Functorial Atlas · Project example

One microsite, fourteen views

Toy scenario

Design a responsive microsite, build its frontend, deploy it and test it. Follow the same small project through schedules, costs, people, risks and evidence. Select any red dot to read what a connection means.

A relationship sketch; functor laws are not checked. Solid edges describe project relations. Dashed edges show proposed object mappings or task-set membership. Colored regions group project views, not verified mathematical categories.
Microsite project relationship graph

No views selected. Use Show all to restore the graph.

Drag the background to pan; wheel or +/− to zoom. Tab to a node or red dot, then Enter for details. Arrow keys pan the focused graph; on a region or node they move it. The selectors below offer the same details without navigating the drawing.

Read the connections

Browse all visible objects and connections by keyboard. Choosing an object highlights its connections.

Start with the deliverable

What makes up the microsite?

W(D1) = {T1, T2, T3, T4}. The deliverable is assigned a set of tasks, so this drawing expands W into four membership links. D2 is assigned {T3}.

These are membership relations, not four images of one object under a D → T functor.

About this repaired project sketch

This merges the original project example’s clickable edge details and region dragging with the later draft’s 14 filters and three layouts. The generic earlier sketch is not used. Original project names, quantities and candidate mapping families are retained.

Connections are declared explicitly. Cost accrual uses the matching schedule intervals; stakeholder update arrows have explicit endpoints; W task sets are expanded into membership links. Z3 makes the originally named daily commit histogram visible. “PERT aggregation” remains an operation annotation on M1 because the draft supplies no input estimates or aggregation rule. It is not a computed forecast.

Some views contain relations that are not directed morphisms (such as overlap and trade-off), and some connections cross views. Object mappings alone do not define functors: arrow mappings, identities and composition would also need to be specified and checked. H’s original contravariant label and Δ’s change notation are retained as proposals in the details, without asserting those structures.