# RUN REPORT - Meta Project Innovation

Date: 2026-07-02

Model: Codex GPT-5 (current local thread)

Runner: Codex

## Output

- Deck: `meta_project_innovation_three_ideas.pptx`
- Preview contact sheet: `final-render-contact-sheet.png`
- Rendered slide previews: `meta_project_innovation_three_ideas/`
- Automation created: `new-model-meta-project-innovation-foray`

## Three Ideas Produced

1. **Project Demand Destruction Engine** - before accepting a project, search for delete, shrink, substitute, standardise, automate, negotiate, or proceed options.
2. **Truth-Sensor Planning** - make each plan claim falsifiable by attaching evidence sensors, confidence states, stale-evidence checks, and drift triggers.
3. **Project Capability Compiler** - make each project deliver the work and compile reusable capability packets for future projects and agents.

## Verdict

Strong first frontier. The run moves beyond the ten examples by changing the meta-object of planning:

- Idea 1 improves demand before WBS or delivery optimisation starts.
- Idea 2 improves the truth conditions of a plan rather than adding another representation of the plan.
- Idea 3 turns delivery into a capability-compounding loop rather than a one-off temporary organisation.

The ideas are feasible with existing local surfaces: vault notes, project artefacts, agent prompts, schedule/status residue, and lightweight dashboards. The next model run should try to beat these by finding still-higher-order project forms rather than merely recombining formal planning methods.

## QA

- Built as a 10-slide editable PowerPoint.
- Rendered final PPTX to PNG previews.
- Created final render contact sheet.
- Ran slide overflow check: passed, no overflow detected.