  "model": {
    "version": "calva-earthworks-1",
    "title": "The Calva earthworks handover",
    "fiction": "An invented railway alignment, schematic placement relative to the real hostel, geometry and probability model. Not surveyed Calva conditions or engineering advice.",
    "probabilityDenominator": 10000,
    "probabilityMeaning": "Assumed marginal probability that a named discrepancy remains unresolved at the agreed handover checkpoint. These numbers are chosen illustrative inputs, not frequencies inferred from observations.",
    "objectiveMeaning": "Expected number of unresolved named seam discrepancies = sum of their marginal probabilities. A seam can contribute quantity, level and gradient events separately. No independence assumption, and not the probability of at least one failure.",
    "ownershipMeaning": "An allocation changes responsibility and assumed review efficacy. It does not repair geometry, change quantities, alter the fixed transfer ledger, or remove a known discrepancy.",
    "packageConstraint": "Three interchangeable packages, exactly six tiles each; connected packages are the principal admissible set. Unrestricted balanced partitions are also enumerated as a lower-bound comparison.",
    "stages": [
      "Strip and store",
      "Formation and drainage",
      "Trim and reinstate"
    ],
    "tiles": [
      {
        "id": 0,
        "code": "1A",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 0,
        "chainageStartM": 0,
        "chainageEndM": 100,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 180,
        "topsoilPlacedM3": 0
      },
      {
        "id": 1,
        "code": "1B",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 1,
        "chainageStartM": 100,
        "chainageEndM": 200,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 240,
        "topsoilPlacedM3": 0
      },
      {
        "id": 2,
        "code": "1C",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 2,
        "chainageStartM": 200,
        "chainageEndM": 300,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 300,
        "topsoilPlacedM3": 0
      },
      {
        "id": 3,
        "code": "1D",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 3,
        "chainageStartM": 300,
        "chainageEndM": 400,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 360,
        "topsoilPlacedM3": 0
      },
      {
        "id": 4,
        "code": "1E",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 4,
        "chainageStartM": 400,
        "chainageEndM": 500,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 240,
        "topsoilPlacedM3": 0
      },
      {
        "id": 5,
        "code": "1F",
        "stage": 0,
        "stageName": "Strip and store",
        "chainageCell": 5,
        "chainageStartM": 500,
        "chainageEndM": 600,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 180,
        "topsoilPlacedM3": 0
      },
      {
        "id": 6,
        "code": "2A",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 0,
        "chainageStartM": 0,
        "chainageEndM": 100,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 7,
        "code": "2B",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 1,
        "chainageStartM": 100,
        "chainageEndM": 200,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 8,
        "code": "2C",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 2,
        "chainageStartM": 200,
        "chainageEndM": 300,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 9,
        "code": "2D",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 3,
        "chainageStartM": 300,
        "chainageEndM": 400,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 10,
        "code": "2E",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 4,
        "chainageStartM": 400,
        "chainageEndM": 500,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 11,
        "code": "2F",
        "stage": 1,
        "stageName": "Formation and drainage",
        "chainageCell": 5,
        "chainageStartM": 500,
        "chainageEndM": 600,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 0
      },
      {
        "id": 12,
        "code": "3A",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 0,
        "chainageStartM": 0,
        "chainageEndM": 100,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 200
      },
      {
        "id": 13,
        "code": "3B",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 1,
        "chainageStartM": 100,
        "chainageEndM": 200,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 220
      },
      {
        "id": 14,
        "code": "3C",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 2,
        "chainageStartM": 200,
        "chainageEndM": 300,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 250
      },
      {
        "id": 15,
        "code": "3D",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 3,
        "chainageStartM": 300,
        "chainageEndM": 400,
        "context": "Bog beside the imagined youth hostel",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 330
      },
      {
        "id": 16,
        "code": "3E",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 4,
        "chainageStartM": 400,
        "chainageEndM": 500,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 260
      },
      {
        "id": 17,
        "code": "3F",
        "stage": 2,
        "stageName": "Trim and reinstate",
        "chainageCell": 5,
        "chainageStartM": 500,
        "chainageEndM": 600,
        "context": "Steep railway climb",
        "topsoilStrippedM3": 0,
        "topsoilPlacedM3": 240
      }
    ],
    "edges": [
      {
        "id": 0,
        "u": 0,
        "v": 1,
        "kind": "space",
        "nearBog": false,
        "label": "1A / 1B",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 5,
        "levelGapMm": 6,
        "gradientGapMilliPermille": 20,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 26,
              "crossBp": 106
            },
            "wet_bog": {
              "withinBp": 26,
              "crossBp": 106
            },
            "bog_joint_review": {
              "withinBp": 26,
              "crossBp": 106
            }
          },
          "level": {
            "reference": {
              "withinBp": 13,
              "crossBp": 53
            },
            "wet_bog": {
              "withinBp": 13,
              "crossBp": 53
            },
            "bog_joint_review": {
              "withinBp": 13,
              "crossBp": 53
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 10,
              "crossBp": 30
            },
            "wet_bog": {
              "withinBp": 10,
              "crossBp": 30
            },
            "bog_joint_review": {
              "withinBp": 10,
              "crossBp": 30
            }
          }
        }
      },
      {
        "id": 1,
        "u": 1,
        "v": 2,
        "kind": "space",
        "nearBog": true,
        "label": "1B / 1C",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 20,
        "levelGapMm": 8,
        "gradientGapMilliPermille": 30,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 60,
              "crossBp": 240
            },
            "wet_bog": {
              "withinBp": 90,
              "crossBp": 630
            },
            "bog_joint_review": {
              "withinBp": 60,
              "crossBp": 105
            }
          },
          "level": {
            "reference": {
              "withinBp": 23,
              "crossBp": 93
            },
            "wet_bog": {
              "withinBp": 34,
              "crossBp": 244
            },
            "bog_joint_review": {
              "withinBp": 23,
              "crossBp": 40
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 10,
              "crossBp": 35
            },
            "wet_bog": {
              "withinBp": 15,
              "crossBp": 90
            },
            "bog_joint_review": {
              "withinBp": 10,
              "crossBp": 16
            }
          }
        }
      },
      {
        "id": 2,
        "u": 2,
        "v": 3,
        "kind": "space",
        "nearBog": true,
        "label": "1C / 1D",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 20,
        "levelGapMm": 10,
        "gradientGapMilliPermille": 40,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 46,
              "crossBp": 186
            },
            "wet_bog": {
              "withinBp": 69,
              "crossBp": 489
            },
            "bog_joint_review": {
              "withinBp": 46,
              "crossBp": 81
            }
          },
          "level": {
            "reference": {
              "withinBp": 28,
              "crossBp": 113
            },
            "wet_bog": {
              "withinBp": 42,
              "crossBp": 297
            },
            "bog_joint_review": {
              "withinBp": 28,
              "crossBp": 49
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 10,
              "crossBp": 40
            },
            "wet_bog": {
              "withinBp": 15,
              "crossBp": 105
            },
            "bog_joint_review": {
              "withinBp": 10,
              "crossBp": 17
            }
          }
        }
      },
      {
        "id": 3,
        "u": 3,
        "v": 4,
        "kind": "space",
        "nearBog": true,
        "label": "1D / 1E",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 20,
        "levelGapMm": 12,
        "gradientGapMilliPermille": 50,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 49,
              "crossBp": 349
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 58
            }
          },
          "level": {
            "reference": {
              "withinBp": 21,
              "crossBp": 86
            },
            "wet_bog": {
              "withinBp": 31,
              "crossBp": 226
            },
            "bog_joint_review": {
              "withinBp": 21,
              "crossBp": 37
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 16,
              "crossBp": 66
            },
            "wet_bog": {
              "withinBp": 24,
              "crossBp": 174
            },
            "bog_joint_review": {
              "withinBp": 16,
              "crossBp": 28
            }
          }
        }
      },
      {
        "id": 4,
        "u": 4,
        "v": 5,
        "kind": "space",
        "nearBog": false,
        "label": "1E / 1F",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 5,
        "levelGapMm": 14,
        "gradientGapMilliPermille": 60,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          },
          "level": {
            "reference": {
              "withinBp": 11,
              "crossBp": 46
            },
            "wet_bog": {
              "withinBp": 11,
              "crossBp": 46
            },
            "bog_joint_review": {
              "withinBp": 11,
              "crossBp": 46
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 28,
              "crossBp": 113
            },
            "wet_bog": {
              "withinBp": 28,
              "crossBp": 113
            },
            "bog_joint_review": {
              "withinBp": 28,
              "crossBp": 113
            }
          }
        }
      },
      {
        "id": 5,
        "u": 6,
        "v": 7,
        "kind": "space",
        "nearBog": false,
        "label": "2A / 2B",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 10,
        "levelGapMm": 10,
        "gradientGapMilliPermille": 30,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          },
          "level": {
            "reference": {
              "withinBp": 30,
              "crossBp": 120
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 30,
              "crossBp": 120
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          }
        }
      },
      {
        "id": 6,
        "u": 7,
        "v": 8,
        "kind": "space",
        "nearBog": true,
        "label": "2B / 2C",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 25,
        "levelGapMm": 12,
        "gradientGapMilliPermille": 40,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 53,
              "crossBp": 213
            },
            "wet_bog": {
              "withinBp": 79,
              "crossBp": 559
            },
            "bog_joint_review": {
              "withinBp": 53,
              "crossBp": 93
            }
          },
          "level": {
            "reference": {
              "withinBp": 63,
              "crossBp": 253
            },
            "wet_bog": {
              "withinBp": 94,
              "crossBp": 664
            },
            "bog_joint_review": {
              "withinBp": 63,
              "crossBp": 110
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 30,
              "crossBp": 120
            },
            "wet_bog": {
              "withinBp": 45,
              "crossBp": 315
            },
            "bog_joint_review": {
              "withinBp": 30,
              "crossBp": 52
            }
          }
        }
      },
      {
        "id": 7,
        "u": 8,
        "v": 9,
        "kind": "space",
        "nearBog": true,
        "label": "2C / 2D",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 25,
        "levelGapMm": 14,
        "gradientGapMilliPermille": 50,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 40,
              "crossBp": 160
            },
            "wet_bog": {
              "withinBp": 60,
              "crossBp": 420
            },
            "bog_joint_review": {
              "withinBp": 40,
              "crossBp": 70
            }
          },
          "level": {
            "reference": {
              "withinBp": 70,
              "crossBp": 280
            },
            "wet_bog": {
              "withinBp": 105,
              "crossBp": 735
            },
            "bog_joint_review": {
              "withinBp": 70,
              "crossBp": 122
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 40,
              "crossBp": 160
            },
            "wet_bog": {
              "withinBp": 60,
              "crossBp": 420
            },
            "bog_joint_review": {
              "withinBp": 40,
              "crossBp": 70
            }
          }
        }
      },
      {
        "id": 8,
        "u": 9,
        "v": 10,
        "kind": "space",
        "nearBog": true,
        "label": "2D / 2E",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 25,
        "levelGapMm": 16,
        "gradientGapMilliPermille": 60,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 43,
              "crossBp": 173
            },
            "wet_bog": {
              "withinBp": 64,
              "crossBp": 454
            },
            "bog_joint_review": {
              "withinBp": 43,
              "crossBp": 75
            }
          },
          "level": {
            "reference": {
              "withinBp": 46,
              "crossBp": 186
            },
            "wet_bog": {
              "withinBp": 69,
              "crossBp": 489
            },
            "bog_joint_review": {
              "withinBp": 46,
              "crossBp": 81
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 60,
              "crossBp": 240
            },
            "wet_bog": {
              "withinBp": 90,
              "crossBp": 630
            },
            "bog_joint_review": {
              "withinBp": 60,
              "crossBp": 105
            }
          }
        }
      },
      {
        "id": 9,
        "u": 10,
        "v": 11,
        "kind": "space",
        "nearBog": false,
        "label": "2E / 2F",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 10,
        "levelGapMm": 18,
        "gradientGapMilliPermille": 70,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 26,
              "crossBp": 106
            },
            "wet_bog": {
              "withinBp": 26,
              "crossBp": 106
            },
            "bog_joint_review": {
              "withinBp": 26,
              "crossBp": 106
            }
          },
          "level": {
            "reference": {
              "withinBp": 30,
              "crossBp": 120
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 30,
              "crossBp": 120
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 73,
              "crossBp": 293
            },
            "wet_bog": {
              "withinBp": 73,
              "crossBp": 293
            },
            "bog_joint_review": {
              "withinBp": 73,
              "crossBp": 293
            }
          }
        }
      },
      {
        "id": 10,
        "u": 12,
        "v": 13,
        "kind": "space",
        "nearBog": false,
        "label": "3A / 3B",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": -20,
        "quantityPlanGapM3": 20,
        "levelGapMm": 14,
        "gradientGapMilliPermille": 40,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 10,
              "crossBp": 40
            },
            "wet_bog": {
              "withinBp": 10,
              "crossBp": 40
            },
            "bog_joint_review": {
              "withinBp": 10,
              "crossBp": 40
            }
          },
          "level": {
            "reference": {
              "withinBp": 36,
              "crossBp": 146
            },
            "wet_bog": {
              "withinBp": 36,
              "crossBp": 146
            },
            "bog_joint_review": {
              "withinBp": 36,
              "crossBp": 146
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 30,
              "crossBp": 120
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 30,
              "crossBp": 120
            }
          }
        }
      },
      {
        "id": 11,
        "u": 13,
        "v": 14,
        "kind": "space",
        "nearBog": true,
        "label": "3B / 3C",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 0,
        "quantityPlanGapM3": 30,
        "levelGapMm": 16,
        "gradientGapMilliPermille": 50,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 13,
              "crossBp": 53
            },
            "wet_bog": {
              "withinBp": 19,
              "crossBp": 139
            },
            "bog_joint_review": {
              "withinBp": 13,
              "crossBp": 23
            }
          },
          "level": {
            "reference": {
              "withinBp": 43,
              "crossBp": 173
            },
            "wet_bog": {
              "withinBp": 64,
              "crossBp": 454
            },
            "bog_joint_review": {
              "withinBp": 43,
              "crossBp": 75
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 49,
              "crossBp": 349
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 58
            }
          }
        }
      },
      {
        "id": 12,
        "u": 14,
        "v": 15,
        "kind": "space",
        "nearBog": true,
        "label": "3C / 3D",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 50,
        "quantityPlanGapM3": 35,
        "levelGapMm": 18,
        "gradientGapMilliPermille": 60,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 11,
              "crossBp": 46
            },
            "wet_bog": {
              "withinBp": 16,
              "crossBp": 121
            },
            "bog_joint_review": {
              "withinBp": 11,
              "crossBp": 19
            }
          },
          "level": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 75,
              "crossBp": 525
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 87
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 46,
              "crossBp": 186
            },
            "wet_bog": {
              "withinBp": 69,
              "crossBp": 489
            },
            "bog_joint_review": {
              "withinBp": 46,
              "crossBp": 81
            }
          }
        }
      },
      {
        "id": 13,
        "u": 15,
        "v": 16,
        "kind": "space",
        "nearBog": true,
        "label": "3D / 3E",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 80,
        "quantityPlanGapM3": 35,
        "levelGapMm": 20,
        "gradientGapMilliPermille": 70,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 16,
              "crossBp": 66
            },
            "wet_bog": {
              "withinBp": 24,
              "crossBp": 174
            },
            "bog_joint_review": {
              "withinBp": 16,
              "crossBp": 28
            }
          },
          "level": {
            "reference": {
              "withinBp": 56,
              "crossBp": 226
            },
            "wet_bog": {
              "withinBp": 84,
              "crossBp": 594
            },
            "bog_joint_review": {
              "withinBp": 56,
              "crossBp": 98
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 66,
              "crossBp": 266
            },
            "wet_bog": {
              "withinBp": 99,
              "crossBp": 699
            },
            "bog_joint_review": {
              "withinBp": 66,
              "crossBp": 116
            }
          }
        }
      },
      {
        "id": 14,
        "u": 16,
        "v": 17,
        "kind": "space",
        "nearBog": false,
        "label": "3E / 3F",
        "comparison": "Same geographic interface in one stage",
        "nominalSignedTransferM3": 60,
        "quantityPlanGapM3": 20,
        "levelGapMm": 22,
        "gradientGapMilliPermille": 80,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 23,
              "crossBp": 93
            },
            "wet_bog": {
              "withinBp": 23,
              "crossBp": 93
            },
            "bog_joint_review": {
              "withinBp": 23,
              "crossBp": 93
            }
          },
          "level": {
            "reference": {
              "withinBp": 66,
              "crossBp": 266
            },
            "wet_bog": {
              "withinBp": 66,
              "crossBp": 266
            },
            "bog_joint_review": {
              "withinBp": 66,
              "crossBp": 266
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 86,
              "crossBp": 346
            },
            "wet_bog": {
              "withinBp": 86,
              "crossBp": 346
            },
            "bog_joint_review": {
              "withinBp": 86,
              "crossBp": 346
            }
          }
        }
      },
      {
        "id": 15,
        "u": 0,
        "v": 6,
        "kind": "time",
        "nearBog": false,
        "label": "1A / 2A",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 180,
        "quantityPlanGapM3": 10,
        "levelGapMm": 4,
        "gradientGapMilliPermille": 20,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 36,
              "crossBp": 146
            },
            "wet_bog": {
              "withinBp": 36,
              "crossBp": 146
            },
            "bog_joint_review": {
              "withinBp": 36,
              "crossBp": 146
            }
          },
          "level": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 13,
              "crossBp": 53
            },
            "wet_bog": {
              "withinBp": 13,
              "crossBp": 53
            },
            "bog_joint_review": {
              "withinBp": 13,
              "crossBp": 53
            }
          }
        }
      },
      {
        "id": 16,
        "u": 1,
        "v": 7,
        "kind": "time",
        "nearBog": false,
        "label": "1B / 2B",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 240,
        "quantityPlanGapM3": 10,
        "levelGapMm": 5,
        "gradientGapMilliPermille": 30,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 50,
              "crossBp": 200
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 200
            }
          },
          "level": {
            "reference": {
              "withinBp": 26,
              "crossBp": 106
            },
            "wet_bog": {
              "withinBp": 26,
              "crossBp": 106
            },
            "bog_joint_review": {
              "withinBp": 26,
              "crossBp": 106
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 13,
              "crossBp": 53
            },
            "wet_bog": {
              "withinBp": 13,
              "crossBp": 53
            },
            "bog_joint_review": {
              "withinBp": 13,
              "crossBp": 53
            }
          }
        }
      },
      {
        "id": 17,
        "u": 2,
        "v": 8,
        "kind": "time",
        "nearBog": true,
        "label": "1C / 2C",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 300,
        "quantityPlanGapM3": 25,
        "levelGapMm": 6,
        "gradientGapMilliPermille": 40,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 100,
              "crossBp": 400
            },
            "wet_bog": {
              "withinBp": 150,
              "crossBp": 600
            },
            "bog_joint_review": {
              "withinBp": 100,
              "crossBp": 175
            }
          },
          "level": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 49,
              "crossBp": 199
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 58
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 35
            }
          }
        }
      },
      {
        "id": 18,
        "u": 3,
        "v": 9,
        "kind": "time",
        "nearBog": true,
        "label": "1D / 2D",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 360,
        "quantityPlanGapM3": 25,
        "levelGapMm": 7,
        "gradientGapMilliPermille": 50,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 120,
              "crossBp": 480
            },
            "wet_bog": {
              "withinBp": 180,
              "crossBp": 720
            },
            "bog_joint_review": {
              "withinBp": 120,
              "crossBp": 210
            }
          },
          "level": {
            "reference": {
              "withinBp": 36,
              "crossBp": 146
            },
            "wet_bog": {
              "withinBp": 54,
              "crossBp": 219
            },
            "bog_joint_review": {
              "withinBp": 36,
              "crossBp": 63
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 35
            }
          }
        }
      },
      {
        "id": 19,
        "u": 4,
        "v": 10,
        "kind": "time",
        "nearBog": false,
        "label": "1E / 2E",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 240,
        "quantityPlanGapM3": 10,
        "levelGapMm": 8,
        "gradientGapMilliPermille": 60,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 53,
              "crossBp": 213
            },
            "wet_bog": {
              "withinBp": 53,
              "crossBp": 213
            },
            "bog_joint_review": {
              "withinBp": 53,
              "crossBp": 213
            }
          },
          "level": {
            "reference": {
              "withinBp": 23,
              "crossBp": 93
            },
            "wet_bog": {
              "withinBp": 23,
              "crossBp": 93
            },
            "bog_joint_review": {
              "withinBp": 23,
              "crossBp": 93
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 26,
              "crossBp": 106
            },
            "wet_bog": {
              "withinBp": 26,
              "crossBp": 106
            },
            "bog_joint_review": {
              "withinBp": 26,
              "crossBp": 106
            }
          }
        }
      },
      {
        "id": 20,
        "u": 5,
        "v": 11,
        "kind": "time",
        "nearBog": false,
        "label": "1F / 2F",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 180,
        "quantityPlanGapM3": 10,
        "levelGapMm": 9,
        "gradientGapMilliPermille": 70,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 33,
              "crossBp": 133
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 133
            }
          },
          "level": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 33,
              "crossBp": 133
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 133
            }
          }
        }
      },
      {
        "id": 21,
        "u": 6,
        "v": 12,
        "kind": "time",
        "nearBog": false,
        "label": "2A / 3A",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 180,
        "quantityPlanGapM3": 15,
        "levelGapMm": 7,
        "gradientGapMilliPermille": 20,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 16,
              "crossBp": 66
            },
            "wet_bog": {
              "withinBp": 16,
              "crossBp": 66
            },
            "bog_joint_review": {
              "withinBp": 16,
              "crossBp": 66
            }
          },
          "level": {
            "reference": {
              "withinBp": 40,
              "crossBp": 160
            },
            "wet_bog": {
              "withinBp": 40,
              "crossBp": 160
            },
            "bog_joint_review": {
              "withinBp": 40,
              "crossBp": 160
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 33,
              "crossBp": 133
            },
            "wet_bog": {
              "withinBp": 33,
              "crossBp": 133
            },
            "bog_joint_review": {
              "withinBp": 33,
              "crossBp": 133
            }
          }
        }
      },
      {
        "id": 22,
        "u": 7,
        "v": 13,
        "kind": "time",
        "nearBog": false,
        "label": "2B / 3B",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 240,
        "quantityPlanGapM3": 15,
        "levelGapMm": 8,
        "gradientGapMilliPermille": 30,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 23,
              "crossBp": 93
            },
            "wet_bog": {
              "withinBp": 23,
              "crossBp": 93
            },
            "bog_joint_review": {
              "withinBp": 23,
              "crossBp": 93
            }
          },
          "level": {
            "reference": {
              "withinBp": 43,
              "crossBp": 173
            },
            "wet_bog": {
              "withinBp": 43,
              "crossBp": 173
            },
            "bog_joint_review": {
              "withinBp": 43,
              "crossBp": 173
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 40,
              "crossBp": 160
            },
            "wet_bog": {
              "withinBp": 40,
              "crossBp": 160
            },
            "bog_joint_review": {
              "withinBp": 40,
              "crossBp": 160
            }
          }
        }
      },
      {
        "id": 23,
        "u": 8,
        "v": 14,
        "kind": "time",
        "nearBog": true,
        "label": "2C / 3C",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 300,
        "quantityPlanGapM3": 30,
        "levelGapMm": 9,
        "gradientGapMilliPermille": 40,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 53,
              "crossBp": 213
            },
            "wet_bog": {
              "withinBp": 79,
              "crossBp": 319
            },
            "bog_joint_review": {
              "withinBp": 53,
              "crossBp": 93
            }
          },
          "level": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 75,
              "crossBp": 300
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 87
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 46,
              "crossBp": 186
            },
            "wet_bog": {
              "withinBp": 69,
              "crossBp": 279
            },
            "bog_joint_review": {
              "withinBp": 46,
              "crossBp": 81
            }
          }
        }
      },
      {
        "id": 24,
        "u": 9,
        "v": 15,
        "kind": "time",
        "nearBog": true,
        "label": "2D / 3D",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 360,
        "quantityPlanGapM3": 30,
        "levelGapMm": 10,
        "gradientGapMilliPermille": 50,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 60,
              "crossBp": 240
            },
            "wet_bog": {
              "withinBp": 90,
              "crossBp": 360
            },
            "bog_joint_review": {
              "withinBp": 60,
              "crossBp": 105
            }
          },
          "level": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 75,
              "crossBp": 300
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 87
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 75,
              "crossBp": 300
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 87
            }
          }
        }
      },
      {
        "id": 25,
        "u": 10,
        "v": 16,
        "kind": "time",
        "nearBog": false,
        "label": "2E / 3E",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 240,
        "quantityPlanGapM3": 15,
        "levelGapMm": 11,
        "gradientGapMilliPermille": 60,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 30,
              "crossBp": 120
            },
            "wet_bog": {
              "withinBp": 30,
              "crossBp": 120
            },
            "bog_joint_review": {
              "withinBp": 30,
              "crossBp": 120
            }
          },
          "level": {
            "reference": {
              "withinBp": 46,
              "crossBp": 186
            },
            "wet_bog": {
              "withinBp": 46,
              "crossBp": 186
            },
            "bog_joint_review": {
              "withinBp": 46,
              "crossBp": 186
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 80,
              "crossBp": 320
            },
            "wet_bog": {
              "withinBp": 80,
              "crossBp": 320
            },
            "bog_joint_review": {
              "withinBp": 80,
              "crossBp": 320
            }
          }
        }
      },
      {
        "id": 26,
        "u": 11,
        "v": 17,
        "kind": "time",
        "nearBog": false,
        "label": "2F / 3F",
        "comparison": "Previous-stage handover surface versus next-stage inherited starting surface",
        "nominalSignedTransferM3": 180,
        "quantityPlanGapM3": 15,
        "levelGapMm": 12,
        "gradientGapMilliPermille": 70,
        "risk": {
          "quantity": {
            "reference": {
              "withinBp": 20,
              "crossBp": 80
            },
            "wet_bog": {
              "withinBp": 20,
              "crossBp": 80
            },
            "bog_joint_review": {
              "withinBp": 20,
              "crossBp": 80
            }
          },
          "level": {
            "reference": {
              "withinBp": 50,
              "crossBp": 200
            },
            "wet_bog": {
              "withinBp": 50,
              "crossBp": 200
            },
            "bog_joint_review": {
              "withinBp": 50,
              "crossBp": 200
            }
          },
          "gradient": {
            "reference": {
              "withinBp": 100,
              "crossBp": 400
            },
            "wet_bog": {
              "withinBp": 100,
              "crossBp": 400
            },
            "bog_joint_review": {
              "withinBp": 100,
              "crossBp": 400
            }
          }
        }
      }
    ],
    "profiles": [
      {
        "id": "reference",
        "label": "Reference assumptions"
      },
      {
        "id": "wet_bog",
        "label": "Wet bog handoffs"
      },
      {
        "id": "bog_joint_review",
        "label": "Joint review at the bog"
      }
    ],
    "materialLedger": {
      "material": "Topsoil only; fixed nominal conserved transfer plan, distinct from provisional quantity disagreements",
      "strippedM3": 1500,
      "placedM3": 1500,
      "exportedM3": 0,
      "importedM3": 0,
      "endingStoredM3": 0,
      "tiles": [
        {
          "tile": 0,
          "sourceStrippedM3": 180,
          "incomingM3": 0,
          "outgoingM3": 180,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 1,
          "sourceStrippedM3": 240,
          "incomingM3": 0,
          "outgoingM3": 240,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 2,
          "sourceStrippedM3": 300,
          "incomingM3": 0,
          "outgoingM3": 300,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 3,
          "sourceStrippedM3": 360,
          "incomingM3": 0,
          "outgoingM3": 360,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 4,
          "sourceStrippedM3": 240,
          "incomingM3": 0,
          "outgoingM3": 240,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 5,
          "sourceStrippedM3": 180,
          "incomingM3": 0,
          "outgoingM3": 180,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 6,
          "sourceStrippedM3": 0,
          "incomingM3": 180,
          "outgoingM3": 180,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 7,
          "sourceStrippedM3": 0,
          "incomingM3": 240,
          "outgoingM3": 240,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 8,
          "sourceStrippedM3": 0,
          "incomingM3": 300,
          "outgoingM3": 300,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 9,
          "sourceStrippedM3": 0,
          "incomingM3": 360,
          "outgoingM3": 360,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 10,
          "sourceStrippedM3": 0,
          "incomingM3": 240,
          "outgoingM3": 240,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 11,
          "sourceStrippedM3": 0,
          "incomingM3": 180,
          "outgoingM3": 180,
          "sinkPlacedM3": 0,
          "balanceM3": 0
        },
        {
          "tile": 12,
          "sourceStrippedM3": 0,
          "incomingM3": 200,
          "outgoingM3": 0,
          "sinkPlacedM3": 200,
          "balanceM3": 0
        },
        {
          "tile": 13,
          "sourceStrippedM3": 0,
          "incomingM3": 240,
          "outgoingM3": 20,
          "sinkPlacedM3": 220,
          "balanceM3": 0
        },
        {
          "tile": 14,
          "sourceStrippedM3": 0,
          "incomingM3": 300,
          "outgoingM3": 50,
          "sinkPlacedM3": 250,
          "balanceM3": 0
        },
        {
          "tile": 15,
          "sourceStrippedM3": 0,
          "incomingM3": 410,
          "outgoingM3": 80,
          "sinkPlacedM3": 330,
          "balanceM3": 0
        },
        {
          "tile": 16,
          "sourceStrippedM3": 0,
          "incomingM3": 320,
          "outgoingM3": 60,
          "sinkPlacedM3": 260,
          "balanceM3": 0
        },
        {
          "tile": 17,
          "sourceStrippedM3": 0,
          "incomingM3": 240,
          "outgoingM3": 0,
          "sinkPlacedM3": 240,
          "balanceM3": 0
        }
      ]
    },
    "geometryCounterexample": {
      "description": "Two draft models at the same interface both give level 120.000 m and agree on a 50 m3 transfer. Their common-direction tangent grades are +25 and +35 per mille. The quantity ledger balances and the levels match, yet the tangent difference is 10 per mille. This example stipulates a shared tangent target at that interface; it is not a claim that every legitimate vertical curve must have one constant grade.",
      "quantityTransferM3": 50,
      "leftLevelMm": 120000,
      "rightLevelMm": 120000,
      "leftGradePermille": 25,
      "rightGradePermille": 35
    },
    "limitations": [
      "Package labels are interchangeable; no specialist competence, cost, duration or resource differences are modelled.",
      "Tile count is the declared workload proxy. Equal tile counts do not establish equal engineering effort.",
      "Only adjacent cells in the time-by-chainage diagram share seams. Long-range drainage, geotechnical dependencies and temporary works are outside this model.",
      "A temporal seam compares inherited starting conditions, not deliberately changed levels at different stages.",
      "Transfer quantities refer to the same named transfer and material. Adjacent cells need not excavate or consume equal volumes.",
      "The model requires within and cross probabilities to be recalibrated before operational use."
    ]
  },
  "objectives": [
    {
      "id": "reference:all",
      "profile": "reference",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 10000,
      "base": 3089,
      "weights": [
        140,
        275,
        255,
        215,
        180,
        210,
        440,
        450,
        450,
        390,
        230,
        270,
        325,
        420,
        530,
        210,
        270,
        460,
        530,
        310,
        260,
        270,
        320,
        450,
        480,
        470,
        510
      ]
    },
    {
      "id": "reference:quantity",
      "profile": "reference",
      "types": [
        "quantity"
      ],
      "denominator": 10000,
      "base": 1034,
      "weights": [
        80,
        180,
        140,
        100,
        60,
        60,
        160,
        120,
        130,
        80,
        30,
        40,
        35,
        50,
        70,
        110,
        150,
        300,
        360,
        160,
        100,
        50,
        70,
        160,
        180,
        90,
        60
      ]
    },
    {
      "id": "reference:level",
      "profile": "reference",
      "types": [
        "level"
      ],
      "denominator": 10000,
      "base": 1023,
      "weights": [
        40,
        70,
        85,
        65,
        35,
        90,
        190,
        210,
        140,
        90,
        110,
        130,
        150,
        170,
        200,
        60,
        80,
        100,
        110,
        70,
        60,
        120,
        130,
        150,
        150,
        140,
        150
      ]
    },
    {
      "id": "reference:gradient",
      "profile": "reference",
      "types": [
        "gradient"
      ],
      "denominator": 10000,
      "base": 1032,
      "weights": [
        20,
        25,
        30,
        50,
        85,
        60,
        90,
        120,
        180,
        220,
        90,
        100,
        140,
        200,
        260,
        40,
        40,
        60,
        60,
        80,
        100,
        100,
        120,
        140,
        150,
        240,
        300
      ]
    },
    {
      "id": "wet_bog:all",
      "profile": "wet_bog",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 10000,
      "base": 3915,
      "weights": [
        140,
        825,
        765,
        645,
        180,
        210,
        1320,
        1350,
        1350,
        390,
        230,
        810,
        975,
        1260,
        530,
        210,
        270,
        690,
        795,
        310,
        260,
        270,
        320,
        675,
        720,
        470,
        510
      ]
    },
    {
      "id": "wet_bog:quantity",
      "profile": "wet_bog",
      "types": [
        "quantity"
      ],
      "denominator": 10000,
      "base": 1355,
      "weights": [
        80,
        540,
        420,
        300,
        60,
        60,
        480,
        360,
        390,
        80,
        30,
        120,
        105,
        150,
        70,
        110,
        150,
        450,
        540,
        160,
        100,
        50,
        70,
        240,
        270,
        90,
        60
      ]
    },
    {
      "id": "wet_bog:level",
      "profile": "wet_bog",
      "types": [
        "level"
      ],
      "denominator": 10000,
      "base": 1305,
      "weights": [
        40,
        210,
        255,
        195,
        35,
        90,
        570,
        630,
        420,
        90,
        110,
        390,
        450,
        510,
        200,
        60,
        80,
        150,
        165,
        70,
        60,
        120,
        130,
        225,
        225,
        140,
        150
      ]
    },
    {
      "id": "wet_bog:gradient",
      "profile": "wet_bog",
      "types": [
        "gradient"
      ],
      "denominator": 10000,
      "base": 1255,
      "weights": [
        20,
        75,
        90,
        150,
        85,
        60,
        270,
        360,
        540,
        220,
        90,
        300,
        420,
        600,
        260,
        40,
        40,
        90,
        90,
        80,
        100,
        100,
        120,
        210,
        225,
        240,
        300
      ]
    },
    {
      "id": "bog_joint_review:all",
      "profile": "bog_joint_review",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 10000,
      "base": 3089,
      "weights": [
        140,
        68,
        63,
        53,
        180,
        210,
        109,
        112,
        112,
        390,
        230,
        67,
        80,
        104,
        530,
        210,
        270,
        115,
        132,
        310,
        260,
        270,
        320,
        112,
        119,
        470,
        510
      ]
    },
    {
      "id": "bog_joint_review:quantity",
      "profile": "bog_joint_review",
      "types": [
        "quantity"
      ],
      "denominator": 10000,
      "base": 1034,
      "weights": [
        80,
        45,
        35,
        25,
        60,
        60,
        40,
        30,
        32,
        80,
        30,
        10,
        8,
        12,
        70,
        110,
        150,
        75,
        90,
        160,
        100,
        50,
        70,
        40,
        45,
        90,
        60
      ]
    },
    {
      "id": "bog_joint_review:level",
      "profile": "bog_joint_review",
      "types": [
        "level"
      ],
      "denominator": 10000,
      "base": 1023,
      "weights": [
        40,
        17,
        21,
        16,
        35,
        90,
        47,
        52,
        35,
        90,
        110,
        32,
        37,
        42,
        200,
        60,
        80,
        25,
        27,
        70,
        60,
        120,
        130,
        37,
        37,
        140,
        150
      ]
    },
    {
      "id": "bog_joint_review:gradient",
      "profile": "bog_joint_review",
      "types": [
        "gradient"
      ],
      "denominator": 10000,
      "base": 1032,
      "weights": [
        20,
        6,
        7,
        12,
        85,
        60,
        22,
        30,
        45,
        220,
        90,
        25,
        35,
        50,
        260,
        40,
        40,
        15,
        15,
        80,
        100,
        100,
        120,
        35,
        37,
        240,
        300
      ]
    },
    {
      "id": "sensitivity:0/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        1100,
        1020,
        860,
        720,
        840,
        1760,
        1800,
        1800,
        1560,
        920,
        1080,
        1300,
        1680,
        2120,
        840,
        1080,
        1840,
        2120,
        1240,
        1040,
        1080,
        1280,
        1800,
        1920,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 0,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:1/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        1650,
        1530,
        1290,
        720,
        840,
        2640,
        2700,
        2700,
        1560,
        920,
        1620,
        1950,
        2520,
        2120,
        840,
        1080,
        2070,
        2385,
        1240,
        1040,
        1080,
        1280,
        2025,
        2160,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 1,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:2/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        2200,
        2040,
        1720,
        720,
        840,
        3520,
        3600,
        3600,
        1560,
        920,
        2160,
        2600,
        3360,
        2120,
        840,
        1080,
        2300,
        2650,
        1240,
        1040,
        1080,
        1280,
        2250,
        2400,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 2,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:3/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        2750,
        2550,
        2150,
        720,
        840,
        4400,
        4500,
        4500,
        1560,
        920,
        2700,
        3250,
        4200,
        2120,
        840,
        1080,
        2530,
        2915,
        1240,
        1040,
        1080,
        1280,
        2475,
        2640,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 3,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:4/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        3300,
        3060,
        2580,
        720,
        840,
        5280,
        5400,
        5400,
        1560,
        920,
        3240,
        3900,
        5040,
        2120,
        840,
        1080,
        2760,
        3180,
        1240,
        1040,
        1080,
        1280,
        2700,
        2880,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 4,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:6/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        4400,
        4080,
        3440,
        720,
        840,
        7040,
        7200,
        7200,
        1560,
        920,
        4320,
        5200,
        6720,
        2120,
        840,
        1080,
        3220,
        3710,
        1240,
        1040,
        1080,
        1280,
        3150,
        3360,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 6,
        "denominator": 4
      }
    },
    {
      "id": "sensitivity:8/4",
      "profile": "crossing-only wet uplift sensitivity",
      "types": [
        "quantity",
        "level",
        "gradient"
      ],
      "denominator": 40000,
      "base": 12356,
      "weights": [
        560,
        5500,
        5100,
        4300,
        720,
        840,
        8800,
        9000,
        9000,
        1560,
        920,
        5400,
        6500,
        8400,
        2120,
        840,
        1080,
        3680,
        4240,
        1240,
        1040,
        1080,
        1280,
        3600,
        3840,
        1880,
        2040
      ],
      "wetUpliftFactor": {
        "numerator": 8,
        "denominator": 4
      }
    }
  ],
  "feasibleConnectedAllocations": [
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        15,
        16,
        17,
        18,
        19,
        20,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        1,
        1,
        2,
        1,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        9,
        10,
        15,
        16,
        17,
        18,
        19,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        1,
        2,
        2,
        1,
        1,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        8,
        11,
        15,
        16,
        17,
        18,
        19,
        20,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        1,
        1,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        7,
        12,
        15,
        16,
        17,
        18,
        19,
        20
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        6,
        13,
        15,
        16,
        17,
        18,
        19,
        20,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        2,
        2,
        1,
        1,
        1,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        5,
        14,
        15,
        16,
        17,
        18,
        19,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        0,
        1,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        4,
        5,
        16,
        17,
        18,
        19,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        0,
        2,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        6,
        14,
        16,
        17,
        18,
        19,
        21,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        0,
        2,
        2,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        7,
        13,
        16,
        17,
        18,
        19,
        21,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        0,
        2,
        2,
        2,
        1,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        8,
        12,
        16,
        17,
        18,
        19,
        21,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        0,
        2,
        2,
        2,
        2,
        1,
        2,
        2,
        1,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        9,
        11,
        16,
        17,
        18,
        19,
        21,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        6,
        14,
        15,
        17,
        18,
        19,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        0,
        2,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        6,
        7,
        13,
        15,
        17,
        18,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        0,
        2,
        2,
        1,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        5,
        6,
        8,
        12,
        15,
        17,
        18,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        6,
        7,
        13,
        15,
        16,
        18,
        19,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        1,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        7,
        8,
        12,
        15,
        16,
        17,
        19,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        1,
        0,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        7,
        8,
        9,
        12,
        15,
        16,
        17,
        18,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        2,
        0,
        1,
        2,
        2,
        1,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        4,
        8,
        9,
        11,
        15,
        16,
        17,
        18,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        0,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        3,
        6,
        17,
        18,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        0,
        2,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        3,
        6,
        7,
        14,
        17,
        18,
        21,
        22,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        0,
        2,
        2,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        6,
        8,
        13,
        17,
        18,
        21,
        22
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        6,
        9,
        12,
        17,
        18,
        19,
        21,
        22,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        6,
        7,
        14,
        16,
        18,
        21,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        0,
        2,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        6,
        7,
        8,
        13,
        16,
        18,
        21,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        2,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        7,
        8,
        13,
        16,
        17,
        21,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        3,
        5,
        9,
        10,
        16,
        17,
        18,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        1,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        3,
        5,
        6,
        10,
        16,
        17,
        18,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        2,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        7,
        10,
        14,
        16,
        17,
        18,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        2,
        2,
        1,
        1,
        0,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        8,
        10,
        13,
        16,
        17,
        18
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1,
        0,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        9,
        10,
        12,
        16,
        17,
        18,
        19,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        1,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        3,
        4,
        5,
        9,
        10,
        11,
        16,
        17,
        18,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        7,
        14,
        15,
        18,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        0,
        2,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        7,
        8,
        13,
        15,
        18,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        2,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        5,
        6,
        7,
        8,
        13,
        15,
        17,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        6,
        8,
        13,
        15,
        16,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        7,
        9,
        12,
        15,
        16,
        17,
        19,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        1,
        1
      ],
      "crossPackageSeams": [
        3,
        7,
        8,
        12,
        13,
        15,
        16,
        17
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        7,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        0,
        1,
        2,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        7,
        8,
        9,
        14,
        19,
        21,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        7,
        8,
        14,
        18,
        21,
        22,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        2,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        2,
        7,
        9,
        13,
        18,
        19,
        21,
        22,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2,
        1,
        1,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        7,
        8,
        13,
        21,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        6,
        9,
        10,
        17,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        1,
        1,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        6,
        8,
        9,
        10,
        17,
        19,
        22,
        23,
        24,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        2,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        6,
        7,
        10,
        17,
        22,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        2,
        1,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        6,
        7,
        8,
        9,
        10,
        14,
        17,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        6,
        8,
        10,
        14,
        17,
        18,
        22,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        1,
        0,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        2,
        6,
        9,
        10,
        13,
        17,
        18,
        19,
        22,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        1,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        4,
        6,
        8,
        10,
        12,
        17,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        1,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        6,
        9,
        10,
        12,
        17,
        19,
        22,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        6,
        8,
        10,
        13,
        17,
        22
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        6,
        8,
        14,
        16,
        18,
        21,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        0,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        5,
        6,
        7,
        10,
        16,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        0,
        1,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        6,
        7,
        8,
        9,
        10,
        14,
        16,
        19,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        0,
        2,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        6,
        7,
        8,
        10,
        14,
        16,
        18,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        0,
        2,
        2,
        1,
        0,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        6,
        7,
        9,
        10,
        13,
        16,
        18,
        19,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        1,
        0,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        5,
        6,
        7,
        8,
        10,
        13,
        16,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        5,
        8,
        11,
        16,
        17,
        19,
        20,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        2,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        5,
        7,
        11,
        16,
        17,
        22,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        2,
        1,
        2,
        1,
        0,
        0,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        7,
        8,
        9,
        11,
        14,
        16,
        17,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        8,
        11,
        14,
        16,
        17,
        18,
        22,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1,
        0,
        0,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        9,
        11,
        13,
        16,
        17,
        18,
        19,
        22,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        4,
        5,
        9,
        11,
        16,
        17,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        4,
        5,
        8,
        11,
        12,
        16,
        17,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        5,
        9,
        11,
        12,
        16,
        17,
        19,
        22,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        2,
        3,
        5,
        8,
        11,
        13,
        16,
        17,
        22
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        2,
        5,
        8,
        14,
        15,
        18,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        2,
        1,
        1
      ],
      "crossPackageSeams": [
        2,
        6,
        9,
        13,
        15,
        16,
        18,
        19,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        0,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        8,
        17,
        18,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        0,
        2,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        1,
        8,
        9,
        14,
        17,
        18,
        19,
        21,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        7,
        9,
        10,
        17,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        1,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        7,
        8,
        9,
        10,
        17,
        19,
        22,
        23,
        24,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        7,
        8,
        10,
        17,
        18,
        22,
        23,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        1,
        7,
        9,
        10,
        14,
        17,
        18,
        19,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        7,
        8,
        10,
        13,
        17,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        8,
        11,
        19,
        20,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        1,
        2,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        7,
        8,
        9,
        11,
        18,
        20,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        1,
        2,
        2,
        1,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        7,
        9,
        11,
        18,
        19,
        23,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        7,
        11,
        12,
        18,
        19,
        20
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        1,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        7,
        9,
        11,
        17,
        20,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        1,
        2,
        1,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        7,
        8,
        9,
        11,
        17,
        19,
        24,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        6,
        8,
        11,
        17,
        18,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        1,
        0,
        0,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        1,
        6,
        9,
        11,
        14,
        17,
        18,
        19
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        6,
        9,
        11,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        6,
        8,
        11,
        12,
        19,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        2,
        1,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        6,
        7,
        8,
        9,
        11,
        12,
        18,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        6,
        7,
        11,
        13,
        18,
        19,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        6,
        9,
        11,
        12,
        19,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        6,
        8,
        11,
        13
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        6,
        7,
        11,
        14,
        18,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        2,
        6,
        9,
        11,
        13,
        18,
        19,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        1,
        2,
        6,
        8,
        11,
        14,
        18,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        2,
        1,
        2,
        0,
        0,
        1,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        1,
        2,
        6,
        7,
        8,
        9,
        11,
        14,
        19,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        1
      ],
      "crossPackageSeams": [
        1,
        2,
        6,
        7,
        11,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        5,
        7,
        12,
        16,
        18,
        19,
        20,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        1,
        1,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        5,
        8,
        12,
        16,
        17,
        18,
        22,
        23,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1,
        0,
        0,
        0,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        1,
        5,
        9,
        12,
        14,
        16,
        17,
        18,
        19,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        5,
        8,
        12,
        16,
        19,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        1,
        1,
        2,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        4,
        5,
        7,
        8,
        9,
        12,
        16,
        18,
        22,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        5,
        9,
        12,
        16,
        19,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        3,
        5,
        8,
        12,
        13,
        16,
        22,
        23
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        1,
        2,
        5,
        9,
        12,
        13,
        16,
        18,
        19,
        22,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        1,
        2,
        5,
        8,
        12,
        14,
        16,
        18,
        22,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        2,
        2,
        1
      ],
      "crossPackageSeams": [
        1,
        5,
        9,
        14,
        15,
        17,
        18,
        19,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        0,
        0,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        9,
        16,
        17,
        18,
        19,
        21,
        22,
        23,
        24,
        25,
        26
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        0,
        1,
        2,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        8,
        9,
        10,
        16,
        17,
        18,
        20,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        0,
        2,
        1,
        0,
        2,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        8,
        9,
        10,
        16,
        17,
        18,
        19,
        22,
        23,
        24,
        26
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        7,
        8,
        11,
        16,
        17,
        19,
        20,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        7,
        8,
        9,
        11,
        16,
        17,
        18,
        20,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        0,
        2,
        2,
        1,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        7,
        9,
        11,
        16,
        17,
        18,
        19,
        23,
        26
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        1,
        1,
        2,
        0,
        0,
        2,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        7,
        9,
        11,
        16,
        17,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        7,
        8,
        11,
        13,
        16,
        17,
        23
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        1,
        2,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        6,
        7,
        12,
        16,
        18,
        19,
        20,
        23
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        6,
        8,
        9,
        12,
        16,
        17,
        18,
        20,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        0,
        2,
        2,
        2,
        1,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        6,
        9,
        12,
        16,
        17,
        18,
        19,
        23,
        26
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        6,
        8,
        12,
        16,
        19,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        1,
        2,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        6,
        7,
        8,
        9,
        12,
        16,
        18,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        6,
        9,
        12,
        16,
        19,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        6,
        8,
        12,
        13,
        16,
        23
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        2,
        6,
        9,
        12,
        13,
        16,
        18,
        19,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        1,
        2
      ],
      "crossPackageSeams": [
        0,
        2,
        6,
        8,
        12,
        14,
        16,
        18,
        23,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        1,
        0,
        2,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        5,
        6,
        7,
        12,
        17,
        18,
        19,
        20,
        22
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        1,
        0,
        1,
        2,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        5,
        6,
        7,
        8,
        12,
        17,
        19,
        22,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        1,
        0,
        2,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        5,
        6,
        7,
        8,
        9,
        12,
        17,
        18,
        22,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        1,
        0,
        1,
        1,
        2,
        0,
        0,
        0,
        2,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        5,
        6,
        7,
        9,
        12,
        17,
        19,
        22,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        1,
        0,
        1,
        2,
        2,
        0,
        0,
        0,
        1,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        5,
        6,
        7,
        8,
        12,
        13,
        17,
        22
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        1,
        2,
        2,
        2,
        2,
        0,
        0,
        0,
        0,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        5,
        6,
        13,
        17,
        18,
        19,
        20,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        1,
        0,
        2,
        2,
        2,
        2,
        1,
        0,
        0,
        0,
        0,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        5,
        9,
        13,
        16,
        17,
        18,
        19,
        22,
        23,
        24,
        26
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        0,
        0,
        0,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        4,
        5,
        7,
        13,
        18,
        19,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        1,
        1,
        1,
        2,
        2,
        0,
        0,
        0,
        0,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        3,
        5,
        8,
        13,
        22,
        23,
        24
      ]
    },
    {
      "allocation": [
        0,
        1,
        1,
        2,
        2,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        0,
        2,
        2
      ],
      "crossPackageSeams": [
        0,
        2,
        5,
        9,
        13,
        18,
        19,
        22,
        23,
        24,
        25
      ]
    },
    {
      "allocation": [
        0,
        1,
        2,
        2,
        2,
        2,
        0,
        1,
        1,
        1,
        1,
        2,
        0,
        0,
        0,
        0,
        1,
        2
      ],
      "crossPackageSeams": [
        0,
        1,
        5,
        9,
        13,
        14,
        17,
        18,
        19,
        22,
        23,
        24
      ]
    }
  ],
  "crossingSensitivityEnvelope": [
    {
      "from": {
        "numerator": 0,
        "denominator": 1
      },
      "to": {
        "numerator": 149,
        "denominator": 419
      },
      "interceptBp": 5159,
      "slopeBp": 4140,
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ]
    },
    {
      "from": {
        "numerator": 149,
        "denominator": 419
      },
      "to": {
        "numerator": 313,
        "denominator": 217
      },
      "interceptBp": 5904,
      "slopeBp": 2045,
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        2,
        2,
        2,
        1,
        1,
        1,
        2,
        2,
        2
      ]
    },
    {
      "from": {
        "numerator": 313,
        "denominator": 217
      },
      "to": {
        "numerator": 2,
        "denominator": 1
      },
      "interceptBp": 7469,
      "slopeBp": 960,
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        1,
        1,
        2,
        1,
        2,
        2,
        2,
        2,
        2
      ]
    }
  ],
  "baselines": {
    "stage_bands": {
      "allocation": [
        0,
        0,
        0,
        0,
        0,
        0,
        1,
        1,
        1,
        1,
        1,
        1,
        2,
        2,
        2,
        2,
        2,
        2
      ],
      "masks": [
        63,
        4032,
        258048
      ],
      "packages": [
        [
          0,
          1,
          2,
          3,
          4,
          5
        ],
        [
          6,
          7,
          8,
          9,
          10,
          11
        ],
        [
          12,
          13,
          14,
          15,
          16,
          17
        ]
      ],
      "crossPackageSeams": [
        15,
        16,
        17,
        18,
        19,
        20,
        21,
        22,
        23,
        24,
        25,
        26
      ],
      "crossPackageSeamCount": 12,
      "scores": {
        "reference:all": {
          "numerator": 7629,
          "denominator": 10000,
          "expectedCount": 0.7629
        },
        "reference:quantity": {
          "numerator": 2824,
          "denominator": 10000,
          "expectedCount": 0.2824
        },
        "reference:level": {
          "numerator": 2343,
          "denominator": 10000,
          "expectedCount": 0.2343
        },
        "reference:gradient": {
          "numerator": 2462,
          "denominator": 10000,
          "expectedCount": 0.2462
        },
        "wet_bog:all": {
          "numerator": 9415,
          "denominator": 10000,
          "expectedCount": 0.9415
        },
        "wet_bog:quantity": {
          "numerator": 3645,
          "denominator": 10000,
          "expectedCount": 0.3645
        },
        "wet_bog:level": {
          "numerator": 2880,
          "denominator": 10000,
          "expectedCount": 0.288
        },
        "wet_bog:gradient": {
          "numerator": 2890,
          "denominator": 10000,
          "expectedCount": 0.289
        },
        "bog_joint_review:all": {
          "numerator": 6187,
          "denominator": 10000,
          "expectedCount": 0.6187
        },
        "bog_joint_review:quantity": {
          "numerator": 2074,
          "denominator": 10000,
          "expectedCount": 0.2074
        },
        "bog_joint_review:level": {
          "numerator": 1959,
          "denominator": 10000,
          "expectedCount": 0.1959
        },
        "bog_joint_review:gradient": {
          "numerator": 2154,
          "denominator": 10000,
          "expectedCount": 0.2154
        },
        "sensitivity:0/4": {
          "numerator": 30516,
          "denominator": 40000,
          "expectedCount": 0.7629
        },
        "sensitivity:1/4": {
          "numerator": 31476,
          "denominator": 40000,
          "expectedCount": 0.7869
        },
        "sensitivity:2/4": {
          "numerator": 32436,
          "denominator": 40000,
          "expectedCount": 0.8109
        },
        "sensitivity:3/4": {
          "numerator": 33396,
          "denominator": 40000,
          "expectedCount": 0.8349
        },
        "sensitivity:4/4": {
          "numerator": 34356,
          "denominator": 40000,
          "expectedCount": 0.8589
        },
        "sensitivity:6/4": {
          "numerator": 36276,
          "denominator": 40000,
          "expectedCount": 0.9069
        },
        "sensitivity:8/4": {
          "numerator": 38196,
          "denominator": 40000,
          "expectedCount": 0.9549
        }
      }
    },
    "chainage_bands": {
      "allocation": [
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2,
        0,
        0,
        1,
        1,
        2,
        2
      ],
      "masks": [
        12483,
        49932,
        199728
      ],
      "packages": [
        [
          0,
          1,
          6,
          7,
          12,
          13
        ],
        [
          2,
          3,
          8,
          9,
          14,
          15
        ],
        [
          4,
          5,
          10,
          11,
          16,
          17
        ]
      ],
      "crossPackageSeams": [
        1,
        3,
        6,
        8,
        11,
        13
      ],
      "crossPackageSeamCount": 6,
      "scores": {
        "reference:all": {
          "numerator": 5159,
          "denominator": 10000,
          "expectedCount": 0.5159
        },
        "reference:quantity": {
          "numerator": 1694,
          "denominator": 10000,
          "expectedCount": 0.1694
        },
        "reference:level": {
          "numerator": 1788,
          "denominator": 10000,
          "expectedCount": 0.1788
        },
        "reference:gradient": {
          "numerator": 1677,
          "denominator": 10000,
          "expectedCount": 0.1677
        },
        "wet_bog:all": {
          "numerator": 10125,
          "denominator": 10000,
          "expectedCount": 1.0125
        },
        "wet_bog:quantity": {
          "numerator": 3335,
          "denominator": 10000,
          "expectedCount": 0.3335
        },
        "wet_bog:level": {
          "numerator": 3600,
          "denominator": 10000,
          "expectedCount": 0.36
        },
        "wet_bog:gradient": {
          "numerator": 3190,
          "denominator": 10000,
          "expectedCount": 0.319
        },
        "bog_joint_review:all": {
          "numerator": 3602,
          "denominator": 10000,
          "expectedCount": 0.3602
        },
        "bog_joint_review:quantity": {
          "numerator": 1198,
          "denominator": 10000,
          "expectedCount": 0.1198
        },
        "bog_joint_review:level": {
          "numerator": 1212,
          "denominator": 10000,
          "expectedCount": 0.1212
        },
        "bog_joint_review:gradient": {
          "numerator": 1192,
          "denominator": 10000,
          "expectedCount": 0.1192
        },
        "sensitivity:0/4": {
          "numerator": 20636,
          "denominator": 40000,
          "expectedCount": 0.5159
        },
        "sensitivity:1/4": {
          "numerator": 24776,
          "denominator": 40000,
          "expectedCount": 0.6194
        },
        "sensitivity:2/4": {
          "numerator": 28916,
          "denominator": 40000,
          "expectedCount": 0.7229
        },
        "sensitivity:3/4": {
          "numerator": 33056,
          "denominator": 40000,
          "expectedCount": 0.8264
        },
        "sensitivity:4/4": {
          "numerator": 37196,
          "denominator": 40000,
          "expectedCount": 0.9299
        },
        "sensitivity:6/4": {
          "numerator": 45476,
          "denominator": 40000,
          "expectedCount": 1.1369
        },
        "sensitivity:8/4": {
          "numerator": 53756,
          "denominator": 40000,
          "expectedCount": 1.3439
        }
      }
    }
  },
  "optima": {
    "connected": {
      "reference:all": {
        "objective": "reference:all",
        "optimalCount": 1,
        "minimumNumerator": 5159,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:quantity": {
        "objective": "reference:quantity",
        "optimalCount": 1,
        "minimumNumerator": 1694,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:level": {
        "objective": "reference:level",
        "optimalCount": 1,
        "minimumNumerator": 1788,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:gradient": {
        "objective": "reference:gradient",
        "optimalCount": 1,
        "minimumNumerator": 1672,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "wet_bog:all": {
        "objective": "wet_bog:all",
        "optimalCount": 1,
        "minimumNumerator": 8775,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "wet_bog:quantity": {
        "objective": "wet_bog:quantity",
        "optimalCount": 2,
        "minimumNumerator": 2915,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            1,
            1,
            1,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            455,
            3640,
            258048
          ],
          "packages": [
            [
              0,
              1,
              2,
              6,
              7,
              8
            ],
            [
              3,
              4,
              5,
              9,
              10,
              11
            ],
            [
              12,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            2,
            7,
            21,
            22,
            23,
            24,
            25,
            26
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 6294,
              "denominator": 10000,
              "expectedCount": 0.6294
            },
            "reference:quantity": {
              "numerator": 1904,
              "denominator": 10000,
              "expectedCount": 0.1904
            },
            "reference:level": {
              "numerator": 2158,
              "denominator": 10000,
              "expectedCount": 0.2158
            },
            "reference:gradient": {
              "numerator": 2232,
              "denominator": 10000,
              "expectedCount": 0.2232
            },
            "wet_bog:all": {
              "numerator": 8995,
              "denominator": 10000,
              "expectedCount": 0.8995
            },
            "wet_bog:quantity": {
              "numerator": 2915,
              "denominator": 10000,
              "expectedCount": 0.2915
            },
            "wet_bog:level": {
              "numerator": 3180,
              "denominator": 10000,
              "expectedCount": 0.318
            },
            "wet_bog:gradient": {
              "numerator": 2900,
              "denominator": 10000,
              "expectedCount": 0.29
            },
            "bog_joint_review:all": {
              "numerator": 5065,
              "denominator": 10000,
              "expectedCount": 0.5065
            },
            "bog_joint_review:quantity": {
              "numerator": 1454,
              "denominator": 10000,
              "expectedCount": 0.1454
            },
            "bog_joint_review:level": {
              "numerator": 1710,
              "denominator": 10000,
              "expectedCount": 0.171
            },
            "bog_joint_review:gradient": {
              "numerator": 1901,
              "denominator": 10000,
              "expectedCount": 0.1901
            },
            "sensitivity:0/4": {
              "numerator": 25176,
              "denominator": 40000,
              "expectedCount": 0.6294
            },
            "sensitivity:1/4": {
              "numerator": 27051,
              "denominator": 40000,
              "expectedCount": 0.676275
            },
            "sensitivity:2/4": {
              "numerator": 28926,
              "denominator": 40000,
              "expectedCount": 0.72315
            },
            "sensitivity:3/4": {
              "numerator": 30801,
              "denominator": 40000,
              "expectedCount": 0.770025
            },
            "sensitivity:4/4": {
              "numerator": 32676,
              "denominator": 40000,
              "expectedCount": 0.8169
            },
            "sensitivity:6/4": {
              "numerator": 36426,
              "denominator": 40000,
              "expectedCount": 0.91065
            },
            "sensitivity:8/4": {
              "numerator": 40176,
              "denominator": 40000,
              "expectedCount": 1.0044
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            1,
            1,
            1,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            2,
            2,
            2
          ],
          [
            0,
            1,
            1,
            1,
            2,
            2,
            0,
            1,
            1,
            1,
            2,
            2,
            0,
            0,
            0,
            0,
            2,
            2
          ]
        ]
      },
      "wet_bog:level": {
        "objective": "wet_bog:level",
        "optimalCount": 1,
        "minimumNumerator": 2810,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            63,
            6080,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              9,
              10,
              12
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            9,
            10,
            15,
            16,
            17,
            18,
            19,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7469,
              "denominator": 10000,
              "expectedCount": 0.7469
            },
            "reference:quantity": {
              "numerator": 2824,
              "denominator": 10000,
              "expectedCount": 0.2824
            },
            "reference:level": {
              "numerator": 2273,
              "denominator": 10000,
              "expectedCount": 0.2273
            },
            "reference:gradient": {
              "numerator": 2372,
              "denominator": 10000,
              "expectedCount": 0.2372
            },
            "wet_bog:all": {
              "numerator": 9255,
              "denominator": 10000,
              "expectedCount": 0.9255
            },
            "wet_bog:quantity": {
              "numerator": 3645,
              "denominator": 10000,
              "expectedCount": 0.3645
            },
            "wet_bog:level": {
              "numerator": 2810,
              "denominator": 10000,
              "expectedCount": 0.281
            },
            "wet_bog:gradient": {
              "numerator": 2800,
              "denominator": 10000,
              "expectedCount": 0.28
            },
            "bog_joint_review:all": {
              "numerator": 6027,
              "denominator": 10000,
              "expectedCount": 0.6027
            },
            "bog_joint_review:quantity": {
              "numerator": 2074,
              "denominator": 10000,
              "expectedCount": 0.2074
            },
            "bog_joint_review:level": {
              "numerator": 1889,
              "denominator": 10000,
              "expectedCount": 0.1889
            },
            "bog_joint_review:gradient": {
              "numerator": 2064,
              "denominator": 10000,
              "expectedCount": 0.2064
            },
            "sensitivity:0/4": {
              "numerator": 29876,
              "denominator": 40000,
              "expectedCount": 0.7469
            },
            "sensitivity:1/4": {
              "numerator": 30836,
              "denominator": 40000,
              "expectedCount": 0.7709
            },
            "sensitivity:2/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:3/4": {
              "numerator": 32756,
              "denominator": 40000,
              "expectedCount": 0.8189
            },
            "sensitivity:4/4": {
              "numerator": 33716,
              "denominator": 40000,
              "expectedCount": 0.8429
            },
            "sensitivity:6/4": {
              "numerator": 35636,
              "denominator": 40000,
              "expectedCount": 0.8909
            },
            "sensitivity:8/4": {
              "numerator": 37556,
              "denominator": 40000,
              "expectedCount": 0.9389
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      },
      "wet_bog:gradient": {
        "objective": "wet_bog:gradient",
        "optimalCount": 1,
        "minimumNumerator": 2475,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:all": {
        "objective": "bog_joint_review:all",
        "optimalCount": 1,
        "minimumNumerator": 3602,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:quantity": {
        "objective": "bog_joint_review:quantity",
        "optimalCount": 1,
        "minimumNumerator": 1198,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:level": {
        "objective": "bog_joint_review:level",
        "optimalCount": 1,
        "minimumNumerator": 1212,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:gradient": {
        "objective": "bog_joint_review:gradient",
        "optimalCount": 1,
        "minimumNumerator": 1192,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:0/4": {
        "objective": "sensitivity:0/4",
        "optimalCount": 1,
        "minimumNumerator": 20636,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:1/4": {
        "objective": "sensitivity:1/4",
        "optimalCount": 1,
        "minimumNumerator": 24776,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:2/4": {
        "objective": "sensitivity:2/4",
        "optimalCount": 1,
        "minimumNumerator": 27706,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "sensitivity:3/4": {
        "objective": "sensitivity:3/4",
        "optimalCount": 1,
        "minimumNumerator": 29751,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "sensitivity:4/4": {
        "objective": "sensitivity:4/4",
        "optimalCount": 1,
        "minimumNumerator": 31796,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "sensitivity:6/4": {
        "objective": "sensitivity:6/4",
        "optimalCount": 1,
        "minimumNumerator": 35636,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            63,
            6080,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              9,
              10,
              12
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            9,
            10,
            15,
            16,
            17,
            18,
            19,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7469,
              "denominator": 10000,
              "expectedCount": 0.7469
            },
            "reference:quantity": {
              "numerator": 2824,
              "denominator": 10000,
              "expectedCount": 0.2824
            },
            "reference:level": {
              "numerator": 2273,
              "denominator": 10000,
              "expectedCount": 0.2273
            },
            "reference:gradient": {
              "numerator": 2372,
              "denominator": 10000,
              "expectedCount": 0.2372
            },
            "wet_bog:all": {
              "numerator": 9255,
              "denominator": 10000,
              "expectedCount": 0.9255
            },
            "wet_bog:quantity": {
              "numerator": 3645,
              "denominator": 10000,
              "expectedCount": 0.3645
            },
            "wet_bog:level": {
              "numerator": 2810,
              "denominator": 10000,
              "expectedCount": 0.281
            },
            "wet_bog:gradient": {
              "numerator": 2800,
              "denominator": 10000,
              "expectedCount": 0.28
            },
            "bog_joint_review:all": {
              "numerator": 6027,
              "denominator": 10000,
              "expectedCount": 0.6027
            },
            "bog_joint_review:quantity": {
              "numerator": 2074,
              "denominator": 10000,
              "expectedCount": 0.2074
            },
            "bog_joint_review:level": {
              "numerator": 1889,
              "denominator": 10000,
              "expectedCount": 0.1889
            },
            "bog_joint_review:gradient": {
              "numerator": 2064,
              "denominator": 10000,
              "expectedCount": 0.2064
            },
            "sensitivity:0/4": {
              "numerator": 29876,
              "denominator": 40000,
              "expectedCount": 0.7469
            },
            "sensitivity:1/4": {
              "numerator": 30836,
              "denominator": 40000,
              "expectedCount": 0.7709
            },
            "sensitivity:2/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:3/4": {
              "numerator": 32756,
              "denominator": 40000,
              "expectedCount": 0.8189
            },
            "sensitivity:4/4": {
              "numerator": 33716,
              "denominator": 40000,
              "expectedCount": 0.8429
            },
            "sensitivity:6/4": {
              "numerator": 35636,
              "denominator": 40000,
              "expectedCount": 0.8909
            },
            "sensitivity:8/4": {
              "numerator": 37556,
              "denominator": 40000,
              "expectedCount": 0.9389
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      },
      "sensitivity:8/4": {
        "objective": "sensitivity:8/4",
        "optimalCount": 1,
        "minimumNumerator": 37556,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            63,
            6080,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              9,
              10,
              12
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            9,
            10,
            15,
            16,
            17,
            18,
            19,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7469,
              "denominator": 10000,
              "expectedCount": 0.7469
            },
            "reference:quantity": {
              "numerator": 2824,
              "denominator": 10000,
              "expectedCount": 0.2824
            },
            "reference:level": {
              "numerator": 2273,
              "denominator": 10000,
              "expectedCount": 0.2273
            },
            "reference:gradient": {
              "numerator": 2372,
              "denominator": 10000,
              "expectedCount": 0.2372
            },
            "wet_bog:all": {
              "numerator": 9255,
              "denominator": 10000,
              "expectedCount": 0.9255
            },
            "wet_bog:quantity": {
              "numerator": 3645,
              "denominator": 10000,
              "expectedCount": 0.3645
            },
            "wet_bog:level": {
              "numerator": 2810,
              "denominator": 10000,
              "expectedCount": 0.281
            },
            "wet_bog:gradient": {
              "numerator": 2800,
              "denominator": 10000,
              "expectedCount": 0.28
            },
            "bog_joint_review:all": {
              "numerator": 6027,
              "denominator": 10000,
              "expectedCount": 0.6027
            },
            "bog_joint_review:quantity": {
              "numerator": 2074,
              "denominator": 10000,
              "expectedCount": 0.2074
            },
            "bog_joint_review:level": {
              "numerator": 1889,
              "denominator": 10000,
              "expectedCount": 0.1889
            },
            "bog_joint_review:gradient": {
              "numerator": 2064,
              "denominator": 10000,
              "expectedCount": 0.2064
            },
            "sensitivity:0/4": {
              "numerator": 29876,
              "denominator": 40000,
              "expectedCount": 0.7469
            },
            "sensitivity:1/4": {
              "numerator": 30836,
              "denominator": 40000,
              "expectedCount": 0.7709
            },
            "sensitivity:2/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:3/4": {
              "numerator": 32756,
              "denominator": 40000,
              "expectedCount": 0.8189
            },
            "sensitivity:4/4": {
              "numerator": 33716,
              "denominator": 40000,
              "expectedCount": 0.8429
            },
            "sensitivity:6/4": {
              "numerator": 35636,
              "denominator": 40000,
              "expectedCount": 0.8909
            },
            "sensitivity:8/4": {
              "numerator": 37556,
              "denominator": 40000,
              "expectedCount": 0.9389
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      }
    },
    "unrestricted": {
      "reference:all": {
        "objective": "reference:all",
        "optimalCount": 1,
        "minimumNumerator": 5159,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:quantity": {
        "objective": "reference:quantity",
        "optimalCount": 1,
        "minimumNumerator": 1694,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:level": {
        "objective": "reference:level",
        "optimalCount": 1,
        "minimumNumerator": 1788,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "reference:gradient": {
        "objective": "reference:gradient",
        "optimalCount": 1,
        "minimumNumerator": 1672,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "wet_bog:all": {
        "objective": "wet_bog:all",
        "optimalCount": 1,
        "minimumNumerator": 8685,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ],
          "masks": [
            137313,
            24966,
            99864
          ],
          "packages": [
            [
              0,
              5,
              6,
              11,
              12,
              17
            ],
            [
              1,
              2,
              7,
              8,
              13,
              14
            ],
            [
              3,
              4,
              9,
              10,
              15,
              16
            ]
          ],
          "crossPackageSeams": [
            0,
            2,
            4,
            5,
            7,
            9,
            10,
            12,
            14
          ],
          "crossPackageSeamCount": 9,
          "scores": {
            "reference:all": {
              "numerator": 5799,
              "denominator": 10000,
              "expectedCount": 0.5799
            },
            "reference:quantity": {
              "numerator": 1709,
              "denominator": 10000,
              "expectedCount": 0.1709
            },
            "reference:level": {
              "numerator": 2033,
              "denominator": 10000,
              "expectedCount": 0.2033
            },
            "reference:gradient": {
              "numerator": 2057,
              "denominator": 10000,
              "expectedCount": 0.2057
            },
            "wet_bog:all": {
              "numerator": 8685,
              "denominator": 10000,
              "expectedCount": 0.8685
            },
            "wet_bog:quantity": {
              "numerator": 2620,
              "denominator": 10000,
              "expectedCount": 0.262
            },
            "wet_bog:level": {
              "numerator": 3205,
              "denominator": 10000,
              "expectedCount": 0.3205
            },
            "wet_bog:gradient": {
              "numerator": 2860,
              "denominator": 10000,
              "expectedCount": 0.286
            },
            "bog_joint_review:all": {
              "numerator": 5024,
              "denominator": 10000,
              "expectedCount": 0.5024
            },
            "bog_joint_review:quantity": {
              "numerator": 1487,
              "denominator": 10000,
              "expectedCount": 0.1487
            },
            "bog_joint_review:level": {
              "numerator": 1698,
              "denominator": 10000,
              "expectedCount": 0.1698
            },
            "bog_joint_review:gradient": {
              "numerator": 1839,
              "denominator": 10000,
              "expectedCount": 0.1839
            },
            "sensitivity:0/4": {
              "numerator": 23196,
              "denominator": 40000,
              "expectedCount": 0.5799
            },
            "sensitivity:1/4": {
              "numerator": 25256,
              "denominator": 40000,
              "expectedCount": 0.6314
            },
            "sensitivity:2/4": {
              "numerator": 27316,
              "denominator": 40000,
              "expectedCount": 0.6829
            },
            "sensitivity:3/4": {
              "numerator": 29376,
              "denominator": 40000,
              "expectedCount": 0.7344
            },
            "sensitivity:4/4": {
              "numerator": 31436,
              "denominator": 40000,
              "expectedCount": 0.7859
            },
            "sensitivity:6/4": {
              "numerator": 35556,
              "denominator": 40000,
              "expectedCount": 0.8889
            },
            "sensitivity:8/4": {
              "numerator": 39676,
              "denominator": 40000,
              "expectedCount": 0.9919
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ]
        ]
      },
      "wet_bog:quantity": {
        "objective": "wet_bog:quantity",
        "optimalCount": 1,
        "minimumNumerator": 2620,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ],
          "masks": [
            137313,
            24966,
            99864
          ],
          "packages": [
            [
              0,
              5,
              6,
              11,
              12,
              17
            ],
            [
              1,
              2,
              7,
              8,
              13,
              14
            ],
            [
              3,
              4,
              9,
              10,
              15,
              16
            ]
          ],
          "crossPackageSeams": [
            0,
            2,
            4,
            5,
            7,
            9,
            10,
            12,
            14
          ],
          "crossPackageSeamCount": 9,
          "scores": {
            "reference:all": {
              "numerator": 5799,
              "denominator": 10000,
              "expectedCount": 0.5799
            },
            "reference:quantity": {
              "numerator": 1709,
              "denominator": 10000,
              "expectedCount": 0.1709
            },
            "reference:level": {
              "numerator": 2033,
              "denominator": 10000,
              "expectedCount": 0.2033
            },
            "reference:gradient": {
              "numerator": 2057,
              "denominator": 10000,
              "expectedCount": 0.2057
            },
            "wet_bog:all": {
              "numerator": 8685,
              "denominator": 10000,
              "expectedCount": 0.8685
            },
            "wet_bog:quantity": {
              "numerator": 2620,
              "denominator": 10000,
              "expectedCount": 0.262
            },
            "wet_bog:level": {
              "numerator": 3205,
              "denominator": 10000,
              "expectedCount": 0.3205
            },
            "wet_bog:gradient": {
              "numerator": 2860,
              "denominator": 10000,
              "expectedCount": 0.286
            },
            "bog_joint_review:all": {
              "numerator": 5024,
              "denominator": 10000,
              "expectedCount": 0.5024
            },
            "bog_joint_review:quantity": {
              "numerator": 1487,
              "denominator": 10000,
              "expectedCount": 0.1487
            },
            "bog_joint_review:level": {
              "numerator": 1698,
              "denominator": 10000,
              "expectedCount": 0.1698
            },
            "bog_joint_review:gradient": {
              "numerator": 1839,
              "denominator": 10000,
              "expectedCount": 0.1839
            },
            "sensitivity:0/4": {
              "numerator": 23196,
              "denominator": 40000,
              "expectedCount": 0.5799
            },
            "sensitivity:1/4": {
              "numerator": 25256,
              "denominator": 40000,
              "expectedCount": 0.6314
            },
            "sensitivity:2/4": {
              "numerator": 27316,
              "denominator": 40000,
              "expectedCount": 0.6829
            },
            "sensitivity:3/4": {
              "numerator": 29376,
              "denominator": 40000,
              "expectedCount": 0.7344
            },
            "sensitivity:4/4": {
              "numerator": 31436,
              "denominator": 40000,
              "expectedCount": 0.7859
            },
            "sensitivity:6/4": {
              "numerator": 35556,
              "denominator": 40000,
              "expectedCount": 0.8889
            },
            "sensitivity:8/4": {
              "numerator": 39676,
              "denominator": 40000,
              "expectedCount": 0.9919
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ]
        ]
      },
      "wet_bog:level": {
        "objective": "wet_bog:level",
        "optimalCount": 1,
        "minimumNumerator": 2810,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            63,
            6080,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              9,
              10,
              12
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            9,
            10,
            15,
            16,
            17,
            18,
            19,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7469,
              "denominator": 10000,
              "expectedCount": 0.7469
            },
            "reference:quantity": {
              "numerator": 2824,
              "denominator": 10000,
              "expectedCount": 0.2824
            },
            "reference:level": {
              "numerator": 2273,
              "denominator": 10000,
              "expectedCount": 0.2273
            },
            "reference:gradient": {
              "numerator": 2372,
              "denominator": 10000,
              "expectedCount": 0.2372
            },
            "wet_bog:all": {
              "numerator": 9255,
              "denominator": 10000,
              "expectedCount": 0.9255
            },
            "wet_bog:quantity": {
              "numerator": 3645,
              "denominator": 10000,
              "expectedCount": 0.3645
            },
            "wet_bog:level": {
              "numerator": 2810,
              "denominator": 10000,
              "expectedCount": 0.281
            },
            "wet_bog:gradient": {
              "numerator": 2800,
              "denominator": 10000,
              "expectedCount": 0.28
            },
            "bog_joint_review:all": {
              "numerator": 6027,
              "denominator": 10000,
              "expectedCount": 0.6027
            },
            "bog_joint_review:quantity": {
              "numerator": 2074,
              "denominator": 10000,
              "expectedCount": 0.2074
            },
            "bog_joint_review:level": {
              "numerator": 1889,
              "denominator": 10000,
              "expectedCount": 0.1889
            },
            "bog_joint_review:gradient": {
              "numerator": 2064,
              "denominator": 10000,
              "expectedCount": 0.2064
            },
            "sensitivity:0/4": {
              "numerator": 29876,
              "denominator": 40000,
              "expectedCount": 0.7469
            },
            "sensitivity:1/4": {
              "numerator": 30836,
              "denominator": 40000,
              "expectedCount": 0.7709
            },
            "sensitivity:2/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:3/4": {
              "numerator": 32756,
              "denominator": 40000,
              "expectedCount": 0.8189
            },
            "sensitivity:4/4": {
              "numerator": 33716,
              "denominator": 40000,
              "expectedCount": 0.8429
            },
            "sensitivity:6/4": {
              "numerator": 35636,
              "denominator": 40000,
              "expectedCount": 0.8909
            },
            "sensitivity:8/4": {
              "numerator": 37556,
              "denominator": 40000,
              "expectedCount": 0.9389
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      },
      "wet_bog:gradient": {
        "objective": "wet_bog:gradient",
        "optimalCount": 1,
        "minimumNumerator": 2475,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ],
          "masks": [
            63,
            29120,
            232960
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              12,
              13,
              14
            ],
            [
              9,
              10,
              11,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            7,
            12,
            15,
            16,
            17,
            18,
            19,
            20
          ],
          "crossPackageSeamCount": 8,
          "scores": {
            "reference:all": {
              "numerator": 5904,
              "denominator": 10000,
              "expectedCount": 0.5904
            },
            "reference:quantity": {
              "numerator": 2369,
              "denominator": 10000,
              "expectedCount": 0.2369
            },
            "reference:level": {
              "numerator": 1863,
              "denominator": 10000,
              "expectedCount": 0.1863
            },
            "reference:gradient": {
              "numerator": 1672,
              "denominator": 10000,
              "expectedCount": 0.1672
            },
            "wet_bog:all": {
              "numerator": 8775,
              "denominator": 10000,
              "expectedCount": 0.8775
            },
            "wet_bog:quantity": {
              "numerator": 3330,
              "denominator": 10000,
              "expectedCount": 0.333
            },
            "wet_bog:level": {
              "numerator": 2970,
              "denominator": 10000,
              "expectedCount": 0.297
            },
            "wet_bog:gradient": {
              "numerator": 2475,
              "denominator": 10000,
              "expectedCount": 0.2475
            },
            "bog_joint_review:all": {
              "numerator": 4578,
              "denominator": 10000,
              "expectedCount": 0.4578
            },
            "bog_joint_review:quantity": {
              "numerator": 1757,
              "denominator": 10000,
              "expectedCount": 0.1757
            },
            "bog_joint_review:level": {
              "numerator": 1434,
              "denominator": 10000,
              "expectedCount": 0.1434
            },
            "bog_joint_review:gradient": {
              "numerator": 1387,
              "denominator": 10000,
              "expectedCount": 0.1387
            },
            "sensitivity:0/4": {
              "numerator": 23616,
              "denominator": 40000,
              "expectedCount": 0.5904
            },
            "sensitivity:1/4": {
              "numerator": 25661,
              "denominator": 40000,
              "expectedCount": 0.641525
            },
            "sensitivity:2/4": {
              "numerator": 27706,
              "denominator": 40000,
              "expectedCount": 0.69265
            },
            "sensitivity:3/4": {
              "numerator": 29751,
              "denominator": 40000,
              "expectedCount": 0.743775
            },
            "sensitivity:4/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:6/4": {
              "numerator": 35886,
              "denominator": 40000,
              "expectedCount": 0.89715
            },
            "sensitivity:8/4": {
              "numerator": 39976,
              "denominator": 40000,
              "expectedCount": 0.9994
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            2,
            2,
            2,
            1,
            1,
            1,
            2,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:all": {
        "objective": "bog_joint_review:all",
        "optimalCount": 1,
        "minimumNumerator": 3602,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:quantity": {
        "objective": "bog_joint_review:quantity",
        "optimalCount": 1,
        "minimumNumerator": 1198,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:level": {
        "objective": "bog_joint_review:level",
        "optimalCount": 1,
        "minimumNumerator": 1212,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "bog_joint_review:gradient": {
        "objective": "bog_joint_review:gradient",
        "optimalCount": 1,
        "minimumNumerator": 1192,
        "denominator": 10000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:0/4": {
        "objective": "sensitivity:0/4",
        "optimalCount": 1,
        "minimumNumerator": 20636,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:1/4": {
        "objective": "sensitivity:1/4",
        "optimalCount": 1,
        "minimumNumerator": 24776,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ],
          "masks": [
            12483,
            49932,
            199728
          ],
          "packages": [
            [
              0,
              1,
              6,
              7,
              12,
              13
            ],
            [
              2,
              3,
              8,
              9,
              14,
              15
            ],
            [
              4,
              5,
              10,
              11,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            1,
            3,
            6,
            8,
            11,
            13
          ],
          "crossPackageSeamCount": 6,
          "scores": {
            "reference:all": {
              "numerator": 5159,
              "denominator": 10000,
              "expectedCount": 0.5159
            },
            "reference:quantity": {
              "numerator": 1694,
              "denominator": 10000,
              "expectedCount": 0.1694
            },
            "reference:level": {
              "numerator": 1788,
              "denominator": 10000,
              "expectedCount": 0.1788
            },
            "reference:gradient": {
              "numerator": 1677,
              "denominator": 10000,
              "expectedCount": 0.1677
            },
            "wet_bog:all": {
              "numerator": 10125,
              "denominator": 10000,
              "expectedCount": 1.0125
            },
            "wet_bog:quantity": {
              "numerator": 3335,
              "denominator": 10000,
              "expectedCount": 0.3335
            },
            "wet_bog:level": {
              "numerator": 3600,
              "denominator": 10000,
              "expectedCount": 0.36
            },
            "wet_bog:gradient": {
              "numerator": 3190,
              "denominator": 10000,
              "expectedCount": 0.319
            },
            "bog_joint_review:all": {
              "numerator": 3602,
              "denominator": 10000,
              "expectedCount": 0.3602
            },
            "bog_joint_review:quantity": {
              "numerator": 1198,
              "denominator": 10000,
              "expectedCount": 0.1198
            },
            "bog_joint_review:level": {
              "numerator": 1212,
              "denominator": 10000,
              "expectedCount": 0.1212
            },
            "bog_joint_review:gradient": {
              "numerator": 1192,
              "denominator": 10000,
              "expectedCount": 0.1192
            },
            "sensitivity:0/4": {
              "numerator": 20636,
              "denominator": 40000,
              "expectedCount": 0.5159
            },
            "sensitivity:1/4": {
              "numerator": 24776,
              "denominator": 40000,
              "expectedCount": 0.6194
            },
            "sensitivity:2/4": {
              "numerator": 28916,
              "denominator": 40000,
              "expectedCount": 0.7229
            },
            "sensitivity:3/4": {
              "numerator": 33056,
              "denominator": 40000,
              "expectedCount": 0.8264
            },
            "sensitivity:4/4": {
              "numerator": 37196,
              "denominator": 40000,
              "expectedCount": 0.9299
            },
            "sensitivity:6/4": {
              "numerator": 45476,
              "denominator": 40000,
              "expectedCount": 1.1369
            },
            "sensitivity:8/4": {
              "numerator": 53756,
              "denominator": 40000,
              "expectedCount": 1.3439
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2
          ]
        ]
      },
      "sensitivity:2/4": {
        "objective": "sensitivity:2/4",
        "optimalCount": 1,
        "minimumNumerator": 27316,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ],
          "masks": [
            137313,
            24966,
            99864
          ],
          "packages": [
            [
              0,
              5,
              6,
              11,
              12,
              17
            ],
            [
              1,
              2,
              7,
              8,
              13,
              14
            ],
            [
              3,
              4,
              9,
              10,
              15,
              16
            ]
          ],
          "crossPackageSeams": [
            0,
            2,
            4,
            5,
            7,
            9,
            10,
            12,
            14
          ],
          "crossPackageSeamCount": 9,
          "scores": {
            "reference:all": {
              "numerator": 5799,
              "denominator": 10000,
              "expectedCount": 0.5799
            },
            "reference:quantity": {
              "numerator": 1709,
              "denominator": 10000,
              "expectedCount": 0.1709
            },
            "reference:level": {
              "numerator": 2033,
              "denominator": 10000,
              "expectedCount": 0.2033
            },
            "reference:gradient": {
              "numerator": 2057,
              "denominator": 10000,
              "expectedCount": 0.2057
            },
            "wet_bog:all": {
              "numerator": 8685,
              "denominator": 10000,
              "expectedCount": 0.8685
            },
            "wet_bog:quantity": {
              "numerator": 2620,
              "denominator": 10000,
              "expectedCount": 0.262
            },
            "wet_bog:level": {
              "numerator": 3205,
              "denominator": 10000,
              "expectedCount": 0.3205
            },
            "wet_bog:gradient": {
              "numerator": 2860,
              "denominator": 10000,
              "expectedCount": 0.286
            },
            "bog_joint_review:all": {
              "numerator": 5024,
              "denominator": 10000,
              "expectedCount": 0.5024
            },
            "bog_joint_review:quantity": {
              "numerator": 1487,
              "denominator": 10000,
              "expectedCount": 0.1487
            },
            "bog_joint_review:level": {
              "numerator": 1698,
              "denominator": 10000,
              "expectedCount": 0.1698
            },
            "bog_joint_review:gradient": {
              "numerator": 1839,
              "denominator": 10000,
              "expectedCount": 0.1839
            },
            "sensitivity:0/4": {
              "numerator": 23196,
              "denominator": 40000,
              "expectedCount": 0.5799
            },
            "sensitivity:1/4": {
              "numerator": 25256,
              "denominator": 40000,
              "expectedCount": 0.6314
            },
            "sensitivity:2/4": {
              "numerator": 27316,
              "denominator": 40000,
              "expectedCount": 0.6829
            },
            "sensitivity:3/4": {
              "numerator": 29376,
              "denominator": 40000,
              "expectedCount": 0.7344
            },
            "sensitivity:4/4": {
              "numerator": 31436,
              "denominator": 40000,
              "expectedCount": 0.7859
            },
            "sensitivity:6/4": {
              "numerator": 35556,
              "denominator": 40000,
              "expectedCount": 0.8889
            },
            "sensitivity:8/4": {
              "numerator": 39676,
              "denominator": 40000,
              "expectedCount": 0.9919
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ]
        ]
      },
      "sensitivity:3/4": {
        "objective": "sensitivity:3/4",
        "optimalCount": 1,
        "minimumNumerator": 29376,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ],
          "masks": [
            137313,
            24966,
            99864
          ],
          "packages": [
            [
              0,
              5,
              6,
              11,
              12,
              17
            ],
            [
              1,
              2,
              7,
              8,
              13,
              14
            ],
            [
              3,
              4,
              9,
              10,
              15,
              16
            ]
          ],
          "crossPackageSeams": [
            0,
            2,
            4,
            5,
            7,
            9,
            10,
            12,
            14
          ],
          "crossPackageSeamCount": 9,
          "scores": {
            "reference:all": {
              "numerator": 5799,
              "denominator": 10000,
              "expectedCount": 0.5799
            },
            "reference:quantity": {
              "numerator": 1709,
              "denominator": 10000,
              "expectedCount": 0.1709
            },
            "reference:level": {
              "numerator": 2033,
              "denominator": 10000,
              "expectedCount": 0.2033
            },
            "reference:gradient": {
              "numerator": 2057,
              "denominator": 10000,
              "expectedCount": 0.2057
            },
            "wet_bog:all": {
              "numerator": 8685,
              "denominator": 10000,
              "expectedCount": 0.8685
            },
            "wet_bog:quantity": {
              "numerator": 2620,
              "denominator": 10000,
              "expectedCount": 0.262
            },
            "wet_bog:level": {
              "numerator": 3205,
              "denominator": 10000,
              "expectedCount": 0.3205
            },
            "wet_bog:gradient": {
              "numerator": 2860,
              "denominator": 10000,
              "expectedCount": 0.286
            },
            "bog_joint_review:all": {
              "numerator": 5024,
              "denominator": 10000,
              "expectedCount": 0.5024
            },
            "bog_joint_review:quantity": {
              "numerator": 1487,
              "denominator": 10000,
              "expectedCount": 0.1487
            },
            "bog_joint_review:level": {
              "numerator": 1698,
              "denominator": 10000,
              "expectedCount": 0.1698
            },
            "bog_joint_review:gradient": {
              "numerator": 1839,
              "denominator": 10000,
              "expectedCount": 0.1839
            },
            "sensitivity:0/4": {
              "numerator": 23196,
              "denominator": 40000,
              "expectedCount": 0.5799
            },
            "sensitivity:1/4": {
              "numerator": 25256,
              "denominator": 40000,
              "expectedCount": 0.6314
            },
            "sensitivity:2/4": {
              "numerator": 27316,
              "denominator": 40000,
              "expectedCount": 0.6829
            },
            "sensitivity:3/4": {
              "numerator": 29376,
              "denominator": 40000,
              "expectedCount": 0.7344
            },
            "sensitivity:4/4": {
              "numerator": 31436,
              "denominator": 40000,
              "expectedCount": 0.7859
            },
            "sensitivity:6/4": {
              "numerator": 35556,
              "denominator": 40000,
              "expectedCount": 0.8889
            },
            "sensitivity:8/4": {
              "numerator": 39676,
              "denominator": 40000,
              "expectedCount": 0.9919
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ]
        ]
      },
      "sensitivity:4/4": {
        "objective": "sensitivity:4/4",
        "optimalCount": 1,
        "minimumNumerator": 31436,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ],
          "masks": [
            137313,
            24966,
            99864
          ],
          "packages": [
            [
              0,
              5,
              6,
              11,
              12,
              17
            ],
            [
              1,
              2,
              7,
              8,
              13,
              14
            ],
            [
              3,
              4,
              9,
              10,
              15,
              16
            ]
          ],
          "crossPackageSeams": [
            0,
            2,
            4,
            5,
            7,
            9,
            10,
            12,
            14
          ],
          "crossPackageSeamCount": 9,
          "scores": {
            "reference:all": {
              "numerator": 5799,
              "denominator": 10000,
              "expectedCount": 0.5799
            },
            "reference:quantity": {
              "numerator": 1709,
              "denominator": 10000,
              "expectedCount": 0.1709
            },
            "reference:level": {
              "numerator": 2033,
              "denominator": 10000,
              "expectedCount": 0.2033
            },
            "reference:gradient": {
              "numerator": 2057,
              "denominator": 10000,
              "expectedCount": 0.2057
            },
            "wet_bog:all": {
              "numerator": 8685,
              "denominator": 10000,
              "expectedCount": 0.8685
            },
            "wet_bog:quantity": {
              "numerator": 2620,
              "denominator": 10000,
              "expectedCount": 0.262
            },
            "wet_bog:level": {
              "numerator": 3205,
              "denominator": 10000,
              "expectedCount": 0.3205
            },
            "wet_bog:gradient": {
              "numerator": 2860,
              "denominator": 10000,
              "expectedCount": 0.286
            },
            "bog_joint_review:all": {
              "numerator": 5024,
              "denominator": 10000,
              "expectedCount": 0.5024
            },
            "bog_joint_review:quantity": {
              "numerator": 1487,
              "denominator": 10000,
              "expectedCount": 0.1487
            },
            "bog_joint_review:level": {
              "numerator": 1698,
              "denominator": 10000,
              "expectedCount": 0.1698
            },
            "bog_joint_review:gradient": {
              "numerator": 1839,
              "denominator": 10000,
              "expectedCount": 0.1839
            },
            "sensitivity:0/4": {
              "numerator": 23196,
              "denominator": 40000,
              "expectedCount": 0.5799
            },
            "sensitivity:1/4": {
              "numerator": 25256,
              "denominator": 40000,
              "expectedCount": 0.6314
            },
            "sensitivity:2/4": {
              "numerator": 27316,
              "denominator": 40000,
              "expectedCount": 0.6829
            },
            "sensitivity:3/4": {
              "numerator": 29376,
              "denominator": 40000,
              "expectedCount": 0.7344
            },
            "sensitivity:4/4": {
              "numerator": 31436,
              "denominator": 40000,
              "expectedCount": 0.7859
            },
            "sensitivity:6/4": {
              "numerator": 35556,
              "denominator": 40000,
              "expectedCount": 0.8889
            },
            "sensitivity:8/4": {
              "numerator": 39676,
              "denominator": 40000,
              "expectedCount": 0.9919
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0,
            0,
            1,
            1,
            2,
            2,
            0
          ]
        ]
      },
      "sensitivity:6/4": {
        "objective": "sensitivity:6/4",
        "optimalCount": 1,
        "minimumNumerator": 35486,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            1,
            1,
            0,
            0,
            1,
            1,
            1,
            1,
            2,
            0,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            4199,
            1944,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              5,
              6,
              12
            ],
            [
              3,
              4,
              7,
              8,
              9,
              10
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            2,
            4,
            5,
            9,
            10,
            16,
            17,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7064,
              "denominator": 10000,
              "expectedCount": 0.7064
            },
            "reference:quantity": {
              "numerator": 2454,
              "denominator": 10000,
              "expectedCount": 0.2454
            },
            "reference:level": {
              "numerator": 2243,
              "denominator": 10000,
              "expectedCount": 0.2243
            },
            "reference:gradient": {
              "numerator": 2367,
              "denominator": 10000,
              "expectedCount": 0.2367
            },
            "wet_bog:all": {
              "numerator": 9095,
              "denominator": 10000,
              "expectedCount": 0.9095
            },
            "wet_bog:quantity": {
              "numerator": 3375,
              "denominator": 10000,
              "expectedCount": 0.3375
            },
            "wet_bog:level": {
              "numerator": 2895,
              "denominator": 10000,
              "expectedCount": 0.2895
            },
            "wet_bog:gradient": {
              "numerator": 2825,
              "denominator": 10000,
              "expectedCount": 0.2825
            },
            "bog_joint_review:all": {
              "numerator": 5828,
              "denominator": 10000,
              "expectedCount": 0.5828
            },
            "bog_joint_review:quantity": {
              "numerator": 1869,
              "denominator": 10000,
              "expectedCount": 0.1869
            },
            "bog_joint_review:level": {
              "numerator": 1878,
              "denominator": 10000,
              "expectedCount": 0.1878
            },
            "bog_joint_review:gradient": {
              "numerator": 2081,
              "denominator": 10000,
              "expectedCount": 0.2081
            },
            "sensitivity:0/4": {
              "numerator": 28256,
              "denominator": 40000,
              "expectedCount": 0.7064
            },
            "sensitivity:1/4": {
              "numerator": 29461,
              "denominator": 40000,
              "expectedCount": 0.736525
            },
            "sensitivity:2/4": {
              "numerator": 30666,
              "denominator": 40000,
              "expectedCount": 0.76665
            },
            "sensitivity:3/4": {
              "numerator": 31871,
              "denominator": 40000,
              "expectedCount": 0.796775
            },
            "sensitivity:4/4": {
              "numerator": 33076,
              "denominator": 40000,
              "expectedCount": 0.8269
            },
            "sensitivity:6/4": {
              "numerator": 35486,
              "denominator": 40000,
              "expectedCount": 0.88715
            },
            "sensitivity:8/4": {
              "numerator": 37896,
              "denominator": 40000,
              "expectedCount": 0.9474
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            1,
            1,
            0,
            0,
            1,
            1,
            1,
            1,
            2,
            0,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      },
      "sensitivity:8/4": {
        "objective": "sensitivity:8/4",
        "optimalCount": 1,
        "minimumNumerator": 37556,
        "denominator": 40000,
        "plan": {
          "allocation": [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ],
          "masks": [
            63,
            6080,
            256000
          ],
          "packages": [
            [
              0,
              1,
              2,
              3,
              4,
              5
            ],
            [
              6,
              7,
              8,
              9,
              10,
              12
            ],
            [
              11,
              13,
              14,
              15,
              16,
              17
            ]
          ],
          "crossPackageSeams": [
            9,
            10,
            15,
            16,
            17,
            18,
            19,
            20,
            22,
            23,
            24,
            25
          ],
          "crossPackageSeamCount": 12,
          "scores": {
            "reference:all": {
              "numerator": 7469,
              "denominator": 10000,
              "expectedCount": 0.7469
            },
            "reference:quantity": {
              "numerator": 2824,
              "denominator": 10000,
              "expectedCount": 0.2824
            },
            "reference:level": {
              "numerator": 2273,
              "denominator": 10000,
              "expectedCount": 0.2273
            },
            "reference:gradient": {
              "numerator": 2372,
              "denominator": 10000,
              "expectedCount": 0.2372
            },
            "wet_bog:all": {
              "numerator": 9255,
              "denominator": 10000,
              "expectedCount": 0.9255
            },
            "wet_bog:quantity": {
              "numerator": 3645,
              "denominator": 10000,
              "expectedCount": 0.3645
            },
            "wet_bog:level": {
              "numerator": 2810,
              "denominator": 10000,
              "expectedCount": 0.281
            },
            "wet_bog:gradient": {
              "numerator": 2800,
              "denominator": 10000,
              "expectedCount": 0.28
            },
            "bog_joint_review:all": {
              "numerator": 6027,
              "denominator": 10000,
              "expectedCount": 0.6027
            },
            "bog_joint_review:quantity": {
              "numerator": 2074,
              "denominator": 10000,
              "expectedCount": 0.2074
            },
            "bog_joint_review:level": {
              "numerator": 1889,
              "denominator": 10000,
              "expectedCount": 0.1889
            },
            "bog_joint_review:gradient": {
              "numerator": 2064,
              "denominator": 10000,
              "expectedCount": 0.2064
            },
            "sensitivity:0/4": {
              "numerator": 29876,
              "denominator": 40000,
              "expectedCount": 0.7469
            },
            "sensitivity:1/4": {
              "numerator": 30836,
              "denominator": 40000,
              "expectedCount": 0.7709
            },
            "sensitivity:2/4": {
              "numerator": 31796,
              "denominator": 40000,
              "expectedCount": 0.7949
            },
            "sensitivity:3/4": {
              "numerator": 32756,
              "denominator": 40000,
              "expectedCount": 0.8189
            },
            "sensitivity:4/4": {
              "numerator": 33716,
              "denominator": 40000,
              "expectedCount": 0.8429
            },
            "sensitivity:6/4": {
              "numerator": 35636,
              "denominator": 40000,
              "expectedCount": 0.8909
            },
            "sensitivity:8/4": {
              "numerator": 37556,
              "denominator": 40000,
              "expectedCount": 0.9389
            }
          }
        },
        "sampleOptimalAllocations": [
          [
            0,
            0,
            0,
            0,
            0,
            0,
            1,
            1,
            1,
            1,
            1,
            2,
            1,
            2,
            2,
            2,
            2,
            2
          ]
        ]
      }
    }
  },
  "certificate": {
    "method": "Exhaustive integer enumeration. For each mask of six tiles, precompute internal-edge uplift. Every balanced partition is enumerated once using two anchor rules; minimizing cut uplift is equivalent to maximizing internal uplift. Connected-domain optimum tests connectivity of all three induced subgraphs.",
    "allBalancedUnlabelledPartitions": 2858856,
    "allBalancedLabelledAllocations": 17153136,
    "connectedUnlabelledPartitions": 132,
    "connectedSixTileSubsets": 514,
    "sixTileSubsets": 18564,
    "objectivesCertified": 19,
    "inputSha256": "1ce69ddf8beea1f356d22c23f4bd5924e5d0bc9ad2794fe811eea54fbd63decd",
    "elapsedSeconds": 6.934,
    "independenceAssumed": false,
    "roundingDuringOptimisation": false,
    "inputSource": "inputs.json",
    "inputFileSha256": "aa8ba9e4292b99c9a6747f0f8caae3c6c5b85c0eb728955d63b287c37a4c127d"
  }
}