FICTIONAL TEACHING EVIDENCE — NO ENGINEERING VERIFICATION PERFORMED
Crag Ridge Mountain Refuge, Stage 1 concept exercise
Version: 0.1; illustrative date: 2026-02-01

The invented concept is a small refuge at North Spur Crag.
Structural loads, ground conditions, access and evacuation remain unverified.
Snow-load assumptions need local data and competent engineering review.
Helicopter component limits need an agreed aircraft and operator assessment.
Any proposed fixed-line access anchors need a site survey and design review.
Environmental effects and permissions have not been assessed.

This file tests whether bytes match a recorded SHA-256 digest. Its presence
and its hash do not turn these open questions into completed checks.
