  "upstream_commit": "defd859819680f4bbc6341ae01a2b6e131a02d5d",
  "calls": [
    {
      "label": "A submit",
      "tool": "log_change_request",
      "arguments": {
        "project_id": "LINEAGE-A",
        "title": "Temporary extra shift",
        "description": "Fictional bounded change-history trial.",
        "impact_cost": 12,
        "impact_schedule_days": -2,
        "raised_date": "2026-10-31",
        "notes": "Original availability basis:20 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "project_id": "LINEAGE-A",
        "title": "Temporary extra shift",
        "change_type": "SCOPE",
        "status_set": "SUBMITTED",
        "raised_date": "2026-10-31",
        "message": "Change request 'Temporary extra shift' logged successfully with ID e79aa71c-7e3f-4257-bf61-21005bec61df.",
        "record": {
          "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
          "project_id": "LINEAGE-A",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "SUBMITTED",
          "raised_by": null,
          "approved_by": null,
          "raised_date": "2026-10-31",
          "decision_date": null,
          "implementation_date": null,
          "notes": "Original availability basis:20 days.",
          "created_at": "2026-11-18T23:37:53.709139+00:00",
          "updated_at": "2026-11-18T23:37:53.709139+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "A first approval",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "status": "APPROVED",
        "approved_by": "Reviewer Alder",
        "decision_date": "2026-11-01",
        "notes": "Approve because the availability basis supports the extra shift.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "new_status": "APPROVED",
        "message": "Change request 'e79aa71c-7e3f-4257-bf61-21005bec61df' updated to status APPROVED.",
        "record": {
          "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
          "project_id": "LINEAGE-A",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "APPROVED",
          "raised_by": null,
          "approved_by": "Reviewer Alder",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-01",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.",
          "created_at": "2026-11-18T23:37:53.709139+00:00",
          "updated_at": "2026-11-18T23:37:53.715306+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "A withdrawal",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "status": "WITHDRAWN",
        "decision_date": "2026-11-05",
        "notes": "Withdraw because the availability basis is corrected to12 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "new_status": "WITHDRAWN",
        "message": "Change request 'e79aa71c-7e3f-4257-bf61-21005bec61df' updated to status WITHDRAWN.",
        "record": {
          "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
          "project_id": "LINEAGE-A",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "WITHDRAWN",
          "raised_by": null,
          "approved_by": "Reviewer Alder",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-05",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.",
          "created_at": "2026-11-18T23:37:53.709139+00:00",
          "updated_at": "2026-11-18T23:37:53.722489+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "A after withdrawal",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-A",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-A",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "WITHDRAWN": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 0.0,
          "total_approved_schedule_impact_days": 0
        },
        "change_requests": [
          {
            "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
            "project_id": "LINEAGE-A",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "WITHDRAWN",
            "raised_by": null,
            "approved_by": "Reviewer Alder",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-05",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.",
            "created_at": "2026-11-18T23:37:53.709139+00:00",
            "updated_at": "2026-11-18T23:37:53.722489+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "A revised approval",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "status": "APPROVED",
        "approved_by": "Reviewer Cedar",
        "decision_date": "2026-11-08",
        "notes": "Approve a reduced shift after a revised plan fits12 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "new_status": "APPROVED",
        "message": "Change request 'e79aa71c-7e3f-4257-bf61-21005bec61df' updated to status APPROVED.",
        "record": {
          "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
          "project_id": "LINEAGE-A",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "APPROVED",
          "raised_by": null,
          "approved_by": "Reviewer Cedar",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-08",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
          "created_at": "2026-11-18T23:37:53.709139+00:00",
          "updated_at": "2026-11-18T23:37:53.733334+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "A before restart",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-A",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-A",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "APPROVED": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 12.0,
          "total_approved_schedule_impact_days": -2
        },
        "change_requests": [
          {
            "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
            "project_id": "LINEAGE-A",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "APPROVED",
            "raised_by": null,
            "approved_by": "Reviewer Cedar",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-08",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
            "created_at": "2026-11-18T23:37:53.709139+00:00",
            "updated_at": "2026-11-18T23:37:53.733334+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "B submit",
      "tool": "log_change_request",
      "arguments": {
        "project_id": "LINEAGE-B",
        "title": "Temporary extra shift",
        "description": "Fictional bounded change-history trial.",
        "impact_cost": 12,
        "impact_schedule_days": -2,
        "raised_date": "2026-10-31",
        "notes": "Original availability basis:20 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "project_id": "LINEAGE-B",
        "title": "Temporary extra shift",
        "change_type": "SCOPE",
        "status_set": "SUBMITTED",
        "raised_date": "2026-10-31",
        "message": "Change request 'Temporary extra shift' logged successfully with ID 6d0ee489-d4a3-4008-9072-00516e9a42f9.",
        "record": {
          "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
          "project_id": "LINEAGE-B",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "SUBMITTED",
          "raised_by": null,
          "approved_by": null,
          "raised_date": "2026-10-31",
          "decision_date": null,
          "implementation_date": null,
          "notes": "Original availability basis:20 days.",
          "created_at": "2026-11-18T23:37:53.742338+00:00",
          "updated_at": "2026-11-18T23:37:53.742338+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "B first approval",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "status": "APPROVED",
        "approved_by": "Reviewer Birch",
        "decision_date": "2026-11-03",
        "notes": "Approve because the availability basis supports the extra shift.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "new_status": "APPROVED",
        "message": "Change request '6d0ee489-d4a3-4008-9072-00516e9a42f9' updated to status APPROVED.",
        "record": {
          "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
          "project_id": "LINEAGE-B",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "APPROVED",
          "raised_by": null,
          "approved_by": "Reviewer Birch",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-03",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.",
          "created_at": "2026-11-18T23:37:53.742338+00:00",
          "updated_at": "2026-11-18T23:37:53.749635+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "B withdrawal",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "status": "WITHDRAWN",
        "decision_date": "2026-11-05",
        "notes": "Withdraw because the availability basis is corrected to12 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "new_status": "WITHDRAWN",
        "message": "Change request '6d0ee489-d4a3-4008-9072-00516e9a42f9' updated to status WITHDRAWN.",
        "record": {
          "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
          "project_id": "LINEAGE-B",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "WITHDRAWN",
          "raised_by": null,
          "approved_by": "Reviewer Birch",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-05",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.",
          "created_at": "2026-11-18T23:37:53.742338+00:00",
          "updated_at": "2026-11-18T23:37:53.755132+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "B after withdrawal",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-B",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-B",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "WITHDRAWN": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 0.0,
          "total_approved_schedule_impact_days": 0
        },
        "change_requests": [
          {
            "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
            "project_id": "LINEAGE-B",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "WITHDRAWN",
            "raised_by": null,
            "approved_by": "Reviewer Birch",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-05",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.",
            "created_at": "2026-11-18T23:37:53.742338+00:00",
            "updated_at": "2026-11-18T23:37:53.755132+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "B revised approval",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "status": "APPROVED",
        "approved_by": "Reviewer Cedar",
        "decision_date": "2026-11-08",
        "notes": "Approve a reduced shift after a revised plan fits12 days.",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "status": "success",
        "change_id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
        "new_status": "APPROVED",
        "message": "Change request '6d0ee489-d4a3-4008-9072-00516e9a42f9' updated to status APPROVED.",
        "record": {
          "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
          "project_id": "LINEAGE-B",
          "title": "Temporary extra shift",
          "description": "Fictional bounded change-history trial.",
          "change_type": "SCOPE",
          "impact_cost": 12.0,
          "impact_schedule_days": -2,
          "impact_scope": null,
          "status": "APPROVED",
          "raised_by": null,
          "approved_by": "Reviewer Cedar",
          "raised_date": "2026-10-31",
          "decision_date": "2026-11-08",
          "implementation_date": null,
          "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
          "created_at": "2026-11-18T23:37:53.742338+00:00",
          "updated_at": "2026-11-18T23:37:53.764186+00:00"
        }
      },
      "mcp_isError": false
    },
    {
      "label": "B before restart",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-B",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-B",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "APPROVED": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 12.0,
          "total_approved_schedule_impact_days": -2
        },
        "change_requests": [
          {
            "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
            "project_id": "LINEAGE-B",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "APPROVED",
            "raised_by": null,
            "approved_by": "Reviewer Cedar",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-08",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
            "created_at": "2026-11-18T23:37:53.742338+00:00",
            "updated_at": "2026-11-18T23:37:53.764186+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "A after restart",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-A",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-A",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "APPROVED": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 12.0,
          "total_approved_schedule_impact_days": -2
        },
        "change_requests": [
          {
            "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
            "project_id": "LINEAGE-A",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "APPROVED",
            "raised_by": null,
            "approved_by": "Reviewer Cedar",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-08",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
            "created_at": "2026-11-18T23:37:53.709139+00:00",
            "updated_at": "2026-11-18T23:37:53.733334+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "B after restart",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-B",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-B",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "APPROVED": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 12.0,
          "total_approved_schedule_impact_days": -2
        },
        "change_requests": [
          {
            "id": "6d0ee489-d4a3-4008-9072-00516e9a42f9",
            "project_id": "LINEAGE-B",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "APPROVED",
            "raised_by": null,
            "approved_by": "Reviewer Cedar",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-08",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
            "created_at": "2026-11-18T23:37:53.742338+00:00",
            "updated_at": "2026-11-18T23:37:53.764186+00:00"
          }
        ]
      },
      "mcp_isError": false
    },
    {
      "label": "A historical withdrawn filter",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-A",
        "status": "WITHDRAWN",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-A",
        "filters_applied": {
          "status": "WITHDRAWN",
          "change_type": null
        },
        "summary": {
          "total": 0,
          "by_status": {},
          "by_type": {},
          "total_approved_cost_impact": 0.0,
          "total_approved_schedule_impact_days": 0
        },
        "change_requests": []
      },
      "mcp_isError": false
    },
    {
      "label": "invalid status",
      "tool": "update_change_status",
      "arguments": {
        "change_id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
        "status": "BANANA",
        "db_path": "runtime/native.sqlite"
      },
      "output": "Input validation error: 'BANANA' is not one of ['SUBMITTED', 'UNDER_REVIEW', 'APPROVED', 'REJECTED', 'IMPLEMENTED', 'WITHDRAWN']",
      "mcp_isError": true
    },
    {
      "label": "after invalid status",
      "tool": "get_change_log",
      "arguments": {
        "project_id": "LINEAGE-A",
        "db_path": "runtime/native.sqlite"
      },
      "output": {
        "project_id": "LINEAGE-A",
        "filters_applied": {
          "status": null,
          "change_type": null
        },
        "summary": {
          "total": 1,
          "by_status": {
            "APPROVED": 1
          },
          "by_type": {
            "SCOPE": 1
          },
          "total_approved_cost_impact": 12.0,
          "total_approved_schedule_impact_days": -2
        },
        "change_requests": [
          {
            "id": "e79aa71c-7e3f-4257-bf61-21005bec61df",
            "project_id": "LINEAGE-A",
            "title": "Temporary extra shift",
            "description": "Fictional bounded change-history trial.",
            "change_type": "SCOPE",
            "impact_cost": 12.0,
            "impact_schedule_days": -2,
            "impact_scope": null,
            "status": "APPROVED",
            "raised_by": null,
            "approved_by": "Reviewer Cedar",
            "raised_date": "2026-10-31",
            "decision_date": "2026-11-08",
            "implementation_date": null,
            "notes": "Original availability basis:20 days.\nApprove because the availability basis supports the extra shift.\nWithdraw because the availability basis is corrected to12 days.\nApprove a reduced shift after a revised plan fits12 days.",
            "created_at": "2026-11-18T23:37:53.709139+00:00",
            "updated_at": "2026-11-18T23:37:53.733334+00:00"
          }
        ]
      },
      "mcp_isError": false
    }
  ],
  "sessions": [
    {
      "label": "write-and-correct",
      "tool_count": 126,
      "server": {
        "name": "pda-platform",
        "title": null,
        "version": "1.25.0",
        "websiteUrl": null,
        "icons": null
      }
    },
    {
      "label": "fresh-process-retrieval",
      "tool_count": 126,
      "server": {
        "name": "pda-platform",
        "title": null,
        "version": "1.25.0",
        "websiteUrl": null,
        "icons": null
      }
    }
  ],
  "adjustments": [
    "default database isolated",
    "audit directory isolated",
    "logs redirected to stderr"
  ],
  "provider_calls": 0,
  "native_handlers_modified": false,
  "ids": {
    "A": "e79aa71c-7e3f-4257-bf61-21005bec61df",
    "B": "6d0ee489-d4a3-4008-9072-00516e9a42f9"
  },
  "history_tools": [
    "get_workflow_history",
    "get_gate_readiness_history",
    "log_change_request",
    "update_change_status",
    "get_change_log",
    "get_change_impact_summary",
    "analyse_change_pressure"
  ],
  "packages": {
    "uvicorn": "0.54.0",
    "mcp": "1.25.0",
    "structlog": "25.5.0",
    "lxml": "6.1.3",
    "agent-task-planning": "2.1.0",
    "sse-starlette": "3.0.3",
    "jsonschema-specifications": "2025.9.1",
    "pydantic-settings": "2.16.3",
    "certifi": "2026.10.23",
    "jsonschema": "4.26.0",
    "PyJWT": "2.15.1",
    "starlette": "0.39.2",
    "pydantic": "2.14.3",
    "click": "8.5.1",
    "docstring_parser": "0.18.0",
    "h2": "4.4.1",
    "httpcore": "1.0.9",
    "cryptography": "50.0.2",
    "pycparser": "3.12",
    "pydantic_core": "2.50.4",
    "pm-data-tools": "2.1.0",
    "typing-inspection": "0.4.5",
    "pip": "25.0.1",
    "h11": "0.16.0",
    "sniffio": "1.3.1",
    "python-dateutil": "2.9.0.post0",
    "python-dotenv": "1.2.4",
    "cffi": "2.1.1",
    "hpack": "4.2.0",
    "anthropic": "0.125.0",
    "annotated-types": "0.8.0",
    "referencing": "0.37.0",
    "python-multipart": "0.0.34",
    "distro": "1.9.0",
    "rpds-py": "2026.9.1",
    "anyio": "4.16.0",
    "attrs": "26.1.0",
    "httpx": "0.28.1",
    "typing_extensions": "4.16.0",
    "jiter": "0.19.0",
    "httpx-sse": "0.4.3",
    "six": "1.17.0",
    "hyperframe": "6.1.0",
    "pm-mcp-servers": "2.1.0",
    "idna": "3.20"
  }
}