{
  "recorded_at_utc": "2026-10-19T11:51:51.289874+00:00",
  "session_type": "fresh Codex subagent with fork_turns=none",
  "model": "Inherited configured model; exact identifier not exposed",
  "reasoning_setting": "Inherited; exact setting not exposed",
  "readers": {
    "R1": {
      "agent_task": "/root/reader365_r1",
      "input": "eight assigned PNGs in assignments.json for R1",
      "observations": "Eight completed actual answers; no retries or replacements",
      "output_capture": "Final JSON content preserved verbatim; whitespace formatting normalized in saved JSON"
    },
    "R2": {
      "agent_task": "/root/reader365_r2",
      "input": "eight assigned PNGs in assignments.json for R2",
      "observations": "Eight completed actual answers; no retries or replacements",
      "output_capture": "Final JSON content preserved verbatim; whitespace formatting normalized in saved JSON"
    },
    "R3": {
      "agent_task": "/root/reader365_r3",
      "input": "eight assigned PNGs in assignments.json for R3",
      "observations": "Eight completed actual answers; no retries or replacements",
      "output_capture": "Final JSON content preserved verbatim; whitespace formatting normalized in saved JSON"
    },
    "R4": {
      "agent_task": "/root/reader365_r4",
      "input": "eight assigned PNGs in assignments.json for R4",
      "observations": "Eight completed actual answers; no retries or replacements",
      "output_capture": "Final JSON content preserved verbatim; whitespace formatting normalized in saved JSON"
    }
  },
  "dispatch": "R1 and R2 first, then R3 and R4 with unchanged frozen instructions and assignments. No feedback between sessions.",
  "limits": "Same inherited configuration, not independent models; hidden compute and model latency not controlled or interpreted as speed."
}
