Back to app index

Composable Uncertainty Wiring Diagram — Co-design Loop (Power ↔ Cooling ↔ Footprint)

A tiny “design problem as a service” demo: boxes are typed morphisms with interval uncertainty; wiring illustrates composition/tensor; the log records this toy interval calculation, not a verified assurance argument. SMCfeedback (optional)uncertainty propagation
Quick controls
Wiring diagram canvas
Legend: numbers are [low, high] intervals; arrows are typed wires; dashed arrow appears when feedback is enabled.
Inputs
Interval for available electrical power.
Uncertain environment (affects cooling efficiency).
Catalogue of reusable morphisms
These are intentionally generic blocks (estimator/checker/optimiser) you can copy between projects.
Formal morphisms (f_in, f_out)
Calculation log
Diagram JSON