,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":1500,"required":1580,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":560,"required":558,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":6,"coolers":10},"resources":{"capitalGBP":11040,"volumeL":948},"values":{"coolingW":560,"drawW":80,"energyWh":24000,"heatW":558,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,6,0,558,0,0,18,10290,888],[2,31,6,10,576,560,80,18,11360,976],[3,32,7,11,597,616,88,21,11870,1018],[4,33,7,11,615,616,88,21,12190,1046],[5,33,7,11,615,616,88,21,12190,1046]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":26400,"required":25744,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":1750,"required":1588,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":1,"provided":616,"required":615,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":33,"converters":7,"coolers":11},"resources":{"capitalGBP":12190,"volumeL":1046},"values":{"coolingW":616,"drawW":88,"energyWh":26400,"heatW":615,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":28,"limit":32,"satisfied":true},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":29,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4544,"provided":24640,"required":29184,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-276,"provided":1500,"required":1776,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":736,"required":708,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":6,"coolers":23},"resources":{"capitalGBP":14340,"volumeL":700},"values":{"coolingW":736,"drawW":276,"energyWh":24640,"heatW":708,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,6,0,708,0,0,48,13650,424],[2,23,6,23,738,736,276,48,14940,716],[3,27,8,24,874,768,288,64,17520,816],[4,27,8,28,874,896,336,64,17640,864],[5,28,8,28,904,896,336,64,18240,880],[6,28,8,29,904,928,348,64,18270,892],[7,28,8,29,904,928,348,64,18270,892]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":31360,"required":30592,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":152,"provided":2000,"required":1848,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":928,"required":904,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":28,"converters":8,"coolers":29},"resources":{"capitalGBP":18270,"volumeL":892},"values":{"coolingW":928,"drawW":348,"energyWh":31360,"heatW":904,"lossW":64,"outputW":2000}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1792,"provided":24640,"required":26432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-104,"provided":1500,"required":1604,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":728,"required":708,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":6,"coolers":13},"resources":{"capitalGBP":14625,"volumeL":502},"values":{"coolingW":728,"drawW":104,"energyWh":24640,"heatW":708,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,6,0,708,0,0,48,13650,424],[2,23,6,13,738,728,104,48,15225,518],[3,24,7,14,776,784,112,56,15975,552],[4,24,7,14,776,784,112,56,15975,552]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":26880,"required":26688,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":138,"provided":1750,"required":1612,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":784,"required":776,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":7,"coolers":14},"resources":{"capitalGBP":15975,"volumeL":552},"values":{"coolingW":784,"drawW":112,"energyWh":26880,"heatW":776,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":27,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3872,"provided":24640,"required":28512,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-264,"provided":1500,"required":1764,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":704,"required":678,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":6,"coolers":22},"resources":{"capitalGBP":14550,"volumeL":664},"values":{"coolingW":704,"drawW":264,"energyWh":24640,"heatW":678,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,6,0,678,0,0,18,13890,400],[2,22,6,22,678,704,264,18,14550,664],[3,26,8,22,804,704,264,24,17180,744],[4,26,8,26,804,832,312,24,17300,792],[5,27,8,26,834,832,312,24,17900,808],[6,27,8,27,834,864,324,24,17930,820],[7,27,8,27,834,864,324,24,17930,820]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":672,"provided":30240,"required":29568,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":176,"provided":2000,"required":1824,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":864,"required":834,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":8,"coolers":27},"resources":{"capitalGBP":17930,"volumeL":820},"values":{"coolingW":864,"drawW":324,"energyWh":30240,"heatW":834,"lossW":24,"outputW":2000}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1312,"provided":24640,"required":25952,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-104,"provided":1500,"required":1604,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":728,"required":678,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":6,"coolers":13},"resources":{"capitalGBP":14865,"volumeL":478},"values":{"coolingW":728,"drawW":104,"energyWh":24640,"heatW":678,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,6,0,678,0,0,18,13890,400],[2,22,6,13,678,728,104,18,14865,478],[3,24,7,13,741,728,104,21,16180,518],[4,24,7,14,741,784,112,21,16255,524],[5,24,7,14,741,784,112,21,16255,524]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":752,"provided":26880,"required":26128,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":138,"provided":1750,"required":1612,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":784,"required":741,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":7,"coolers":14},"resources":{"capitalGBP":16255,"volumeL":524},"values":{"coolingW":784,"drawW":112,"energyWh":26880,"heatW":741,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":24,"frontier":["compact-standard-liquid","compact-efficient-liquid"],"id":"p1500-h24-mild","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":42,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4608,"provided":36000,"required":40608,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1500,"required":1644,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":480,"required":480,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":36,"converters":6,"coolers":12},"resources":{"capitalGBP":12330,"volumeL":1224},"values":{"coolingW":480,"drawW":144,"energyWh":36000,"heatW":480,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,36,6,0,480,0,0,48,11970,1080],[2,38,6,12,504,480,144,48,12970,1280],[3,41,7,13,548,520,156,56,14035,1388],[4,42,7,14,560,560,168,56,14385,1428],[5,42,7,14,560,560,168,56,14385,1428]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":624,"provided":42000,"required":41376,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1750,"required":1668,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":560,"required":560,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":42,"converters":7,"coolers":14},"resources":{"capitalGBP":14385,"volumeL":1428},"values":{"coolingW":560,"drawW":168,"energyWh":42000,"heatW":560,"lossW":56,"outputW":1750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":39,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2496,"provided":36000,"required":38496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1500,"required":1556,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":490,"required":480,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":36,"converters":6,"coolers":7},"resources":{"capitalGBP":12495,"volumeL":1122},"values":{"coolingW":490,"drawW":56,"energyWh":36000,"heatW":480,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,36,6,0,480,0,0,48,11970,1080],[2,38,6,7,504,490,56,48,13135,1178],[3,39,7,8,524,560,64,56,13605,1224],[4,39,7,8,524,560,64,56,13605,1224]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":120,"provided":39000,"required":38880,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":1750,"required":1564,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":560,"required":524,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":39,"converters":7,"coolers":8},"resources":{"capitalGBP":13605,"volumeL":1224},"values":{"coolingW":560,"drawW":64,"energyWh":39000,"heatW":524,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":41,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3888,"provided":36000,"required":39888,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1500,"required":1644,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":480,"required":450,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":36,"converters":6,"coolers":12},"resources":{"capitalGBP":12570,"volumeL":1200},"values":{"coolingW":480,"drawW":144,"energyWh":36000,"heatW":450,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,36,6,0,450,0,0,18,12210,1056],[2,37,6,12,462,480,144,18,12890,1228],[3,40,7,12,501,480,144,21,13965,1320],[4,40,7,13,501,520,156,21,13995,1332],[5,41,7,13,513,520,156,21,14315,1360],[6,41,7,13,513,520,156,21,14315,1360]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":752,"provided":41000,"required":40248,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":94,"provided":1750,"required":1656,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":7,"provided":520,"required":513,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":41,"converters":7,"coolers":13},"resources":{"capitalGBP":14315,"volumeL":1360},"values":{"coolingW":520,"drawW":156,"energyWh":41000,"heatW":513,"lossW":21,"outputW":1750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":38,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1776,"provided":36000,"required":37776,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":1500,"required":1556,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":490,"required":450,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":36,"converters":6,"coolers":7},"resources":{"capitalGBP":12735,"volumeL":1098},"values":{"coolingW":490,"drawW":56,"energyWh":36000,"heatW":450,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,36,6,0,450,0,0,18,12210,1056],[2,37,6,7,462,490,56,18,13055,1126],[3,38,7,7,477,490,56,21,13490,1162],[4,38,7,7,477,490,56,21,13490,1162]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":152,"provided":38000,"required":37848,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":1750,"required":1556,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":490,"required":477,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":38,"converters":7,"coolers":7},"resources":{"capitalGBP":13490,"volumeL":1162},"values":{"coolingW":490,"drawW":56,"energyWh":38000,"heatW":477,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":31,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":17,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5072,"provided":36400,"required":41472,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-180,"provided":1500,"required":1680,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":600,"required":568,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":26,"converters":6,"coolers":15},"resources":{"capitalGBP":16500,"volumeL":668},"values":{"coolingW":600,"drawW":180,"energyWh":36400,"heatW":568,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,26,6,0,568,0,0,48,16050,488],[2,27,6,15,588,600,180,48,17100,684],[3,30,7,15,656,600,180,56,18975,744],[4,30,7,17,656,680,204,56,19035,768],[5,31,7,17,676,680,204,56,19635,784],[6,31,7,17,676,680,204,56,19635,784]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1160,"provided":43400,"required":42240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":46,"provided":1750,"required":1704,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":680,"required":676,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":31,"converters":7,"coolers":17},"resources":{"capitalGBP":19635,"volumeL":784},"values":{"coolingW":680,"drawW":204,"energyWh":43400,"heatW":676,"lossW":56,"outputW":1750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":28,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2480,"provided":36400,"required":38880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":1500,"required":1572,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":62,"provided":630,"required":568,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":26,"converters":6,"coolers":9},"resources":{"capitalGBP":16725,"volumeL":542},"values":{"coolingW":630,"drawW":72,"energyWh":36400,"heatW":568,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,26,6,0,568,0,0,48,16050,488],[2,27,6,9,588,630,72,48,17325,558],[3,28,7,9,616,630,72,56,18000,586],[4,28,7,9,616,630,72,56,18000,586]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":128,"provided":39200,"required":39072,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":630,"required":616,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":28,"converters":7,"coolers":9},"resources":{"capitalGBP":18000,"volumeL":586},"values":{"coolingW":630,"drawW":72,"energyWh":39200,"heatW":616,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":30,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4064,"provided":36400,"required":40464,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":1500,"required":1668,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":560,"required":538,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":26,"converters":6,"coolers":14},"resources":{"capitalGBP":16710,"volumeL":632},"values":{"coolingW":560,"drawW":168,"energyWh":36400,"heatW":538,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,26,6,0,538,0,0,18,16290,464],[2,27,6,14,558,560,168,18,17310,648],[3,29,7,14,601,560,168,21,18625,688],[4,29,7,16,601,640,192,21,18685,712],[5,30,7,16,621,640,192,21,19285,728],[6,30,7,16,621,640,192,21,19285,728]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":888,"provided":42000,"required":41112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":1750,"required":1692,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":640,"required":621,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":30,"converters":7,"coolers":16},"resources":{"capitalGBP":19285,"volumeL":728},"values":{"coolingW":640,"drawW":192,"energyWh":42000,"heatW":621,"lossW":21,"outputW":1750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":28,"limit":32,"satisfied":true},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1568,"provided":36400,"required":37968,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":1500,"required":1564,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":560,"required":538,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":26,"converters":6,"coolers":8},"resources":{"capitalGBP":16890,"volumeL":512},"values":{"coolingW":560,"drawW":64,"energyWh":36400,"heatW":538,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,26,6,0,538,0,0,18,16290,464],[2,27,6,8,558,560,64,18,17490,528],[3,28,7,8,581,560,64,21,18205,552],[4,28,7,9,581,630,72,21,18280,558],[5,28,7,9,581,630,72,21,18280,558]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":968,"provided":39200,"required":38232,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":1750,"required":1572,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":630,"required":581,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":28,"converters":7,"coolers":9},"resources":{"capitalGBP":18280,"volumeL":558},"values":{"coolingW":630,"drawW":72,"energyWh":39200,"heatW":581,"lossW":21,"outputW":1750}}}]},{"condition":"hot","durationHours":24,"frontier":[],"id":"p1500-h24-hot","powerW":1500,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":60,"limit":32,"satisfied":false},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":36,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-8928,"provided":36000,"required":44928,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-324,"provided":1500,"required":1824,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":864,"required":858,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":45,"converters":6,"coolers":27},"resources":{"capitalGBP":15660,"volumeL":1656},"values":{"coolingW":864,"drawW":324,"energyWh":36000,"heatW":858,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,45,6,0,858,0,0,48,14850,1332],[2,47,6,27,894,864,324,48,16300,1712],[3,57,8,28,1090,896,336,64,19680,2028],[4,57,8,35,1090,1120,420,64,19890,2112],[5,60,8,35,1144,1120,420,64,20850,2196],[6,60,8,36,1144,1152,432,64,20880,2208],[7,60,8,36,1144,1152,432,64,20880,2208]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":48000,"required":47904,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":68,"provided":2000,"required":1932,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":1152,"required":1144,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":60,"converters":8,"coolers":36},"resources":{"capitalGBP":20880,"volumeL":2208},"values":{"coolingW":1152,"drawW":432,"energyWh":48000,"heatW":1144,"lossW":64,"outputW":2000}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":51,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":18,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4224,"provided":36000,"required":40224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-128,"provided":1500,"required":1628,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":896,"required":858,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":45,"converters":6,"coolers":16},"resources":{"capitalGBP":16050,"volumeL":1428},"values":{"coolingW":896,"drawW":128,"energyWh":36000,"heatW":858,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,45,6,0,858,0,0,48,14850,1332],[2,47,6,16,894,896,128,48,16690,1484],[3,51,7,16,974,896,128,56,18045,1608],[4,51,7,18,974,1008,144,56,18195,1620],[5,51,7,18,974,1008,144,56,18195,1620]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":40800,"required":40800,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":1750,"required":1644,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":34,"provided":1008,"required":974,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":51,"converters":7,"coolers":18},"resources":{"capitalGBP":18195,"volumeL":1620},"values":{"coolingW":1008,"drawW":144,"energyWh":40800,"heatW":974,"lossW":56,"outputW":1750}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":58,"limit":32,"satisfied":false},{"component":"converters","count":8,"limit":12,"satisfied":true},{"component":"coolers","count":34,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-7920,"provided":36000,"required":43920,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-312,"provided":1500,"required":1812,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":832,"required":828,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":45,"converters":6,"coolers":26},"resources":{"capitalGBP":15870,"volumeL":1620},"values":{"coolingW":832,"drawW":312,"energyWh":36000,"heatW":828,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,45,6,0,828,0,0,18,15090,1308],[2,46,6,26,846,832,312,18,16190,1648],[3,55,8,27,1014,864,324,24,19330,1928],[4,56,8,32,1032,1024,384,24,19800,2016],[5,58,8,33,1068,1056,396,24,20470,2084],[6,58,8,34,1068,1088,408,24,20500,2096],[7,58,8,34,1068,1088,408,24,20500,2096]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":32,"provided":46400,"required":46368,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":92,"provided":2000,"required":1908,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":1088,"required":1068,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":58,"converters":8,"coolers":34},"resources":{"capitalGBP":20500,"volumeL":2096},"values":{"coolingW":1088,"drawW":408,"energyWh":46400,"heatW":1068,"lossW":24,"outputW":2000}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":50,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":17,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3312,"provided":36000,"required":39312,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":1500,"required":1620,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":840,"required":828,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":45,"converters":6,"coolers":15},"resources":{"capitalGBP":16215,"volumeL":1398},"values":{"coolingW":840,"drawW":120,"energyWh":36000,"heatW":828,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,45,6,0,828,0,0,18,15090,1308],[2,46,6,15,846,840,120,18,16535,1426],[3,50,7,16,921,896,128,21,18005,1552],[4,50,7,17,921,952,136,21,18080,1558],[5,50,7,17,921,952,136,21,18080,1558]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":232,"provided":40000,"required":39768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":114,"provided":1750,"required":1636,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":952,"required":921,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":50,"converters":7,"coolers":17},"resources":{"capitalGBP":18080,"volumeL":1558},"values":{"coolingW":952,"drawW":136,"energyWh":40000,"heatW":921,"lossW":21,"outputW":1750}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":46,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":46,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":9,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-9696,"provided":36960,"required":46656,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-396,"provided":1500,"required":1896,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":1056,"required":1038,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":33,"converters":6,"coolers":33},"resources":{"capitalGBP":21240,"volumeL":996},"values":{"coolingW":1056,"drawW":396,"energyWh":36960,"heatW":1038,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,33,6,0,1038,0,0,48,20250,600],[2,34,6,33,1068,1056,396,48,21840,1012],[3,42,8,34,1324,1088,408,64,26820,1176],[4,43,8,42,1354,1344,504,64,27660,1288],[5,45,9,43,1422,1376,516,72,28965,1344],[6,45,9,45,1422,1440,540,72,29025,1368],[7,46,9,45,1452,1440,540,72,29625,1384],[8,46,9,46,1452,1472,552,72,29655,1396],[9,46,9,46,1452,1472,552,72,29655,1396]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":51520,"required":50976,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":198,"provided":2250,"required":2052,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":1472,"required":1452,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":46,"converters":9,"coolers":46},"resources":{"capitalGBP":29655,"volumeL":1396},"values":{"coolingW":1472,"drawW":552,"energyWh":51520,"heatW":1452,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":37,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3840,"provided":36960,"required":40800,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-152,"provided":1500,"required":1652,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":1064,"required":1038,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":33,"converters":6,"coolers":19},"resources":{"capitalGBP":21675,"volumeL":714},"values":{"coolingW":1064,"drawW":152,"energyWh":36960,"heatW":1038,"lossW":48,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,33,6,0,1038,0,0,48,20250,600],[2,34,6,19,1068,1064,152,48,22275,730],[3,37,7,20,1166,1120,160,56,24225,796],[4,37,7,21,1166,1176,168,56,24300,802],[5,37,7,21,1166,1176,168,56,24300,802]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":41440,"required":41376,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1750,"required":1668,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":1176,"required":1166,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":37,"converters":7,"coolers":21},"resources":{"capitalGBP":24300,"volumeL":802},"values":{"coolingW":1176,"drawW":168,"energyWh":41440,"heatW":1166,"lossW":56,"outputW":1750}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":44,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":43,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":9,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-8688,"provided":36960,"required":45648,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-384,"provided":1500,"required":1884,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":1024,"required":1008,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":33,"converters":6,"coolers":32},"resources":{"capitalGBP":21450,"volumeL":960},"values":{"coolingW":1024,"drawW":384,"energyWh":36960,"heatW":1008,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,33,6,0,1008,0,0,18,20490,576],[2,33,6,32,1008,1024,384,18,21450,960],[3,41,8,32,1254,1024,384,24,26480,1104],[4,41,8,40,1254,1280,480,24,26720,1200],[5,43,8,40,1314,1280,480,24,27920,1232],[6,43,8,42,1314,1344,504,24,27980,1256],[7,44,9,42,1347,1344,504,27,28695,1280],[8,44,9,43,1347,1376,516,27,28725,1292],[9,44,9,43,1347,1376,516,27,28725,1292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":248,"provided":49280,"required":49032,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":1376,"required":1347,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":44,"converters":9,"coolers":43},"resources":{"capitalGBP":28725,"volumeL":1292},"values":{"coolingW":1376,"drawW":516,"energyWh":49280,"heatW":1347,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":37,"limit":32,"satisfied":false},{"component":"converters","count":7,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2928,"provided":36960,"required":39888,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":1500,"required":1644,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":1008,"required":1008,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":33,"converters":6,"coolers":18},"resources":{"capitalGBP":21840,"volumeL":684},"values":{"coolingW":1008,"drawW":144,"energyWh":36960,"heatW":1008,"lossW":18,"outputW":1500}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,33,6,0,1008,0,0,18,20490,576],[2,33,6,18,1008,1008,144,18,21840,684],[3,36,7,18,1101,1008,144,21,23755,740],[4,36,7,20,1101,1120,160,21,23905,752],[5,37,7,20,1131,1120,160,21,24505,768],[6,37,7,21,1131,1176,168,21,24580,774],[7,37,7,21,1131,1176,168,21,24580,774]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":904,"provided":41440,"required":40536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":1750,"required":1668,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":45,"provided":1176,"required":1131,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":37,"converters":7,"coolers":21},"resources":{"capitalGBP":24580,"volumeL":774},"values":{"coolingW":1176,"drawW":168,"energyWh":41440,"heatW":1131,"lossW":21,"outputW":1750}}}]},{"condition":"mild","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p2000-h2-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-200,"provided":4000,"required":4200,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":2000,"required":2036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":120,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":3},"resources":{"capitalGBP":1970,"volumeL":244},"values":{"coolingW":120,"drawW":36,"energyWh":4000,"heatW":112,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,112,0,0,64,1880,208],[2,5,8,3,124,120,36,64,2290,272],[3,5,9,4,132,160,48,72,2395,296],[4,5,9,4,132,160,48,72,2395,296]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":760,"provided":5000,"required":4240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":160,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":9,"coolers":4},"resources":{"capitalGBP":2395,"volumeL":296},"values":{"coolingW":160,"drawW":48,"energyWh":5000,"heatW":132,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-160,"provided":4000,"required":4160,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":2000,"required":2016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":140,"required":112,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":2},"resources":{"capitalGBP":2030,"volumeL":220},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":112,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,112,0,0,64,1880,208],[2,5,8,2,124,140,16,64,2350,248],[3,5,9,2,132,140,16,72,2425,260],[4,5,9,2,132,140,16,72,2425,260]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":824,"provided":5000,"required":4176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":9,"coolers":2},"resources":{"capitalGBP":2425,"volumeL":260},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":132,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-96,"provided":4000,"required":4096,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":80,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":2},"resources":{"capitalGBP":2260,"volumeL":200},"values":{"coolingW":80,"drawW":24,"energyWh":4000,"heatW":72,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,72,0,0,24,2200,176],[2,5,8,2,84,80,24,24,2580,228],[3,5,9,3,87,120,36,27,2725,248],[4,5,9,3,87,120,36,27,2725,248]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":874,"provided":5000,"required":4126,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":2250,"required":2036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":120,"required":87,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":9,"coolers":3},"resources":{"capitalGBP":2725,"volumeL":248},"values":{"coolingW":120,"drawW":36,"energyWh":5000,"heatW":87,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":5,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-80,"provided":4000,"required":4080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":2000,"required":2016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":140,"required":72,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":2},"resources":{"capitalGBP":2350,"volumeL":188},"values":{"coolingW":140,"drawW":16,"energyWh":4000,"heatW":72,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,72,0,0,24,2200,176],[2,5,8,2,84,140,16,24,2670,216],[3,5,9,2,87,140,16,27,2785,224],[4,5,9,2,87,140,16,27,2785,224]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":914,"provided":5000,"required":4086,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":53,"provided":140,"required":87,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":5,"converters":9,"coolers":2},"resources":{"capitalGBP":2785,"volumeL":224},"values":{"coolingW":140,"drawW":16,"energyWh":5000,"heatW":87,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-24,"provided":4200,"required":4224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":160,"required":124,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":8,"coolers":4},"resources":{"capitalGBP":2520,"volumeL":192},"values":{"coolingW":160,"drawW":48,"energyWh":4200,"heatW":124,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,8,0,124,0,0,64,2400,144],[2,3,8,4,124,160,48,64,2520,192],[3,4,9,4,152,160,48,72,3195,220],[4,4,9,4,152,160,48,72,3195,220]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1360,"provided":5600,"required":4240,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":160,"required":152,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":9,"coolers":4},"resources":{"capitalGBP":3195,"volumeL":220},"values":{"coolingW":160,"drawW":48,"energyWh":5600,"heatW":152,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":4200,"required":4160,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":2000,"required":2016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":140,"required":124,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":8,"coolers":2},"resources":{"capitalGBP":2550,"volumeL":156},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":124,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,8,0,124,0,0,64,2400,144],[2,3,8,2,124,140,16,64,2550,156],[3,3,9,2,132,140,16,72,2625,168],[4,3,9,2,132,140,16,72,2625,168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":4200,"required":4176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":140,"required":132,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":9,"coolers":2},"resources":{"capitalGBP":2625,"volumeL":168},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":132,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":4200,"required":4120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":2000,"required":2036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":120,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":8,"coolers":3},"resources":{"capitalGBP":2810,"volumeL":148},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":84,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,8,0,84,0,0,24,2720,112],[2,3,8,3,84,120,36,24,2810,148],[3,3,9,3,87,120,36,27,2925,156],[4,3,9,3,87,120,36,27,2925,156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":74,"provided":4200,"required":4126,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":214,"provided":2250,"required":2036,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":120,"required":87,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":9,"coolers":3},"resources":{"capitalGBP":2925,"volumeL":156},"values":{"coolingW":120,"drawW":36,"energyWh":4200,"heatW":87,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":3,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":120,"provided":4200,"required":4080,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":2000,"required":2016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":56,"provided":140,"required":84,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":3,"converters":8,"coolers":2},"resources":{"capitalGBP":2870,"volumeL":124},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":84,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,3,8,0,84,0,0,24,2720,112],[2,3,8,2,84,140,16,24,2870,124],[3,3,9,2,87,140,16,27,2985,132],[4,3,9,2,87,140,16,27,2985,132]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":114,"provided":4200,"required":4086,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":53,"provided":140,"required":87,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":3,"converters":9,"coolers":2},"resources":{"capitalGBP":2985,"volumeL":132},"values":{"coolingW":140,"drawW":16,"energyWh":4200,"heatW":87,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":2,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p2000-h2-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-248,"provided":4000,"required":4248,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":2000,"required":2060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":160,"required":154,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":8,"coolers":5},"resources":{"capitalGBP":2350,"volumeL":296},"values":{"coolingW":160,"drawW":60,"energyWh":4000,"heatW":154,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,8,0,154,0,0,64,2200,236],[2,6,8,5,172,160,60,64,2670,324],[3,6,9,6,180,192,72,72,2775,348],[4,6,9,6,180,192,72,72,2775,348]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":512,"provided":4800,"required":4288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":192,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":6},"resources":{"capitalGBP":2775,"volumeL":348},"values":{"coolingW":192,"drawW":72,"energyWh":4800,"heatW":180,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-176,"provided":4000,"required":4176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":168,"required":154,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":8,"coolers":3},"resources":{"capitalGBP":2425,"volumeL":254},"values":{"coolingW":168,"drawW":24,"energyWh":4000,"heatW":154,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,8,0,154,0,0,64,2200,236],[2,6,8,3,172,168,24,64,2745,282],[3,6,9,4,180,224,32,72,2895,300],[4,6,9,4,180,224,32,72,2895,300]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":592,"provided":4800,"required":4208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":224,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":4},"resources":{"capitalGBP":2895,"volumeL":300},"values":{"coolingW":224,"drawW":32,"energyWh":4800,"heatW":180,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-144,"provided":4000,"required":4144,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":14,"provided":128,"required":114,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":8,"coolers":4},"resources":{"capitalGBP":2640,"volumeL":252},"values":{"coolingW":128,"drawW":48,"energyWh":4000,"heatW":114,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,8,0,114,0,0,24,2520,204],[2,6,8,4,132,128,48,24,2960,280],[3,6,9,5,135,160,60,27,3105,300],[4,6,9,5,135,160,60,27,3105,300]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":626,"provided":4800,"required":4174,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":2250,"required":2060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":160,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":5},"resources":{"capitalGBP":3105,"volumeL":300},"values":{"coolingW":160,"drawW":60,"energyWh":4800,"heatW":135,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-96,"provided":4000,"required":4096,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":168,"required":114,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":5,"converters":8,"coolers":3},"resources":{"capitalGBP":2745,"volumeL":222},"values":{"coolingW":168,"drawW":24,"energyWh":4000,"heatW":114,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,5,8,0,114,0,0,24,2520,204],[2,6,8,3,132,168,24,24,3065,250],[3,6,9,3,135,168,24,27,3180,258],[4,6,9,3,135,168,24,27,3180,258]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":698,"provided":4800,"required":4102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":168,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":3},"resources":{"capitalGBP":3180,"volumeL":258},"values":{"coolingW":168,"drawW":24,"energyWh":4800,"heatW":135,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":4480,"required":4272,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":192,"required":184,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":6},"resources":{"capitalGBP":3180,"volumeL":232},"values":{"coolingW":192,"drawW":72,"energyWh":4480,"heatW":184,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,184,0,0,64,3000,160],[2,4,8,6,184,192,72,64,3180,232],[3,4,9,6,192,192,72,72,3255,244],[4,4,9,6,192,192,72,72,3255,244]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":4480,"required":4288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":192,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":9,"coolers":6},"resources":{"capitalGBP":3255,"volumeL":244},"values":{"coolingW":192,"drawW":72,"energyWh":4480,"heatW":192,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":4480,"required":4192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":224,"required":184,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":4},"resources":{"capitalGBP":3300,"volumeL":184},"values":{"coolingW":224,"drawW":32,"energyWh":4480,"heatW":184,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,184,0,0,64,3000,160],[2,4,8,4,184,224,32,64,3300,184],[3,4,9,4,192,224,32,72,3375,196],[4,4,9,4,192,224,32,72,3375,196]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":4480,"required":4208,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":224,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":9,"coolers":4},"resources":{"capitalGBP":3375,"volumeL":196},"values":{"coolingW":224,"drawW":32,"energyWh":4480,"heatW":192,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":312,"provided":4480,"required":4168,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":2000,"required":2060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":160,"required":144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":5},"resources":{"capitalGBP":3470,"volumeL":188},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":144,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,144,0,0,24,3320,128],[2,4,8,5,144,160,60,24,3470,188],[3,4,9,5,147,160,60,27,3585,196],[4,4,9,5,147,160,60,27,3585,196]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":306,"provided":4480,"required":4174,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":2250,"required":2060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":160,"required":147,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":9,"coolers":5},"resources":{"capitalGBP":3585,"volumeL":196},"values":{"coolingW":160,"drawW":60,"energyWh":4480,"heatW":147,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":4,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":4480,"required":4096,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":168,"required":144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":4,"converters":8,"coolers":3},"resources":{"capitalGBP":3545,"volumeL":146},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":144,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,4,8,0,144,0,0,24,3320,128],[2,4,8,3,144,168,24,24,3545,146],[3,4,9,3,147,168,24,27,3660,154],[4,4,9,3,147,168,24,27,3660,154]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":378,"provided":4480,"required":4102,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":168,"required":147,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":4,"converters":9,"coolers":3},"resources":{"capitalGBP":3660,"volumeL":154},"values":{"coolingW":168,"drawW":24,"energyWh":4480,"heatW":147,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-air","standard-efficient-liquid","compact-standard-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p2000-h4-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-448,"provided":8000,"required":8448,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":160,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":4},"resources":{"capitalGBP":3280,"volumeL":368},"values":{"coolingW":160,"drawW":48,"energyWh":8000,"heatW":160,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,160,0,0,64,3160,320],[2,9,8,4,172,160,48,64,3600,396],[3,9,9,5,180,200,60,72,3705,420],[4,9,9,5,180,200,60,72,3705,420]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":472,"provided":9000,"required":8528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":2250,"required":2060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":200,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":5},"resources":{"capitalGBP":3705,"volumeL":420},"values":{"coolingW":200,"drawW":60,"energyWh":9000,"heatW":180,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-352,"provided":8000,"required":8352,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":50,"provided":210,"required":160,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":3},"resources":{"capitalGBP":3385,"volumeL":338},"values":{"coolingW":210,"drawW":24,"energyWh":8000,"heatW":160,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,160,0,0,64,3160,320],[2,9,8,3,172,210,24,64,3705,366],[3,9,9,3,180,210,24,72,3780,378],[4,9,9,3,180,210,24,72,3780,378]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":9000,"required":8384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":210,"required":180,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":3},"resources":{"capitalGBP":3780,"volumeL":378},"values":{"coolingW":210,"drawW":24,"energyWh":9000,"heatW":180,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":8000,"required":8240,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-36,"provided":2000,"required":2036,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":120,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":3},"resources":{"capitalGBP":3570,"volumeL":324},"values":{"coolingW":120,"drawW":36,"energyWh":8000,"heatW":120,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,120,0,0,24,3480,288],[2,9,8,3,132,120,36,24,3890,352],[3,9,9,4,135,160,48,27,4035,372],[4,9,9,4,135,160,48,27,4035,372]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":700,"provided":9000,"required":8300,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":160,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":4},"resources":{"capitalGBP":4035,"volumeL":372},"values":{"coolingW":160,"drawW":48,"energyWh":9000,"heatW":135,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":2,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-160,"provided":8000,"required":8160,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-16,"provided":2000,"required":2016,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":140,"required":120,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":2},"resources":{"capitalGBP":3630,"volumeL":300},"values":{"coolingW":140,"drawW":16,"energyWh":8000,"heatW":120,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,120,0,0,24,3480,288],[2,9,8,2,132,140,16,24,3950,328],[3,9,9,2,135,140,16,27,4065,336],[4,9,9,2,135,140,16,27,4065,336]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":828,"provided":9000,"required":8172,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":234,"provided":2250,"required":2016,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":140,"required":135,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":2},"resources":{"capitalGBP":4065,"volumeL":336},"values":{"coolingW":140,"drawW":16,"energyWh":9000,"heatW":135,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":7,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-96,"provided":8400,"required":8496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":2000,"required":2060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":200,"required":184,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":8,"coolers":5},"resources":{"capitalGBP":4350,"volumeL":252},"values":{"coolingW":200,"drawW":60,"energyWh":8400,"heatW":184,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,8,0,184,0,0,64,4200,192],[2,6,8,5,184,200,60,64,4350,252],[3,7,9,5,212,200,60,72,5025,280],[4,7,9,6,212,240,72,72,5055,292],[5,7,9,6,212,240,72,72,5055,292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1224,"provided":9800,"required":8576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":240,"required":212,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":7,"converters":9,"coolers":6},"resources":{"capitalGBP":5055,"volumeL":292},"values":{"coolingW":240,"drawW":72,"energyWh":9800,"heatW":212,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":8400,"required":8352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":210,"required":184,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":8,"coolers":3},"resources":{"capitalGBP":4425,"volumeL":210},"values":{"coolingW":210,"drawW":24,"energyWh":8400,"heatW":184,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,8,0,184,0,0,64,4200,192],[2,6,8,3,184,210,24,64,4425,210],[3,6,9,3,192,210,24,72,4500,222],[4,6,9,3,192,210,24,72,4500,222]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":16,"provided":8400,"required":8384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":210,"required":192,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":3},"resources":{"capitalGBP":4500,"volumeL":222},"values":{"coolingW":210,"drawW":24,"energyWh":8400,"heatW":192,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":112,"provided":8400,"required":8288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":160,"required":144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":8,"coolers":4},"resources":{"capitalGBP":4640,"volumeL":208},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":144,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,8,0,144,0,0,24,4520,160],[2,6,8,4,144,160,48,24,4640,208],[3,6,9,4,147,160,48,27,4755,216],[4,6,9,4,147,160,48,27,4755,216]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":100,"provided":8400,"required":8300,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":160,"required":147,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":4},"resources":{"capitalGBP":4755,"volumeL":216},"values":{"coolingW":160,"drawW":48,"energyWh":8400,"heatW":147,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":6,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":8400,"required":8192,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":66,"provided":210,"required":144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":6,"converters":8,"coolers":3},"resources":{"capitalGBP":4745,"volumeL":178},"values":{"coolingW":210,"drawW":24,"energyWh":8400,"heatW":144,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,6,8,0,144,0,0,24,4520,160],[2,6,8,3,144,210,24,24,4745,178],[3,6,9,3,147,210,24,27,4860,186],[4,6,9,3,147,210,24,27,4860,186]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":196,"provided":8400,"required":8204,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":63,"provided":210,"required":147,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":6,"converters":9,"coolers":3},"resources":{"capitalGBP":4860,"volumeL":186},"values":{"coolingW":210,"drawW":24,"energyWh":8400,"heatW":147,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":4,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p2000-h4-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-640,"provided":8000,"required":8640,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":2000,"required":2096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":256,"required":244,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":8,"coolers":8},"resources":{"capitalGBP":4040,"volumeL":472},"values":{"coolingW":256,"drawW":96,"energyWh":8000,"heatW":244,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,8,0,244,0,0,64,3800,376],[2,11,8,8,262,256,96,64,4360,500],[3,11,9,9,270,288,108,72,4465,524],[4,11,9,9,270,288,108,72,4465,524]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":80,"provided":8800,"required":8720,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":2250,"required":2108,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":288,"required":270,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":9,"coolers":9},"resources":{"capitalGBP":4465,"volumeL":524},"values":{"coolingW":288,"drawW":108,"energyWh":8800,"heatW":270,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-416,"provided":8000,"required":8416,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":2000,"required":2040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":280,"required":244,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":8,"coolers":5},"resources":{"capitalGBP":4175,"volumeL":406},"values":{"coolingW":280,"drawW":40,"energyWh":8000,"heatW":244,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,8,0,244,0,0,64,3800,376],[2,11,8,5,262,280,40,64,4495,434],[3,11,9,5,270,280,40,72,4570,446],[4,11,9,5,270,280,40,72,4570,446]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":8800,"required":8448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2250,"required":2040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":280,"required":270,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":9,"coolers":5},"resources":{"capitalGBP":4570,"volumeL":446},"values":{"coolingW":280,"drawW":40,"energyWh":8800,"heatW":270,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-432,"provided":8000,"required":8432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":2000,"required":2084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":224,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":8,"coolers":7},"resources":{"capitalGBP":4330,"volumeL":428},"values":{"coolingW":224,"drawW":84,"energyWh":8000,"heatW":204,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,8,0,204,0,0,24,4120,344],[2,11,8,7,222,224,84,24,4650,456],[3,11,9,7,225,224,84,27,4765,464],[4,11,9,8,225,256,96,27,4795,476],[5,11,9,8,225,256,96,27,4795,476]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":308,"provided":8800,"required":8492,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":2250,"required":2096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":31,"provided":256,"required":225,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":9,"coolers":8},"resources":{"capitalGBP":4795,"volumeL":476},"values":{"coolingW":256,"drawW":96,"energyWh":8800,"heatW":225,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":11,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-224,"provided":8000,"required":8224,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":224,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":10,"converters":8,"coolers":4},"resources":{"capitalGBP":4420,"volumeL":368},"values":{"coolingW":224,"drawW":32,"energyWh":8000,"heatW":204,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,10,8,0,204,0,0,24,4120,344],[2,11,8,4,222,224,32,24,4740,396],[3,11,9,4,225,224,32,27,4855,404],[4,11,9,5,225,280,40,27,4930,410],[5,11,9,5,225,280,40,27,4930,410]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":532,"provided":8800,"required":8268,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2250,"required":2040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":280,"required":225,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":11,"converters":9,"coolers":5},"resources":{"capitalGBP":4930,"volumeL":410},"values":{"coolingW":280,"drawW":40,"energyWh":8800,"heatW":225,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":224,"provided":8960,"required":8736,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":2000,"required":2120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":320,"required":304,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":10},"resources":{"capitalGBP":5700,"volumeL":344},"values":{"coolingW":320,"drawW":120,"energyWh":8960,"heatW":304,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,304,0,0,64,5400,224],[2,8,8,10,304,320,120,64,5700,344],[3,8,9,10,312,320,120,72,5775,356],[4,8,9,10,312,320,120,72,5775,356]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":8960,"required":8768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":2250,"required":2120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":320,"required":312,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":9,"coolers":10},"resources":{"capitalGBP":5775,"volumeL":356},"values":{"coolingW":320,"drawW":120,"energyWh":8960,"heatW":312,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":512,"provided":8960,"required":8448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":336,"required":304,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":6},"resources":{"capitalGBP":5850,"volumeL":260},"values":{"coolingW":336,"drawW":48,"energyWh":8960,"heatW":304,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,304,0,0,64,5400,224],[2,8,8,6,304,336,48,64,5850,260],[3,8,9,6,312,336,48,72,5925,272],[4,8,9,6,312,336,48,72,5925,272]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":480,"provided":8960,"required":8480,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":336,"required":312,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":9,"coolers":6},"resources":{"capitalGBP":5925,"volumeL":272},"values":{"coolingW":336,"drawW":48,"energyWh":8960,"heatW":312,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":432,"provided":8960,"required":8528,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":2000,"required":2108,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":288,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":9},"resources":{"capitalGBP":5990,"volumeL":300},"values":{"coolingW":288,"drawW":108,"energyWh":8960,"heatW":264,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,264,0,0,24,5720,192],[2,8,8,9,264,288,108,24,5990,300],[3,8,9,9,267,288,108,27,6105,308],[4,8,9,9,267,288,108,27,6105,308]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":420,"provided":8960,"required":8540,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":2250,"required":2108,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":288,"required":267,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":9,"coolers":9},"resources":{"capitalGBP":6105,"volumeL":308},"values":{"coolingW":288,"drawW":108,"energyWh":8960,"heatW":267,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":8,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":8960,"required":8256,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":2000,"required":2040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":8,"converters":8,"coolers":5},"resources":{"capitalGBP":6095,"volumeL":222},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":264,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,8,8,0,264,0,0,24,5720,192],[2,8,8,5,264,280,40,24,6095,222],[3,8,9,5,267,280,40,27,6210,230],[4,8,9,5,267,280,40,27,6210,230]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":692,"provided":8960,"required":8268,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2250,"required":2040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":280,"required":267,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":8,"converters":9,"coolers":5},"resources":{"capitalGBP":6210,"volumeL":230},"values":{"coolingW":280,"drawW":40,"energyWh":8960,"heatW":267,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":6,"frontier":["standard-standard-air","standard-standard-liquid","standard-efficient-liquid","compact-efficient-air","compact-efficient-liquid"],"id":"p2000-h6-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-816,"provided":12000,"required":12816,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":240,"required":208,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":6},"resources":{"capitalGBP":4620,"volumeL":504},"values":{"coolingW":240,"drawW":72,"energyWh":12000,"heatW":208,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,208,0,0,64,4440,432],[2,13,8,6,220,240,72,64,4940,532],[3,13,9,6,228,240,72,72,5015,544],[4,13,9,6,228,240,72,72,5015,544]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":136,"provided":13000,"required":12864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":240,"required":228,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":6},"resources":{"capitalGBP":5015,"volumeL":544},"values":{"coolingW":240,"drawW":72,"energyWh":13000,"heatW":228,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-528,"provided":12000,"required":12528,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":210,"required":208,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":3},"resources":{"capitalGBP":4665,"volumeL":450},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":208,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,208,0,0,64,4440,432],[2,13,8,3,220,210,24,64,4985,478],[3,13,9,4,228,280,32,72,5135,496],[4,13,9,4,228,280,32,72,5135,496]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":376,"provided":13000,"required":12624,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":280,"required":228,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":4},"resources":{"capitalGBP":5135,"volumeL":496},"values":{"coolingW":280,"drawW":32,"energyWh":13000,"heatW":228,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-504,"provided":12000,"required":12504,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-60,"provided":2000,"required":2060,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":200,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":5},"resources":{"capitalGBP":4910,"volumeL":460},"values":{"coolingW":200,"drawW":60,"energyWh":12000,"heatW":168,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,168,0,0,24,4760,400],[2,13,8,5,180,200,60,24,5230,488],[3,13,9,5,183,200,60,27,5345,496],[4,13,9,5,183,200,60,27,5345,496]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":478,"provided":13000,"required":12522,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":190,"provided":2250,"required":2060,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":17,"provided":200,"required":183,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":5},"resources":{"capitalGBP":5345,"volumeL":496},"values":{"coolingW":200,"drawW":60,"energyWh":13000,"heatW":183,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-288,"provided":12000,"required":12288,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":210,"required":168,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":3},"resources":{"capitalGBP":4985,"volumeL":418},"values":{"coolingW":210,"drawW":24,"energyWh":12000,"heatW":168,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,168,0,0,24,4760,400],[2,13,8,3,180,210,24,24,5305,446],[3,13,9,3,183,210,24,27,5420,454],[4,13,9,3,183,210,24,27,5420,454]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":694,"provided":13000,"required":12306,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":210,"required":183,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":3},"resources":{"capitalGBP":5420,"volumeL":454},"values":{"coolingW":210,"drawW":24,"energyWh":13000,"heatW":183,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-288,"provided":12600,"required":12888,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":2000,"required":2084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":280,"required":244,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":8,"coolers":7},"resources":{"capitalGBP":6210,"volumeL":324},"values":{"coolingW":280,"drawW":84,"energyWh":12600,"heatW":244,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,8,0,244,0,0,64,6000,240],[2,9,8,7,244,280,84,64,6210,324],[3,10,9,7,272,280,84,72,6885,352],[4,10,9,7,272,280,84,72,6885,352]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1064,"provided":14000,"required":12936,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":166,"provided":2250,"required":2084,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":9,"coolers":7},"resources":{"capitalGBP":6885,"volumeL":352},"values":{"coolingW":280,"drawW":84,"energyWh":14000,"heatW":272,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":10,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":12600,"required":12576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":280,"required":244,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":8,"coolers":4},"resources":{"capitalGBP":6300,"volumeL":264},"values":{"coolingW":280,"drawW":32,"energyWh":12600,"heatW":244,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,8,0,244,0,0,64,6000,240],[2,9,8,4,244,280,32,64,6300,264],[3,9,9,4,252,280,32,72,6375,276],[4,10,9,4,272,280,32,72,6975,292],[5,10,9,4,272,280,32,72,6975,292]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1376,"provided":14000,"required":12624,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":280,"required":272,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":10,"converters":9,"coolers":4},"resources":{"capitalGBP":6975,"volumeL":292},"values":{"coolingW":280,"drawW":32,"energyWh":14000,"heatW":272,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":24,"provided":12600,"required":12576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":240,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":8,"coolers":6},"resources":{"capitalGBP":6500,"volumeL":280},"values":{"coolingW":240,"drawW":72,"energyWh":12600,"heatW":204,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,8,0,204,0,0,24,6320,208],[2,9,8,6,204,240,72,24,6500,280],[3,9,9,6,207,240,72,27,6615,288],[4,9,9,6,207,240,72,27,6615,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":6,"provided":12600,"required":12594,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":240,"required":207,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":6},"resources":{"capitalGBP":6615,"volumeL":288},"values":{"coolingW":240,"drawW":72,"energyWh":12600,"heatW":207,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":9,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":3,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":312,"provided":12600,"required":12288,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-24,"provided":2000,"required":2024,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":210,"required":204,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":9,"converters":8,"coolers":3},"resources":{"capitalGBP":6545,"volumeL":226},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":204,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,9,8,0,204,0,0,24,6320,208],[2,9,8,3,204,210,24,24,6545,226],[3,9,9,3,207,210,24,27,6660,234],[4,9,9,3,207,210,24,27,6660,234]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":294,"provided":12600,"required":12306,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":226,"provided":2250,"required":2024,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":210,"required":207,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":9,"converters":9,"coolers":3},"resources":{"capitalGBP":6660,"volumeL":234},"values":{"coolingW":210,"drawW":24,"energyWh":12600,"heatW":207,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":6,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-standard-air","compact-standard-liquid","compact-efficient-liquid"],"id":"p2000-h6-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1176,"provided":12000,"required":13176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":2000,"required":2132,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":352,"required":334,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":11},"resources":{"capitalGBP":5730,"volumeL":648},"values":{"coolingW":352,"drawW":132,"energyWh":12000,"heatW":334,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,334,0,0,64,5400,516],[2,16,8,11,352,352,132,64,6050,676],[3,17,9,11,378,352,132,72,6445,716],[4,17,9,12,378,384,144,72,6475,728],[5,17,9,12,378,384,144,72,6475,728]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":304,"provided":13600,"required":13296,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":2250,"required":2144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":384,"required":378,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":12},"resources":{"capitalGBP":6475,"volumeL":728},"values":{"coolingW":384,"drawW":144,"energyWh":13600,"heatW":378,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-672,"provided":12000,"required":12672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":336,"required":334,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":6},"resources":{"capitalGBP":5850,"volumeL":552},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":334,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,334,0,0,64,5400,516],[2,16,8,6,352,336,48,64,6170,580],[3,16,9,7,360,392,56,72,6320,598],[4,16,9,7,360,392,56,72,6320,598]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":32,"provided":12800,"required":12768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":2250,"required":2056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":392,"required":360,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":9,"coolers":7},"resources":{"capitalGBP":6320,"volumeL":598},"values":{"coolingW":392,"drawW":56,"energyWh":12800,"heatW":360,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-864,"provided":12000,"required":12864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":2000,"required":2120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":320,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":10},"resources":{"capitalGBP":6020,"volumeL":604},"values":{"coolingW":320,"drawW":120,"energyWh":12000,"heatW":294,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,294,0,0,24,5720,484],[2,16,8,10,312,320,120,24,6340,632],[3,17,9,10,333,320,120,27,6775,668],[4,17,9,11,333,352,132,27,6805,680],[5,17,9,11,333,352,132,27,6805,680]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":646,"provided":13600,"required":12954,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":2250,"required":2132,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":352,"required":333,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":11},"resources":{"capitalGBP":6805,"volumeL":680},"values":{"coolingW":352,"drawW":132,"energyWh":13600,"heatW":333,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-432,"provided":12000,"required":12432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":336,"required":294,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":6},"resources":{"capitalGBP":6170,"volumeL":520},"values":{"coolingW":336,"drawW":48,"energyWh":12000,"heatW":294,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,294,0,0,24,5720,484],[2,16,8,6,312,336,48,24,6490,548],[3,16,9,6,315,336,48,27,6605,556],[4,16,9,6,315,336,48,27,6605,556]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":350,"provided":12800,"required":12450,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":336,"required":315,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":9,"coolers":6},"resources":{"capitalGBP":6605,"volumeL":556},"values":{"coolingW":336,"drawW":48,"energyWh":12800,"heatW":315,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1000,"provided":12320,"required":13320,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-156,"provided":2000,"required":2156,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":416,"required":394,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":8,"coolers":13},"resources":{"capitalGBP":7590,"volumeL":428},"values":{"coolingW":416,"drawW":156,"energyWh":12320,"heatW":394,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,8,0,394,0,0,64,7200,272],[2,12,8,13,424,416,156,64,8190,444],[3,12,9,14,432,448,168,72,8295,468],[4,12,9,14,432,448,168,72,8295,468]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":13440,"required":13440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":2250,"required":2168,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":448,"required":432,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":9,"coolers":14},"resources":{"capitalGBP":8295,"volumeL":468},"values":{"coolingW":448,"drawW":168,"energyWh":13440,"heatW":432,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-448,"provided":12320,"required":12768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":2000,"required":2064,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":54,"provided":448,"required":394,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":8,"coolers":8},"resources":{"capitalGBP":7800,"volumeL":320},"values":{"coolingW":448,"drawW":64,"energyWh":12320,"heatW":394,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,8,0,394,0,0,64,7200,272],[2,12,8,8,424,448,64,64,8400,336],[3,12,9,8,432,448,64,72,8475,348],[4,12,9,8,432,448,64,72,8475,348]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":624,"provided":13440,"required":12816,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":2250,"required":2064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":448,"required":432,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":9,"coolers":8},"resources":{"capitalGBP":8475,"volumeL":348},"values":{"coolingW":448,"drawW":64,"energyWh":13440,"heatW":432,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-688,"provided":12320,"required":13008,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":2000,"required":2144,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":384,"required":354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":8,"coolers":12},"resources":{"capitalGBP":7880,"volumeL":384},"values":{"coolingW":384,"drawW":144,"energyWh":12320,"heatW":354,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,8,0,354,0,0,24,7520,240],[2,11,8,12,354,384,144,24,7880,384],[3,12,9,12,387,384,144,27,8595,408],[4,12,9,13,387,416,156,27,8625,420],[5,12,9,13,387,416,156,27,8625,420]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":342,"provided":13440,"required":13098,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":94,"provided":2250,"required":2156,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":29,"provided":416,"required":387,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":9,"coolers":13},"resources":{"capitalGBP":8625,"volumeL":420},"values":{"coolingW":416,"drawW":156,"energyWh":13440,"heatW":387,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-160,"provided":12320,"required":12480,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":392,"required":354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":11,"converters":8,"coolers":7},"resources":{"capitalGBP":8045,"volumeL":282},"values":{"coolingW":392,"drawW":56,"energyWh":12320,"heatW":354,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,11,8,0,354,0,0,24,7520,240],[2,11,8,7,354,392,56,24,8045,282],[3,12,9,7,387,392,56,27,8760,306],[4,12,9,7,387,392,56,27,8760,306]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":942,"provided":13440,"required":12498,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":2250,"required":2056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":392,"required":387,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":9,"coolers":7},"resources":{"capitalGBP":8760,"volumeL":306},"values":{"coolingW":392,"drawW":56,"energyWh":13440,"heatW":387,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":8,"frontier":["standard-standard-liquid","standard-efficient-liquid","compact-efficient-liquid"],"id":"p2000-h8-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1184,"provided":16000,"required":17184,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":2000,"required":2084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":8,"coolers":7},"resources":{"capitalGBP":5930,"volumeL":628},"values":{"coolingW":280,"drawW":84,"energyWh":16000,"heatW":256,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,8,0,256,0,0,64,5720,544],[2,17,8,7,268,280,84,64,6250,656],[3,18,9,7,288,280,84,72,6645,696],[4,18,9,8,288,320,96,72,6675,708],[5,18,9,8,288,320,96,72,6675,708]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":656,"provided":18000,"required":17344,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":2250,"required":2096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":320,"required":288,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":9,"coolers":8},"resources":{"capitalGBP":6675,"volumeL":708},"values":{"coolingW":320,"drawW":96,"energyWh":18000,"heatW":288,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":16000,"required":16768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":280,"required":256,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":8,"coolers":4},"resources":{"capitalGBP":6020,"volumeL":568},"values":{"coolingW":280,"drawW":32,"energyWh":16000,"heatW":256,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,8,0,256,0,0,64,5720,544],[2,17,8,4,268,280,32,64,6340,596],[3,17,9,4,276,280,32,72,6415,608],[4,17,9,4,276,280,32,72,6415,608]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":168,"provided":17000,"required":16832,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":280,"required":276,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":4},"resources":{"capitalGBP":6415,"volumeL":608},"values":{"coolingW":280,"drawW":32,"energyWh":17000,"heatW":276,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":16000,"required":16768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":240,"required":216,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":8,"coolers":6},"resources":{"capitalGBP":6220,"volumeL":584},"values":{"coolingW":240,"drawW":72,"energyWh":16000,"heatW":216,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,8,0,216,0,0,24,6040,512],[2,17,8,6,228,240,72,24,6540,612],[3,17,9,6,231,240,72,27,6655,620],[4,17,9,6,231,240,72,27,6655,620]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":208,"provided":17000,"required":16792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":9,"provided":240,"required":231,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":6},"resources":{"capitalGBP":6655,"volumeL":620},"values":{"coolingW":240,"drawW":72,"energyWh":17000,"heatW":231,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-448,"provided":16000,"required":16448,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":64,"provided":280,"required":216,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":16,"converters":8,"coolers":4},"resources":{"capitalGBP":6340,"volumeL":536},"values":{"coolingW":280,"drawW":32,"energyWh":16000,"heatW":216,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,16,8,0,216,0,0,24,6040,512],[2,17,8,4,228,280,32,24,6660,564],[3,17,9,4,231,280,32,27,6775,572],[4,17,9,4,231,280,32,27,6775,572]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":17000,"required":16472,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":49,"provided":280,"required":231,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":4},"resources":{"capitalGBP":6775,"volumeL":572},"values":{"coolingW":280,"drawW":32,"energyWh":17000,"heatW":231,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-480,"provided":16800,"required":17280,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":2000,"required":2096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":320,"required":304,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":8},"resources":{"capitalGBP":8040,"volumeL":384},"values":{"coolingW":320,"drawW":96,"energyWh":16800,"heatW":304,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,304,0,0,64,7800,288],[2,12,8,8,304,320,96,64,8040,384],[3,13,9,8,332,320,96,72,8715,412],[4,13,9,9,332,360,108,72,8745,424],[5,13,9,9,332,360,108,72,8745,424]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":760,"provided":18200,"required":17440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":2250,"required":2108,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":360,"required":332,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":9},"resources":{"capitalGBP":8745,"volumeL":424},"values":{"coolingW":360,"drawW":108,"energyWh":18200,"heatW":332,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-32,"provided":16800,"required":16832,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":2000,"required":2040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":350,"required":304,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":5},"resources":{"capitalGBP":8175,"volumeL":318},"values":{"coolingW":350,"drawW":40,"energyWh":16800,"heatW":304,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,304,0,0,64,7800,288],[2,12,8,5,304,350,40,64,8175,318],[3,13,9,5,332,350,40,72,8850,346],[4,13,9,5,332,350,40,72,8850,346]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1304,"provided":18200,"required":16896,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2250,"required":2040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":350,"required":332,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":5},"resources":{"capitalGBP":8850,"volumeL":346},"values":{"coolingW":350,"drawW":40,"energyWh":18200,"heatW":332,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":13,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-64,"provided":16800,"required":16864,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-84,"provided":2000,"required":2084,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":7},"resources":{"capitalGBP":8330,"volumeL":340},"values":{"coolingW":280,"drawW":84,"energyWh":16800,"heatW":264,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,264,0,0,24,8120,256],[2,12,8,7,264,280,84,24,8330,340],[3,13,9,7,287,280,84,27,9045,364],[4,13,9,8,287,320,96,27,9075,376],[5,13,9,8,287,320,96,27,9075,376]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1216,"provided":18200,"required":16984,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":2250,"required":2096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":320,"required":287,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":13,"converters":9,"coolers":8},"resources":{"capitalGBP":9075,"volumeL":376},"values":{"coolingW":320,"drawW":96,"energyWh":18200,"heatW":287,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":12,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":4,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":16800,"required":16448,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-32,"provided":2000,"required":2032,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":280,"required":264,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":12,"converters":8,"coolers":4},"resources":{"capitalGBP":8420,"volumeL":280},"values":{"coolingW":280,"drawW":32,"energyWh":16800,"heatW":264,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,12,8,0,264,0,0,24,8120,256],[2,12,8,4,264,280,32,24,8420,280],[3,12,9,4,267,280,32,27,8535,288],[4,12,9,4,267,280,32,27,8535,288]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":328,"provided":16800,"required":16472,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":218,"provided":2250,"required":2032,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":280,"required":267,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":12,"converters":9,"coolers":4},"resources":{"capitalGBP":8535,"volumeL":288},"values":{"coolingW":280,"drawW":32,"energyWh":16800,"heatW":267,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":8,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p2000-h8-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":23,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1856,"provided":16000,"required":17856,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":2000,"required":2168,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":448,"required":424,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":8,"coolers":14},"resources":{"capitalGBP":7420,"volumeL":824},"values":{"coolingW":448,"drawW":168,"energyWh":16000,"heatW":424,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,8,0,424,0,0,64,7000,656],[2,21,8,14,442,448,168,64,7740,852],[3,23,9,14,486,448,168,72,8455,920],[4,23,9,16,486,512,192,72,8515,944],[5,23,9,16,486,512,192,72,8515,944]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":288,"provided":18400,"required":18112,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":2250,"required":2192,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":512,"required":486,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":23,"converters":9,"coolers":16},"resources":{"capitalGBP":8515,"volumeL":944},"values":{"coolingW":512,"drawW":192,"energyWh":18400,"heatW":486,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":22,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1024,"provided":16000,"required":17024,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":2000,"required":2064,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":448,"required":424,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":8,"coolers":8},"resources":{"capitalGBP":7600,"volumeL":704},"values":{"coolingW":448,"drawW":64,"energyWh":16000,"heatW":424,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,8,0,424,0,0,64,7000,656],[2,21,8,8,442,448,64,64,7920,732],[3,22,9,8,468,448,64,72,8315,772],[4,22,9,9,468,504,72,72,8390,778],[5,22,9,9,468,504,72,72,8390,778]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":448,"provided":17600,"required":17152,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":504,"required":468,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":22,"converters":9,"coolers":9},"resources":{"capitalGBP":8390,"volumeL":778},"values":{"coolingW":504,"drawW":72,"energyWh":17600,"heatW":468,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":22,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":16000,"required":17344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":2000,"required":2144,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":384,"required":384,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":8,"coolers":12},"resources":{"capitalGBP":7680,"volumeL":768},"values":{"coolingW":384,"drawW":144,"energyWh":16000,"heatW":384,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,8,0,384,0,0,24,7320,624],[2,21,8,12,402,384,144,24,8000,796],[3,22,9,13,423,416,156,27,8465,844],[4,22,9,14,423,448,168,27,8495,856],[5,22,9,14,423,448,168,27,8495,856]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":17600,"required":17560,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":2250,"required":2168,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":25,"provided":448,"required":423,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":22,"converters":9,"coolers":14},"resources":{"capitalGBP":8495,"volumeL":856},"values":{"coolingW":448,"drawW":168,"energyWh":17600,"heatW":423,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":21,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-640,"provided":16000,"required":16640,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":392,"required":384,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":20,"converters":8,"coolers":7},"resources":{"capitalGBP":7845,"volumeL":666},"values":{"coolingW":392,"drawW":56,"energyWh":16000,"heatW":384,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,20,8,0,384,0,0,24,7320,624],[2,21,8,7,402,392,56,24,8165,694],[3,21,9,8,405,448,64,27,8355,708],[4,21,9,8,405,448,64,27,8355,708]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":72,"provided":16800,"required":16728,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":2250,"required":2064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":43,"provided":448,"required":405,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":21,"converters":9,"coolers":8},"resources":{"capitalGBP":8355,"volumeL":708},"values":{"coolingW":448,"drawW":64,"energyWh":16800,"heatW":405,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":17,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":19,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":16800,"required":18144,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-204,"provided":2000,"required":2204,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":544,"required":514,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":17},"resources":{"capitalGBP":10110,"volumeL":540},"values":{"coolingW":544,"drawW":204,"energyWh":16800,"heatW":514,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,514,0,0,64,9600,336],[2,15,8,17,514,544,204,64,10110,540],[3,17,9,17,582,544,204,72,11385,584],[4,17,9,19,582,608,228,72,11445,608],[5,17,9,19,582,608,228,72,11445,608]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":640,"provided":19040,"required":18400,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":22,"provided":2250,"required":2228,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":608,"required":582,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":17,"converters":9,"coolers":19},"resources":{"capitalGBP":11445,"volumeL":608},"values":{"coolingW":608,"drawW":228,"energyWh":19040,"heatW":582,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-352,"provided":16800,"required":17152,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":2000,"required":2080,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":560,"required":514,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":10},"resources":{"capitalGBP":10350,"volumeL":396},"values":{"coolingW":560,"drawW":80,"energyWh":16800,"heatW":514,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,514,0,0,64,9600,336],[2,15,8,10,514,560,80,64,10350,396],[3,16,9,10,552,560,80,72,11025,424],[4,16,9,10,552,560,80,72,11025,424]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":17920,"required":17216,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":170,"provided":2250,"required":2080,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":560,"required":552,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":9,"coolers":10},"resources":{"capitalGBP":11025,"volumeL":424},"values":{"coolingW":560,"drawW":80,"energyWh":17920,"heatW":552,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":16,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-832,"provided":16800,"required":17632,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-180,"provided":2000,"required":2180,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":480,"required":474,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":15},"resources":{"capitalGBP":10370,"volumeL":484},"values":{"coolingW":480,"drawW":180,"energyWh":16800,"heatW":474,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,474,0,0,24,9920,304],[2,15,8,15,474,480,180,24,10370,484],[3,16,9,15,507,480,180,27,11085,508],[4,16,9,16,507,512,192,27,11115,520],[5,16,9,16,507,512,192,27,11115,520]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":168,"provided":17920,"required":17752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":2250,"required":2192,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":512,"required":507,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":16,"converters":9,"coolers":16},"resources":{"capitalGBP":11115,"volumeL":520},"values":{"coolingW":512,"drawW":192,"energyWh":17920,"heatW":507,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":15,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":32,"provided":16800,"required":16768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":504,"required":474,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":15,"converters":8,"coolers":9},"resources":{"capitalGBP":10595,"volumeL":358},"values":{"coolingW":504,"drawW":72,"energyWh":16800,"heatW":474,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,15,8,0,474,0,0,24,9920,304],[2,15,8,9,474,504,72,24,10595,358],[3,15,9,9,477,504,72,27,10710,366],[4,15,9,9,477,504,72,27,10710,366]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":16800,"required":16792,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":27,"provided":504,"required":477,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":15,"converters":9,"coolers":9},"resources":{"capitalGBP":10710,"volumeL":366},"values":{"coolingW":504,"drawW":72,"energyWh":16800,"heatW":477,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":12,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p2000-h12-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":27,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2064,"provided":24000,"required":26064,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-108,"provided":2000,"required":2108,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":360,"required":352,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":8,"coolers":9},"resources":{"capitalGBP":8550,"volumeL":876},"values":{"coolingW":360,"drawW":108,"energyWh":24000,"heatW":352,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,8,0,352,0,0,64,8280,768],[2,25,8,9,364,360,108,64,8870,904],[3,27,9,10,396,400,120,72,9615,984],[4,27,9,10,396,400,120,72,9615,984]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":696,"provided":27000,"required":26304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":2250,"required":2120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":400,"required":396,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":27,"converters":9,"coolers":10},"resources":{"capitalGBP":9615,"volumeL":984},"values":{"coolingW":400,"drawW":120,"energyWh":27000,"heatW":396,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":24000,"required":25344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":420,"required":352,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":8,"coolers":6},"resources":{"capitalGBP":8730,"volumeL":804},"values":{"coolingW":420,"drawW":48,"energyWh":24000,"heatW":352,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,8,0,352,0,0,64,8280,768],[2,25,8,6,364,420,48,64,9050,832],[3,26,9,6,384,420,48,72,9445,872],[4,26,9,6,384,420,48,72,9445,872]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":560,"provided":26000,"required":25440,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":420,"required":384,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":9,"coolers":6},"resources":{"capitalGBP":9445,"volumeL":872},"values":{"coolingW":420,"drawW":48,"energyWh":26000,"heatW":384,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1440,"provided":24000,"required":25440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-96,"provided":2000,"required":2096,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":320,"required":312,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":8,"coolers":8},"resources":{"capitalGBP":8840,"volumeL":832},"values":{"coolingW":320,"drawW":96,"energyWh":24000,"heatW":312,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,8,0,312,0,0,24,8600,736],[2,25,8,8,324,320,96,24,9160,860],[3,26,9,9,339,360,108,27,9625,908],[4,26,9,9,339,360,108,27,9625,908]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":380,"provided":26000,"required":25620,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":142,"provided":2250,"required":2108,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":360,"required":339,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":9,"coolers":9},"resources":{"capitalGBP":9625,"volumeL":908},"values":{"coolingW":360,"drawW":108,"energyWh":26000,"heatW":339,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":5,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-768,"provided":24000,"required":24768,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-40,"provided":2000,"required":2040,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":350,"required":312,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":24,"converters":8,"coolers":5},"resources":{"capitalGBP":8975,"volumeL":766},"values":{"coolingW":350,"drawW":40,"energyWh":24000,"heatW":312,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,24,8,0,312,0,0,24,8600,736],[2,25,8,5,324,350,40,24,9295,794],[3,25,9,5,327,350,40,27,9410,802],[4,25,9,5,327,350,40,27,9410,802]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":196,"provided":25000,"required":24804,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2250,"required":2040,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":23,"provided":350,"required":327,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":9,"coolers":5},"resources":{"capitalGBP":9410,"volumeL":802},"values":{"coolingW":350,"drawW":40,"energyWh":25000,"heatW":327,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1152,"provided":25200,"required":26352,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":2000,"required":2132,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":440,"required":424,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":8,"coolers":11},"resources":{"capitalGBP":11730,"volumeL":516},"values":{"coolingW":440,"drawW":132,"energyWh":25200,"heatW":424,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,8,0,424,0,0,64,11400,384],[2,18,8,11,424,440,132,64,11730,516],[3,19,9,11,452,440,132,72,12405,544],[4,19,9,12,452,480,144,72,12435,556],[5,19,9,12,452,480,144,72,12435,556]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":8,"provided":26600,"required":26592,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":2250,"required":2144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":28,"provided":480,"required":452,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":9,"coolers":12},"resources":{"capitalGBP":12435,"volumeL":556},"values":{"coolingW":480,"drawW":144,"energyWh":26600,"heatW":452,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-240,"provided":25200,"required":25440,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":66,"provided":490,"required":424,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":8,"coolers":7},"resources":{"capitalGBP":11925,"volumeL":426},"values":{"coolingW":490,"drawW":56,"energyWh":25200,"heatW":424,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,8,0,424,0,0,64,11400,384],[2,18,8,7,424,490,56,64,11925,426],[3,19,9,7,452,490,56,72,12600,454],[4,19,9,7,452,490,56,72,12600,454]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1064,"provided":26600,"required":25536,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":2250,"required":2056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":38,"provided":490,"required":452,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":9,"coolers":7},"resources":{"capitalGBP":12600,"volumeL":454},"values":{"coolingW":490,"drawW":56,"energyWh":26600,"heatW":452,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":19,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-528,"provided":25200,"required":25728,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-120,"provided":2000,"required":2120,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":400,"required":384,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":8,"coolers":10},"resources":{"capitalGBP":12020,"volumeL":472},"values":{"coolingW":400,"drawW":120,"energyWh":25200,"heatW":384,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,8,0,384,0,0,24,11720,352],[2,18,8,10,384,400,120,24,12020,472],[3,19,9,10,407,400,120,27,12735,496],[4,19,9,11,407,440,132,27,12765,508],[5,19,9,11,407,440,132,27,12765,508]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":692,"provided":26600,"required":25908,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":118,"provided":2250,"required":2132,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":440,"required":407,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":19,"converters":9,"coolers":11},"resources":{"capitalGBP":12765,"volumeL":508},"values":{"coolingW":440,"drawW":132,"energyWh":26600,"heatW":407,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":18,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":6,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":336,"provided":25200,"required":24864,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":420,"required":384,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":18,"converters":8,"coolers":6},"resources":{"capitalGBP":12170,"volumeL":388},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":384,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,18,8,0,384,0,0,24,11720,352],[2,18,8,6,384,420,48,24,12170,388],[3,18,9,6,387,420,48,27,12285,396],[4,18,9,6,387,420,48,27,12285,396]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":300,"provided":25200,"required":24900,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":202,"provided":2250,"required":2048,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":420,"required":387,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":18,"converters":9,"coolers":6},"resources":{"capitalGBP":12285,"volumeL":396},"values":{"coolingW":420,"drawW":48,"energyWh":25200,"heatW":387,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":12,"frontier":["standard-efficient-liquid","compact-efficient-liquid"],"id":"p2000-h12-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":36,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3504,"provided":24000,"required":27504,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-228,"provided":2000,"required":2228,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":608,"required":604,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":8,"coolers":19},"resources":{"capitalGBP":10770,"volumeL":1164},"values":{"coolingW":608,"drawW":228,"energyWh":24000,"heatW":604,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,8,0,604,0,0,64,10200,936],[2,31,8,19,622,608,228,64,11090,1192],[3,35,9,20,702,640,240,72,12475,1328],[4,35,9,22,702,704,264,72,12535,1352],[5,36,10,22,728,704,264,80,12930,1392],[6,36,10,23,728,736,276,80,12960,1404],[7,36,10,23,728,736,276,80,12960,1404]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":528,"provided":28800,"required":28272,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":2500,"required":2276,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":736,"required":728,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":36,"converters":10,"coolers":23},"resources":{"capitalGBP":12960,"volumeL":1404},"values":{"coolingW":736,"drawW":276,"energyWh":28800,"heatW":728,"lossW":80,"outputW":2500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":33,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1824,"provided":24000,"required":25824,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":2000,"required":2088,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":616,"required":604,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":8,"coolers":11},"resources":{"capitalGBP":11025,"volumeL":1002},"values":{"coolingW":616,"drawW":88,"energyWh":24000,"heatW":604,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,8,0,604,0,0,64,10200,936],[2,31,8,11,622,616,88,64,11345,1030],[3,33,9,12,666,672,96,72,12135,1104],[4,33,9,12,666,672,96,72,12135,1104]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":384,"provided":26400,"required":26016,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":2250,"required":2096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":672,"required":666,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":33,"converters":9,"coolers":12},"resources":{"capitalGBP":12135,"volumeL":1104},"values":{"coolingW":672,"drawW":96,"energyWh":26400,"heatW":666,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":35,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2880,"provided":24000,"required":26880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-216,"provided":2000,"required":2216,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":576,"required":564,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":8,"coolers":18},"resources":{"capitalGBP":11060,"volumeL":1120},"values":{"coolingW":576,"drawW":216,"energyWh":24000,"heatW":564,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,8,0,564,0,0,24,10520,904],[2,31,8,18,582,576,216,24,11380,1148],[3,34,9,19,639,608,228,27,12485,1252],[4,34,9,20,639,640,240,27,12515,1264],[5,35,9,20,657,640,240,27,12835,1292],[6,35,9,21,657,672,252,27,12865,1304],[7,35,10,21,660,672,252,30,12980,1312],[8,35,10,21,660,672,252,30,12980,1312]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":616,"provided":28000,"required":27384,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":248,"provided":2500,"required":2252,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":672,"required":660,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":35,"converters":10,"coolers":21},"resources":{"capitalGBP":12980,"volumeL":1312},"values":{"coolingW":672,"drawW":252,"energyWh":28000,"heatW":660,"lossW":30,"outputW":2500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":32,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1344,"provided":24000,"required":25344,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":2000,"required":2088,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":616,"required":564,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":30,"converters":8,"coolers":11},"resources":{"capitalGBP":11345,"volumeL":970},"values":{"coolingW":616,"drawW":88,"energyWh":24000,"heatW":564,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,30,8,0,564,0,0,24,10520,904],[2,31,8,11,582,616,88,24,11665,998],[3,32,9,11,603,616,88,27,12100,1034],[4,32,9,11,603,616,88,27,12100,1034]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":220,"provided":25600,"required":25380,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":2250,"required":2088,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":616,"required":603,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":32,"converters":9,"coolers":11},"resources":{"capitalGBP":12100,"volumeL":1034},"values":{"coolingW":616,"drawW":88,"energyWh":25600,"heatW":603,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":27,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3440,"provided":24640,"required":28080,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-276,"provided":2000,"required":2276,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":736,"required":724,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":8,"coolers":23},"resources":{"capitalGBP":14490,"volumeL":724},"values":{"coolingW":736,"drawW":276,"energyWh":24640,"heatW":724,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,8,0,724,0,0,64,13800,448],[2,23,8,23,754,736,276,64,15090,740],[3,26,10,24,860,768,288,80,17070,824],[4,26,10,27,860,864,324,80,17160,860],[5,26,10,27,860,864,324,80,17160,860]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":272,"provided":29120,"required":28848,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":176,"provided":2500,"required":2324,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":864,"required":860,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":10,"coolers":27},"resources":{"capitalGBP":17160,"volumeL":860},"values":{"coolingW":864,"drawW":324,"energyWh":29120,"heatW":860,"lossW":80,"outputW":2500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1376,"provided":24640,"required":26016,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-104,"provided":2000,"required":2104,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":728,"required":724,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":8,"coolers":13},"resources":{"capitalGBP":14775,"volumeL":526},"values":{"coolingW":728,"drawW":104,"energyWh":24640,"heatW":724,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,8,0,724,0,0,64,13800,448],[2,23,8,13,754,728,104,64,15375,542],[3,24,9,14,792,784,112,72,16125,576],[4,24,9,15,792,840,120,72,16200,582],[5,24,9,15,792,840,120,72,16200,582]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":576,"provided":26880,"required":26304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":2250,"required":2120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":840,"required":792,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":9,"coolers":15},"resources":{"capitalGBP":16200,"volumeL":582},"values":{"coolingW":840,"drawW":120,"energyWh":26880,"heatW":792,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":25,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2816,"provided":24640,"required":27456,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-264,"provided":2000,"required":2264,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":704,"required":684,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":8,"coolers":22},"resources":{"capitalGBP":14780,"volumeL":680},"values":{"coolingW":704,"drawW":264,"energyWh":24640,"heatW":684,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,8,0,684,0,0,24,14120,416],[2,22,8,22,684,704,264,24,14780,680],[3,25,10,22,780,704,264,30,16810,744],[4,25,10,25,780,800,300,30,16900,780],[5,25,10,25,780,800,300,30,16900,780]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":28000,"required":27960,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":200,"provided":2500,"required":2300,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":800,"required":780,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":10,"coolers":25},"resources":{"capitalGBP":16900,"volumeL":780},"values":{"coolingW":800,"drawW":300,"energyWh":28000,"heatW":780,"lossW":30,"outputW":2500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":23,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-896,"provided":24640,"required":25536,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-104,"provided":2000,"required":2104,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":44,"provided":728,"required":684,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":22,"converters":8,"coolers":13},"resources":{"capitalGBP":15095,"volumeL":494},"values":{"coolingW":728,"drawW":104,"energyWh":24640,"heatW":684,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,22,8,0,684,0,0,24,14120,416],[2,22,8,13,684,728,104,24,15095,494],[3,23,9,13,717,728,104,27,15810,518],[4,23,9,13,717,728,104,27,15810,518]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":188,"provided":25760,"required":25572,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":146,"provided":2250,"required":2104,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":11,"provided":728,"required":717,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":23,"converters":9,"coolers":13},"resources":{"capitalGBP":15810,"volumeL":518},"values":{"coolingW":728,"drawW":104,"energyWh":25760,"heatW":717,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":16,"frontier":["compact-efficient-liquid"],"id":"p2000-h16-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":36,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":13,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3328,"provided":32000,"required":35328,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-144,"provided":2000,"required":2144,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":480,"required":448,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":32,"converters":8,"coolers":12},"resources":{"capitalGBP":11200,"volumeL":1136},"values":{"coolingW":480,"drawW":144,"energyWh":32000,"heatW":448,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,32,8,0,448,0,0,64,10840,992],[2,34,8,12,472,480,144,64,11840,1192],[3,36,9,12,504,480,144,72,12555,1260],[4,36,9,13,504,520,156,72,12585,1272],[5,36,9,13,504,520,156,72,12585,1272]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":36000,"required":35648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":94,"provided":2250,"required":2156,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":520,"required":504,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":36,"converters":9,"coolers":13},"resources":{"capitalGBP":12585,"volumeL":1272},"values":{"coolingW":520,"drawW":156,"energyWh":36000,"heatW":504,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":35,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1920,"provided":32000,"required":33920,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":42,"provided":490,"required":448,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":32,"converters":8,"coolers":7},"resources":{"capitalGBP":11365,"volumeL":1034},"values":{"coolingW":490,"drawW":56,"energyWh":32000,"heatW":448,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,32,8,0,448,0,0,64,10840,992],[2,34,8,7,472,490,56,64,12005,1090],[3,34,9,7,480,490,56,72,12080,1102],[4,35,9,7,492,490,56,72,12400,1130],[5,35,9,8,492,560,64,72,12475,1136],[6,35,9,8,492,560,64,72,12475,1136]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":824,"provided":35000,"required":34176,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":2250,"required":2064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":68,"provided":560,"required":492,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":35,"converters":9,"coolers":8},"resources":{"capitalGBP":12475,"volumeL":1136},"values":{"coolingW":560,"drawW":64,"energyWh":35000,"heatW":492,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":35,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2496,"provided":32000,"required":34496,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-132,"provided":2000,"required":2132,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":440,"required":408,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":32,"converters":8,"coolers":11},"resources":{"capitalGBP":11490,"volumeL":1092},"values":{"coolingW":440,"drawW":132,"energyWh":32000,"heatW":408,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,32,8,0,408,0,0,24,11160,960],[2,33,8,11,420,440,132,24,11810,1120],[3,35,9,11,447,440,132,27,12565,1184],[4,35,9,12,447,480,144,27,12595,1196],[5,35,9,12,447,480,144,27,12595,1196]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":264,"provided":35000,"required":34736,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":2250,"required":2144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":33,"provided":480,"required":447,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":35,"converters":9,"coolers":12},"resources":{"capitalGBP":12595,"volumeL":1196},"values":{"coolingW":480,"drawW":144,"energyWh":35000,"heatW":447,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":34,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":7,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1152,"provided":32000,"required":33152,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-48,"provided":2000,"required":2048,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":420,"required":408,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":32,"converters":8,"coolers":6},"resources":{"capitalGBP":11610,"volumeL":996},"values":{"coolingW":420,"drawW":48,"energyWh":32000,"heatW":408,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,32,8,0,408,0,0,24,11160,960],[2,33,8,6,420,420,48,24,11930,1024],[3,34,9,6,435,420,48,27,12365,1060],[4,34,9,7,435,490,56,27,12440,1066],[5,34,9,7,435,490,56,27,12440,1066]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":672,"provided":34000,"required":33328,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":194,"provided":2250,"required":2056,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":490,"required":435,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":34,"converters":9,"coolers":7},"resources":{"capitalGBP":12440,"volumeL":1066},"values":{"coolingW":490,"drawW":56,"energyWh":34000,"heatW":435,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3512,"provided":32200,"required":35712,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":2000,"required":2168,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":560,"required":524,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":8,"coolers":14},"resources":{"capitalGBP":14820,"volumeL":632},"values":{"coolingW":560,"drawW":168,"energyWh":32200,"heatW":524,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,8,0,524,0,0,64,14400,464],[2,24,8,14,544,560,168,64,15420,648],[3,26,9,14,592,560,168,72,16695,692],[4,26,9,15,592,600,180,72,16725,704],[5,26,9,15,592,600,180,72,16725,704]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":368,"provided":36400,"required":36032,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":70,"provided":2250,"required":2180,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":600,"required":592,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":9,"coolers":15},"resources":{"capitalGBP":16725,"volumeL":704},"values":{"coolingW":600,"drawW":180,"energyWh":36400,"heatW":592,"lossW":72,"outputW":2250}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":25,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":9,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1848,"provided":32200,"required":34048,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-64,"provided":2000,"required":2064,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":560,"required":524,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":8,"coolers":8},"resources":{"capitalGBP":15000,"volumeL":512},"values":{"coolingW":560,"drawW":64,"energyWh":32200,"heatW":524,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,8,0,524,0,0,64,14400,464],[2,24,8,8,544,560,64,64,15600,528],[3,25,9,8,572,560,64,72,16275,556],[4,25,9,9,572,630,72,72,16350,562],[5,25,9,9,572,630,72,72,16350,562]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":696,"provided":35000,"required":34304,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":178,"provided":2250,"required":2072,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":58,"provided":630,"required":572,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":25,"converters":9,"coolers":9},"resources":{"capitalGBP":16350,"volumeL":562},"values":{"coolingW":630,"drawW":72,"energyWh":35000,"heatW":572,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":26,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":14,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2680,"provided":32200,"required":34880,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-156,"provided":2000,"required":2156,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":520,"required":484,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":8,"coolers":13},"resources":{"capitalGBP":15110,"volumeL":588},"values":{"coolingW":520,"drawW":156,"energyWh":32200,"heatW":484,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,8,0,484,0,0,24,14720,432],[2,24,8,13,504,520,156,24,15710,604],[3,25,9,13,527,520,156,27,16425,628],[4,25,9,14,527,560,168,27,16455,640],[5,26,9,14,547,560,168,27,17055,656],[6,26,9,14,547,560,168,27,17055,656]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1280,"provided":36400,"required":35120,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":82,"provided":2250,"required":2168,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":13,"provided":560,"required":547,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":26,"converters":9,"coolers":14},"resources":{"capitalGBP":17055,"volumeL":656},"values":{"coolingW":560,"drawW":168,"energyWh":36400,"heatW":547,"lossW":27,"outputW":2250}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":24,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":8,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1080,"provided":32200,"required":33280,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-56,"provided":2000,"required":2056,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":490,"required":484,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":23,"converters":8,"coolers":7},"resources":{"capitalGBP":15245,"volumeL":474},"values":{"coolingW":490,"drawW":56,"energyWh":32200,"heatW":484,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,23,8,0,484,0,0,24,14720,432],[2,24,8,7,504,490,56,24,15845,490],[3,24,9,8,507,560,64,27,16035,504],[4,24,9,8,507,560,64,27,16035,504]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":144,"provided":33600,"required":33456,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":186,"provided":2250,"required":2064,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":53,"provided":560,"required":507,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":24,"converters":9,"coolers":8},"resources":{"capitalGBP":16035,"volumeL":504},"values":{"coolingW":560,"drawW":64,"energyWh":33600,"heatW":507,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":16,"frontier":["compact-standard-liquid","compact-efficient-liquid"],"id":"p2000-h16-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":50,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":31,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5824,"provided":32000,"required":37824,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-300,"provided":2000,"required":2300,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":800,"required":784,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":40,"converters":8,"coolers":25},"resources":{"capitalGBP":14150,"volumeL":1516},"values":{"coolingW":800,"drawW":300,"energyWh":32000,"heatW":784,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,40,8,0,784,0,0,64,13400,1216],[2,42,8,25,820,800,300,64,14790,1572],[3,48,10,26,944,832,312,80,16890,1776],[4,48,10,30,944,960,360,80,17010,1824],[5,49,10,30,962,960,360,80,17330,1852],[6,49,10,31,962,992,372,80,17360,1864],[7,50,10,31,980,992,372,80,17680,1892],[8,50,10,31,980,992,372,80,17680,1892]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":768,"provided":40000,"required":39232,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":128,"provided":2500,"required":2372,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":12,"provided":992,"required":980,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":50,"converters":10,"coolers":31},"resources":{"capitalGBP":17680,"volumeL":1892},"values":{"coolingW":992,"drawW":372,"energyWh":40000,"heatW":980,"lossW":80,"outputW":2500}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":44,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":16,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2816,"provided":32000,"required":34816,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-112,"provided":2000,"required":2112,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":784,"required":784,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":40,"converters":8,"coolers":14},"resources":{"capitalGBP":14450,"volumeL":1300},"values":{"coolingW":784,"drawW":112,"energyWh":32000,"heatW":784,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,40,8,0,784,0,0,64,13400,1216],[2,42,8,14,820,784,112,64,15090,1356],[3,44,9,15,864,840,120,72,15880,1430],[4,44,9,16,864,896,128,72,15955,1436],[5,44,9,16,864,896,128,72,15955,1436]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":0,"provided":35200,"required":35200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":122,"provided":2250,"required":2128,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":896,"required":864,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":44,"converters":9,"coolers":16},"resources":{"capitalGBP":15955,"volumeL":1436},"values":{"coolingW":896,"drawW":128,"energyWh":35200,"heatW":864,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":48,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":28,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4992,"provided":32000,"required":36992,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-288,"provided":2000,"required":2288,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":24,"provided":768,"required":744,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":40,"converters":8,"coolers":24},"resources":{"capitalGBP":14440,"volumeL":1472},"values":{"coolingW":768,"drawW":288,"energyWh":32000,"heatW":744,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,40,8,0,744,0,0,24,13720,1184],[2,41,8,24,762,768,288,24,14760,1500],[3,47,10,24,876,768,288,30,16910,1684],[4,47,10,28,876,896,336,30,17030,1732],[5,48,10,28,894,896,336,30,17350,1760],[6,48,10,28,894,896,336,30,17350,1760]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":544,"provided":38400,"required":37856,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":164,"provided":2500,"required":2336,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":896,"required":894,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":48,"converters":10,"coolers":28},"resources":{"capitalGBP":17350,"volumeL":1760},"values":{"coolingW":896,"drawW":336,"energyWh":38400,"heatW":894,"lossW":30,"outputW":2500}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":43,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":15,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2176,"provided":32000,"required":34176,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-112,"provided":2000,"required":2112,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":40,"provided":784,"required":744,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":40,"converters":8,"coolers":14},"resources":{"capitalGBP":14770,"volumeL":1268},"values":{"coolingW":784,"drawW":112,"energyWh":32000,"heatW":744,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,40,8,0,744,0,0,24,13720,1184],[2,41,8,14,762,784,112,24,15090,1296],[3,43,9,14,801,784,112,27,15845,1360],[4,43,9,15,801,840,120,27,15920,1366],[5,43,9,15,801,840,120,27,15920,1366]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":48,"provided":34400,"required":34352,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":130,"provided":2250,"required":2120,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":39,"provided":840,"required":801,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":43,"converters":9,"coolers":15},"resources":{"capitalGBP":15920,"volumeL":1366},"values":{"coolingW":840,"drawW":120,"energyWh":34400,"heatW":801,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":37,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":38,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-6304,"provided":32480,"required":38784,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-360,"provided":2000,"required":2360,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":960,"required":934,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":29,"converters":8,"coolers":30},"resources":{"capitalGBP":18900,"volumeL":920},"values":{"coolingW":960,"drawW":360,"energyWh":32480,"heatW":934,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,29,8,0,934,0,0,64,18000,560],[2,30,8,30,964,960,360,64,19500,936],[3,35,10,31,1130,992,372,80,22680,1052],[4,36,10,36,1160,1152,432,80,23430,1128],[5,36,10,37,1160,1184,444,80,23460,1140],[6,37,10,37,1190,1184,444,80,24060,1156],[7,37,10,38,1190,1216,456,80,24090,1168],[8,37,10,38,1190,1216,456,80,24090,1168]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":864,"provided":41440,"required":40576,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":44,"provided":2500,"required":2456,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":26,"provided":1216,"required":1190,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":37,"converters":10,"coolers":38},"resources":{"capitalGBP":24090,"volumeL":1168},"values":{"coolingW":1216,"drawW":456,"energyWh":41440,"heatW":1190,"lossW":80,"outputW":2500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":32,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":19,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2720,"provided":32480,"required":35200,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-136,"provided":2000,"required":2136,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":18,"provided":952,"required":934,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":29,"converters":8,"coolers":17},"resources":{"capitalGBP":19275,"volumeL":662},"values":{"coolingW":952,"drawW":136,"energyWh":32480,"heatW":934,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,29,8,0,934,0,0,64,18000,560],[2,30,8,17,964,952,136,64,19875,678],[3,32,9,18,1032,1008,144,72,21225,728],[4,32,9,19,1032,1064,152,72,21300,734],[5,32,9,19,1032,1064,152,72,21300,734]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":256,"provided":35840,"required":35584,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":98,"provided":2250,"required":2152,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":1064,"required":1032,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":32,"converters":9,"coolers":19},"resources":{"capitalGBP":21300,"volumeL":734},"values":{"coolingW":1064,"drawW":152,"energyWh":35840,"heatW":1032,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":35,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":34,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5280,"provided":32480,"required":37760,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-336,"provided":2000,"required":2336,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":896,"required":894,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":29,"converters":8,"coolers":28},"resources":{"capitalGBP":19160,"volumeL":864},"values":{"coolingW":896,"drawW":336,"energyWh":32480,"heatW":894,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,29,8,0,894,0,0,24,18320,528],[2,29,8,28,894,896,336,24,19160,864],[3,34,10,28,1050,896,336,30,22390,960],[4,34,10,33,1050,1056,396,30,22540,1020],[5,35,10,33,1080,1056,396,30,23140,1036],[6,35,10,34,1080,1088,408,30,23170,1048],[7,35,10,34,1080,1088,408,30,23170,1048]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":192,"provided":39200,"required":39008,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":92,"provided":2500,"required":2408,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":1088,"required":1080,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":35,"converters":10,"coolers":34},"resources":{"capitalGBP":23170,"volumeL":1048},"values":{"coolingW":1088,"drawW":408,"energyWh":39200,"heatW":1080,"lossW":30,"outputW":2500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":32,"limit":32,"satisfied":true},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":18,"limit":20,"satisfied":true}],"catalogue_feasible":true,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1952,"provided":32480,"required":34432,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-128,"provided":2000,"required":2128,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":2,"provided":896,"required":894,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":29,"converters":8,"coolers":16},"resources":{"capitalGBP":19520,"volumeL":624},"values":{"coolingW":896,"drawW":128,"energyWh":32480,"heatW":894,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,29,8,0,894,0,0,24,18320,528],[2,29,8,16,894,896,128,24,19520,624],[3,31,9,16,957,896,128,27,20835,664],[4,31,9,18,957,1008,144,27,20985,676],[5,32,9,18,987,1008,144,27,21585,692],[6,32,9,18,987,1008,144,27,21585,692]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1104,"provided":35840,"required":34736,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":106,"provided":2250,"required":2144,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":21,"provided":1008,"required":987,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":32,"converters":9,"coolers":18},"resources":{"capitalGBP":21585,"volumeL":692},"values":{"coolingW":1008,"drawW":144,"energyWh":35840,"heatW":987,"lossW":27,"outputW":2250}}}]},{"condition":"mild","durationHours":24,"frontier":[],"id":"p2000-h24-mild","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":56,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":19,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-6144,"provided":48000,"required":54144,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-192,"provided":2000,"required":2192,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":640,"required":640,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":48,"converters":8,"coolers":16},"resources":{"capitalGBP":16440,"volumeL":1632},"values":{"coolingW":640,"drawW":192,"energyWh":48000,"heatW":640,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,48,8,0,640,0,0,64,15960,1440],[2,50,8,16,664,640,192,64,17080,1688],[3,55,9,17,732,680,204,72,18785,1852],[4,55,9,19,732,760,228,72,18845,1876],[5,56,9,19,744,760,228,72,19165,1904],[6,56,9,19,744,760,228,72,19165,1904]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":800,"provided":56000,"required":55200,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":22,"provided":2250,"required":2228,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":760,"required":744,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":56,"converters":9,"coolers":19},"resources":{"capitalGBP":19165,"volumeL":1904},"values":{"coolingW":760,"drawW":228,"energyWh":56000,"heatW":744,"lossW":72,"outputW":2250}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":52,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-3456,"provided":48000,"required":51456,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-80,"provided":2000,"required":2080,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":60,"provided":700,"required":640,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":48,"converters":8,"coolers":10},"resources":{"capitalGBP":16710,"volumeL":1500},"values":{"coolingW":700,"drawW":80,"energyWh":48000,"heatW":640,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,48,8,0,640,0,0,64,15960,1440],[2,50,8,10,664,700,80,64,17350,1556],[3,52,9,10,696,700,80,72,18065,1624],[4,52,9,10,696,700,80,72,18065,1624]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":352,"provided":52000,"required":51648,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":170,"provided":2250,"required":2080,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":4,"provided":700,"required":696,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":52,"converters":9,"coolers":10},"resources":{"capitalGBP":18065,"volumeL":1624},"values":{"coolingW":700,"drawW":80,"energyWh":52000,"heatW":696,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":54,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":17,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4896,"provided":48000,"required":52896,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-180,"provided":2000,"required":2180,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":600,"required":600,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":48,"converters":8,"coolers":15},"resources":{"capitalGBP":16730,"volumeL":1588},"values":{"coolingW":600,"drawW":180,"energyWh":48000,"heatW":600,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,48,8,0,600,0,0,24,16280,1408],[2,49,8,15,612,600,180,24,17050,1616],[3,53,9,16,663,640,192,27,18475,1748],[4,54,9,17,675,680,204,27,18825,1788],[5,54,9,17,675,680,204,27,18825,1788]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":456,"provided":54000,"required":53544,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":46,"provided":2250,"required":2204,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":5,"provided":680,"required":675,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":54,"converters":9,"coolers":17},"resources":{"capitalGBP":18825,"volumeL":1788},"values":{"coolingW":680,"drawW":204,"energyWh":54000,"heatW":675,"lossW":27,"outputW":2250}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":51,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":10,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2304,"provided":48000,"required":50304,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-72,"provided":2000,"required":2072,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":630,"required":600,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":48,"converters":8,"coolers":9},"resources":{"capitalGBP":16955,"volumeL":1462},"values":{"coolingW":630,"drawW":72,"energyWh":48000,"heatW":600,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,48,8,0,600,0,0,24,16280,1408],[2,49,8,9,612,630,72,24,17275,1490],[3,51,9,9,639,630,72,27,18030,1554],[4,51,9,10,639,700,80,27,18105,1560],[5,51,9,10,639,700,80,27,18105,1560]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":432,"provided":51000,"required":50568,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":170,"provided":2250,"required":2080,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":61,"provided":700,"required":639,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":51,"converters":9,"coolers":10},"resources":{"capitalGBP":18105,"volumeL":1560},"values":{"coolingW":700,"drawW":80,"energyWh":51000,"heatW":639,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":41,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-6296,"provided":49000,"required":55296,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-240,"provided":2000,"required":2240,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":800,"required":764,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":35,"converters":8,"coolers":20},"resources":{"capitalGBP":22200,"volumeL":896},"values":{"coolingW":800,"drawW":240,"energyWh":49000,"heatW":764,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,35,8,0,764,0,0,64,21600,656],[2,36,8,20,784,800,240,64,22800,912],[3,40,9,20,872,800,240,72,25275,988],[4,40,9,22,872,880,264,72,25335,1012],[5,41,10,22,900,880,264,80,26010,1040],[6,41,10,23,900,920,276,80,26040,1052],[7,41,10,23,900,920,276,80,26040,1052]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":856,"provided":57400,"required":56544,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":224,"provided":2500,"required":2276,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":20,"provided":920,"required":900,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":41,"converters":10,"coolers":23},"resources":{"capitalGBP":26040,"volumeL":1052},"values":{"coolingW":920,"drawW":276,"energyWh":57400,"heatW":900,"lossW":80,"outputW":2500}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":38,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":12,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":5,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-2648,"provided":49000,"required":51648,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":2000,"required":2088,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":6,"provided":770,"required":764,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":35,"converters":8,"coolers":11},"resources":{"capitalGBP":22425,"volumeL":722},"values":{"coolingW":770,"drawW":88,"energyWh":49000,"heatW":764,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,35,8,0,764,0,0,64,21600,656],[2,36,8,11,784,770,88,64,23025,738],[3,37,9,12,812,840,96,72,23775,772],[4,38,9,12,832,840,96,72,24375,788],[5,38,9,12,832,840,96,72,24375,788]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1168,"provided":53200,"required":52032,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":154,"provided":2250,"required":2096,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":840,"required":832,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":38,"converters":9,"coolers":12},"resources":{"capitalGBP":24375,"volumeL":788},"values":{"coolingW":840,"drawW":96,"energyWh":53200,"heatW":832,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":40,"limit":32,"satisfied":false},{"component":"converters","count":10,"limit":12,"satisfied":true},{"component":"coolers","count":21,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5048,"provided":49000,"required":54048,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-228,"provided":2000,"required":2228,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":36,"provided":760,"required":724,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":35,"converters":8,"coolers":19},"resources":{"capitalGBP":22490,"volumeL":852},"values":{"coolingW":760,"drawW":228,"energyWh":49000,"heatW":724,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,35,8,0,724,0,0,24,21920,624],[2,35,8,19,724,760,228,24,22490,852],[3,39,9,19,807,760,228,27,25005,924],[4,39,9,21,807,840,252,27,25065,948],[5,40,10,21,830,840,252,30,25780,972],[6,40,10,21,830,840,252,30,25780,972]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1232,"provided":56000,"required":54768,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":248,"provided":2500,"required":2252,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":10,"provided":840,"required":830,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":40,"converters":10,"coolers":21},"resources":{"capitalGBP":25780,"volumeL":972},"values":{"coolingW":840,"drawW":252,"energyWh":56000,"heatW":830,"lossW":30,"outputW":2500}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":37,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":11,"limit":20,"satisfied":true}],"catalogue_feasible":false,"iterations":4,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-1688,"provided":49000,"required":50688,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-88,"provided":2000,"required":2088,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":770,"required":724,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":35,"converters":8,"coolers":11},"resources":{"capitalGBP":22745,"volumeL":690},"values":{"coolingW":770,"drawW":88,"energyWh":49000,"heatW":724,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,35,8,0,724,0,0,24,21920,624],[2,35,8,11,724,770,88,24,22745,690],[3,37,9,11,767,770,88,27,24060,730],[4,37,9,11,767,770,88,27,24060,730]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1040,"provided":51800,"required":50760,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":162,"provided":2250,"required":2088,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":770,"required":767,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":37,"converters":9,"coolers":11},"resources":{"capitalGBP":24060,"volumeL":730},"values":{"coolingW":770,"drawW":88,"energyWh":51800,"heatW":767,"lossW":27,"outputW":2250}}}]},{"condition":"hot","durationHours":24,"frontier":[],"id":"p2000-h24-hot","powerW":2000,"results":[{"architectureId":"standard-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":80,"limit":32,"satisfied":false},{"component":"converters","count":11,"limit":12,"satisfied":true},{"component":"coolers","count":48,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-11904,"provided":48000,"required":59904,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-432,"provided":2000,"required":2432,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":1152,"required":1144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":60,"converters":8,"coolers":36},"resources":{"capitalGBP":20880,"volumeL":2208},"values":{"coolingW":1152,"drawW":432,"energyWh":48000,"heatW":1144,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,60,8,0,1144,0,0,64,19800,1776],[2,62,8,36,1180,1152,432,64,21520,2264],[3,75,10,37,1430,1184,444,80,25860,2664],[4,76,10,45,1448,1440,540,80,26420,2788],[5,79,11,46,1510,1472,552,88,27485,2896],[6,80,11,48,1528,1536,576,88,27865,2948],[7,80,11,48,1528,1536,576,88,27865,2948]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":64000,"required":63936,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":174,"provided":2750,"required":2576,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":8,"provided":1536,"required":1528,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":80,"converters":11,"coolers":48},"resources":{"capitalGBP":27865,"volumeL":2948},"values":{"coolingW":1536,"drawW":576,"energyWh":64000,"heatW":1528,"lossW":88,"outputW":2750}}},{"architectureId":"standard-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":68,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":24,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5568,"provided":48000,"required":53568,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-168,"provided":2000,"required":2168,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":32,"provided":1176,"required":1144,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":60,"converters":8,"coolers":21},"resources":{"capitalGBP":21375,"volumeL":1902},"values":{"coolingW":1176,"drawW":168,"energyWh":48000,"heatW":1144,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,60,8,0,1144,0,0,64,19800,1776],[2,62,8,21,1180,1176,168,64,22015,1958],[3,67,9,22,1278,1232,176,72,23765,2116],[4,68,9,23,1296,1288,184,72,24160,2150],[5,68,9,24,1296,1344,192,72,24235,2156],[6,68,9,24,1296,1344,192,72,24235,2156]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":64,"provided":54400,"required":54336,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":58,"provided":2250,"required":2192,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":48,"provided":1344,"required":1296,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":68,"converters":9,"coolers":24},"resources":{"capitalGBP":24235,"volumeL":2156},"values":{"coolingW":1344,"drawW":192,"energyWh":54400,"heatW":1296,"lossW":72,"outputW":2250}}},{"architectureId":"standard-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":78,"limit":32,"satisfied":false},{"component":"converters","count":11,"limit":12,"satisfied":true},{"component":"coolers","count":45,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":8,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-10656,"provided":48000,"required":58656,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-420,"provided":2000,"required":2420,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":1120,"required":1104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":60,"converters":8,"coolers":35},"resources":{"capitalGBP":21170,"volumeL":2164},"values":{"coolingW":1120,"drawW":420,"energyWh":48000,"heatW":1104,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,60,8,0,1104,0,0,24,20120,1744],[2,61,8,35,1122,1120,420,24,21490,2192],[3,74,10,36,1362,1152,432,30,25910,2584],[4,74,10,43,1362,1376,516,30,26120,2668],[5,77,11,43,1419,1376,516,33,27195,2760],[6,77,11,45,1419,1440,540,33,27255,2784],[7,78,11,45,1437,1440,540,33,27575,2812],[8,78,11,45,1437,1440,540,33,27575,2812]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":648,"provided":62400,"required":61752,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":210,"provided":2750,"required":2540,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":3,"provided":1440,"required":1437,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":78,"converters":11,"coolers":45},"resources":{"capitalGBP":27575,"volumeL":2812},"values":{"coolingW":1440,"drawW":540,"energyWh":62400,"heatW":1437,"lossW":33,"outputW":2750}}},{"architectureId":"standard-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":67,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":23,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-4416,"provided":48000,"required":52416,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-160,"provided":2000,"required":2160,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":16,"provided":1120,"required":1104,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":60,"converters":8,"coolers":20},"resources":{"capitalGBP":21620,"volumeL":1864},"values":{"coolingW":1120,"drawW":160,"energyWh":48000,"heatW":1104,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,60,8,0,1104,0,0,24,20120,1744],[2,61,8,20,1122,1120,160,24,21940,1892],[3,66,9,21,1215,1176,168,27,23730,2046],[4,66,9,22,1215,1232,176,27,23805,2052],[5,67,9,22,1233,1232,176,27,24125,2080],[6,67,9,23,1233,1288,184,27,24200,2086],[7,67,9,23,1233,1288,184,27,24200,2086]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":536,"provided":53600,"required":53064,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":66,"provided":2250,"required":2184,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":55,"provided":1288,"required":1233,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":67,"converters":9,"coolers":23},"resources":{"capitalGBP":24200,"volumeL":2086},"values":{"coolingW":1288,"drawW":184,"energyWh":53600,"heatW":1233,"lossW":27,"outputW":2250}}},{"architectureId":"compact-standard-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":60,"limit":32,"satisfied":false},{"component":"converters","count":11,"limit":12,"satisfied":true},{"component":"coolers","count":59,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-13760,"provided":48160,"required":61920,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-516,"provided":2000,"required":2516,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":22,"provided":1376,"required":1354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":43,"converters":8,"coolers":43},"resources":{"capitalGBP":27690,"volumeL":1300},"values":{"coolingW":1376,"drawW":516,"energyWh":48160,"heatW":1354,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,43,8,0,1354,0,0,64,26400,784],[2,45,8,43,1414,1376,516,64,28890,1332],[3,56,11,45,1768,1440,540,88,35775,1568],[4,57,11,56,1798,1792,672,88,36705,1716],[5,60,11,57,1888,1824,684,88,38535,1776],[6,60,11,59,1888,1888,708,88,38595,1800],[7,60,11,59,1888,1888,708,88,38595,1800]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":96,"provided":67200,"required":67104,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":42,"provided":2750,"required":2708,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":0,"provided":1888,"required":1888,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":60,"converters":11,"coolers":59},"resources":{"capitalGBP":38595,"volumeL":1800},"values":{"coolingW":1888,"drawW":708,"energyWh":67200,"heatW":1888,"lossW":88,"outputW":2750}}},{"architectureId":"compact-standard-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":50,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":29,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-6176,"provided":48160,"required":54336,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-200,"provided":2000,"required":2200,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":46,"provided":1400,"required":1354,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":43,"converters":8,"coolers":25},"resources":{"capitalGBP":28275,"volumeL":934},"values":{"coolingW":1400,"drawW":200,"energyWh":48160,"heatW":1354,"lossW":64,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,43,8,0,1354,0,0,64,26400,784],[2,45,8,25,1414,1400,200,64,29475,966],[3,49,9,26,1542,1456,208,72,32025,1048],[4,49,9,28,1542,1568,224,72,32175,1060],[5,50,9,28,1572,1568,224,72,32775,1076],[6,50,9,29,1572,1624,232,72,32850,1082],[7,50,9,29,1572,1624,232,72,32850,1082]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":704,"provided":56000,"required":55296,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":18,"provided":2250,"required":2232,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":52,"provided":1624,"required":1572,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":50,"converters":9,"coolers":29},"resources":{"capitalGBP":32850,"volumeL":1082},"values":{"coolingW":1624,"drawW":232,"energyWh":56000,"heatW":1572,"lossW":72,"outputW":2250}}},{"architectureId":"compact-efficient-air","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":58,"limit":32,"satisfied":false},{"component":"converters","count":11,"limit":12,"satisfied":true},{"component":"coolers","count":56,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":7,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-12512,"provided":48160,"required":60672,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-504,"provided":2000,"required":2504,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":1344,"required":1314,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":43,"converters":8,"coolers":42},"resources":{"capitalGBP":27980,"volumeL":1256},"values":{"coolingW":1344,"drawW":504,"energyWh":48160,"heatW":1314,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,43,8,0,1314,0,0,24,26720,752],[2,44,8,42,1344,1344,504,24,28580,1272],[3,55,11,42,1683,1344,504,33,35525,1472],[4,55,11,53,1683,1696,636,33,35855,1604],[5,58,11,53,1773,1696,636,33,37655,1652],[6,58,11,56,1773,1792,672,33,37745,1688],[7,58,11,56,1773,1792,672,33,37745,1688]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":40,"provided":64960,"required":64920,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":78,"provided":2750,"required":2672,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":19,"provided":1792,"required":1773,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":58,"converters":11,"coolers":56},"resources":{"capitalGBP":37745,"volumeL":1688},"values":{"coolingW":1792,"drawW":672,"energyWh":64960,"heatW":1773,"lossW":33,"outputW":2750}}},{"architectureId":"compact-efficient-liquid","calculation_status":"converged","catalogueChecks":[{"component":"batteries","count":49,"limit":32,"satisfied":false},{"component":"converters","count":9,"limit":12,"satisfied":true},{"component":"coolers","count":27,"limit":20,"satisfied":false}],"catalogue_feasible":false,"iterations":6,"service_only":{"checks":[{"id":"energy","label":"Battery energy","margin":-5024,"provided":48160,"required":53184,"satisfied":false,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":-192,"provided":2000,"required":2192,"satisfied":false,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":30,"provided":1344,"required":1314,"satisfied":true,"unit":"W"}],"complete":false,"counts":{"batteries":43,"converters":8,"coolers":24},"resources":{"capitalGBP":28520,"volumeL":896},"values":{"coolingW":1344,"drawW":192,"energyWh":48160,"heatW":1314,"lossW":24,"outputW":2000}},"trace":[[0,0,0,0,0,0,0,0,0,0],[1,43,8,0,1314,0,0,24,26720,752],[2,44,8,24,1344,1344,192,24,29120,912],[3,48,9,24,1467,1344,192,27,31635,984],[4,48,9,27,1467,1512,216,27,31860,1002],[5,49,9,27,1497,1512,216,27,32460,1018],[6,49,9,27,1497,1512,216,27,32460,1018]],"verified_complete":true,"witness":{"checks":[{"id":"energy","label":"Battery energy","margin":1048,"provided":54880,"required":53832,"satisfied":true,"unit":"Wh"},{"id":"conversion","label":"Converter output","margin":34,"provided":2250,"required":2216,"satisfied":true,"unit":"W"},{"id":"cooling","label":"Heat removal","margin":15,"provided":1512,"required":1497,"satisfied":true,"unit":"W"}],"complete":true,"counts":{"batteries":49,"converters":9,"coolers":27},"resources":{"capitalGBP":32460,"volumeL":1018},"values":{"coolingW":1512,"drawW":216,"energyWh":54880,"heatW":1497,"lossW":27,"outputW":2250}}}]}],"scenarioMapping":{"cabinetVolume":"New synthetic cabinet-volume allocations use the historical area coefficient numbers as litres; this is a new declared resource relation, not conversion from square metres to litres.","capital":"Every equipment capital coefficient divided by 1000, in GBP.","from":"historical rail-power-loop-1 at aa8047d9315d0dce9c9ea08b077531573a617207","powerAndEnergy":"Numerical catalogue ratings retained, physical magnitudes divided by 1000: kW becomes W, kWh becomes Wh. All three interface inequalities are recomputed with the pinned package.","unchanged":"Integer counts, availability caps, hours, condition factors and the feedback structure are retained for a comparable numerical experiment."},"schemaVersion":"monitoring-power-loop-1","summary":{"architectures":8,"calculations":784,"catalogueFeasible":726,"catalogueInfeasible":58,"converged":784,"emptyQueryFrontiers":3,"maxIterations":9,"queries":98,"traceRows":3987},"title":"Can wildlife monitoring power cover its own overhead?","traceColumns":["iteration","batteries","converters","coolers","heatW","coolingW","drawW","lossW","capitalGBP","volumeL"],"unitContract":{"cabinetVolume":"L","capital":"GBP","duration":"hours","energy":"Wh","power":"W"}}
