Reproduction of a fictional finite construction.
Unzip preserving directories.
Run from this folder: python3 tests/trial-design-certificates.py
Generator requires scipy==1.13.1; the certificate checker uses only Python standard library.
If Node.js is available, the checker also compares the browser sensitivity calculation with its independent enumeration.
