  "schemaVersion": 1,
  "foray": 155,
  "essai": 8,
  "date": "2026-10-10",
  "sourcePin": "4316df420184af3349a450a0f14e43f9efa91b30",
  "semantics": "Finite ordinary count nets; named events occur at most once. Atomic joint steps consume aggregate inputs before any output. No duration, probability or partial observation semantics. Existing ownership gluing is shared; no source-net traversal is called by guard composition.",
  "conclusion": "No state quotient under completed-work observation; exact guard encoding remains adequate in all three contexts.",
  "cases": [
    {
      "id": "alternative-support-initial-0",
      "source": {
        "id": "alternative-support-initial-0",
        "title": "Keep either producer sufficient",
        "description": "A or B can supply C. All three selected events must still finish; the source has two ways to supply the same exact boundary place.",
        "assumptions": [
          "Ordinary count tokens with unique, once-only selected event identities.",
          "All listed work must finish, even after a physical output is available.",
          "Positive durations are illustrative; schedules reserve inputs at start and release outputs at finish.",
          "The tokens produced by A and B are interchangeable at this explicitly shared place.",
          "C consumes one token; any leftover token is permitted."
        ],
        "naive": "all-producers",
        "fragments": [
          {
            "id": "source",
            "title": "Alternative producers",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 0
              }
            ],
            "ports": [
              {
                "id": "supportOut",
                "place": "support",
                "direction": "out"
              }
            ],
            "events": [
              {
                "id": "A",
                "label": "Produce support A",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 2
              },
              {
                "id": "B",
                "label": "Produce support B",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 1
              }
            ]
          },
          {
            "id": "receiver",
            "title": "Consumer",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 0
              }
            ],
            "ports": [
              {
                "id": "supportIn",
                "place": "support",
                "direction": "in",
                "supply": 0
              }
            ],
            "events": [
              {
                "id": "C",
                "label": "Use either support",
                "consume": {
                  "support": 1
                },
                "produce": {},
                "duration": 2
              }
            ]
          }
        ],
        "connections": [
          {
            "from": "source.supportOut",
            "to": "receiver.supportIn"
          }
        ],
        "expected": "Exactly A B C, A C B, B A C and B C A are legal. C-first and requiring both producers are wrong."
      },
      "preservation": "Named completed work, boundary counts, terminal status and uniform labelled joint steps",
      "context": {
        "initialSupport": 0,
        "change": "Owned initial tokens only; events, typed boundary and once-only rule fixed"
      },
      "complete": true,
      "initial": "s0",
      "stateCorrespondence": "Same bit mask names the same completed subset across contexts; only reachable states are listed.",
      "states": [
        {
          "id": "s0",
          "observation": {
            "completed": [],
            "boundaryCounts": {
              "receiver.support=source.support": 0
            }
          },
          "terminal": false
        },
        {
          "id": "s1",
          "observation": {
            "completed": [
              "A"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s2",
          "observation": {
            "completed": [
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s3",
          "observation": {
            "completed": [
              "A",
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s5",
          "observation": {
            "completed": [
              "A",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 0
            }
          },
          "terminal": false
        },
        {
          "id": "s6",
          "observation": {
            "completed": [
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 0
            }
          },
          "terminal": false
        },
        {
          "id": "s7",
          "observation": {
            "completed": [
              "A",
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": true
        }
      ],
      "actions": [
        {
          "id": "[\"A\"]",
          "events": [
            "A"
          ]
        },
        {
          "id": "[\"B\"]",
          "events": [
            "B"
          ]
        },
        {
          "id": "[\"A\",\"B\"]",
          "events": [
            "A",
            "B"
          ]
        },
        {
          "id": "[\"C\"]",
          "events": [
            "C"
          ]
        },
        {
          "id": "[\"B\",\"C\"]",
          "events": [
            "B",
            "C"
          ]
        },
        {
          "id": "[\"A\",\"C\"]",
          "events": [
            "A",
            "C"
          ]
        }
      ],
      "transitions": [
        {
          "from": "s0",
          "action": "[\"A\"]",
          "to": "s1"
        },
        {
          "from": "s0",
          "action": "[\"B\"]",
          "to": "s2"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"B\"]",
          "to": "s3"
        },
        {
          "from": "s1",
          "action": "[\"B\"]",
          "to": "s3"
        },
        {
          "from": "s1",
          "action": "[\"C\"]",
          "to": "s5"
        },
        {
          "from": "s1",
          "action": "[\"B\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s2",
          "action": "[\"A\"]",
          "to": "s3"
        },
        {
          "from": "s2",
          "action": "[\"C\"]",
          "to": "s6"
        },
        {
          "from": "s2",
          "action": "[\"A\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s3",
          "action": "[\"C\"]",
          "to": "s7"
        },
        {
          "from": "s5",
          "action": "[\"B\"]",
          "to": "s7"
        },
        {
          "from": "s6",
          "action": "[\"A\"]",
          "to": "s7"
        }
      ],
      "summaries": {
        "completedIdentity": {
          "s0": "",
          "s1": "A",
          "s2": "B",
          "s3": "A|B",
          "s5": "A|C",
          "s6": "B|C",
          "s7": "A|B|C"
        },
        "boundaryOnlyDefective": {
          "s0": "[{\"receiver.support=source.support\":0},false]",
          "s1": "[{\"receiver.support=source.support\":1},false]",
          "s2": "[{\"receiver.support=source.support\":1},false]",
          "s3": "[{\"receiver.support=source.support\":2},false]",
          "s5": "[{\"receiver.support=source.support\":0},false]",
          "s6": "[{\"receiver.support=source.support\":0},false]",
          "s7": "[{\"receiver.support=source.support\":1},true]"
        }
      },
      "receiverGuard": {
        "kind": "guard-contract",
        "status": "complete",
        "id": "receiver",
        "title": "Consumer",
        "places": [
          {
            "id": "support",
            "type": "usable-support",
            "initial": 0
          }
        ],
        "ports": [
          {
            "id": "supportIn",
            "place": "support",
            "direction": "in",
            "supply": 0
          }
        ],
        "eventIds": [
          "C"
        ],
        "guards": [
          {
            "id": "C",
            "label": "Use either support",
            "duration": 2,
            "internalDemand": {},
            "internalDelta": {},
            "boundaryDemand": {
              "support": 1
            },
            "boundaryOutput": {}
          }
        ]
      },
      "witness": {
        "defectiveMerge": [
          "s1",
          "s2"
        ],
        "inventedSequence": [
          "[\"A\"]",
          "[\"A\"]"
        ],
        "repair": "Retain named completed occurrence identities. No nonidentity quotient preserves that observation."
      }
    },
    {
      "id": "alternative-support-initial-1",
      "source": {
        "id": "alternative-support-initial-1",
        "title": "Keep either producer sufficient",
        "description": "A or B can supply C. All three selected events must still finish; the source has two ways to supply the same exact boundary place.",
        "assumptions": [
          "Ordinary count tokens with unique, once-only selected event identities.",
          "All listed work must finish, even after a physical output is available.",
          "Positive durations are illustrative; schedules reserve inputs at start and release outputs at finish.",
          "The tokens produced by A and B are interchangeable at this explicitly shared place.",
          "C consumes one token; any leftover token is permitted."
        ],
        "naive": "all-producers",
        "fragments": [
          {
            "id": "source",
            "title": "Alternative producers",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 1
              }
            ],
            "ports": [
              {
                "id": "supportOut",
                "place": "support",
                "direction": "out"
              }
            ],
            "events": [
              {
                "id": "A",
                "label": "Produce support A",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 2
              },
              {
                "id": "B",
                "label": "Produce support B",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 1
              }
            ]
          },
          {
            "id": "receiver",
            "title": "Consumer",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 0
              }
            ],
            "ports": [
              {
                "id": "supportIn",
                "place": "support",
                "direction": "in",
                "supply": 0
              }
            ],
            "events": [
              {
                "id": "C",
                "label": "Use either support",
                "consume": {
                  "support": 1
                },
                "produce": {},
                "duration": 2
              }
            ]
          }
        ],
        "connections": [
          {
            "from": "source.supportOut",
            "to": "receiver.supportIn"
          }
        ],
        "expected": "Exactly A B C, A C B, B A C and B C A are legal. C-first and requiring both producers are wrong."
      },
      "preservation": "Named completed work, boundary counts, terminal status and uniform labelled joint steps",
      "context": {
        "initialSupport": 1,
        "change": "Owned initial tokens only; events, typed boundary and once-only rule fixed"
      },
      "complete": true,
      "initial": "s0",
      "stateCorrespondence": "Same bit mask names the same completed subset across contexts; only reachable states are listed.",
      "states": [
        {
          "id": "s0",
          "observation": {
            "completed": [],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s1",
          "observation": {
            "completed": [
              "A"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s2",
          "observation": {
            "completed": [
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s3",
          "observation": {
            "completed": [
              "A",
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 3
            }
          },
          "terminal": false
        },
        {
          "id": "s4",
          "observation": {
            "completed": [
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 0
            }
          },
          "terminal": false
        },
        {
          "id": "s5",
          "observation": {
            "completed": [
              "A",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s6",
          "observation": {
            "completed": [
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s7",
          "observation": {
            "completed": [
              "A",
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": true
        }
      ],
      "actions": [
        {
          "id": "[\"A\"]",
          "events": [
            "A"
          ]
        },
        {
          "id": "[\"B\"]",
          "events": [
            "B"
          ]
        },
        {
          "id": "[\"A\",\"B\"]",
          "events": [
            "A",
            "B"
          ]
        },
        {
          "id": "[\"C\"]",
          "events": [
            "C"
          ]
        },
        {
          "id": "[\"A\",\"C\"]",
          "events": [
            "A",
            "C"
          ]
        },
        {
          "id": "[\"B\",\"C\"]",
          "events": [
            "B",
            "C"
          ]
        },
        {
          "id": "[\"A\",\"B\",\"C\"]",
          "events": [
            "A",
            "B",
            "C"
          ]
        }
      ],
      "transitions": [
        {
          "from": "s0",
          "action": "[\"A\"]",
          "to": "s1"
        },
        {
          "from": "s0",
          "action": "[\"B\"]",
          "to": "s2"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"B\"]",
          "to": "s3"
        },
        {
          "from": "s0",
          "action": "[\"C\"]",
          "to": "s4"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"C\"]",
          "to": "s5"
        },
        {
          "from": "s0",
          "action": "[\"B\",\"C\"]",
          "to": "s6"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"B\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s1",
          "action": "[\"B\"]",
          "to": "s3"
        },
        {
          "from": "s1",
          "action": "[\"C\"]",
          "to": "s5"
        },
        {
          "from": "s1",
          "action": "[\"B\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s2",
          "action": "[\"A\"]",
          "to": "s3"
        },
        {
          "from": "s2",
          "action": "[\"C\"]",
          "to": "s6"
        },
        {
          "from": "s2",
          "action": "[\"A\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s3",
          "action": "[\"C\"]",
          "to": "s7"
        },
        {
          "from": "s4",
          "action": "[\"A\"]",
          "to": "s5"
        },
        {
          "from": "s4",
          "action": "[\"B\"]",
          "to": "s6"
        },
        {
          "from": "s4",
          "action": "[\"A\",\"B\"]",
          "to": "s7"
        },
        {
          "from": "s5",
          "action": "[\"B\"]",
          "to": "s7"
        },
        {
          "from": "s6",
          "action": "[\"A\"]",
          "to": "s7"
        }
      ],
      "summaries": {
        "completedIdentity": {
          "s0": "",
          "s1": "A",
          "s2": "B",
          "s3": "A|B",
          "s4": "C",
          "s5": "A|C",
          "s6": "B|C",
          "s7": "A|B|C"
        },
        "boundaryOnlyDefective": {
          "s0": "[{\"receiver.support=source.support\":1},false]",
          "s1": "[{\"receiver.support=source.support\":2},false]",
          "s2": "[{\"receiver.support=source.support\":2},false]",
          "s3": "[{\"receiver.support=source.support\":3},false]",
          "s4": "[{\"receiver.support=source.support\":0},false]",
          "s5": "[{\"receiver.support=source.support\":1},false]",
          "s6": "[{\"receiver.support=source.support\":1},false]",
          "s7": "[{\"receiver.support=source.support\":2},true]"
        }
      },
      "receiverGuard": {
        "kind": "guard-contract",
        "status": "complete",
        "id": "receiver",
        "title": "Consumer",
        "places": [
          {
            "id": "support",
            "type": "usable-support",
            "initial": 0
          }
        ],
        "ports": [
          {
            "id": "supportIn",
            "place": "support",
            "direction": "in",
            "supply": 0
          }
        ],
        "eventIds": [
          "C"
        ],
        "guards": [
          {
            "id": "C",
            "label": "Use either support",
            "duration": 2,
            "internalDemand": {},
            "internalDelta": {},
            "boundaryDemand": {
              "support": 1
            },
            "boundaryOutput": {}
          }
        ]
      },
      "witness": {
        "defectiveMerge": [
          "s1",
          "s2"
        ],
        "inventedSequence": [
          "[\"A\"]",
          "[\"A\"]"
        ],
        "repair": "Retain named completed occurrence identities. No nonidentity quotient preserves that observation."
      }
    },
    {
      "id": "alternative-support-initial-2",
      "source": {
        "id": "alternative-support-initial-2",
        "title": "Keep either producer sufficient",
        "description": "A or B can supply C. All three selected events must still finish; the source has two ways to supply the same exact boundary place.",
        "assumptions": [
          "Ordinary count tokens with unique, once-only selected event identities.",
          "All listed work must finish, even after a physical output is available.",
          "Positive durations are illustrative; schedules reserve inputs at start and release outputs at finish.",
          "The tokens produced by A and B are interchangeable at this explicitly shared place.",
          "C consumes one token; any leftover token is permitted."
        ],
        "naive": "all-producers",
        "fragments": [
          {
            "id": "source",
            "title": "Alternative producers",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 2
              }
            ],
            "ports": [
              {
                "id": "supportOut",
                "place": "support",
                "direction": "out"
              }
            ],
            "events": [
              {
                "id": "A",
                "label": "Produce support A",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 2
              },
              {
                "id": "B",
                "label": "Produce support B",
                "consume": {},
                "produce": {
                  "support": 1
                },
                "duration": 1
              }
            ]
          },
          {
            "id": "receiver",
            "title": "Consumer",
            "places": [
              {
                "id": "support",
                "type": "usable-support",
                "initial": 0
              }
            ],
            "ports": [
              {
                "id": "supportIn",
                "place": "support",
                "direction": "in",
                "supply": 0
              }
            ],
            "events": [
              {
                "id": "C",
                "label": "Use either support",
                "consume": {
                  "support": 1
                },
                "produce": {},
                "duration": 2
              }
            ]
          }
        ],
        "connections": [
          {
            "from": "source.supportOut",
            "to": "receiver.supportIn"
          }
        ],
        "expected": "Exactly A B C, A C B, B A C and B C A are legal. C-first and requiring both producers are wrong."
      },
      "preservation": "Named completed work, boundary counts, terminal status and uniform labelled joint steps",
      "context": {
        "initialSupport": 2,
        "change": "Owned initial tokens only; events, typed boundary and once-only rule fixed"
      },
      "complete": true,
      "initial": "s0",
      "stateCorrespondence": "Same bit mask names the same completed subset across contexts; only reachable states are listed.",
      "states": [
        {
          "id": "s0",
          "observation": {
            "completed": [],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s1",
          "observation": {
            "completed": [
              "A"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 3
            }
          },
          "terminal": false
        },
        {
          "id": "s2",
          "observation": {
            "completed": [
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 3
            }
          },
          "terminal": false
        },
        {
          "id": "s3",
          "observation": {
            "completed": [
              "A",
              "B"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 4
            }
          },
          "terminal": false
        },
        {
          "id": "s4",
          "observation": {
            "completed": [
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 1
            }
          },
          "terminal": false
        },
        {
          "id": "s5",
          "observation": {
            "completed": [
              "A",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s6",
          "observation": {
            "completed": [
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 2
            }
          },
          "terminal": false
        },
        {
          "id": "s7",
          "observation": {
            "completed": [
              "A",
              "B",
              "C"
            ],
            "boundaryCounts": {
              "receiver.support=source.support": 3
            }
          },
          "terminal": true
        }
      ],
      "actions": [
        {
          "id": "[\"A\"]",
          "events": [
            "A"
          ]
        },
        {
          "id": "[\"B\"]",
          "events": [
            "B"
          ]
        },
        {
          "id": "[\"A\",\"B\"]",
          "events": [
            "A",
            "B"
          ]
        },
        {
          "id": "[\"C\"]",
          "events": [
            "C"
          ]
        },
        {
          "id": "[\"A\",\"C\"]",
          "events": [
            "A",
            "C"
          ]
        },
        {
          "id": "[\"B\",\"C\"]",
          "events": [
            "B",
            "C"
          ]
        },
        {
          "id": "[\"A\",\"B\",\"C\"]",
          "events": [
            "A",
            "B",
            "C"
          ]
        }
      ],
      "transitions": [
        {
          "from": "s0",
          "action": "[\"A\"]",
          "to": "s1"
        },
        {
          "from": "s0",
          "action": "[\"B\"]",
          "to": "s2"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"B\"]",
          "to": "s3"
        },
        {
          "from": "s0",
          "action": "[\"C\"]",
          "to": "s4"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"C\"]",
          "to": "s5"
        },
        {
          "from": "s0",
          "action": "[\"B\",\"C\"]",
          "to": "s6"
        },
        {
          "from": "s0",
          "action": "[\"A\",\"B\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s1",
          "action": "[\"B\"]",
          "to": "s3"
        },
        {
          "from": "s1",
          "action": "[\"C\"]",
          "to": "s5"
        },
        {
          "from": "s1",
          "action": "[\"B\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s2",
          "action": "[\"A\"]",
          "to": "s3"
        },
        {
          "from": "s2",
          "action": "[\"C\"]",
          "to": "s6"
        },
        {
          "from": "s2",
          "action": "[\"A\",\"C\"]",
          "to": "s7"
        },
        {
          "from": "s3",
          "action": "[\"C\"]",
          "to": "s7"
        },
        {
          "from": "s4",
          "action": "[\"A\"]",
          "to": "s5"
        },
        {
          "from": "s4",
          "action": "[\"B\"]",
          "to": "s6"
        },
        {
          "from": "s4",
          "action": "[\"A\",\"B\"]",
          "to": "s7"
        },
        {
          "from": "s5",
          "action": "[\"B\"]",
          "to": "s7"
        },
        {
          "from": "s6",
          "action": "[\"A\"]",
          "to": "s7"
        }
      ],
      "summaries": {
        "completedIdentity": {
          "s0": "",
          "s1": "A",
          "s2": "B",
          "s3": "A|B",
          "s4": "C",
          "s5": "A|C",
          "s6": "B|C",
          "s7": "A|B|C"
        },
        "boundaryOnlyDefective": {
          "s0": "[{\"receiver.support=source.support\":2},false]",
          "s1": "[{\"receiver.support=source.support\":3},false]",
          "s2": "[{\"receiver.support=source.support\":3},false]",
          "s3": "[{\"receiver.support=source.support\":4},false]",
          "s4": "[{\"receiver.support=source.support\":1},false]",
          "s5": "[{\"receiver.support=source.support\":2},false]",
          "s6": "[{\"receiver.support=source.support\":2},false]",
          "s7": "[{\"receiver.support=source.support\":3},true]"
        }
      },
      "receiverGuard": {
        "kind": "guard-contract",
        "status": "complete",
        "id": "receiver",
        "title": "Consumer",
        "places": [
          {
            "id": "support",
            "type": "usable-support",
            "initial": 0
          }
        ],
        "ports": [
          {
            "id": "supportIn",
            "place": "support",
            "direction": "in",
            "supply": 0
          }
        ],
        "eventIds": [
          "C"
        ],
        "guards": [
          {
            "id": "C",
            "label": "Use either support",
            "duration": 2,
            "internalDemand": {},
            "internalDelta": {},
            "boundaryDemand": {
              "support": 1
            },
            "boundaryOutput": {}
          }
        ]
      },
      "witness": {
        "defectiveMerge": [
          "s1",
          "s2"
        ],
        "inventedSequence": [
          "[\"A\"]",
          "[\"A\"]"
        ],
        "repair": "Retain named completed occurrence identities. No nonidentity quotient preserves that observation."
      }
    }
  ]
}