Back to processes to plans

Cliff shed build — conflict-aware dual view (prime event structure → configuration category)
The left view is a prime event structure: prerequisites together with mutually exclusive choices, such as rope access, scaffolding or helicopter. The right view is its configuration category: down-closed, conflict-free sets of completed events, ordered by inclusion.
How to use this view
What changed
Event structure 101
Conflict heredity
Configuration definition
Enabled events
Decision commitments
Why joins are hard
F and G under conflict
variation
Event structure view: E, ≤, #
Directed edges = prerequisites (≤). Red edges = conflicts (#) between access methods (toggle implied conflicts if you dare).
Implied conflicts: OFF
Clear selection
base
rope branch
scaffold branch
helicopter branch
conflict edge
click nodes to cross-highlight F(e) and G(e)
Configuration category: Cfg(E,≤,#), ⊆
Nodes = conflict-free down-closed histories. Arrows = add one enabled event (cover edges). Node colour = commitment (none / heli / rope / scaffold).
Edge labels: ON
All inclusions: OFF
Download JSON

Inspector

Click an event or a state. This panel explains conflicts/commitments and shows the F and G mappings for the selection.