  "schema": "pw270-permitted-moves-v1",
  "date": "2026-10-10",
  "baseline": "273eee7d197ab3604241319b670444798d39c63e",
  "sourceHash": "7b0c7fd413b9cfd328d09b0351a7b46cb68491e8c094994d7c2ac0f6d1650aa3",
  "units": "illustrative days",
  "scope": "Two supplied process alternatives, fixed scheduler and durations; no optimisation or real project forecast",
  "interventions": [
    {
      "id": "baseline",
      "label": "Report the supplied baseline",
      "settings": {
        "crewTokens": 1,
        "toolsTokens": 1,
        "liftTokens": 1,
        "policy": "wallsFirst",
        "maxSteps": 100
      },
      "finishes": [
        36,
        36
      ],
      "sameWholePlan": true,
      "plans": [
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 1,
            "tools": 1,
            "lift": 1
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 33,
              "end": 35,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 35,
              "end": 36,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 36,
              "end": 36,
              "duration": 0
            }
          ],
          "makespan": 36,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; Interior Fit-Out ; Safety Systems ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n  Stage 9 (start t=33)\n    - Safety Systems\n  Stage 10 (start t=35)\n    - Inspection/Commission\n  Stage 11 (start t=36)\n    - Open Refuge"
        },
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 1,
            "tools": 1,
            "lift": 1
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 33,
              "end": 35,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 35,
              "end": 36,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 36,
              "end": 36,
              "duration": 0
            }
          ],
          "makespan": 36,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; Interior Fit-Out ; Safety Systems ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n  Stage 9 (start t=33)\n    - Safety Systems\n  Stage 10 (start t=35)\n    - Inspection/Commission\n  Stage 11 (start t=36)\n    - Open Refuge"
        }
      ],
      "thresholds": [
        {
          "threshold": 0,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 1,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 2,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 3,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 4,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 5,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 6,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 7,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 8,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 9,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 10,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 11,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 12,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 13,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 14,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 15,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 16,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 17,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 18,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 19,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 20,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 21,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 22,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 23,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 24,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 25,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 26,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 27,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 28,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 29,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 30,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 31,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 32,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 33,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 34,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 35,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 36,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 37,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 38,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 39,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 40,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        }
      ]
    },
    {
      "id": "crew",
      "label": "Double crew only",
      "settings": {
        "crewTokens": 2,
        "toolsTokens": 1,
        "liftTokens": 1,
        "policy": "wallsFirst",
        "maxSteps": 100
      },
      "finishes": [
        34,
        34
      ],
      "sameWholePlan": true,
      "plans": [
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 2,
            "tools": 1,
            "lift": 1
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 29,
              "end": 31,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 33,
              "end": 34,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 34,
              "end": 34,
              "duration": 0
            }
          ],
          "makespan": 34,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; (Interior Fit-Out ⊗ Safety Systems) ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n    - Safety Systems\n  Stage 9 (start t=33)\n    - Inspection/Commission\n  Stage 10 (start t=34)\n    - Open Refuge"
        },
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 2,
            "tools": 1,
            "lift": 1
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 29,
              "end": 31,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 33,
              "end": 34,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 34,
              "end": 34,
              "duration": 0
            }
          ],
          "makespan": 34,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; (Interior Fit-Out ⊗ Safety Systems) ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n    - Safety Systems\n  Stage 9 (start t=33)\n    - Inspection/Commission\n  Stage 10 (start t=34)\n    - Open Refuge"
        }
      ],
      "thresholds": [
        {
          "threshold": 0,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 1,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 2,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 3,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 4,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 5,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 6,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 7,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 8,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 9,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 10,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 11,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 12,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 13,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 14,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 15,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 16,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 17,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 18,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 19,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 20,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 21,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 22,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 23,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 24,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 25,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 26,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 27,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 28,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 29,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 30,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 31,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 32,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 33,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 34,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 35,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 36,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 37,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 38,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 39,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 40,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        }
      ]
    },
    {
      "id": "all",
      "label": "Double crew, tools and lift",
      "settings": {
        "crewTokens": 2,
        "toolsTokens": 2,
        "liftTokens": 2,
        "policy": "wallsFirst",
        "maxSteps": 100
      },
      "finishes": [
        31,
        34
      ],
      "sameWholePlan": false,
      "plans": [
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 2,
            "tools": 2,
            "lift": 2
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 19,
              "end": 22,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 26,
              "end": 30,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 26,
              "end": 28,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 30,
              "end": 31,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 31,
              "end": 31,
              "duration": 0
            }
          ],
          "makespan": 31,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; (Build Wall Shell ⊗ Install Roof) ; Install Utilities ; (Interior Fit-Out ⊗ Safety Systems) ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n    - Install Roof\n  Stage 6 (start t=23)\n    - Install Utilities\n  Stage 7 (start t=26)\n    - Interior Fit-Out\n    - Safety Systems\n  Stage 8 (start t=30)\n    - Inspection/Commission\n  Stage 9 (start t=31)\n    - Open Refuge"
        },
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 2,
            "tools": 2,
            "lift": 2
          },
          "policy": "wallsFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 29,
              "end": 31,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 33,
              "end": 34,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 34,
              "end": 34,
              "duration": 0
            }
          ],
          "makespan": 34,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; (Interior Fit-Out ⊗ Safety Systems) ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n    - Safety Systems\n  Stage 9 (start t=33)\n    - Inspection/Commission\n  Stage 10 (start t=34)\n    - Open Refuge"
        }
      ],
      "thresholds": [
        {
          "threshold": 0,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 1,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 2,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 3,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 4,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 5,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 6,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 7,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 8,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 9,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 10,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 11,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 12,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 13,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 14,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 15,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 16,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 17,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 18,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 19,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 20,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 21,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 22,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 23,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 24,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 25,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 26,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 27,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 28,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 29,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 30,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 31,
          "answers": [
            true,
            false
          ],
          "agreement": false,
          "verdict": "unresolved"
        },
        {
          "threshold": 32,
          "answers": [
            true,
            false
          ],
          "agreement": false,
          "verdict": "unresolved"
        },
        {
          "threshold": 33,
          "answers": [
            true,
            false
          ],
          "agreement": false,
          "verdict": "unresolved"
        },
        {
          "threshold": 34,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 35,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 36,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 37,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 38,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 39,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 40,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        }
      ]
    },
    {
      "id": "roofFirst",
      "label": "Choose roof first",
      "settings": {
        "crewTokens": 1,
        "toolsTokens": 1,
        "liftTokens": 1,
        "policy": "roofFirst",
        "maxSteps": 100
      },
      "finishes": [
        36,
        36
      ],
      "sameWholePlan": false,
      "plans": [
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 1,
            "tools": 1,
            "lift": 1
          },
          "policy": "roofFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 19,
              "end": 22,
              "duration": 3
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 22,
              "end": 26,
              "duration": 4
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 33,
              "end": 35,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 35,
              "end": 36,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 36,
              "end": 36,
              "duration": 0
            }
          ],
          "makespan": 36,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Install Roof ; Build Wall Shell ; Install Utilities ; Interior Fit-Out ; Safety Systems ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Install Roof\n  Stage 6 (start t=22)\n    - Build Wall Shell\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n  Stage 9 (start t=33)\n    - Safety Systems\n  Stage 10 (start t=35)\n    - Inspection/Commission\n  Stage 11 (start t=36)\n    - Open Refuge"
        },
        {
          "schema": "chosen-execution-plan-v1",
          "units": "days",
          "resources": {
            "crew": 1,
            "tools": 1,
            "lift": 1
          },
          "policy": "roofFirst",
          "tasks": [
            {
              "id": "access",
              "label": "Establish Access/Pad",
              "start": 0,
              "end": 3,
              "duration": 3
            },
            {
              "id": "kickoff",
              "label": "Kickoff",
              "start": 0,
              "end": 0,
              "duration": 0
            },
            {
              "id": "liftMaterials",
              "label": "Lift Materials to Site",
              "start": 0,
              "end": 4,
              "duration": 4
            },
            {
              "id": "permits",
              "label": "Permits & Env Review",
              "start": 0,
              "end": 10,
              "duration": 10
            },
            {
              "id": "siteprep",
              "label": "Prep Site/Anchors",
              "start": 3,
              "end": 5,
              "duration": 2
            },
            {
              "id": "foundation",
              "label": "Build Foundation",
              "start": 10,
              "end": 14,
              "duration": 4
            },
            {
              "id": "frame",
              "label": "Assemble Structural Frame",
              "start": 14,
              "end": 19,
              "duration": 5
            },
            {
              "id": "walls",
              "label": "Build Wall Shell",
              "start": 19,
              "end": 23,
              "duration": 4
            },
            {
              "id": "roof",
              "label": "Install Roof",
              "start": 23,
              "end": 26,
              "duration": 3
            },
            {
              "id": "utilities",
              "label": "Install Utilities",
              "start": 26,
              "end": 29,
              "duration": 3
            },
            {
              "id": "interior",
              "label": "Interior Fit-Out",
              "start": 29,
              "end": 33,
              "duration": 4
            },
            {
              "id": "safety",
              "label": "Safety Systems",
              "start": 33,
              "end": 35,
              "duration": 2
            },
            {
              "id": "inspect",
              "label": "Inspection/Commission",
              "start": 35,
              "end": 36,
              "duration": 1
            },
            {
              "id": "open",
              "label": "Open Refuge",
              "start": 36,
              "end": 36,
              "duration": 0
            }
          ],
          "makespan": 36,
          "smcExpression": "(Establish Access/Pad ⊗ Kickoff ⊗ Lift Materials to Site ⊗ Permits & Env Review) ; Prep Site/Anchors ; Build Foundation ; Assemble Structural Frame ; Build Wall Shell ; Install Roof ; Install Utilities ; Interior Fit-Out ; Safety Systems ; Inspection/Commission ; Open Refuge",
          "wbsText": "Build Mountain Refuge\n  Stage 1 (start t=0)\n    - Establish Access/Pad\n    - Kickoff\n    - Lift Materials to Site\n    - Permits & Env Review\n  Stage 2 (start t=3)\n    - Prep Site/Anchors\n  Stage 3 (start t=10)\n    - Build Foundation\n  Stage 4 (start t=14)\n    - Assemble Structural Frame\n  Stage 5 (start t=19)\n    - Build Wall Shell\n  Stage 6 (start t=23)\n    - Install Roof\n  Stage 7 (start t=26)\n    - Install Utilities\n  Stage 8 (start t=29)\n    - Interior Fit-Out\n  Stage 9 (start t=33)\n    - Safety Systems\n  Stage 10 (start t=35)\n    - Inspection/Commission\n  Stage 11 (start t=36)\n    - Open Refuge"
        }
      ],
      "thresholds": [
        {
          "threshold": 0,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 1,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 2,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 3,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 4,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 5,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 6,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 7,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 8,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 9,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 10,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 11,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 12,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 13,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 14,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 15,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 16,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 17,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 18,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 19,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 20,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 21,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 22,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 23,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 24,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 25,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 26,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 27,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 28,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 29,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 30,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 31,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 32,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 33,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 34,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 35,
          "answers": [
            false,
            false
          ],
          "agreement": true,
          "verdict": "refuted"
        },
        {
          "threshold": 36,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 37,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 38,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 39,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        },
        {
          "threshold": 40,
          "answers": [
            true,
            true
          ],
          "agreement": true,
          "verdict": "supported"
        }
      ]
    }
  ],
  "cases": [
    {
      "id": "report",
      "label": "Original baseline report",
      "intervention": "baseline",
      "threshold": 36,
      "answers": [
        true,
        true
      ],
      "agreement": true,
      "verdict": "supported",
      "authorised": true,
      "mayPromise": true
    },
    {
      "id": "crew32",
      "label": "Crew-only control: both miss 32",
      "intervention": "crew",
      "threshold": 32,
      "answers": [
        false,
        false
      ],
      "agreement": true,
      "verdict": "refuted",
      "authorised": true,
      "mayPromise": false
    },
    {
      "id": "all32",
      "label": "Approved capacity proposal: uncertain 32-day claim",
      "intervention": "all",
      "threshold": 32,
      "answers": [
        true,
        false
      ],
      "agreement": false,
      "verdict": "unresolved",
      "authorised": true,
      "mayPromise": false
    },
    {
      "id": "unapproved35",
      "label": "Forecast supports 35; permission absent",
      "intervention": "all",
      "threshold": 35,
      "answers": [
        true,
        true
      ],
      "agreement": true,
      "verdict": "supported",
      "authorised": false,
      "mayPromise": false
    },
    {
      "id": "successor35",
      "label": "Separately approved successor criterion 35",
      "intervention": "all",
      "threshold": 35,
      "answers": [
        true,
        true
      ],
      "agreement": true,
      "verdict": "supported",
      "authorised": true,
      "mayPromise": true
    },
    {
      "id": "roof36",
      "label": "Equal finish claims can hide different whole plans",
      "intervention": "roofFirst",
      "threshold": 36,
      "answers": [
        true,
        true
      ],
      "agreement": true,
      "verdict": "supported",
      "authorised": true,
      "mayPromise": true
    }
  ]
}