  "simulations": 48,
  "rows": [
    {
      "crew": 1,
      "tools": 1,
      "lift": 1,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 1,
      "tools": 1,
      "lift": 1,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 1,
      "tools": 1,
      "lift": 2,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 1,
      "tools": 1,
      "lift": 2,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 1,
      "tools": 2,
      "lift": 1,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 1,
      "tools": 2,
      "lift": 1,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 1,
      "tools": 2,
      "lift": 2,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 1,
      "tools": 2,
      "lift": 2,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 36
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 36
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 2,
      "tools": 1,
      "lift": 1,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 2,
      "tools": 1,
      "lift": 1,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 2,
      "tools": 1,
      "lift": 2,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 2,
      "tools": 1,
      "lift": 2,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 2,
      "tools": 2,
      "lift": 1,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 2,
      "tools": 2,
      "lift": 1,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "tasks": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ]
      },
      "day19": {
        "ordinary": "roof",
        "handoff": "walls",
        "permit": "roof"
      }
    },
    {
      "crew": 2,
      "tools": 2,
      "lift": 2,
      "policy": "wallsFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 19,
          "finish": 31
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary"
          ],
          [
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary"
          ],
          [
            "handoff",
            "permit"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff",
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary"
          ],
          [
            "handoff",
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls+roof",
        "handoff": "walls",
        "permit": "walls"
      }
    },
    {
      "crew": 2,
      "tools": 2,
      "lift": 2,
      "policy": "roofFirst",
      "times": {
        "ordinary": {
          "walls": 19,
          "roof": 19,
          "finish": 31
        },
        "handoff": {
          "walls": 19,
          "roof": 23,
          "finish": 34
        },
        "permit": {
          "walls": 22,
          "roof": 19,
          "finish": 34
        }
      },
      "signatures": {
        "finish": [
          [
            "ordinary"
          ],
          [
            "handoff",
            "permit"
          ]
        ],
        "roof": [
          [
            "ordinary",
            "permit"
          ],
          [
            "handoff"
          ]
        ],
        "walls": [
          [
            "ordinary",
            "handoff"
          ],
          [
            "permit"
          ]
        ],
        "tasks": [
          [
            "ordinary"
          ],
          [
            "handoff"
          ],
          [
            "permit"
          ]
        ]
      },
      "day19": {
        "ordinary": "walls+roof",
        "handoff": "walls",
        "permit": "roof"
      }
    }
  ],
  "separatingPlans": {
    "ordinary": [
      {
        "id": "access",
        "label": "Establish Access/Pad",
        "start": 0,
        "end": 3,
        "duration": 3
      },
      {
        "id": "kickoff",
        "label": "Kickoff",
        "start": 0,
        "end": 0,
        "duration": 0
      },
      {
        "id": "liftMaterials",
        "label": "Lift Materials to Site",
        "start": 0,
        "end": 4,
        "duration": 4
      },
      {
        "id": "permits",
        "label": "Permits & Env Review",
        "start": 0,
        "end": 10,
        "duration": 10
      },
      {
        "id": "siteprep",
        "label": "Prep Site/Anchors",
        "start": 3,
        "end": 5,
        "duration": 2
      },
      {
        "id": "foundation",
        "label": "Build Foundation",
        "start": 10,
        "end": 14,
        "duration": 4
      },
      {
        "id": "frame",
        "label": "Assemble Structural Frame",
        "start": 14,
        "end": 19,
        "duration": 5
      },
      {
        "id": "walls",
        "label": "Build Wall Shell",
        "start": 19,
        "end": 23,
        "duration": 4
      },
      {
        "id": "roof",
        "label": "Install Roof",
        "start": 19,
        "end": 22,
        "duration": 3
      },
      {
        "id": "utilities",
        "label": "Install Utilities",
        "start": 23,
        "end": 26,
        "duration": 3
      },
      {
        "id": "interior",
        "label": "Interior Fit-Out",
        "start": 26,
        "end": 30,
        "duration": 4
      },
      {
        "id": "safety",
        "label": "Safety Systems",
        "start": 26,
        "end": 28,
        "duration": 2
      },
      {
        "id": "inspect",
        "label": "Inspection/Commission",
        "start": 30,
        "end": 31,
        "duration": 1
      },
      {
        "id": "open",
        "label": "Open Refuge",
        "start": 31,
        "end": 31,
        "duration": 0
      }
    ],
    "handoff": [
      {
        "id": "access",
        "label": "Establish Access/Pad",
        "start": 0,
        "end": 3,
        "duration": 3
      },
      {
        "id": "kickoff",
        "label": "Kickoff",
        "start": 0,
        "end": 0,
        "duration": 0
      },
      {
        "id": "liftMaterials",
        "label": "Lift Materials to Site",
        "start": 0,
        "end": 4,
        "duration": 4
      },
      {
        "id": "permits",
        "label": "Permits & Env Review",
        "start": 0,
        "end": 10,
        "duration": 10
      },
      {
        "id": "siteprep",
        "label": "Prep Site/Anchors",
        "start": 3,
        "end": 5,
        "duration": 2
      },
      {
        "id": "foundation",
        "label": "Build Foundation",
        "start": 10,
        "end": 14,
        "duration": 4
      },
      {
        "id": "frame",
        "label": "Assemble Structural Frame",
        "start": 14,
        "end": 19,
        "duration": 5
      },
      {
        "id": "walls",
        "label": "Build Wall Shell",
        "start": 19,
        "end": 23,
        "duration": 4
      },
      {
        "id": "roof",
        "label": "Install Roof",
        "start": 23,
        "end": 26,
        "duration": 3
      },
      {
        "id": "utilities",
        "label": "Install Utilities",
        "start": 26,
        "end": 29,
        "duration": 3
      },
      {
        "id": "interior",
        "label": "Interior Fit-Out",
        "start": 29,
        "end": 33,
        "duration": 4
      },
      {
        "id": "safety",
        "label": "Safety Systems",
        "start": 29,
        "end": 31,
        "duration": 2
      },
      {
        "id": "inspect",
        "label": "Inspection/Commission",
        "start": 33,
        "end": 34,
        "duration": 1
      },
      {
        "id": "open",
        "label": "Open Refuge",
        "start": 34,
        "end": 34,
        "duration": 0
      }
    ],
    "permit": [
      {
        "id": "access",
        "label": "Establish Access/Pad",
        "start": 0,
        "end": 3,
        "duration": 3
      },
      {
        "id": "kickoff",
        "label": "Kickoff",
        "start": 0,
        "end": 0,
        "duration": 0
      },
      {
        "id": "liftMaterials",
        "label": "Lift Materials to Site",
        "start": 0,
        "end": 4,
        "duration": 4
      },
      {
        "id": "permits",
        "label": "Permits & Env Review",
        "start": 0,
        "end": 10,
        "duration": 10
      },
      {
        "id": "siteprep",
        "label": "Prep Site/Anchors",
        "start": 3,
        "end": 5,
        "duration": 2
      },
      {
        "id": "foundation",
        "label": "Build Foundation",
        "start": 10,
        "end": 14,
        "duration": 4
      },
      {
        "id": "frame",
        "label": "Assemble Structural Frame",
        "start": 14,
        "end": 19,
        "duration": 5
      },
      {
        "id": "roof",
        "label": "Install Roof",
        "start": 19,
        "end": 22,
        "duration": 3
      },
      {
        "id": "walls",
        "label": "Build Wall Shell",
        "start": 22,
        "end": 26,
        "duration": 4
      },
      {
        "id": "utilities",
        "label": "Install Utilities",
        "start": 26,
        "end": 29,
        "duration": 3
      },
      {
        "id": "interior",
        "label": "Interior Fit-Out",
        "start": 29,
        "end": 33,
        "duration": 4
      },
      {
        "id": "safety",
        "label": "Safety Systems",
        "start": 29,
        "end": 31,
        "duration": 2
      },
      {
        "id": "inspect",
        "label": "Inspection/Commission",
        "start": 33,
        "end": 34,
        "duration": 1
      },
      {
        "id": "open",
        "label": "Open Refuge",
        "start": 34,
        "end": 34,
        "duration": 0
      }
    ]
  },
  "separatingDays": [
    19,
    20,
    21,
    23,
    24,
    25
  ]
}