Road × canal
The western and southern boundaries meet at a fixed corner. Their local coordinate accounts already agree.
Fixed by briefEssay 03 · later compatibility and composition enquiry
Five local constraint views describe the same difficult site. Do they leave any locations that can exist in the global project account—or do their overlaps reveal an obstruction?
The six early Tangled Triangle variants explore how well AI can make sense of interfaces, topology and system architecture. This later essay asks a different question: can declared local constraints compose into a compatible global account? Its checker evaluates those rules, not AI understanding.
The source scenario asks for a project and system architecture for a regional signalling control centre on a triangular site: canal to the south, road to the west, railway on a viaduct, an overhead high-voltage line and an old mine passage below. Here the aim is narrower. Each specialist supplies one local exclusion rule. The checker asks whether those rules can be patched into a candidate global location.
Model status: a finite, sheaf-shaped compatibility toy. It is not a full sheaf construction, site survey, design or safety assessment. Diagram units and clearances are illustrative.
Check the continuous site between the grid points →
Interpretation: all five margins must be non-negative at the same sample. The preset changes several buffers; Canal identifies this selected point’s failure, not the sole cause of the whole result. Zero passing samples is not proof that every point between them is impossible.
Start from the same preset and note the number of passing samples and the selected point’s coordinates. Move only the canal buffer, leaving road, rail, power and mine unchanged, then compare the total count. The app may select a new best point if the earlier one no longer passes; reselect the original point before comparing its five margins. Restore the preset before varying a different buffer. This isolates the effect of one input within the sampled model, without attributing the multi-buffer preset’s whole result to one constraint.
Construction, named sources and limits · The separate early AI interpretation enquiry
Compatibility lab
What is actually being patched?
The important modelling move is not to call a WBS a sheaf. It is to choose meaningful local views, say where they overlap, and define what agreement means there.
The western and southern boundaries meet at a fixed corner. Their local coordinate accounts already agree.
Fixed by briefThe viaduct crosses both ground features. Its construction clearance is compared with their usable site envelope.
Checking…The overhead corridor restricts candidates on both sides of the line without changing the ground boundary.
Checking…The mine account removes a band from the otherwise two-dimensional site view.
Checking…A candidate survives only when every restriction returns a non-negative margin at the same location.
Checking…Method boundary
From source question to this finite check
Daniel Rosiak’s Sheaf Theory through Examples is part of the retained reading on local data, restriction to overlaps and gluing compatible sections. Choosing the cover and comparison maps matters; the vocabulary alone does not establish a sheaf.
Named sources, scenario provenance and the full interpretation
The code supplies a triangular envelope, five illustrative exclusion rules and 462 sampled locations on a 16-unit grid. For each point it computes five margins and takes their minimum, M(x). A point passes when M(x) ≥ 0; the strongest sample maximises that minimum.
The result concerns this grid and these declared rules. It neither proves continuous infeasibility nor establishes the full sheaf condition of unique gluing. Geometry, units and buffers are illustrative; there is no site survey, engineering validation or measured AI performance here.
To compare package disagreements with missing information, continue to Essay 001: Scope coherence.