{"schema":1,"model":"Finite target-compatible marginals; independent transported Bernoulli trial","models":[[0.2,0.3],[0.2,0.35],[0.2,0.4],[0.2,0.45],[0.2,0.5],[0.2,0.55],[0.2,0.6],[0.2,0.65],[0.2,0.7],[0.2,0.75],[0.2,0.8],[0.25,0.3],[0.25,0.35],[0.25,0.4],[0.25,0.45],[0.25,0.5],[0.25,0.55],[0.25,0.6],[0.25,0.65],[0.25,0.7],[0.25,0.75],[0.25,0.8],[0.3,0.3],[0.3,0.35],[0.3,0.4],[0.3,0.45],[0.3,0.5],[0.3,0.55],[0.3,0.6],[0.3,0.65],[0.3,0.7],[0.3,0.75],[0.3,0.8],[0.35,0.3],[0.35,0.35],[0.35,0.4],[0.35,0.45],[0.35,0.5],[0.35,0.55],[0.35,0.6],[0.35,0.65],[0.35,0.7],[0.35,0.75],[0.35,0.8],[0.4,0.3],[0.4,0.35],[0.4,0.4],[0.4,0.45],[0.4,0.5],[0.4,0.55],[0.4,0.6],[0.4,0.65],[0.4,0.7],[0.4,0.75],[0.4,0.8],[0.45,0.3],[0.45,0.35],[0.45,0.4],[0.45,0.45],[0.45,0.5],[0.45,0.55],[0.45,0.6],[0.45,0.65],[0.45,0.7],[0.45,0.75],[0.45,0.8],[0.5,0.3],[0.5,0.35],[0.5,0.4],[0.5,0.45],[0.5,0.5],[0.5,0.55],[0.5,0.6],[0.5,0.65],[0.5,0.7],[0.5,0.75],[0.5,0.8],[0.55,0.3],[0.55,0.35],[0.55,0.4],[0.55,0.45],[0.55,0.5],[0.55,0.55],[0.55,0.6],[0.55,0.65],[0.55,0.7],[0.55,0.75],[0.55,0.8],[0.6,0.3],[0.6,0.35],[0.6,0.4],[0.6,0.45],[0.6,0.5],[0.6,0.55],[0.6,0.6],[0.6,0.65],[0.6,0.7],[0.6,0.75],[0.6,0.8],[0.65,0.3],[0.65,0.35],[0.65,0.4],[0.65,0.45],[0.65,0.5],[0.65,0.55],[0.65,0.6],[0.65,0.65],[0.65,0.7],[0.65,0.75],[0.65,0.8],[0.7,0.3],[0.7,0.35],[0.7,0.4],[0.7,0.45],[0.7,0.5],[0.7,0.55],[0.7,0.6],[0.7,0.65],[0.7,0.7],[0.7,0.75],[0.7,0.8]],"designs":[{"n0":0,"n1":0,"cost":0,"outcomes":[[0,0]],"q":[0.6000000000000001],"risk":0.24,"risks":[0.03999999999999998,0.05999999999999997,0.07999999999999999,0.09999999999999998,0.11999999999999997,0.13999999999999999,0.15999999999999995,0.17999999999999994,0.19999999999999996,0.21999999999999997,0.24,0.01999999999999999,0.03999999999999998,0.06,0.07999999999999999,0.09999999999999998,0.12,0.13999999999999996,0.15999999999999998,0.17999999999999994,0.19999999999999996,0.21999999999999997,0.0,0.01999999999999999,0.04000000000000001,0.06,0.07999999999999999,0.1,0.11999999999999997,0.13999999999999999,0.15999999999999995,0.17999999999999994,0.19999999999999996,0.03,0.0,0.020000000000000014,0.04000000000000001,0.06,0.08000000000000002,0.09999999999999998,0.12,0.13999999999999996,0.15999999999999998,0.18,0.060000000000000026,0.03000000000000003,0.0,0.01999999999999999,0.03999999999999998,0.06,0.07999999999999996,0.09999999999999998,0.11999999999999994,0.13999999999999996,0.15999999999999998,0.09000000000000002,0.060000000000000026,0.03,0.0,0.01999999999999999,0.04000000000000001,0.05999999999999997,0.07999999999999999,0.09999999999999995,0.11999999999999997,0.13999999999999999,0.12000000000000002,0.09000000000000002,0.06,0.03,0.0,0.020000000000000014,0.03999999999999998,0.06,0.07999999999999996,0.09999999999999998,0.12,0.15000000000000005,0.12000000000000005,0.09000000000000002,0.060000000000000026,0.03000000000000003,0.0,0.01999999999999997,0.03999999999999998,0.059999999999999956,0.07999999999999996,0.09999999999999998,0.18000000000000002,0.15000000000000002,0.12,0.09,0.06,0.029999999999999964,0.0,0.020000000000000014,0.03999999999999998,0.06,0.08000000000000002,0.21000000000000005,0.18000000000000005,0.15000000000000002,0.12000000000000002,0.09000000000000002,0.06,0.03000000000000003,0.0,0.01999999999999997,0.03999999999999998,0.06,0.24000000000000002,0.21000000000000002,0.18,0.15,0.12,0.08999999999999996,0.06,0.029999999999999964,0.0,0.020000000000000014,0.04000000000000003],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0],"upper":[0.0,0.0]}},{"n0":0,"n1":1,"cost":0,"outcomes":[[0,0],[0,1]],"q":[0.09090909090909097,1.0],"risk":0.14545454545454545,"risks":[0.06363636363636363,0.08863636363636361,0.10909090909090909,0.125,0.13636363636363633,0.1431818181818182,0.14545454545454545,0.14318181818181813,0.13636363636363635,0.125,0.10909090909090907,0.031818181818181815,0.059090909090909076,0.08181818181818182,0.1,0.11363636363636362,0.12272727272727274,0.12727272727272726,0.12727272727272726,0.12272727272727268,0.11363636363636365,0.09999999999999998,0.0,0.029545454545454538,0.05454545454545456,0.07500000000000001,0.0909090909090909,0.10227272727272729,0.1090909090909091,0.11136363636363636,0.10909090909090907,0.10227272727272729,0.09090909090909088,0.018181818181818177,0.0,0.027272727272727296,0.05000000000000002,0.06818181818181818,0.08181818181818185,0.09090909090909091,0.09545454545454546,0.09545454545454546,0.09090909090909094,0.08181818181818179,0.036363636363636376,0.020454545454545475,0.0,0.024999999999999994,0.045454545454545435,0.06136363636363637,0.07272727272727272,0.07954545454545453,0.08181818181818179,0.07954545454545453,0.0727272727272727,0.05454545454545456,0.04090909090909092,0.022727272727272724,0.0,0.022727272727272717,0.04090909090909092,0.054545454545454536,0.06363636363636363,0.06818181818181815,0.06818181818181818,0.0636363636363636,0.07272727272727274,0.06136363636363638,0.04545454545454545,0.024999999999999994,0.0,0.020454545454545472,0.03636363636363636,0.04772727272727273,0.054545454545454536,0.05681818181818182,0.054545454545454536,0.09090909090909093,0.08181818181818185,0.0681818181818182,0.05000000000000002,0.0272727272727273,0.0,0.01818181818181816,0.0318181818181818,0.04090909090909088,0.04545454545454544,0.04545454545454544,0.10909090909090909,0.10227272727272728,0.0909090909090909,0.07499999999999998,0.05454545454545454,0.029545454545454507,0.0,0.01590909090909092,0.027272727272727268,0.0340909090909091,0.036363636363636376,0.1272727272727273,0.12272727272727275,0.11363636363636365,0.1,0.08181818181818185,0.05909090909090908,0.03181818181818184,0.0,0.01363636363636362,0.02272727272727272,0.027272727272727268,0.14545454545454545,0.1431818181818182,0.13636363636363635,0.12499999999999997,0.10909090909090909,0.08863636363636358,0.06363636363636362,0.03409090909090905,0.0,0.011363636363636374,0.018181818181818188],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6363636363636362,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3636363636363637,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0],"upper":[0.0,-0.10909090909090904,0.0]}},{"n0":1,"n1":0,"cost":0,"outcomes":[[0,0],[1,0]],"q":[1.0,0.09090909090909095],"risk":0.14545454545454548,"risks":[0.018181818181818174,0.027272727272727254,0.03636363636363635,0.04545454545454544,0.054545454545454536,0.0636363636363636,0.0727272727272727,0.08181818181818179,0.09090909090909088,0.09999999999999998,0.10909090909090907,0.01136363636363636,0.02272727272727272,0.0340909090909091,0.04545454545454547,0.05681818181818182,0.0681818181818182,0.07954545454545453,0.09090909090909094,0.10227272727272729,0.11363636363636365,0.125,0.0,0.013636363636363634,0.027272727272727282,0.04090909090909091,0.054545454545454536,0.0681818181818182,0.08181818181818182,0.09545454545454546,0.10909090909090907,0.12272727272727274,0.13636363636363635,0.03409090909090909,0.0,0.01590909090909092,0.03181818181818183,0.04772727272727273,0.06363636363636366,0.07954545454545453,0.09545454545454546,0.11136363636363633,0.12727272727272726,0.1431818181818182,0.06363636363636366,0.03181818181818184,0.0,0.01818181818181818,0.03636363636363636,0.05454545454545455,0.07272727272727272,0.09090909090909091,0.10909090909090907,0.12727272727272726,0.14545454545454545,0.08863636363636365,0.05909090909090911,0.02954545454545454,0.0,0.020454545454545447,0.04090909090909092,0.06136363636363634,0.08181818181818182,0.10227272727272724,0.12272727272727271,0.1431818181818182,0.10909090909090911,0.08181818181818185,0.05454545454545454,0.02727272727272727,0.0,0.022727272727272745,0.045454545454545435,0.06818181818181818,0.09090909090909087,0.11363636363636362,0.13636363636363635,0.12500000000000003,0.10000000000000003,0.07500000000000001,0.05000000000000002,0.025000000000000022,0.0,0.024999999999999967,0.04999999999999999,0.07499999999999996,0.09999999999999998,0.125,0.13636363636363638,0.11363636363636365,0.0909090909090909,0.06818181818181818,0.04545454545454545,0.0227272727272727,0.0,0.027272727272727296,0.05454545454545453,0.08181818181818182,0.10909090909090911,0.14318181818181822,0.12272727272727275,0.10227272727272728,0.08181818181818183,0.06136363636363638,0.0409090909090909,0.020454545454545475,0.0,0.029545454545454503,0.059090909090909076,0.08863636363636365,0.14545454545454548,0.1272727272727273,0.10909090909090909,0.09090909090909091,0.07272727272727272,0.05454545454545452,0.03636363636363636,0.01818181818181816,0.0,0.03181818181818184,0.06363636363636369],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6363636363636362,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3636363636363637,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0],"upper":[-0.10909090909090903,0.0,0.0]}},{"n0":0,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2]],"q":[0.0,0.606761565836299,1.0],"risk":0.13950177935943062,"risks":[0.06551601423487544,0.09021352313167258,0.1097508896797153,0.12428825622775797,0.13398576512455515,0.13900355871886122,0.1395017793594306,0.13564056939501773,0.1275800711743772,0.11548042704626332,0.09950177935943061,0.03275800711743772,0.060142348754448384,0.08231316725978648,0.09943060498220638,0.11165480427046262,0.11914590747330961,0.12206405693950176,0.12056939501779357,0.11482206405693945,0.10498220640569395,0.09120996441281137,0.0,0.030071174377224192,0.054875444839857665,0.07457295373665479,0.0893238434163701,0.09928825622775803,0.10462633451957296,0.10549822064056938,0.10206405693950177,0.09448398576512457,0.08291814946619214,0.017241992882562274,0.0,0.027437722419928846,0.0497153024911032,0.06699288256227759,0.07943060498220643,0.08718861209964412,0.09042704626334519,0.08930604982206403,0.08398576512455513,0.07462633451957296,0.03448398576512457,0.019928825622775818,0.0,0.024857651245551587,0.04466192170818504,0.059572953736654805,0.0697508896797153,0.07535587188612097,0.07654804270462631,0.07348754448398576,0.06633451957295372,0.05172597864768685,0.039857651245551615,0.022562277580071174,0.0,0.02233096085409252,0.039715302491103215,0.052313167259786464,0.060284697508896784,0.06379003558718857,0.06298932384341638,0.058042704626334485,0.06896797153024913,0.05978647686832741,0.04512455516014235,0.0251423487544484,0.0,0.019857651245551618,0.03487544483985765,0.045213523131672595,0.051032028469750856,0.05249110320284697,0.049750889679715304,0.08620996441281141,0.07971530249110323,0.06768683274021355,0.05028469750889683,0.0276690391459075,0.0,0.017437722419928803,0.030142348754448378,0.03827402135231314,0.04199288256227757,0.04145907473309607,0.10345195729537367,0.099644128113879,0.0902491103202847,0.0754270462633452,0.05533807829181494,0.03014234875444836,0.0,0.01507117437722421,0.025516014234875428,0.03149466192170819,0.03316725978647686,0.12069395017793597,0.11957295373665482,0.11281138790035589,0.10056939501779363,0.08300711743772243,0.060284697508896784,0.03256227758007121,0.0,0.0127580071174377,0.020996441281138783,0.024875444839857652,0.13793594306049822,0.1395017793594306,0.13537366548042704,0.125711743772242,0.11067615658362988,0.09042704626334515,0.06512455516014233,0.03492882562277576,0.0,0.010498220640569406,0.016583629893238444],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4533807829181494,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5466192170818506,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.051814946619217095,0.0,0.0,0.0],"upper":[0.0,0.0,-0.04185053380782918,0.0]}},{"n0":1,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1]],"q":[0.513361462728552,1.0,0.0,0.5147679324894509],"risk":0.12236286919831225,"risks":[0.04416315049226437,0.0625527426160337,0.07848101265822778,0.09194796061884661,0.10295358649789021,0.11149789029535859,0.11758087201125172,0.12120253164556954,0.12236286919831224,0.12106188466947948,0.11729957805907171,0.02334388185654007,0.0442194092827004,0.06262658227848097,0.07856540084388182,0.09203586497890293,0.10303797468354425,0.1115717299578059,0.11763713080168775,0.12123417721518986,0.12236286919831224,0.12102320675105477,0.0,0.023368495077355823,0.04426160337552743,0.06267932489451475,0.07862165963431784,0.09208860759493673,0.1030801687763713,0.11159634317862166,0.11763713080168775,0.12120253164556966,0.12229254571026732,0.02413150492264417,0.0,0.0233860759493671,0.04428973277074543,0.06271097046413501,0.07864978902953589,0.09210618846694796,0.1030801687763713,0.11157172995780593,0.11758087201125178,0.12110759493670897,0.045738396624472606,0.02411392405063294,0.0,0.02339662447257383,0.04430379746835441,0.06272151898734177,0.07864978902953586,0.09208860759493673,0.10303797468354431,0.11149789029535867,0.11746835443037978,0.06482067510548527,0.0457102672292546,0.02410337552742616,0.0,0.02340014064697608,0.04430379746835444,0.06271097046413501,0.07862165963431784,0.09203586497890295,0.10295358649789033,0.11137482419127992,0.08137834036568216,0.064789029535865,0.04569620253164557,0.024099859353023906,0.0,0.02339662447257386,0.04428973277074543,0.06267932489451479,0.07856540084388186,0.09194796061884675,0.10282700421940935,0.09541139240506333,0.08135021097046417,0.06477848101265825,0.04569620253164559,0.02410337552742618,0.0,0.02338607594936706,0.044261603375527425,0.062626582278481,0.07848101265822788,0.091824894514768,0.1069198312236287,0.09539381153305204,0.08135021097046412,0.06478902953586496,0.04571026722925455,0.024113924050632878,0.0,0.023368495077355864,0.04421940928270043,0.06255274261603379,0.07836849507735591,0.11590365682137836,0.1069198312236287,0.09541139240506329,0.08137834036568214,0.06482067510548523,0.04573839662447256,0.024131504922644174,0.0,0.02334388185654006,0.04416315049226443,0.06245780590717305,0.12236286919831224,0.11592827004219408,0.10696202531645567,0.095464135021097,0.0814345991561181,0.06487341772151893,0.045780590717299556,0.024156118143459877,0.0,0.023312236286919866,0.04409282700421947],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47257383966244715,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5274261603375527,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.08860759493670883,0.0,0.0],"upper":[0.0,-0.11392405063291135,0.0,0.0,0.0]}},{"n0":2,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0]],"q":[1.0,0.6067615658362989,0.0],"risk":0.13950177935943062,"risks":[0.016583629893238416,0.024875444839857624,0.03316725978647683,0.04145907473309604,0.04975088967971525,0.058042704626334485,0.06633451957295367,0.0746263345195729,0.08291814946619208,0.09120996441281132,0.0995017793594305,0.010498220640569392,0.020996441281138783,0.03149466192170819,0.04199288256227757,0.05249110320284697,0.06298932384341638,0.07348754448398576,0.08398576512455513,0.09448398576512457,0.10498220640569395,0.11548042704626332,0.0,0.012758007117437721,0.025516014234875456,0.038274021352313184,0.05103202846975091,0.06379003558718865,0.07654804270462634,0.08930604982206408,0.10206405693950177,0.11482206405693951,0.12758007117437725,0.0349288256227758,0.0,0.01507117437722421,0.030142348754448406,0.045213523131672595,0.06028469750889681,0.07535587188612097,0.09042704626334519,0.10549822064056935,0.12056939501779357,0.13564056939501778,0.06512455516014237,0.03256227758007121,0.0,0.017437722419928824,0.03487544483985765,0.05231316725978648,0.0697508896797153,0.08718861209964412,0.10462633451957293,0.12206405693950176,0.1395017793594306,0.09042704626334522,0.06028469750889682,0.030142348754448392,0.0,0.019857651245551597,0.039715302491103215,0.05957295373665479,0.0794306049822064,0.09928825622775797,0.11914590747330958,0.13900355871886122,0.11067615658362989,0.08300711743772242,0.055338078291814925,0.027669039145907463,0.0,0.02233096085409255,0.04466192170818505,0.0669928825622776,0.0893238434163701,0.11165480427046265,0.1339857651245552,0.125711743772242,0.10056939501779362,0.0754270462633452,0.05028469750889681,0.02514234875444842,0.0,0.02485765124555157,0.049715302491103196,0.07457295373665476,0.09943060498220639,0.12428825622775802,0.13537366548042704,0.11281138790035587,0.09024911032028468,0.0676868327402135,0.04512455516014234,0.022562277580071146,0.0,0.02743772241992885,0.05487544483985764,0.08231316725978649,0.10975088967971534,0.13950177935943062,0.11957295373665482,0.099644128113879,0.0797153024911032,0.05978647686832741,0.039857651245551594,0.019928825622775818,0.0,0.03007117437722416,0.060142348754448384,0.09021352313167261,0.13793594306049822,0.12069395017793595,0.10345195729537365,0.08620996441281138,0.0689679715302491,0.051725978647686806,0.03448398576512455,0.017241992882562257,0.0,0.032758007117437746,0.06551601423487549],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4533807829181494,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5466192170818506,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0518149466192171,0.0],"upper":[-0.041850533807829174,0.0,0.0,0.0]}},{"n0":0,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3]],"q":[0.0,0.18339529120198264,1.0,1.0],"risk":0.12936802973977696,"risks":[0.07031226765799255,0.09553368959107805,0.11375464684014869,0.12496398698884756,0.12936802973977696,0.12739056691449813,0.11967286245353159,0.10707365241635686,0.09066914498141265,0.07175302044609666,0.05183643122676573,0.035156133828996274,0.06368912639405203,0.08531598513011153,0.09997118959107805,0.10780669144981414,0.10919191449814128,0.10471375464684016,0.09517657992565054,0.08160223048327137,0.0652300185873606,0.047516728624535265,0.0,0.03184456319702601,0.056877323420074365,0.07497839219330854,0.08624535315985132,0.0909932620817844,0.0897546468401487,0.08327950743494422,0.07253531598513013,0.05870701672862455,0.043197026022304796,0.014843866171003714,0.0,0.028438661710037196,0.04998559479553904,0.06468401486988849,0.07279460966542753,0.07479553903345726,0.0713824349442379,0.06346840148698885,0.052184014869888495,0.03887732342007433,0.029687732342007445,0.018155436802973993,0.0,0.024992797397769505,0.04312267657992565,0.05459595724907064,0.059836431226765796,0.05948536245353159,0.054401486988847586,0.04566101301115244,0.03455762081784386,0.04453159851301116,0.036310873605947966,0.021561338289962824,0.0,0.021561338289962824,0.036397304832713764,0.04487732342007435,0.04758828996282527,0.045334572490706326,0.039138011152416385,0.030237918215613335,0.05937546468401487,0.054466310408921935,0.04312267657992565,0.025007202602230483,0.0,0.01819865241635689,0.029918215613382898,0.03569121747211895,0.03626765799256507,0.0326150092936803,0.025918215613382867,0.0742193308550186,0.07262174721189593,0.06468401486988849,0.050014405204460995,0.028438661710037196,0.0,0.014959107806691435,0.023794144981412635,0.02720074349442378,0.026092007434944248,0.021598513011152398,0.08906319702602229,0.09077718401486988,0.0862453531598513,0.07502160780669145,0.05687732342007433,0.03180134758364308,0.0,0.011897072490706331,0.018133828996282533,0.019569005576208193,0.01727881040892193,0.10390706319702603,0.10893262081784387,0.10780669144981414,0.10002881040892196,0.08531598513011153,0.06360269516728624,0.03504089219330858,0.0,0.009066914498141253,0.013046003717472124,0.012959107806691433,0.11875092936802972,0.12708805762081782,0.12936802973977693,0.1250360130111524,0.11375464684014866,0.09540404275092931,0.07008178438661708,0.03810292750929363,0.0,0.006523001858736069,0.008639405204460965],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.5353159851301115,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4646840148698885,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.010037174721189585,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,-0.020074349442379173,-0.011152416356877321,0.0]}},{"n0":1,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2]],"q":[0.2559982390490861,1.0,1.0,0.0,0.0,0.7748184019370468],"risk":0.09577812018489983,"risks":[0.04777019590578914,0.06487343165309267,0.07789566365837555,0.08716707021791767,0.0930178296279991,0.09577812018489984,0.09577812018489984,0.09334800792427905,0.08881796169931755,0.08251815980629534,0.07477878054149223,0.02529936165529386,0.04620267444419988,0.06298316090688973,0.07591404358353511,0.08526854501430772,0.09131988773937927,0.09434129429892141,0.09460598723310587,0.0923871890821043,0.08795812238608847,0.0815920096852299,0.0,0.024578197226502313,0.04502971604666522,0.06157082324455207,0.0744177856042263,0.08378686990975129,0.08989434294519041,0.09295647149460706,0.09318952234206473,0.09080976227162668,0.0860334580673563,0.021872110939907537,0.0,0.02403532907770198,0.04413740920096853,0.060465551397754794,0.07317906669601587,0.0824372661237068,0.08839946070878271,0.09122496147919873,0.09107307946290988,0.08810312568787138,0.04091569447501651,0.022468082764692945,0.0,0.023613801452784494,0.04341184239489323,0.059496478098173,0.07197006383447058,0.08093495487563282,0.08649350649350648,0.08874807395993833,0.08780101254677514,0.05713075060532687,0.04198244552058112,0.022923728813559318,0.0,0.02325665859564164,0.04273910411622276,0.0584927360774818,0.07056295399515736,0.07899515738498783,0.0838347457627118,0.08512711864406769,0.07051727933083864,0.058543088267664536,0.04280651551837992,0.02329600484261501,0.0,0.022906944750165102,0.042005282852740466,0.057283458067356366,0.06872991415364291,0.07633309487123041,0.08008144397974898,0.08107528065155183,0.0721500110059432,0.05964836011446182,0.043501815980629556,0.023641866607968326,0.0,0.022507704160246497,0.04109646709222977,0.05569777679947166,0.06624312128549412,0.07266398855381898,0.0888047545674664,0.08280321373541712,0.07344926260180495,0.06061743341404358,0.04418225841954655,0.02401826986572747,0.0,0.02200198106977769,0.03989874532247411,0.05356482500550294,0.06287475236627776,0.09370570107858243,0.09050269645608629,0.08420922298040943,0.07464285714285716,0.06162117543473478,0.044961754347347574,0.024482170372000903,0.0,0.021332819722650196,0.038298206031256846,0.050713735417125205,0.09577812018489984,0.09524845916795069,0.09192824125027516,0.08557808716707023,0.0759586176535329,0.06283045344486021,0.04595421527624918,0.025090523882896742,0.0,0.020443264362755887,0.036180937706361424],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.3550077041602467,-0.16178736517719552,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4832049306625578,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.059192604006163316,0.038311248073959935,0.0,0.0],"upper":[0.0,-0.04970107858243452,-0.043488443759630194,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1]],"q":[0.774818401937047,1.0,0.0,1.0,0.0,0.2559982390490859],"risk":0.09577812018489983,"risks":[0.03618093770636138,0.05071373541712515,0.06287475236627768,0.07266398855381892,0.08008144397974895,0.08512711864406763,0.08780101254677514,0.08810312568787132,0.08603345806735618,0.08159200968522984,0.07477878054149223,0.02044326436275587,0.03829820603125683,0.05356482500550294,0.06624312128549412,0.07633309487123041,0.08383474576271183,0.08874807395993828,0.09107307946290988,0.09080976227162657,0.08795812238608841,0.08251815980629534,0.0,0.021332819722650217,0.03989874532247413,0.0556977767994717,0.06872991415364293,0.07899515738498789,0.08649350649350648,0.09122496147919879,0.09318952234206473,0.09238718908210442,0.08881796169931766,0.02509052388289677,0.0,0.022001981069777684,0.0410964670922298,0.057283458067356366,0.07056295399515738,0.08093495487563282,0.08839946070878268,0.09295647149460706,0.09460598723310587,0.09334800792427911,0.04595421527624922,0.02448217037200091,0.0,0.022507704160246524,0.04200528285274046,0.058492736077481844,0.07197006383447058,0.08243726612370678,0.08989434294519033,0.09434129429892141,0.09577812018489984,0.06283045344486025,0.0449617543473476,0.0240182698657275,0.0,0.022906944750165078,0.042739104116222754,0.05949647809817299,0.07317906669601582,0.08378686990975123,0.09131988773937924,0.09577812018489984,0.07595861765353294,0.06162117543473478,0.04418225841954656,0.023641866607968305,0.0,0.023256658595641664,0.04341184239489323,0.060465551397754794,0.0744177856042263,0.08526854501430775,0.0930178296279991,0.08557808716707024,0.07464285714285716,0.0606174334140436,0.043501815980629556,0.023296004842615032,0.0,0.023613801452784473,0.04413740920096853,0.06157082324455204,0.07591404358353511,0.0871670702179177,0.09192824125027516,0.08420922298040942,0.07344926260180495,0.0596483601144618,0.04280651551837991,0.02292372881355929,0.0,0.02403532907770198,0.045029716046665204,0.06298316090688975,0.07789566365837557,0.09524845916795069,0.09050269645608629,0.08280321373541712,0.07215001100594319,0.058543088267664536,0.04198244552058109,0.022468082764692945,0.0,0.024578197226502292,0.04620267444419988,0.0648734316530927,0.09577812018489983,0.0937057010785824,0.0888047545674664,0.08107528065155181,0.07051727933083862,0.05713075060532684,0.04091569447501648,0.021872110939907513,0.0,0.025299361655293888,0.04777019590578918],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.16178736517719677,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.35500770416024535,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48320493066255793,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.03831124807395995,0.0,0.05919260400616333,0.0,0.0],"upper":[0.0,-0.04348844375963023,0.0,-0.049701078582434534,0.0,0.0,0.0]}},{"n0":3,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0]],"q":[1.0,1.0,0.18339529120198267,0.0],"risk":0.12936802973977696,"risks":[0.008639405204460937,0.012959107806691406,0.017278810408921874,0.021598513011152343,0.02591821561338281,0.03023791821561328,0.03455762081784375,0.03887732342007422,0.043197026022304685,0.047516728624535154,0.05183643122676562,0.006523001858736062,0.013046003717472124,0.019569005576208193,0.026092007434944248,0.0326150092936803,0.039138011152416385,0.04566101301115244,0.052184014869888495,0.05870701672862455,0.0652300185873606,0.07175302044609666,0.0,0.009066914498141274,0.01813382899628256,0.027200743494423835,0.036267657992565094,0.04533457249070638,0.05440148698884767,0.06346840148698896,0.07253531598513019,0.08160223048327148,0.09066914498141276,0.03810292750929367,0.0,0.011897072490706331,0.02379414498141265,0.03569121747211895,0.0475882899628253,0.05948536245353159,0.0713824349442379,0.08327950743494422,0.09517657992565054,0.10707365241635686,0.07008178438661712,0.03504089219330858,0.0,0.014959107806691449,0.029918215613382898,0.04487732342007436,0.059836431226765796,0.07479553903345726,0.0897546468401487,0.10471375464684016,0.11967286245353165,0.09540404275092941,0.06360269516728628,0.03180134758364312,0.0,0.01819865241635687,0.03639730483271375,0.0545959572490706,0.07279460966542747,0.09099326208178432,0.10919191449814122,0.1273905669144981,0.11375464684014869,0.08531598513011153,0.05687732342007433,0.028438661710037165,0.0,0.021561338289962848,0.04312267657992565,0.06468401486988849,0.0862453531598513,0.10780669144981414,0.12936802973977699,0.12503601301115244,0.10002881040892196,0.07502160780669145,0.05001440520446098,0.025007202602230504,0.0,0.024992797397769485,0.049985594795539025,0.07497839219330851,0.09997118959107805,0.12496398698884759,0.12936802973977696,0.10780669144981414,0.0862453531598513,0.06468401486988846,0.04312267657992565,0.0215613382899628,0.0,0.028438661710037196,0.05687732342007433,0.08531598513011153,0.11375464684014873,0.12708805762081787,0.10893262081784388,0.0907771840148699,0.07262174721189592,0.05446631040892194,0.03631087360594795,0.018155436802973993,0.0,0.03184456319702598,0.06368912639405203,0.09553368959107808,0.11875092936802975,0.10390706319702603,0.08906319702602229,0.07421933085501858,0.05937546468401486,0.04453159851301113,0.02968773234200743,0.0148438661710037,0.0,0.03515613382899631,0.07031226765799262],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5353159851301115,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4646840148698885,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.010037174721189581,0.0],"upper":[-0.011152416356877323,-0.02007434944237918,0.0,0.0,0.0]}},{"n0":0,"n1":4,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4]],"q":[0.0,0.0,0.7053844018873161,1.0,1.0],"risk":0.12689425478767694,"risks":[0.0729655287260616,0.09817056619483762,0.1154038301415487,0.1248158825978351,0.12689425478767694,0.12241723563696916,0.1124076602830974,0.09808669858451291,0.08082764363030809,0.062109700249791844,0.04347177352206488,0.0364827643630308,0.06544704412989175,0.08655287260616153,0.09985270607826809,0.10574521232306411,0.10492905911740216,0.09835670274771025,0.08718817651956706,0.0727448792672773,0.056463363863447136,0.039849125728559476,0.0,0.03272352206494587,0.057701915070774365,0.07488952955870107,0.0845961698584513,0.08744088259783514,0.08430574521232306,0.07628965445462116,0.06466211490424645,0.05081702747710243,0.03622647793505407,0.013517235636969188,0.0,0.0288509575353872,0.04992635303913406,0.06344712739383847,0.06995270607826812,0.07025478767693588,0.06539113238967531,0.056579350541215656,0.04517069109075772,0.03260383014154866,0.02703447127393839,0.017276477935054133,0.0,0.024963176519567015,0.042298084929225634,0.05246452955870108,0.0562038301415487,0.05449261032472941,0.048496586178184864,0.03952435470441301,0.028981182348043255,0.04055170691090758,0.034552955870108246,0.021149042464612824,0.0,0.021149042464612817,0.03497635303913406,0.04215287260616152,0.04359408825978353,0.040413821815154044,0.033878018318068304,0.025358534554537848,0.05406894254787677,0.05182943380516236,0.04229808492922565,0.025036823480432974,0.0,0.017488176519567036,0.02810191507077435,0.032695566194837655,0.032331057452123224,0.028231681931723568,0.02173588676103244,0.06758617818484597,0.06910591174021649,0.0634471273938385,0.050073646960865976,0.028850957535387203,0.0,0.014050957535387161,0.02179704412989175,0.024248293089092404,0.02258534554537886,0.018113238967527034,0.08110341382181514,0.0863823896752706,0.0845961698584513,0.07511047044129893,0.057701915070774344,0.03251182348043293,0.0,0.01089852206494589,0.016165528726061612,0.016939009159034152,0.014490591174021628,0.09462064945878434,0.10365886761032472,0.10574521232306414,0.10014729392173193,0.08655287260616155,0.06502364696086595,0.035949042464612856,0.0,0.008082764363030799,0.01129267277268943,0.01086794338051622,0.10813788509575352,0.12093534554537883,0.12689425478767694,0.12518411740216487,0.11540383014154869,0.09753547044129887,0.07189808492922563,0.039101477935054064,0.0,0.005646336386344722,0.007245295587010814],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.47960033305578686,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5203996669442131,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.011240632805994999,0.017985012489591987,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.011990008326394672,-0.004995836802664447,0.0]}},{"n0":1,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3]],"q":[0.0,1.0,1.0,1.0,0.0,0.0,-0.0,1.0],"risk":0.08666875000000002,"risks":[0.0469,0.06166874999999998,0.07199999999999998,0.07871874999999995,0.08249999999999996,0.08386874999999999,0.0832,0.08071875,0.07650000000000001,0.07046874999999997,0.0623999999999999,0.025025,0.044524999999999995,0.059399999999999994,0.07039999999999999,0.078125,0.08302499999999999,0.08539999999999998,0.08540000000000003,0.08302500000000002,0.078125,0.07039999999999996,0.0,0.02396875,0.04320000000000001,0.05836875,0.07000000000000003,0.07846875000000003,0.08399999999999999,0.08666875000000002,0.08640000000000003,0.08296875000000004,0.07599999999999996,0.021824999999999994,0.0,0.023400000000000015,0.042624999999999996,0.058124999999999996,0.07020000000000001,0.07899999999999999,0.08452499999999999,0.08662500000000001,0.08499999999999996,0.07919999999999999,0.04050000000000001,0.022618750000000017,0.0,0.023168749999999988,0.042499999999999996,0.05821875,0.07039999999999999,0.07896874999999998,0.08370000000000002,0.08421875000000001,0.07999999999999996,0.056025,0.041825000000000015,0.023,0.0,0.02312499999999999,0.04252500000000001,0.058199999999999974,0.07,0.07762499999999997,0.08062499999999997,0.07839999999999997,0.0684,0.057618749999999996,0.04239999999999999,0.02311875,0.0,0.02311875000000002,0.042399999999999986,0.057618749999999996,0.06839999999999999,0.07421875,0.07440000000000002,0.07762499999999999,0.07000000000000002,0.05820000000000001,0.04252500000000002,0.023125000000000017,0.0,0.02299999999999997,0.041824999999999994,0.05602499999999998,0.06499999999999997,0.06799999999999998,0.08369999999999998,0.07896875,0.0704,0.05821874999999999,0.042499999999999996,0.023168749999999974,0.0,0.022618750000000017,0.040499999999999994,0.052968749999999995,0.059199999999999975,0.086625,0.084525,0.079,0.07020000000000003,0.058125,0.04262499999999999,0.023400000000000018,0.0,0.021824999999999976,0.038125,0.048,0.08639999999999999,0.08666875,0.084,0.07846875000000002,0.06999999999999999,0.058368749999999976,0.043199999999999995,0.02396874999999997,0.0,0.02046875000000002,0.034400000000000014],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5568181818181818,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.44318181818181823,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.006930397727272732,0.0,0.0,0.0,0.027311931818181822,0.034202556818181816,0.0,0.0,0.0],"upper":[0.0,-0.01194374999999999,-0.04940369318181818,-0.03546931818181819,0.0,0.0,0.0,-0.011400852272727274,0.0]}},{"n0":2,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2]],"q":[0.9333333333332843,1.0,1.0,0.0,0.27766439909299595,1.0,0.0,0.0,0.9333333333332839],"risk":0.08680000000000002,"risks":[0.031142857142858346,0.04407380952381097,0.055107482993198786,0.06414115646258645,0.07107210884353865,0.07579761904761995,0.07821496598639521,0.07822142857142894,0.07571428571428584,0.07059081632653053,0.0627482993197277,0.018657142857143337,0.03528839285714362,0.04975306122449069,0.0619104591836743,0.07161989795918439,0.07874068877551077,0.08313214285714315,0.08465357142857155,0.08316428571428569,0.07852359693877542,0.07059081632653053,0.0,0.02045000000000029,0.03851428571428616,0.05401428571428617,0.06677142857142895,0.07660714285714312,0.08334285714285725,0.08679999999999999,0.08679999999999993,0.0831642857142858,0.07571428571428584,0.0256499999999997,0.0,0.02179523809523826,0.04081934523809542,0.05685595238095252,0.06968869047619056,0.07910119047619046,0.08487708333333327,0.08679999999999999,0.08465357142857155,0.078221428571429,0.04608571428571387,0.02437976190476178,0.0,0.02269234693877555,0.04220272108843539,0.05827704081632652,0.07066122448979589,0.07910119047619046,0.08334285714285725,0.08313214285714321,0.07821496598639527,0.06178571428571387,0.044030654761904604,0.02353265306122444,0.0,0.023140986394557812,0.04266390306122447,0.058277040816326495,0.06968869047619053,0.07660714285714307,0.07874068877551074,0.07579761904762006,0.07322857142857107,0.05939404761904749,0.04279727891156459,0.02310901360544218,0.0,0.023140986394557837,0.04220272108843539,0.05685595238095252,0.06677142857142893,0.07161989795918441,0.0710721088435387,0.0808928571428569,0.07091130952380947,0.05819795918367349,0.04238609693877554,0.023109013605442198,0.0,0.022692346938775528,0.040819345238095404,0.054014285714286125,0.06191045918367433,0.0641411564625865,0.08525714285714277,0.07902380952380954,0.0701387755102041,0.05819795918367347,0.04279727891156459,0.023532653061224415,0.0,0.02179523809523826,0.03851428571428614,0.04975306122449069,0.055107482993198814,0.0868,0.08417291666666672,0.07902380952380954,0.07091130952380946,0.05939404761904749,0.04403065476190458,0.02437976190476178,0.0,0.020450000000000274,0.03528839285714362,0.044073809523810986,0.08600000000000005,0.08680000000000002,0.08525714285714277,0.0808928571428569,0.07322857142857106,0.06178571428571382,0.04608571428571385,0.025649999999999673,0.0,0.01865714285714337,0.031142857142858388],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000003,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.023887499999999996,0.0,0.0,0.03429999999999999,0.030012499999999984,0.0,0.0],"upper":[0.0,-0.02388750000000002,-0.03430000000000002,0.0,0.0,-0.03001250000000002,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1]],"q":[1.0,1.0,0.0,1.0,0.0,0.9999999999999999,0.0,0.0],"risk":0.08666874999999999,"risks":[0.03439999999999997,0.04799999999999996,0.059199999999999975,0.06799999999999995,0.07439999999999994,0.07839999999999991,0.0799999999999999,0.07919999999999988,0.0759999999999999,0.07039999999999991,0.06239999999999979,0.020468749999999997,0.038125,0.052968749999999995,0.065,0.07421875,0.080625,0.08421875000000001,0.08499999999999996,0.08296875000000004,0.078125,0.07046874999999997,0.0,0.021825,0.04050000000000003,0.05602500000000003,0.06840000000000004,0.07762500000000006,0.08370000000000002,0.08662500000000001,0.08640000000000009,0.08302500000000013,0.07650000000000007,0.023968749999999994,0.0,0.022618750000000017,0.041825000000000015,0.05761875000000001,0.07,0.07896875,0.08452500000000002,0.08666875000000002,0.08540000000000003,0.08071875000000006,0.04320000000000001,0.023400000000000018,0.0,0.022999999999999993,0.042399999999999986,0.058200000000000016,0.07039999999999999,0.07899999999999999,0.08399999999999999,0.08539999999999998,0.08319999999999994,0.058368750000000025,0.042625000000000024,0.02316875,0.0,0.023118749999999993,0.04252499999999999,0.05821874999999996,0.07019999999999996,0.07846874999999995,0.08302499999999993,0.08386874999999994,0.06999999999999999,0.058125,0.042499999999999996,0.023124999999999996,0.0,0.02312500000000002,0.042499999999999996,0.058125000000000024,0.07,0.078125,0.08249999999999999,0.07846874999999999,0.07020000000000001,0.05821875,0.04252500000000001,0.02311875000000002,0.0,0.023168749999999974,0.042625,0.05836874999999997,0.07039999999999999,0.07871875,0.084,0.079,0.07039999999999999,0.058199999999999995,0.04239999999999999,0.022999999999999972,0.0,0.023400000000000018,0.043199999999999995,0.059399999999999994,0.07200000000000001,0.08666875,0.084525,0.07896874999999999,0.06999999999999999,0.05761875000000001,0.041824999999999994,0.022618750000000017,0.0,0.023968749999999973,0.044524999999999995,0.06166875000000002,0.08639999999999999,0.08662499999999998,0.08369999999999997,0.077625,0.06839999999999999,0.05602499999999998,0.040499999999999994,0.02182499999999997,0.0,0.025025000000000026,0.04690000000000005],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.44318181818181823,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5568181818181818,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.01194374999999999,0.0,0.04940369318181817,0.0,0.035469318181818185,0.011400852272727274,0.0],"upper":[-0.006930397727272731,-0.027311931818181822,0.0,-0.034202556818181816,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0]],"q":[1.0,1.0,0.7053844018873162,0.0,0.0],"risk":0.12689425478767696,"risks":[0.007245295587010786,0.010867943380516193,0.014490591174021572,0.01811323896752698,0.021735886761032386,0.025358534554537793,0.028981182348043144,0.03260383014154855,0.03622647793505396,0.039849125728559365,0.04347177352206477,0.005646336386344708,0.011292672772689416,0.016939009159034124,0.022585345545378832,0.02823168193172354,0.03387801831806825,0.039524354704412956,0.045170691090757664,0.05081702747710237,0.05646336386344708,0.06210970024979179,0.0,0.008082764363030813,0.01616552872606164,0.02424829308909246,0.03233105745212325,0.04041382181515407,0.048496586178184864,0.05657935054121571,0.0646621149042465,0.07274487926727735,0.08082764363030814,0.03910147793505411,0.0,0.010898522064945883,0.021797044129891766,0.03269556619483763,0.04359408825978353,0.05449261032472938,0.06539113238967525,0.0762896544546211,0.087188176519567,0.09808669858451291,0.07189808492922567,0.035949042464612856,0.0,0.014050957535387175,0.02810191507077435,0.04215287260616153,0.0562038301415487,0.07025478767693588,0.08430574521232304,0.09835670274771025,0.1124076602830974,0.09753547044129897,0.06502364696086599,0.03251182348043297,0.0,0.017488176519567016,0.034976353039134045,0.05246452955870104,0.06995270607826806,0.08744088259783506,0.10492905911740211,0.12241723563696913,0.11540383014154872,0.08655287260616155,0.057701915070774344,0.028850957535387172,0.0,0.02114904246461284,0.042298084929225634,0.06344712739383847,0.08459616985845127,0.10574521232306411,0.12689425478767694,0.12518411740216487,0.10014729392173191,0.07511047044129891,0.050073646960865956,0.02503682348043299,0.0,0.024963176519566997,0.04992635303913405,0.07488952955870105,0.0998527060782681,0.12481588259783516,0.12689425478767696,0.10574521232306414,0.0845961698584513,0.06344712739383847,0.04229808492922565,0.0211490424646128,0.0,0.0288509575353872,0.05770191507077433,0.08655287260616153,0.11540383014154873,0.12093534554537887,0.10365886761032475,0.08638238967527061,0.06910591174021649,0.051829433805162375,0.03455295587010823,0.017276477935054137,0.0,0.03272352206494583,0.06544704412989175,0.09817056619483765,0.10813788509575355,0.09462064945878434,0.08110341382181514,0.06758617818484595,0.05406894254787676,0.04055170691090756,0.02703447127393838,0.013517235636969176,0.0,0.03648276436303084,0.07296552872606168],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47960033305578686,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5203996669442131,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.017985012489591987,0.011240632805995,0.0],"upper":[-0.004995836802664448,-0.011990008326394675,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":5,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5]],"q":[0.0,0.0,0.3202836445260672,0.9463830221405994,1.0,1.0],"risk":0.125,"risks":[0.07451419651056017,0.10001921258034896,0.1168446648301194,0.125,0.12500000000000003,0.11782749999999997,0.10487067033976111,0.0878348622589531,0.06862901744719918,0.04922664141414124,0.03150134067952237,0.037257098255280084,0.06667947505356597,0.08763349862258957,0.1,0.10416666666666669,0.10099499999999997,0.09176183654729098,0.07807543311906939,0.06176611570247925,0.04475149219467389,0.028876228956228767,0.0,0.033339737526782987,0.058422332415059716,0.07500000000000001,0.08333333333333336,0.0841625,0.07865300275482084,0.06831600397918575,0.05490321395775932,0.04027634297520649,0.026251117232935273,0.012742901744719906,0.0,0.029211166207529875,0.05000000000000002,0.06250000000000001,0.06733,0.06554416896235071,0.058556574839302045,0.04804031221303945,0.03580119375573909,0.023626005509641723,0.025485803489439827,0.01666026247321702,0.0,0.024999999999999994,0.041666666666666664,0.05049749999999999,0.052435335169880554,0.04879714569941837,0.04117741046831952,0.03132604453627175,0.02100089378634823,0.038228705234159735,0.03332052494643402,0.020788833792470148,0.0,0.020833333333333332,0.033665,0.03932650137741042,0.039037716559534696,0.03431450872359959,0.026850895316804346,0.01837578206305468,0.05097160697887964,0.04998078741965102,0.041577667584940296,0.024999999999999994,0.0,0.016832500000000007,0.026217667584940277,0.029278287419651022,0.02745160697887966,0.022375746097336946,0.015750670339761186,0.06371450872359956,0.06664104989286804,0.06236650137741046,0.05000000000000002,0.029166666666666688,0.0,0.013108833792470125,0.019518858279767348,0.020588705234159732,0.017900596877869546,0.013125558616467636,0.07645741046831946,0.08330131236608503,0.08315533516988059,0.07499999999999998,0.05833333333333331,0.03316749999999996,0.0,0.009759429139883681,0.01372580348943983,0.013425447658402173,0.010500446893174115,0.08920031221303937,0.09996157483930204,0.10394416896235076,0.1,0.08750000000000001,0.06633499999999999,0.03689116620752989,0.0,0.006862901744719908,0.008950298438934773,0.007875335169880593,0.10194321395775927,0.11662183731251903,0.12473300275482088,0.12499999999999997,0.11666666666666663,0.09950249999999995,0.0737823324150597,0.04024057086011627,0.0,0.004475149219467393,0.005250223446587057],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":4,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4]],"q":[0.0,0.689771229859451,1.0,1.0,1.0,0.0,0.0,0.0,0.3123981952480653,1.0],"risk":0.08594150258776544,"risks":[0.04878886687197291,0.06423884960351617,0.07494703556208765,0.08170068827795032,0.08517775327971192,0.08594150258776545,0.08443517920772964,0.08097664162389034,0.07575300829263987,0.0688153021359183,0.06007309503465419,0.02589566477260995,0.04608783825960211,0.06138228097843568,0.07248008773105832,0.0799732517995872,0.08434022914198991,0.0859415025877654,0.08501514603362531,0.08167238863917448,0.07589317902259213,0.06752174945631317,0.0,0.024674888391763395,0.04436952352353708,0.05969971862981728,0.07117203402619826,0.07918026100729361,0.08400190574465771,0.08579467318470735,0.08459295094664271,0.08030429322036908,0.07270590466441818,0.021101872554143062,0.0,0.023908763197391863,0.0433595809742272,0.05877409995954504,0.07046159818367645,0.07861638867840659,0.08331522307713646,0.08451469521504462,0.08204864472924911,0.07562556065896925,0.03920128243503916,0.02206317308431195,0.0,0.0234596747642881,0.042779449599627574,0.058184240671138546,0.06978495138901206,0.07757679571091267,0.08143762144438013,0.08112623354923215,0.07628071743996634,0.05429822964268827,0.040864407644699216,0.022643233931361535,0.0,0.023188082946445903,0.04234818846967982,0.05750759387647414,0.06857939108603595,0.0753617296346493,0.07753705968031832,0.07467137500740939,0.06639271417709038,0.05640370368116179,0.04183846499147645,0.02298055668136288,0.0,0.022953441579300324,0.04178431614079283,0.05632300920250634,0.06628701978585216,0.07128112312250759,0.07079753336129857,0.07548473603824551,0.06868106119369972,0.057585693180344774,0.042401344808376755,0.023215200760289878,0.0,0.022615118181968093,0.04080765006032379,0.05421349189798866,0.06235842387579993,0.06465919250163371,0.08157429522615367,0.07769648018231295,0.06988491849796644,0.05826236438104158,0.042833685227315475,0.023487863731778868,0.0,0.022033313659488376,0.03914114597105879,0.050768961940195326,0.05625635242841495,0.08466139174081484,0.08344996064700153,0.07873614094434152,0.0705636153993574,0.05885545340107689,0.043417032774636995,0.023938961594888498,0.0,0.021069982005062556,0.036512737315693794,0.045589013141642154,0.08474602558222905,0.08594150258776544,0.08413936051946996,0.07930509786332424,0.07128050528157404,0.05978750712857429,0.04443200296663354,0.024707709081858698,0.0,0.019589750002295375,0.03265717464131544],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.07210322096688015,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4140755811052598,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.51382119792786,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.006020171934960237,0.0,0.0,0.0,0.0,0.021336975236079567,0.04182307590727376,0.02471569360867199,0.0,0.0,0.0],"upper":[0.0,0.0,-0.0282312364627714,-0.03759679521150912,-0.015124656389111578,0.0,0.0,0.0,0.0,-0.003268390074091475,0.0]}},{"n0":2,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3]],"q":[0.5315951269497851,1.0,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.4684048730502143],"risk":0.07302701582602757,"risks":[0.03931983604690889,0.05270452891950367,0.062182634635090606,0.06802210378002965,0.0705391096436298,0.07009804821814875,0.06711153819879306,0.06204042098371848,0.055393760674029346,0.04772884407377875,0.03965118068996909,0.022304121598542677,0.040294614596379424,0.05408063588751004,0.06383992940908578,0.0698188261414096,0.07233224410793582,0.07176368837527042,0.0685652510531709,0.06325761129454627,0.05643003529545709,0.048740376295115406,0.0,0.02264445149721055,0.04090379596948656,0.054860942445633665,0.06468404873050218,0.07062652140498696,0.07302701582602758,0.07230943612660823,0.06898293521575771,0.06364191477854947,0.056966025276101506,0.022722459296367944,0.0,0.02282071672549246,0.04117083228965049,0.05513477741090747,0.06489519070932487,0.07073291870659226,0.07302701582602755,0.07225474439257656,0.06899157463281336,0.06391118467494006,0.040786487532733645,0.022607220482750764,0.0,0.022855288341113517,0.041171012182625526,0.05505256262097234,0.06471279517249229,0.0704720297734259,0.07275805077991568,0.07210610696800634,0.0691589115336444,0.05450707275418416,0.04071207332346577,0.022610247637481488,0.0,0.022792753045656377,0.04101294773995218,0.05479804337925534,0.06439851759080037,0.07017786633268805,0.0726126038938858,0.0722922628942273,0.0641992030058066,0.05456051890014798,0.04082006148240918,0.02269065666628714,0.0,0.02269065666628716,0.04082006148240918,0.05456051890014797,0.06419920300580662,0.07013815752020941,0.07289429579870188,0.07017786633268808,0.06439851759080037,0.05479804337925537,0.04101294773995219,0.0227927530456564,0.0,0.02261024763748146,0.04071207332346575,0.05450707275418415,0.06430985995673452,0.07054806728908103,0.07275805077991568,0.0704720297734259,0.0647127951724923,0.05505256262097233,0.041171012182625526,0.022855288341113496,0.0,0.02260722048275077,0.04078648753273363,0.05475480331321865,0.06483663440737775,0.07225474439257651,0.07302701582602752,0.07073291870659229,0.06489519070932485,0.05513477741090746,0.041170832289650475,0.02282071672549246,0.0,0.022722459296367934,0.04110007969941927,0.055343054195605035,0.06898293521575767,0.07230943612660821,0.07302701582602757,0.07062652140498693,0.06468404873050214,0.05486094244563364,0.04090379596948654,0.022644451497210515,0.0,0.02297278122509391,0.04165038369577587],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.061618947124948864,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.43429352157577134,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5040875312992799,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.010680675370548507,0.011041699582496968,0.0,0.0,0.015215012451577442,0.027719912117270207,0.01354194404186326,0.0,0.0],"upper":[0.0,-0.009878304164899808,-0.024413358974611842,-0.016202662602504303,0.0,0.0,-0.011360276963102487,-0.013892122079070071,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2]],"q":[0.4684048730502146,1.0,1.0,0.0,1.0,1.0,0.0,0.0,1.0,0.0,0.0,0.5315951269497856],"risk":0.07302701582602757,"risks":[0.041650383695775804,0.05534305419560499,0.06483663440737772,0.07054806728908097,0.07289429579870182,0.0722922628942273,0.06915891153364429,0.06391118467494,0.05696602527610134,0.048740376295115295,0.03965118068996898,0.022972781225093886,0.04110007969941927,0.05475480331321865,0.0643098599567345,0.07013815752020938,0.07261260389388582,0.07210610696800629,0.0689915746328133,0.06364191477854941,0.05643003529545709,0.04772884407377875,0.0,0.02272245929636796,0.04078648753273365,0.054507072754184205,0.06419920300580664,0.07017786633268816,0.07275805077991576,0.07225474439257651,0.06898293521575782,0.06325761129454638,0.0553937606740294,0.022644451497210543,0.0,0.022607220482750778,0.04071207332346577,0.054560518900148014,0.0643985175908004,0.07047202977342593,0.07302701582602755,0.07230943612660823,0.06856525105317096,0.062040420983718536,0.04090379596948656,0.022820716725492466,0.0,0.02261024763748148,0.04082006148240918,0.05479804337925538,0.06471279517249229,0.07073291870659226,0.07302701582602752,0.07176368837527042,0.06711153819879312,0.05486094244563367,0.041170832289650516,0.022855288341113524,0.0,0.02269065666628713,0.04101294773995217,0.0550525626209723,0.06489519070932478,0.07062652140498688,0.07233224410793576,0.07009804821814869,0.06468404873050214,0.05513477741090746,0.041171012182625526,0.02279275304565638,0.0,0.022792753045656405,0.04117101218262553,0.05513477741090746,0.06468404873050213,0.0698188261414096,0.0705391096436298,0.07062652140498693,0.06489519070932484,0.05505256262097234,0.04101294773995219,0.022690656666287164,0.0,0.022855288341113496,0.04117083228965048,0.05486094244563362,0.06383992940908578,0.06802210378002965,0.07302701582602758,0.07073291870659229,0.0647127951724923,0.054798043379255375,0.04082006148240919,0.02261024763748146,0.0,0.022820716725492456,0.040903795969486526,0.054080635887510026,0.062182634635090606,0.07230943612660823,0.07302701582602755,0.07047202977342591,0.06439851759080038,0.054560518900147986,0.04071207332346575,0.022607220482750767,0.0,0.022644451497210515,0.04029461459637941,0.05270452891950367,0.06898293521575768,0.07225474439257652,0.07275805077991569,0.07017786633268809,0.0641992030058066,0.05450707275418414,0.04078648753273364,0.02272245929636793,0.0,0.02230412159854269,0.03931983604690891],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4342935215757714,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.061618947124948774,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5040875312992799,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.013541944041863263,0.0,0.0,0.027719912117270214,0.011041699582496968,0.0,0.015215012451577442,0.010680675370548507,0.0,0.0],"upper":[0.0,-0.013892122079070071,-0.016202662602504303,0.0,-0.011360276963102484,-0.02441335897461184,0.0,0.0,-0.009878304164899801,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1]],"q":[1.0,1.0,0.3123981952480673,1.0,0.0,1.0,0.0,0.6897712298594493,0.0,0.0],"risk":0.08594150258776542,"risks":[0.03265717464131533,0.04558901314164204,0.05625635242841481,0.06465919250163357,0.0707975333612984,0.07467137500740922,0.07628071743996612,0.07562556065896903,0.07270590466441795,0.06752174945631295,0.06007309503465397,0.019589750002295334,0.03651273731569374,0.05076896194019527,0.06235842387579982,0.07128112312250748,0.07753705968031827,0.0811262335492321,0.082048644729249,0.08030429322036897,0.07589317902259207,0.06881530213591824,0.0,0.021069982005062556,0.03914114597105878,0.05421349189798863,0.06628701978585214,0.07536172963464935,0.08143762144438008,0.08451469521504457,0.08459295094664271,0.08167238863917442,0.07575300829263987,0.024707709081858747,0.0,0.02203331365948836,0.040807650060323775,0.0563230092025063,0.06857939108603592,0.07757679571091261,0.08331522307713643,0.08579467318470729,0.08501514603362531,0.0809766416238904,0.044432002966633605,0.02393896159488851,0.0,0.022615118181968104,0.041784316140792824,0.05750759387647415,0.06978495138901206,0.07861638867840659,0.08400190574465768,0.08594150258776545,0.08443517920772975,0.059787507128574384,0.04341703277463705,0.023487863731778913,0.0,0.02295344157930029,0.042348188469679804,0.05818424067113849,0.07046159818367642,0.07918026100729353,0.08434022914198988,0.08594150258776545,0.07128050528157409,0.058855453401076924,0.042833685227315496,0.02321520076028986,0.0,0.023188082946445924,0.04277944959962759,0.05877409995954505,0.07117203402619826,0.07997325179958725,0.08517775327971205,0.07930509786332425,0.07056361539935743,0.058262364381041584,0.04240134480837675,0.022980556681362892,0.0,0.023459674764288087,0.04335958097422721,0.05969971862981728,0.07248008773105838,0.08170068827795046,0.08413936051946998,0.0787361409443415,0.06988491849796642,0.057585693180344746,0.04183846499147644,0.0226432339313615,0.0,0.02390876319739188,0.044369523523537104,0.061382280978435746,0.07494703556208776,0.08594150258776542,0.0834499606470015,0.07769648018231293,0.06868106119369967,0.05640370368116176,0.04086440764469916,0.022063173084311934,0.0,0.024674888391763385,0.04608783825960216,0.06423884960351625,0.084746025582229,0.08466139174081479,0.0815742952261536,0.07548473603824546,0.06639271417709032,0.054298229642688184,0.0392012824350391,0.02110187255414302,0.0,0.02589566477261,0.048788866871973015],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.41407558110525944,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07210322096688061,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.51382119792786,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.024715693608672,0.0,0.041823075907273764,0.0,0.021336975236079567,0.006020171934960233,0.0],"upper":[-0.003268390074091473,-0.015124656389111578,0.0,-0.03759679521150912,0.0,-0.028231236462771408,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0]],"q":[0.9526460595317078,1.0,1.0,0.23717162764360092,0.06846086613978987,0.0],"risk":0.12500000000000003,"risks":[0.006085560233400275,0.009128340350100406,0.01217112046680055,0.015213900583500695,0.01825668070020081,0.021299460816900984,0.0243422409336011,0.027385021050301273,0.03042780116700139,0.033470581283701506,0.03651336140040162,0.0046452464870006885,0.009290492974001377,0.013935739461002072,0.018580985948002754,0.023226232435003435,0.027871478922004145,0.0325167254090048,0.03716197189600551,0.04180721838300616,0.04645246487000687,0.05109771135700758,0.0,0.006886005244109733,0.013772010488219466,0.0206580157323292,0.027544020976438932,0.034430026220548665,0.0413160314646584,0.04820203670876816,0.055088041952877864,0.061974047196987625,0.06886005244109733,0.04028189743518717,0.0,0.009718102564812835,0.019436205129625655,0.029154307694438483,0.03887241025925131,0.048590512824064125,0.058308615388876966,0.06802671795368975,0.07774482051850262,0.08746292308331544,0.07387798951178073,0.03693899475589039,0.0,0.013061005244109643,0.026122010488219286,0.03918301573232895,0.05224402097643857,0.06530502622054823,0.07836603146465787,0.0914270367087675,0.1044880419528772,0.09957612972246845,0.06638408648164565,0.033192043240822804,0.0,0.016807956759177185,0.033615913518354384,0.05042387027753156,0.06723182703670877,0.08403978379588592,0.10084774055506313,0.11765569731424033,0.11666666666666665,0.08750000000000001,0.05833333333333331,0.029166666666666657,0.0,0.020833333333333356,0.041666666666666664,0.06250000000000001,0.08333333333333333,0.10416666666666669,0.12500000000000003,0.12500000000000003,0.10000000000000003,0.07500000000000001,0.05000000000000002,0.025000000000000022,0.0,0.024999999999999967,0.04999999999999999,0.07499999999999996,0.09999999999999998,0.125,0.12500000000000003,0.10416666666666669,0.08333333333333333,0.0625,0.041666666666666664,0.020833333333333308,0.0,0.029166666666666688,0.05833333333333331,0.08750000000000001,0.1166666666666667,0.11763329074802417,0.10082853492687786,0.08402377910573154,0.06721902328458523,0.05041426746343893,0.03360951164229261,0.016804755821146322,0.0,0.033195244178853646,0.06639048835770736,0.09958573253656108,0.10433439692739482,0.09129259731147048,0.0782507976955461,0.06520899807962176,0.052167198463697405,0.03912539884777304,0.026083599231848702,0.013041799615924337,0.0,0.03695820038407568,0.07391640076815136],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000014,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999988,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,3.531516225285803e-17,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":6,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6]],"q":[0.0,0.0,0.0,0.9507624036163617,0.7889941222056119,1.0,0.4831734279219174],"risk":0.12499999999999999,"risks":[0.07663687891077112,0.10195459988594055,0.11784391696673528,0.125,0.12500000000000003,0.12010210698020476,0.11302301576967594,0.10674379489262897,0.10439415358973791,0.10926510205975282,0.1250000000000001,0.03831843945538556,0.0679697332572937,0.08838293772505146,0.1,0.10416666666666669,0.10294466312588979,0.09889513879846645,0.09488337323789242,0.09395473823076411,0.09933191096341165,0.11458333333333343,0.0,0.03398486662864685,0.058921958483367655,0.07500000000000001,0.08333333333333336,0.08578721927157484,0.08476726182725697,0.08302295158315587,0.08351532287179031,0.08939871986707049,0.10416666666666674,0.011681560544614429,0.0,0.029460979241683845,0.05000000000000002,0.06250000000000001,0.06862977541725987,0.07063938485604748,0.07116252992841932,0.07307590751281656,0.07946552877072932,0.09375000000000006,0.023363121089228868,0.016015133371353154,0.0,0.024999999999999994,0.041666666666666664,0.051472331562944895,0.05651150788483797,0.05930210827368276,0.06263649215384273,0.06953233767438816,0.08333333333333337,0.0350446816338433,0.032030266742706294,0.020539020758316175,0.0,0.020833333333333332,0.034314887708629935,0.042383630913628484,0.04744168661894621,0.05219707679486896,0.05959914657804699,0.07291666666666674,0.04672624217845772,0.04804540011405943,0.04107804151663235,0.024999999999999994,0.0,0.01715744385431498,0.028255753942418985,0.03558126496420966,0.041757661435895155,0.049665955481705826,0.06250000000000006,0.058407802723072166,0.06406053348541259,0.06161706227494856,0.05000000000000002,0.029166666666666688,0.0,0.014127876971209478,0.023720843309473105,0.03131824607692135,0.03973276438536466,0.05208333333333337,0.07008936326768658,0.0800756668567657,0.0821560830332647,0.07499999999999998,0.05833333333333331,0.032842556145684994,0.0,0.011860421654736567,0.020878830717947577,0.029799573289023495,0.04166666666666671,0.08177092381230103,0.09609080022811886,0.10269510379158091,0.1,0.08750000000000001,0.06568511229137006,0.03587212302879054,0.0,0.010439415358973775,0.01986638219268233,0.03125000000000003,0.09345248435691543,0.11210593359947198,0.12323412454989706,0.12499999999999997,0.11666666666666663,0.09852766843705506,0.071744246057581,0.038139578345263395,0.0,0.009933191096341172,0.02083333333333337],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":5,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5]],"q":[0.0,0.4185259920593772,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.5814740079406234,1.0],"risk":0.08197895647333,"risks":[0.04982073335428289,0.0647124781749529,0.07436060190491989,0.07980831512361158,0.08197895647333,0.08162338996393775,0.07928886019049192,0.0753093054638237,0.0698171288540651,0.0627764271471224,0.054037677714096066,0.026419360046929116,0.04648523100573374,0.061145136928679567,0.07130593633046098,0.07776316421759027,0.08115183203073284,0.08191868549998965,0.08031592041312613,0.07641635629674759,0.07015006801042178,0.06136247525374733,0.0,0.02491440494741611,0.044346548285779476,0.05907391542152453,0.06976842509925779,0.07695063198174201,0.0809653871428275,0.08197895647332998,0.07999759699985481,0.07490759111656825,0.06653673872991517,0.020562653213495537,0.0,0.023964835976219626,0.04311225239680222,0.057994739118332514,0.06901978981696533,0.0764289651190056,0.08029841364443538,0.08056085096338667,0.07704899646556163,0.06956046814259936,0.03810731968741575,0.021742016163485433,0.0,0.02342094725629403,0.04244210627481443,0.057359305536402755,0.068309419428524,0.07527429192644236,0.07810611818734312,0.07657428405740191,0.07043366349180014,0.05263399942176061,0.040140453437872384,0.022452040357120635,0.0,0.023110526568703604,0.04196917914005437,0.056606750071382606,0.06690659131935081,0.07263339867172428,0.0734834538920893,0.06915632477751732,0.06414269241653013,0.05519531182316085,0.04132095704758152,0.022849410627920116,0.0,0.02284941062792013,0.0413209570475815,0.055195311823160814,0.06414269241653012,0.06777650596962365,0.06572845199975108,0.0726333986717243,0.06690659131935084,0.05660675007138266,0.04196917914005438,0.023110526568703636,0.0,0.022452040357120603,0.04014045343787234,0.05263399942176057,0.05945344029000496,0.060150045158501336,0.07810611818734316,0.07527429192644237,0.06830941942852402,0.05735930553640277,0.04244210627481445,0.023420947256294015,0.0,0.02174201616348543,0.038107319687415736,0.048514256853233254,0.052421104253768086,0.08056085096338665,0.08029841364443542,0.07642896511900565,0.06901978981696533,0.05799473911833252,0.04311225239680222,0.023964835976219633,0.0,0.020562653213495513,0.0349589556593085,0.0425416292855513,0.07999759699985481,0.08197895647333,0.08096538714282753,0.07695063198174201,0.06976842509925779,0.05907391542152454,0.044346548285779476,0.02491440494741609,0.0,0.01878753670823078,0.03051162025385107],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.4257484810249754,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.06413922845016853,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5101122905248561,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0029390772732302106,0.0,0.0,0.0,0.0,0.0,0.01366737357205102,0.034721375513753865,0.03284164833101225,0.012390870520322275,0.0,0.0,0.0],"upper":[0.0,0.0,-0.016758674943649025,-0.027515057570857728,-0.018262210064876314,-0.004735090605022622,0.0,0.0,0.0,0.0,0.0,-0.0009232846073159003,0.0]}},{"n0":2,"n1":4,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4]],"q":[0.21641080339797614,1.0,1.0,1.0,1.0,0.0,0.0,0.49999999999999845,1.0,1.0,0.0,0.0,0.0,0.0,0.78358919660204],"risk":0.07155886754790293,"risks":[0.041103556740695435,0.05383350221420119,0.06231032539712755,0.06713120888251856,0.06881537846177277,0.06782173388156632,0.064566479600777,0.05944075554740763,0.05282826787550948,0.04512291972210569,0.03674644196411547,0.023096596320140116,0.040978883661574705,0.05420548645765867,0.06327122157251144,0.06862179059845336,0.07066847215344174,0.06980281417850748,0.06641132623519108,0.060890171802978954,0.05365986057673994,0.04517994076416132,0.0,0.022957287131918747,0.04101156588320442,0.05454566047007729,0.06391794598301018,0.0694741022246772,0.07155886754790294,0.07052779269361176,0.06675899462877616,0.06066491038436633,0.052704050893299215,0.022103423260066323,0.0,0.022889443716429852,0.04103697213439487,0.05470384461544321,0.06415617753609387,0.06967375966629841,0.07155886754790297,0.07014508087310956,0.06580609786293856,0.05896455064568956,0.039696521580130366,0.022338309640585162,0.0,0.022827603124642853,0.040979486495752525,0.0546322515285132,0.06398661049102891,0.0692732634232982,0.07075877505618833,0.06875145173041025,0.06360721831549265,0.05306895043998334,0.04020350342844087,0.02250411477657995,0.0,0.02274487162393813,0.04081987764275648,0.054336539979429346,0.06343969294503066,0.06831042169822096,0.06916900070473497,0.06627783219686845,0.06251036531941649,0.05382686873833382,0.04056266808883472,0.022636609319644965,0.0,0.02263660931964499,0.0405626680888347,0.05382686873833377,0.06251036531941637,0.06672677350386647,0.06662217058397757,0.0683104216982211,0.0634396929450307,0.054336539979429374,0.04081987764275649,0.022744871623938148,0.0,0.022504114776579914,0.040203503428440805,0.05306895043998319,0.06109279884575816,0.06428601177098,0.0707587750561884,0.06927326342329818,0.06398661049102893,0.0546322515285132,0.04097948649575253,0.02282760312464284,0.0,0.022338309640585134,0.03969652158013024,0.051935105448363814,0.058915134052035995,0.07014508087310962,0.07155886754790294,0.06967375966629843,0.06415617753609386,0.05470384461544322,0.04103697213439487,0.022889443716429873,0.0,0.02210342326006624,0.038921722029636896,0.05015531572130573,0.06675899462877607,0.07052779269361167,0.07155886754790293,0.06947410222467716,0.06391794598301016,0.05454566047007733,0.04101156588320446,0.022957287131918774,0.0,0.02172067730753112,0.03765233507294953],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4731819740200369,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.026818025979962936,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.026818025979962384,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4731819740200377,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.00679909458687288,0.01244657864462306,0.0,0.0,0.0,0.00927960717686945,0.02327381417850748,0.02037332307340673,0.006268714791817458,0.0,0.0],"upper":[0.0,-0.006268714791817453,-0.020373323073406724,-0.023273814178507473,-0.00927960717686945,0.0,0.0,0.0,-0.012446578644623051,-0.006799094586872879,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3]],"q":[0.9923126208897849,1.0,1.0,1.0,0.0,0.30234888781430475,1.0,1.0,0.0,0.0,0.6976511121856933,1.0,0.0,0.0,0.0,0.007687379110236748],"risk":0.07055081249999999,"risks":[0.03399532144584087,0.0463898995783964,0.05561790328820057,0.06170355933419913,0.06474918749999953,0.06493520059387048,0.0625201044487424,0.057840497922207246,0.05131107289651826,0.043424614278590234,0.03475199999999978,0.020475947273180417,0.03740966638962738,0.05069398052919458,0.06031342632525358,0.06634425386469395,0.06895442668792295,0.068403621788866,0.06504322961496611,0.05931635406718444,0.051757812499999944,0.04299413572140953,0.0,0.02173559310399531,0.039465262209864474,0.05312316992943046,0.06274633631528037,0.06847463886076524,0.07055081249999998,0.06932044960786393,0.06523200000000007,0.05883677093281564,0.05078892710348171,0.023341531896004682,0.0,0.02242131763025867,0.040481964481080705,0.05416994523316605,0.06358478955361457,0.06893755209592597,0.07055081249999998,0.06885867539213614,0.06440677038503384,0.05785225207779249,0.041210737790135545,0.02277843236974136,0.0,0.022690303561714188,0.04078192202611216,0.05432515045484766,0.06348799999999996,0.06855619790407397,0.06993318749999997,0.06814012821113391,0.06381589555125722,0.054253955070569536,0.040589660518919324,0.022587446438285804,0.0,0.022701439128233785,0.04068731249999999,0.054074599545152285,0.06310171044638535,0.0681284861392347,0.06963619831207685,0.06822754940612902,0.06305366368471964,0.05389567976683396,0.040518077973887824,0.022614185871766203,0.0,0.02261418587176621,0.04051807797388779,0.053895679766833904,0.06305366368471954,0.06842137113530589,0.07055081250000006,0.06812848613923485,0.06310171044638543,0.054074599545152334,0.04068731250000002,0.02270143912823382,0.0,0.022587446438285756,0.04058966051891925,0.05425395507056939,0.0639490736747462,0.0701651906658004,0.06993318750000005,0.06855619790407401,0.06348800000000002,0.05432515045484769,0.04078192202611219,0.022690303561714194,0.0,0.02277843236974132,0.04121073779013541,0.05559976947080518,0.06636609671179897,0.06885867539213614,0.07055081250000002,0.06893755209592603,0.06358478955361462,0.05416994523316612,0.040481964481080754,0.02242131763025872,0.0,0.02334153189600459,0.04268095861037241,0.05836485042160315,0.06523200000000001,0.06932044960786389,0.07055081250000002,0.06847463886076524,0.06274633631528044,0.05312316992943058,0.03946526220986457,0.02173559310399536,0.0,0.024427177726819464,0.045288678554158794],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000007,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.00698709375,0.0,0.0,0.0,0.016738312500000005,0.020961281249999995,0.0,0.0,0.011037093750000004,0.0167383125,0.00698709375,0.0,0.0],"upper":[0.0,-0.006987093750000015,-0.016738312500000026,-0.011037093750000018,0.0,0.0,-0.020961281250000036,-0.016738312500000026,0.0,0.0,0.0,-0.006987093750000015,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2]],"q":[0.7835891966020353,1.0,1.0,0.0,1.0,1.0,0.0,0.49999999999999944,1.0,0.0,0.0,1.0,0.0,0.0,0.21641080339797109],"risk":0.07155886754790293,"risks":[0.03765233507294957,0.0501553157213058,0.05891513405203605,0.06428601177098006,0.06662217058397771,0.06627783219686856,0.06360721831549265,0.05896455064568962,0.052704050893299215,0.04517994076416121,0.03674644196411547,0.02172067730753113,0.038921722029636945,0.05193510544836387,0.061092798845758245,0.06672677350386652,0.06916900070473508,0.0687514517304103,0.06580609786293856,0.06066491038436628,0.05365986057673988,0.0451229197221058,0.0,0.02210342326006628,0.03969652158013031,0.05306895043998326,0.06251036531941642,0.06831042169822105,0.07075877505618836,0.07014508087310967,0.06675899462877616,0.06089017180297901,0.05282826787550954,0.02295728713191878,0.0,0.022338309640585138,0.040203503428440826,0.05382686873833378,0.06343969294503068,0.06927326342329818,0.07155886754790297,0.0705277926936117,0.06641132623519103,0.059440755547407687,0.041011565883204454,0.022889443716429866,0.0,0.022504114776579938,0.0405626680888347,0.05433653997942936,0.06398661049102891,0.06967375966629841,0.07155886754790289,0.06980281417850748,0.06456647960077705,0.05454566047007735,0.04103697213439489,0.022827603124642874,0.0,0.02263660931964496,0.040819877642756464,0.05463225152851317,0.06415617753609384,0.06947410222467709,0.07066847215344174,0.06782173388156632,0.06391794598301018,0.05470384461544322,0.04097948649575253,0.02274487162393813,0.0,0.022744871623938154,0.040979486495752525,0.05470384461544324,0.06391794598301012,0.06862179059845336,0.06881537846177282,0.06947410222467716,0.06415617753609386,0.0546322515285132,0.040819877642756484,0.02263660931964499,0.0,0.02282760312464284,0.041036972134394854,0.05454566047007728,0.06327122157251147,0.0671312088825187,0.07155886754790294,0.06967375966629843,0.06398661049102891,0.05433653997942936,0.040562668088834714,0.02250411477657992,0.0,0.022889443716429852,0.041011565883204405,0.0542054864576587,0.062310325397127636,0.07052779269361167,0.07155886754790294,0.06927326342329818,0.0634396929450307,0.053826868738333804,0.04020350342844084,0.02233830964058515,0.0,0.02295728713191874,0.04097888366157474,0.05383350221420129,0.06675899462877607,0.07014508087310961,0.07075877505618837,0.06831042169822106,0.06251036531941644,0.05306895043998326,0.03969652158013032,0.022103423260066278,0.0,0.023096596320140172,0.041103556740695546],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.026818025979962277,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47318197402003775,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47318197402003687,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.026818025979963047,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0062687147918174535,0.0,0.0,0.02037332307340672,0.0,0.0,0.023273814178507473,0.012446578644623051,0.0,0.00927960717686945,0.00679909458687288,0.0,0.0],"upper":[0.0,-0.006799094586872878,-0.009279607176869448,0.0,-0.012446578644623058,-0.023273814178507476,0.0,0.0,-0.02037332307340673,0.0,0.0,-0.006268714791817458,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1]],"q":[1.0,1.0,0.5814740079406213,1.0,0.0,1.0,0.0,1.0,0.0,0.4185259920593782,0.0,0.0],"risk":0.08197895647333,"risks":[0.030511620253851082,0.04254162928555137,0.05242110425376814,0.06015004515850142,0.06572845199975116,0.06915632477751743,0.07043366349180014,0.06956046814259936,0.06653673872991511,0.061362475253747384,0.054037677714095955,0.018787536708230787,0.03495895565930855,0.04851425685323332,0.059453440290005044,0.06777650596962373,0.07348345389208943,0.07657428405740208,0.07704899646556174,0.0749075911165683,0.0701500680104219,0.0627764271471225,0.0,0.020562653213495565,0.03810731968741581,0.05263399942176068,0.06414269241653023,0.07263339867172444,0.07810611818734328,0.08056085096338683,0.07999759699985498,0.07641635629674781,0.06981712885406532,0.02491440494741609,0.0,0.021742016163485447,0.0401404534378724,0.05519531182316087,0.0669065913193509,0.07527429192644239,0.08029841364443546,0.08197895647333003,0.08031592041312613,0.07530930546382375,0.044346548285779455,0.02396483597621962,0.0,0.022452040357120635,0.04132095704758152,0.056606750071382675,0.06830941942852403,0.07642896511900565,0.0809653871428275,0.08191868549998965,0.07928886019049203,0.05907391542152455,0.04311225239680223,0.023420947256294036,0.0,0.022849410627920102,0.04196917914005436,0.05735930553640274,0.0690197898169653,0.07695063198174193,0.08115183203073276,0.08162338996393775,0.06976842509925776,0.0579947391183325,0.04244210627481443,0.023110526568703604,0.0,0.023110526568703636,0.04244210627481443,0.057994739118332514,0.06976842509925774,0.07776316421759027,0.08197895647333003,0.07695063198174197,0.0690197898169653,0.057359305536402755,0.041969179140054366,0.02284941062792013,0.0,0.023420947256294,0.04311225239680221,0.0590739154215245,0.071305936330461,0.07980831512361161,0.08096538714282751,0.07642896511900565,0.06830941942852403,0.056606750071382654,0.04132095704758152,0.022452040357120614,0.0,0.023964835976219623,0.044346548285779434,0.061145136928679567,0.07436060190491992,0.08197895647333,0.08029841364443542,0.07527429192644236,0.06690659131935084,0.05519531182316085,0.04014045343787236,0.021742016163485443,0.0,0.024914404947416074,0.04648523100573372,0.06471247817495289,0.07999759699985487,0.08056085096338671,0.0781061181873432,0.07263339867172434,0.06414269241653016,0.05263399942176062,0.038107319687415764,0.02056265321349553,0.0,0.02641936004692912,0.0498207333542829],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0641392284501685,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4257484810249753,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5101122905248562,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.012390870520322285,0.0,0.03284164833101226,0.0,0.03472137551375388,0.0,0.013667373572051025,0.002939077273230212,0.0],"upper":[-0.0009232846073158994,-0.004735090605022621,0.0,-0.01826221006487631,0.0,-0.02751505757085772,0.0,-0.01675867494364902,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0]],"q":[0.8743641002373522,0.6206635904820007,1.0,0.8867493845101989,0.0,0.0,0.0],"risk":0.12500000000000003,"risks":[0.02083333333333333,0.03125,0.041666666666666685,0.05208333333333334,0.0625,0.07291666666666669,0.08333333333333331,0.09375,0.10416666666666669,0.11458333333333337,0.12500000000000006,0.010495805522078926,0.02099161104415785,0.031487416566236784,0.0419832220883157,0.052479027610394635,0.06297483313247357,0.0734706386545525,0.0839664441766314,0.09446224969871031,0.10495805522078927,0.11545386074286823,0.0,0.011049317179901957,0.02209863435980393,0.0331479515397059,0.04419726871960786,0.055246585899509815,0.06629590307941177,0.07734522025931373,0.08839453743921571,0.09944385461911764,0.11049317179901963,0.0377000889609627,0.0,0.012299911039037305,0.024599822078074596,0.03689973311711188,0.04919964415614919,0.06149955519518646,0.07379946623422376,0.08609937727326106,0.09839928831229833,0.11069919935133565,0.07128335232001669,0.03564167616000836,0.0,0.014358323839991666,0.02871664767998333,0.043074971519975025,0.05743329535996666,0.07179161919995836,0.08614994303995002,0.10050826687994169,0.11486659071993338,0.09830578997760124,0.06553719331840084,0.03276859665920041,0.0,0.017231403340799582,0.03446280668159919,0.051694210022398754,0.06892561336319836,0.08615701670399792,0.10338842004479754,0.12061982338559712,0.11666666666666668,0.08750000000000002,0.05833333333333333,0.029166666666666664,0.0,0.02083333333333335,0.04166666666666665,0.0625,0.0833333333333333,0.10416666666666666,0.125,0.125,0.1,0.075,0.05,0.025000000000000015,0.0,0.024999999999999974,0.05,0.07499999999999997,0.1,0.12500000000000003,0.12296100233504415,0.10246750194587012,0.08197400155669608,0.06148050116752206,0.04098700077834804,0.020493500389173996,0.0,0.029506499610826003,0.059012999221651936,0.08851949883247795,0.11802599844330394,0.1113854870735006,0.09547327463442909,0.07956106219535757,0.06364884975628606,0.047736637317214545,0.03182442487814302,0.015912212439071528,0.0,0.03408778756092844,0.06817557512185696,0.10226336268278548,0.09230025001300457,0.080762718761379,0.06922518750975341,0.05768765625812785,0.04615012500650228,0.0346125937548767,0.02307506250325114,0.011537531251625557,0.0,0.03846246874837446,0.07692493749674892],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-1.0008172983665402e-14,-0.5000000000000011,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.499999999999989,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,1.3399812769793193e-16,3.7897002810177754e-17,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":7,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7]],"q":[0.822714612130007,0.0,0.0,0.41063925515742083,1.0,0.815222074333112,1.0,0.3519145630315767],"risk":0.125,"risks":[0.07178001784219341,0.09882783416224364,0.11666666666666667,0.12499999999999997,0.12500000000000003,0.11899889256347987,0.11015616952847163,0.10215475170041649,0.0989965307011183,0.10498500287022083,0.125,0.03589000892109671,0.0658852227748291,0.08750000000000001,0.09999999999999998,0.10416666666666669,0.10199905076869706,0.09638664833741267,0.09080422373370356,0.08909687763100649,0.09544091170020075,0.11458333333333331,0.0,0.03294261138741455,0.05833333333333335,0.075,0.08333333333333336,0.08499920897391422,0.08261712714635372,0.07945369576699063,0.07919722456089462,0.08589682053018066,0.10416666666666663,0.01410999107890328,0.0,0.02916666666666669,0.05,0.06250000000000001,0.06799936717913138,0.06884760595529477,0.06810316780027767,0.0692975714907828,0.07635272936016058,0.09375,0.028219982157806578,0.01705738861258546,0.0,0.024999999999999988,0.041666666666666664,0.05099952538434853,0.05507808476423581,0.05675263983356471,0.059397918420670964,0.06680863819014055,0.08333333333333331,0.04232997323670986,0.0341147772251709,0.02083333333333333,0.0,0.020833333333333332,0.03399968358956569,0.041308563573176846,0.04540211186685178,0.04949826535055915,0.05726454702012046,0.07291666666666663,0.056439964315613135,0.05117216583775634,0.04166666666666666,0.025,0.0,0.016999841794782852,0.027539042382117906,0.034051583900138835,0.03959861228044731,0.047720455850100374,0.0625,0.07054995539451643,0.0682295544503418,0.06250000000000001,0.05000000000000003,0.029166666666666688,0.0,0.013769521191058932,0.022701055933425876,0.029698959210335468,0.03817636468008029,0.052083333333333315,0.08465994647341969,0.08528694306292722,0.08333333333333331,0.075,0.05833333333333331,0.033000158205217116,0.0,0.011350527966712952,0.019799306140223655,0.02863227351006023,0.04166666666666666,0.098769937552323,0.10234433167551268,0.10416666666666667,0.10000000000000003,0.08750000000000001,0.06600031641043431,0.03623047880894108,0.0,0.009899653070111814,0.019088182340040144,0.03125,0.11287992863122626,0.1194017202880981,0.12499999999999997,0.125,0.11666666666666663,0.09900047461565142,0.07246095761788207,0.03864947203328701,0.0,0.009544091170020086,0.020833333333333343],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":6,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6]],"q":[0.0,0.06341168296612297,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.9692711268141679,1.0],"risk":0.07843358704493256,"risks":[0.05186687775351395,0.06578470506599653,0.07383824885974574,0.07762378076518126,0.0784335870449325,0.0771368344505754,0.07415554496847837,0.06952492024164025,0.06302725645440077,0.05438869046690731,0.043528017986219525,0.027404407130958833,0.0472298634097427,0.06091913862808175,0.06987625014602686,0.07523726850168436,0.07774636048855782,0.07772816803384874,0.0751476212110655,0.06974828372029057,0.06126032916945717,0.04966924648998572,0.0,0.02530162838774386,0.04430639374090281,0.05824010675993155,0.06809057157273996,0.07447952858766158,0.0776316293316677,0.07743339915364444,0.07357514367255141,0.06576875485028061,0.054034372569033484,0.01965365636063744,0.0,0.024000014198208897,0.0427153506068953,0.05699349625809931,0.06733633874788664,0.0738659288619351,0.07638225406937701,0.07450783631118346,0.06791396750937762,0.05662339622336282,0.03636537621287118,0.021324978246511136,0.0,0.023301981686918105,0.04194604255776242,0.05631679096923299,0.06643106662465101,0.07199418595826329,0.07254636163618666,0.06769596714674803,0.057436317452973784,0.050135159556701184,0.03927656312727724,0.02230635114627616,0.0,0.02294821047172932,0.04142088525170068,0.0553270426198155,0.06426919482030322,0.06769071964756096,0.06511475376239209,0.056473136257866374,0.060963006392127456,0.05385475464229832,0.04091906763703736,0.022809405546140957,0.0,0.0226486215952897,0.040553856847428474,0.0532072806554969,0.059940910345306464,0.06017032735630959,0.05373385263804065,0.06884891671915003,0.06505955279157441,0.055838149472283605,0.04173019832534101,0.02310141114257446,0.0,0.02211150930748995,0.03880844346384424,0.049296933729423106,0.0528626879285006,0.04921846659349646,0.07379289053776887,0.07289095757510547,0.06706359665201488,0.05676237833760008,0.042252443899452645,0.023475020465831605,0.0,0.021072683245345294,0.035758789799910914,0.04319183547896521,0.04292697812423393,0.07579492784798399,0.07734896899289151,0.0745954091762312,0.06790594558291828,0.05745309827063464,0.04307368299278458,0.02421932892495856,0.0,0.019326478556769867,0.03115777000770327,0.03485938723025302,0.0748550286497954,0.07843358704493256,0.07843358704493256,0.07516090006129553,0.0687033742561204,0.05879598758085882,0.0447694960823656,0.025590393727808386,0.0,0.016760491514714898,0.025015693911553727],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.5068347367058583,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3550763254844501,-0.1380889378096915,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0014910542790734964,0.0,0.0,0.0,0.0,0.0,0.0,0.007438773031686009,0.02375787828308711,0.030426773864079923,0.01900063079638122,0.005154697963224678,0.0,0.0,0.0],"upper":[0.0,0.0,-0.012414823647273357,-0.02579669863453249,-0.023245713319068467,-0.010181947835608763,-0.0017811890732569195,0.0,0.0,0.0,0.0,0.0,0.0,-0.00019646145708496085,0.0]}},{"n0":2,"n1":5,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5]],"q":[0.10500311398544084,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.8949968860145607],"risk":0.06646559705045471,"risks":[0.04039975673474582,0.05265284821522649,0.06051867646072867,0.06449200507721933,0.06503435748383182,0.0626385838507924,0.05786498131117007,0.051348967446447735,0.04378030704591551,0.03585389213988599,0.0281920753067314,0.02304107592893496,0.040743086907280825,0.053555154868084126,0.061845502422982424,0.06599608158599438,0.06646559705045474,0.06382092401909456,0.058736920587267316,0.05196463467931889,0.044267905538104,0.03632835976764748,0.0,0.02308450842924718,0.040995190021953024,0.05395475671447807,0.06223749221503641,0.06623130593248883,0.06646559705045471,0.06360492874674323,0.058408512558102255,0.05165550289028703,0.04403610167344729,0.02167072348479135,0.0,0.02306729928002758,0.040938061825370256,0.05375858937095797,0.06181741662323084,0.06557048304755828,0.06563010470600097,0.06271774614541509,0.057580592335899516,0.05087192065958518,0.03844744092015944,0.021812448838413736,0.0,0.022913711629322913,0.04055937305375909,0.05310563524901689,0.06090706465271303,0.06448956124616628,0.06449814090440728,0.0616070820144059,0.056392436361515474,0.05072434684295467,0.038844742163362804,0.022021809539562547,0.0,0.02263984326343977,0.03997766793618306,0.05224682450822683,0.0598604111483646,0.06335550229822809,0.06329888006527085,0.06015426841469246,0.058895635790027406,0.0514197671937216,0.03936124525640742,0.022315220811065403,0.0,0.02231522081106542,0.03936124525640742,0.0514197671937216,0.058895635790027406,0.06221989462795874,0.06171403645457049,0.06335550229822814,0.05986041114836463,0.05224682450822687,0.03997766793618307,0.022639843263439794,0.0,0.02202180953956252,0.03884474216336277,0.050724346842954626,0.0579340338419341,0.0606283601166038,0.06449814090440724,0.06448956124616627,0.06090706465271307,0.05310563524901689,0.04055937305375909,0.0229137116293229,0.0,0.021812448838413736,0.03844744092015942,0.05000520584666142,0.056453859036246695,0.06271774614541512,0.06563010470600097,0.06557048304755828,0.06181741662323084,0.053758589370957975,0.040938061825370256,0.023067299280027584,0.0,0.021670723484791325,0.037997318781605165,0.04874715284895348,0.05840851255810219,0.06360492874674319,0.06646559705045472,0.06623130593248878,0.06223749221503639,0.053954756714478046,0.04099519002195301,0.023084508429247162,0.0,0.021474280786229878,0.03706486119017843],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.21495435336519841,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2715462916433463,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5134993549914553,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.004234550910426658,0.011415801719201708,0.0078115956335774025,0.0,0.0,0.0,0.0057202181212736205,0.018547983223214628,0.02328718452474438,0.01349987663189349,0.0030669986826499674,0.0,0.0],"upper":[0.0,-0.0035624410187058567,-0.014404298482437166,-0.022821941868812846,-0.01675009977242409,-0.004787588274799889,0.0,0.0,0.0,-0.0050648199173928465,-0.008878338497805682,-0.003215068619730334,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":4,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4]],"q":[1.0,1.0,1.0,1.0,1.0,0.0,0.01890426963670274,1.0,1.0,1.0,0.0,0.0,0.0,0.9718510082913897,1.0,0.0,0.0,0.0,0.0,0.08107127840425653],"risk":0.062079853229565225,"risks":[0.03434287377085164,0.04583146657805473,0.05343265543782527,0.057323947010139265,0.05784606908300424,0.055471229791526244,0.050771376836976745,0.04438645670585972,0.03699267388897842,0.029270750100502396,0.021874183497034294,0.020821100755685048,0.037332726857708554,0.04940165207947693,0.05711803117771805,0.0607643142827983,0.06078416128903899,0.05775135624503397,0.05233872174396603,0.04528703331392403,0.03737393380821935,0.02938284779570377,0.0,0.021886235380750692,0.03895743478476428,0.05118943744716545,0.058771807269695664,0.06207985322956516,0.061646649788305335,0.05813505730062063,0.052309742423240824,0.04500919852377305,0.03711776608955408,0.022605254188578967,0.0,0.022389984716118316,0.039620918143942176,0.05176523253792813,0.05909916722499953,0.06207985322956522,0.06132239789853844,0.05757696952635516,0.051705881979992874,0.04466067932398926,0.039336173585327726,0.022176635687219802,0.0,0.022516203169243715,0.03966607811686388,0.051604968430273554,0.058686342751548215,0.06144540916658853,0.06058272959428257,0.05694783417566829,0.051522835663096456,0.050865696033275315,0.03891336453311774,0.02209889572690016,0.0,0.022420635571007538,0.03938212554335554,0.05111427495694873,0.05804648783979349,0.06079888425962743,0.060173417375548516,0.057144990489645386,0.05784038695457405,0.050702015747345924,0.03900880395133943,0.022217993688875427,0.0,0.022237510805250486,0.03902458686842128,0.050665761759330005,0.05767514181658315,0.06077550611034224,0.06089740640508967,0.06088043935049964,0.0580290256585009,0.05106257369186839,0.039336846864268964,0.0224000700386186,0.0,0.022090995928580198,0.038841089872528156,0.050639057220932204,0.0581014871767179,0.06207985322956522,0.06057967380145102,0.06137543771412357,0.058603770931067424,0.05154419973031403,0.03964154785677701,0.022520472454682552,0.0,0.022108062232872202,0.039096032090046175,0.05145325963730368,0.0599216080018915,0.057505538466950404,0.06121690248069929,0.0619866786155468,0.05904867006687863,0.05176993915952541,0.039671811039413356,0.022450877365215057,0.0,0.022429314702885554,0.04008723482068757,0.053581454979570994,0.05219910908564337,0.0580236776436578,0.06157629665594668,0.062079853229565225,0.05885555318705022,0.051348902167344224,0.03915568672671974,0.022047955439703313,0.0,0.023214336321417242,0.0421476856387893],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.028022230768825263,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.38242755037168996,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0741722924039792,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5153779264555056,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0010059360147372128,0.0,0.0,0.0,0.0,0.004548357602600422,0.013049067056726503,0.011341009667101562,0.0,0.0,0.0039263652231335535,0.012488368254342236,0.0142827699821424,0.006122754583527275,0.0,0.0],"upper":[-0.0004550603842478534,-0.0035160939637565287,-0.008938199975910645,-0.009788402168614294,-0.00417212783385727,0.0,0.0,-0.00779516255289932,-0.013239227447526074,-0.007318699739832291,0.0,0.0,0.0,0.0,-0.0038526910899141006,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3]],"q":[0.0810712784042241,1.0,1.0,1.0,0.0,0.9718510082914018,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.018904269636691333,1.0,0.0,0.0,0.0,1.0],"risk":0.0620798532295652,"risks":[0.04214768563878949,0.053581454979571175,0.05992160800189161,0.06207985322956522,0.06089740640508959,0.05714499048964533,0.05152283566309618,0.04466067932398898,0.037117766089553805,0.029382847795703437,0.021874183497034183,0.02321433632141729,0.040087234820687635,0.05145325963730368,0.05810148717671784,0.06077550611034216,0.06017341737554843,0.05694783417566812,0.051705881979992596,0.04500919852377283,0.03737393380821924,0.029270750100502396,0.0,0.02242931470288559,0.03909603209004619,0.05063905722093216,0.057675141816583064,0.06079888425962729,0.0605827295942824,0.05757696952635499,0.05230974242324066,0.04528703331392392,0.03699267388897853,0.022047955439703327,0.0,0.022108062232872185,0.0388410898725281,0.05066576175932992,0.058046487839793465,0.061445409166588416,0.061322397898538356,0.058135057300620574,0.05233872174396603,0.044386456705859834,0.03915568672671976,0.02245087736521507,0.0,0.022090995928580194,0.039024586868421245,0.051114274956948716,0.05868634275154819,0.06207985322956522,0.061646649788305335,0.05775135624503408,0.05077137683697697,0.051348902167344286,0.03967181103941341,0.022520472454682593,0.0,0.022237510805250448,0.03938212554335554,0.05160496843027354,0.05909916722499953,0.06207985322956522,0.06078416128903913,0.05547122979152641,0.05885555318705025,0.05176993915952542,0.03964154785677701,0.02240007003861858,0.0,0.022420635571007583,0.03966607811686395,0.05176523253792821,0.058771807269695775,0.06076431428279849,0.05784606908300452,0.06207985322956521,0.059048670066878604,0.05154419973031399,0.03933684686426892,0.022217993688875417,0.0,0.022516203169243736,0.03962091814394225,0.05118943744716557,0.0571180311777183,0.05732394701013957,0.06157629665594662,0.0619866786155467,0.05860377093106731,0.051062573691868285,0.03900880395133934,0.02209889572690008,0.0,0.022389984716118385,0.03895743478476438,0.04940165207947715,0.05343265543782555,0.05802367764365766,0.06121690248069911,0.061375437714123376,0.0580290256585007,0.050702015747345744,0.038913364533117584,0.022176635687219722,0.0,0.021886235380750744,0.03733272685770872,0.04583146657805498,0.05219910908564313,0.05750553846695012,0.060579673801450705,0.06088043935049933,0.057840386954573754,0.05086569603327504,0.03933617358532754,0.02260525418857885,0.0,0.02082110075568516,0.03434287377085184],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.07417229240397927,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.382427550371689,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.028022230768826133,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5153779264555056,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.006122754583527275,0.0,0.0,0.0,0.014282769982142403,0.011341009667101564,0.0,0.0,0.012488368254342241,0.013049067056726503,0.0,0.0,0.003926365223133555,0.004548357602600422,0.0010059360147372123,0.0,0.0],"upper":[0.0,-0.003852691089914101,-0.007318699739832289,-0.00417212783385727,0.0,0.0,-0.013239227447526071,-0.009788402168614298,0.0,0.0,-0.007795162552899318,-0.008938199975910652,0.0,0.0,0.0,-0.0035160939637565343,0.0,0.0,0.0,-0.0004550603842478548,0.0]}},{"n0":5,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2]],"q":[0.894996886014574,1.0,1.0,0.0,1.0,1.0,0.0,1.0,1.0,0.0,0.0,1.0,0.0,0.0,1.0,0.0,0.0,0.10500311398541598],"risk":0.06646559705045468,"risks":[0.03706486119017818,0.048747152848953174,0.056453859036246334,0.060628360116603414,0.061714036454570076,0.060154268414692125,0.056392436361515086,0.05087192065958479,0.044036101673446904,0.036328359767647145,0.028192075306731068,0.021474280786229785,0.03799731878160502,0.05000520584666125,0.057934033841933935,0.06221989462795857,0.06329888006527071,0.06160708201440579,0.05758059233589935,0.05165550289028692,0.04426790553810389,0.03585389213988599,0.0,0.02167072348479131,0.038447440920159386,0.05072434684295457,0.05889563579002735,0.06335550229822809,0.06449814090440723,0.06271774614541514,0.0584085125581022,0.05196463467931889,0.04378030704591568,0.02308450842924722,0.0,0.021812448838413708,0.038844742163362735,0.05141976719372153,0.059860411148364545,0.06448956124616617,0.06563010470600092,0.06360492874674317,0.05873692058726726,0.05134896744644779,0.04099519002195308,0.0230672992800276,0.0,0.022021809539562526,0.039361245256407384,0.05224682450822683,0.06090706465271303,0.06557048304755825,0.06646559705045471,0.06382092401909462,0.05786498131117013,0.05395475671447814,0.040938061825370305,0.02291371162932294,0.0,0.022315220811065385,0.03997766793618304,0.05310563524901686,0.061817416623230814,0.06623130593248874,0.06646559705045466,0.06263858385079246,0.06223749221503643,0.05375858937095799,0.0405593730537591,0.022639843263439773,0.0,0.0226398432634398,0.04055937305375912,0.053758589370958024,0.062237492215036466,0.06599608158599446,0.06503435748383202,0.06623130593248878,0.061817416623230814,0.053105635249016875,0.03997766793618305,0.022315220811065406,0.0,0.022913711629322923,0.0409380618253703,0.053954756714478136,0.06184550242298259,0.06449200507721964,0.06646559705045468,0.06557048304755823,0.06090706465271301,0.052246824508226805,0.03936124525640738,0.022021809539562492,0.0,0.02306729928002762,0.0409951900219531,0.05355515486808429,0.06051867646072892,0.06360492874674312,0.06563010470600088,0.06448956124616616,0.059860411148364503,0.0514197671937215,0.03884474216336268,0.021812448838413687,0.0,0.023084508429247228,0.04074308690728099,0.05265284821522681,0.058408512558102074,0.06271774614541496,0.06449814090440706,0.06335550229822794,0.05889563579002721,0.050724346842954446,0.03844744092015928,0.02167072348479124,0.0,0.023041075928935093,0.040399756734746106],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.27154629164334654,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.21495435336519814,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5134993549914554,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0030669986826499683,0.0,0.0,0.013499876631893493,0.0,0.0,0.023287184524744393,0.007811595633577405,0.0,0.018547983223214635,0.011415801719201712,0.0,0.005720218121273623,0.00423455091042666,0.0,0.0],"upper":[0.0,-0.0032150686197303336,-0.004787588274799888,0.0,-0.008878338497805683,-0.016750099772424087,0.0,-0.005064819917392849,-0.022821941868812843,0.0,0.0,-0.01440429848243716,0.0,0.0,-0.0035624410187058545,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1]],"q":[1.0,1.0,0.9692711268141684,1.0,0.0,1.0,0.0,1.0,0.0,1.0,0.0,0.06341168296612283,0.0,0.0],"risk":0.07843358704493256,"risks":[0.025015693911553685,0.03485938723025296,0.04292697812423385,0.04921846659349635,0.05373385263804051,0.05647313625786626,0.05743631745297362,0.056623396223362654,0.05403437256903332,0.0496692464899855,0.0435280179862193,0.016760491514714877,0.03115777000770327,0.0431918354789652,0.05286268792850063,0.06017032735630956,0.06511475376239206,0.06769596714674808,0.06791396750937756,0.06576875485028055,0.06126032916945712,0.05438869046690725,0.0,0.019326478556769895,0.035758789799910956,0.04929693372942316,0.05994091034530652,0.06769071964756107,0.07254636163618672,0.07450783631118357,0.07357514367255152,0.06974828372029068,0.06302725645440094,0.025590393727808407,0.0,0.021072683245345288,0.038808443463844246,0.0532072806554969,0.06426919482030324,0.07199418595826329,0.07638225406937701,0.07743339915364444,0.07514762121106555,0.06952492024164031,0.04476949608236563,0.024219328924958563,0.0,0.02211150930748997,0.04055385684742846,0.0553270426198155,0.06643106662465101,0.0738659288619351,0.07763162933166767,0.07772816803384874,0.07415554496847837,0.058795987580858876,0.043073682992784613,0.02347502046583164,0.0,0.02264862159528967,0.04142088525170066,0.056316790969232935,0.06733633874788655,0.07447952858766146,0.07774636048855771,0.07713683445057529,0.0687033742561204,0.05745309827063465,0.04225244389945265,0.023101411142574437,0.0,0.02294821047172935,0.04194604255776242,0.0569934962580993,0.06809057157273993,0.07523726850168436,0.07843358704493256,0.07516090006129551,0.06790594558291828,0.05676237833760009,0.041730198325341,0.022809405546140978,0.0,0.02330198168691809,0.0427153506068953,0.05824010675993155,0.06987625014602691,0.07762378076518131,0.07843358704493256,0.0745954091762312,0.06706359665201488,0.055838149472283584,0.04091906763703736,0.022306351146276132,0.0,0.024000014198208897,0.04430639374090278,0.060919138628081765,0.07383824885974574,0.07843358704493257,0.07734896899289154,0.07289095757510547,0.0650595527915744,0.05385475464229832,0.039276563127277224,0.021324978246511143,0.0,0.025301628387743833,0.0472298634097427,0.06578470506599655,0.07485502864979543,0.07579492784798401,0.07379289053776888,0.06884891671915004,0.060963006392127456,0.05013515955670116,0.03636537621287117,0.019653656360637425,0.0,0.027404407130958857,0.051866877753513986],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5068347367058584,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.13808893780969111,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.35507632548445045,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.005154697963224672,0.0,0.019000630796381215,0.0,0.030426773864079933,0.0,0.02375787828308712,0.0,0.007438773031686012,0.0014910542790734966,0.0],"upper":[-0.0001964614570849611,-0.0017811890732569204,0.0,-0.010181947835608766,0.0,-0.02324571331906848,0.0,-0.025796698634532506,0.0,-0.012414823647273369,0.0,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0]],"q":[1.0,0.49337090434958686,1.0,1.0,0.3813218564561113,0.0,0.0,0.8668053602556612],"risk":0.12500000000000003,"risks":[0.02083333333333333,0.03125,0.041666666666666685,0.05208333333333334,0.0625,0.07291666666666669,0.08333333333333331,0.09375,0.10416666666666669,0.11458333333333337,0.12500000000000006,0.010315284165627367,0.020630568331254734,0.030945852496882115,0.04126113666250947,0.05157642082813685,0.06189170499376423,0.07220698915939161,0.08252227332501894,0.09283755749064632,0.1031528416562737,0.11346812582190108,0.0,0.010696787764038013,0.02139357552807604,0.032090363292114066,0.04278715105615208,0.05348393882019009,0.0641807265842281,0.07487751434826612,0.08557430211230416,0.09627108987634214,0.10696787764038018,0.03810500496669527,0.0,0.011894995033304732,0.02378999006660945,0.03568498509991418,0.0475799801332189,0.059474975166523614,0.07136997019982835,0.08326496523313304,0.0951599602664378,0.10705495529974252,0.07192432768706691,0.03596216384353348,0.0,0.014037836156466553,0.028075672312933106,0.042113508469399666,0.05615134462586621,0.07018918078233277,0.0842270169387993,0.09826485309526589,0.11230268925173242,0.09876082703029934,0.06584055135353291,0.03292027567676643,0.0,0.017079724323233555,0.034159448646467125,0.051239172969700666,0.06831889729293425,0.08539862161616776,0.10247834593940133,0.11955807026263493,0.11666666666666665,0.08750000000000001,0.05833333333333331,0.029166666666666657,0.0,0.020833333333333356,0.041666666666666664,0.06250000000000001,0.08333333333333333,0.10416666666666669,0.12500000000000003,0.125,0.1,0.075,0.05,0.025000000000000015,0.0,0.024999999999999974,0.05,0.07499999999999997,0.1,0.12500000000000003,0.1248121863273584,0.10401015527279867,0.08320812421823891,0.062406093163679184,0.041604062109119454,0.020802031054559706,0.0,0.029197968945440293,0.058395937890880524,0.08759390683632082,0.1167918757817611,0.11908611833922635,0.10207381571933688,0.08506151309944739,0.0680492104795579,0.05103690785966844,0.034024605239778946,0.017012302619889494,0.0,0.03298769738011048,0.06597539476022103,0.09896309214033158,0.11285250033888444,0.0987459377965239,0.08463937525416332,0.07053281271180277,0.056426250169442214,0.042319687627081645,0.028213125084721107,0.014106562542360538,0.0,0.035893437457639475,0.07178687491527895],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999998,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":8,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[0,8]],"q":[1.0,0.14490283719065863,0.0,0.09448464496862172,1.0,0.6384210451518563,1.0,1.0,0.13139198906129496],"risk":0.12499999999999999,"risks":[0.07125307822130604,0.09865870892691538,0.11666666666666667,0.12499999999999997,0.12499999999999997,0.11907301420136099,0.11021228228848196,0.10177090984520742,0.09763654741602168,0.10289811430864698,0.125,0.03562653911065302,0.06577247261794358,0.08750000000000001,0.09999999999999998,0.10416666666666666,0.10206258360116657,0.09643574700242169,0.09046303097351771,0.0878728926744195,0.09354374028058815,0.11458333333333331,0.0,0.03288623630897179,0.05833333333333335,0.075,0.08333333333333333,0.08505215300097216,0.08265921171636145,0.079155152101828,0.07810923793281732,0.08418936625252932,0.10416666666666663,0.01437346088934697,0.0,0.02916666666666669,0.05,0.0625,0.06804172240077772,0.06888267643030122,0.06784727323013828,0.0683455831912152,0.07483499222447054,0.09375,0.028746921778693955,0.017113763691028214,0.0,0.024999999999999988,0.04166666666666665,0.05103129180058329,0.05510614114424095,0.05653939435844857,0.05858192844961299,0.06548061819641171,0.08333333333333331,0.04312038266804093,0.03422752738205641,0.02083333333333333,0.0,0.020833333333333325,0.03402086120038886,0.041329605858180726,0.045231515486758855,0.04881827370801084,0.05612624416835288,0.07291666666666663,0.057493843557387896,0.051341291073084605,0.04166666666666666,0.025,0.0,0.017010430600194443,0.027553070572120475,0.03392363661506914,0.03905461896640866,0.046771870140294075,0.0625,0.07186730444673488,0.06845505476411282,0.06250000000000001,0.05000000000000003,0.029166666666666695,0.0,0.013776535286060224,0.022615757743379428,0.02929096422480648,0.03741749611223524,0.052083333333333315,0.08624076533608184,0.085568818455141,0.08333333333333331,0.075,0.05833333333333333,0.03298956939980553,0.0,0.01130787887168972,0.01952730948320433,0.028063122084176453,0.04166666666666666,0.10061422622542882,0.10268258214616921,0.10416666666666667,0.10000000000000003,0.08750000000000002,0.06597913879961113,0.036223464713939786,0.0,0.009763654741602158,0.01870874805611762,0.03125,0.11498768711477578,0.1197963458371974,0.12499999999999997,0.125,0.11666666666666665,0.09896870819941667,0.0724469294278795,0.03869212112831023,0.0,0.009354374028058825,0.020833333333333343],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":7,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[1,7]],"q":[0.0,0.0,0.7693265342520198,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.2306734657479804,1.0,1.0],"risk":0.07806207578537004,"risks":[0.0520241181393256,0.06572542230631988,0.07355592397340019,0.07722019462477026,0.07806207578537006,0.07694377784729112,0.07423175239733998,0.06987388459550564,0.0635543726292137,0.054914481743364774,0.043829180821279845,0.027481434375280788,0.047204908361352785,0.06074995546929578,0.06963081997019863,0.07504310818428475,0.07773380598896601,0.07797981248924557,0.07566196026900762,0.07042331311685424,0.06190235259526944,0.05003348529701174,0.0,0.025296434259246155,0.04422197863902761,0.058114113180435786,0.06802758923794225,0.07459650199544968,0.07800586425498748,0.07806207578537006,0.07435350299325871,0.06649420415418661,0.054445655916227575,0.01957981501348323,0.0,0.023971993482595683,0.04267007425548172,0.05701551894634252,0.06753186586674215,0.07430990769456558,0.07707423114459291,0.0753449422584273,0.06869003642011617,0.05706569267892725,0.03622087941573051,0.021315605583614325,0.0,0.023298703195336452,0.04200689730948555,0.056539897602843406,0.06689194280797991,0.07269842634667623,0.07339763091235987,0.06848984939305813,0.05789359558511087,0.0499231932067418,0.039243251010089096,0.022305998191240597,0.0,0.02300172432737138,0.041620597203753475,0.05575196959523056,0.06493466139162005,0.06851156895505645,0.0658936430730126,0.05692936463477832,0.06068675638651712,0.05378293627942435,0.040889988056317446,0.02277396466947234,0.0,0.022773964669472357,0.04088998805631743,0.053782936279424334,0.06068675638651716,0.06090141745997943,0.05417299982792975,0.06851156895505647,0.06493466139162009,0.05575196959523057,0.041620597203753495,0.02300172432737141,0.0,0.022305998191240566,0.039243251010089075,0.049923193206741795,0.05351317255395871,0.049624501164565044,0.07339763091235986,0.07269842634667625,0.06689194280797993,0.05653989760284342,0.04200689730948556,0.023298703195336435,0.0,0.021315605583614325,0.0362208794157305,0.0437289083549504,0.04328386864468428,0.07534494225842728,0.07707423114459293,0.07430990769456558,0.06753186586674217,0.05701551894634252,0.04267007425548172,0.023971993482595686,0.0,0.019579815013483222,0.0315486248629545,0.03515110226828734,0.07435350299325871,0.07806207578537006,0.07800586425498746,0.0745965019954497,0.06802758923794223,0.05811411318043578,0.04422197863902758,0.025296434259246135,0.0,0.01697232207797105,0.025226202035374345],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.4028679555441165,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.06669479722514737,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5304372472307362,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.001964449878256907,0.004866970015848872,0.0,0.0,0.0,0.0,0.0,0.0,0.006177444450284191,0.022632510542150458,0.0344981525474644,0.02719209174150385,0.010259341569878925,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.013875778156464413,-0.022781803221277656,-0.01814480271446566,-0.007841081351237983,-0.0015205781421818317,0.0,0.0,0.0,0.0,0.0,0.0,-0.0015289147178367884,-0.0004485316032021524,0.0]}},{"n0":2,"n1":6,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[2,6]],"q":[0.0,1.0,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.5000000000000002,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0,1.0],"risk":0.06633984000000001,"risks":[0.03830805999999999,0.04994105390624998,0.05762303999999996,0.061796014843749913,0.06281249999999997,0.061042304531249925,0.05693439999999994,0.05103627046874992,0.04397309999999999,0.03638916015624993,0.02885375999999995,0.022123850000000007,0.03916197187499999,0.05166719999999998,0.05999479062499999,0.064453125,0.06540547499999999,0.06332480000000001,0.058803543749999965,0.05252040000000002,0.045166015625,0.037329600000000074,0.0,0.02240093375,0.03991680000000001,0.05278941937499998,0.06125000000000003,0.06561607500000002,0.06633984000000001,0.06400946562500004,0.05930496000000007,0.05291015625000006,0.045382400000000045,0.022354199999999987,0.0,0.02261376000000002,0.04030505874999999,0.053203125000000004,0.06154894687500001,0.06573760000000001,0.06631197562499999,0.06390909,0.059160156249999984,0.052545600000000026,0.03960414,0.022301231093750023,0.0,0.022666866406249986,0.04031249999999999,0.05307893296875002,0.06127615999999997,0.06536901328125,0.06591509999999998,0.06345458984375002,0.058352639999999956,0.05216751,0.03964668750000002,0.022317440000000004,0.0,0.022578124999999987,0.040080875625000005,0.05271359999999997,0.06083851812499996,0.06490529999999997,0.06533203124999998,0.06233695999999994,0.06046199999999999,0.05237842968750001,0.039808,0.022429617187500004,0.0,0.022429617187500014,0.03980799999999999,0.052378429687500005,0.060462000000000016,0.0643310546875,0.064032,0.06490529999999999,0.06083851812500002,0.0527136,0.040080875625000026,0.02257812500000002,0.0,0.02231743999999997,0.03964668749999999,0.052167509999999986,0.05999023437499998,0.06297119999999998,0.06591509999999999,0.06536901328125001,0.06127616000000001,0.053078932968750006,0.0403125,0.022666866406249972,0.0,0.022301231093750016,0.03960414,0.051848144531250015,0.05868800000000002,0.06390908999999997,0.066311975625,0.06573760000000001,0.06154894687500001,0.053203125000000004,0.04030505874999999,0.02261376000000002,0.0,0.022354199999999973,0.03944335937499999,0.05071584000000001,0.05930495999999999,0.064009465625,0.06633984000000001,0.06561607500000002,0.06125,0.05278941937499999,0.0399168,0.022400933749999977,0.0,0.02231445312500002,0.03858816000000002],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0003287999999999999,0.0,0.0,0.0,0.0,0.0,0.0,0.0026812799999999986,0.00943488,0.0108864,0.0,0.0,0.0,0.0,0.0033739199999999986,0.013219199999999995,0.0209952,0.016588799999999994,0.005961599999999998,0.00019008000000000046,0.0,0.0],"upper":[0.0,-0.00019008000000000002,-0.0059615999999999975,-0.016588799999999997,-0.0209952,-0.013219199999999995,-0.003373919999999999,0.0,0.0,0.0,0.0,-0.010886400000000001,-0.009434879999999996,-0.0026812799999999994,0.0,0.0,0.0,0.0,0.0,0.0,-0.00032879999999999975,0.0]}},{"n0":3,"n1":5,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[3,0],[3,1],[3,2],[3,3],[3,4],[3,5]],"q":[0.0,0.8540243583235548,1.0,1.0,1.0,1.0,0.0,0.0,0.953597086839539,1.0,1.0,1.0,0.0,0.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.0,0.412203213504238,1.0],"risk":0.06064770053475937,"risks":[0.04222385919626318,0.052780696399053584,0.05800907546189013,0.0591076045877047,0.05714434406894714,0.0530242367701223,0.0474746735944061,0.0410491939343382,0.03414932110659347,0.02706453277083065,0.020030366332619787,0.023683540717376654,0.04037678061505117,0.0511565005949864,0.05707628232498038,0.05910333033595255,0.0580773087768518,0.054691192827187485,0.049494134767182785,0.04291634470554967,0.035315985964887,0.027048085124700916,0.0,0.022817974481512248,0.03937395568587278,0.05053558863244492,0.05712086024181043,0.05985225286825582,0.05933622561889704,0.056068023459441896,0.0504618141065904,0.04290615270707315,0.03384477430332744,0.021246366824757917,0.0,0.02237529991606697,0.039029587677076226,0.05059772654339108,0.05764493947550001,0.060647700534759375,0.06000270014099851,0.05606388418698788,0.04920756700976997,0.03992561821885321,0.03757298877486134,0.02192250528789489,0.0,0.022242759496702104,0.03908190390481997,0.05089665275300172,0.05799884318629611,0.06064770053475935,0.059094861236097085,0.05365964811234197,0.044834598000566495,0.04920743123610735,0.03868906457839459,0.022213130185016135,0.0,0.02226854889747773,0.03919409057842993,0.05089817623132538,0.05747025595665442,0.05902120295535562,0.05576870048113697,0.04815449155669016,0.056454477396879255,0.05050717822051414,0.03910537225137281,0.022266620966497033,0.0,0.022269364552705267,0.038989519373962035,0.05005529331563731,0.05540351845828406,0.05510791380948654,0.049506873574381494,0.0596961282481466,0.05768827267908587,0.05089301551224076,0.03914835004657008,0.022265777598277543,0.0,0.02205198936461748,0.03810543511368491,0.047896568270485385,0.05131736301770551,0.04855211551973204,0.05939160258346513,0.06064770053475936,0.057917956813703875,0.050891330761445676,0.0392025839854562,0.022408935967738172,0.0,0.02144099944579784,0.03624926432964558,0.04410400825309245,0.044989385637768164,0.05607733699897676,0.0599047404840015,0.06064770053475937,0.05788212250320012,0.05109430336193704,0.03966452522659552,0.0228832621231144,0.0,0.020304669985533288,0.03324169488992949,0.03855664895245059,0.05036698589340966,0.05608259733909647,0.059675358587317616,0.060647700534759375,0.058372001835376094,0.05208053427049933,0.04088678362326219,0.023838146057338888,0.0,0.018571153529482305,0.029030667266674484],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5133689839572191,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4866310160427809,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0002600013368983958,0.0,0.0,0.0,0.0,0.0,0.001968581550802139,0.004828596256684495,0.0,0.0,0.0,0.0,0.004002605614973263,0.012186457219251342,0.011956524064171132,0.0,0.0,0.0,0.0025548409090909094,0.0082593449197861,0.010058663101604283,0.004934438502673802,0.0,0.0,0.0],"upper":[0.0,0.0,-0.0032190641711229914,-0.008124304812834219,-0.008259344919786093,-0.0031631363636363628,0.0,0.0,0.0,-0.011956524064171116,-0.015087994652406414,-0.006135513368983957,0.0,0.0,0.0,0.0,-0.007401657754010692,-0.0037360748663101597,0.0,0.0,0.0,0.0,0.0,-0.0006109304812834223,0.0]}},{"n0":4,"n1":4,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4],[4,0],[4,1],[4,2],[4,3],[4,4]],"q":[0.0,1.0,1.0,1.0,1.0,0.0,0.7649817707128088,1.0,1.0,1.0,0.0,0.0,0.2894189121969398,1.0,1.0,0.0,0.0,0.0,0.7649817707128066,1.0,0.0,0.0,0.0,0.0,0.0],"risk":0.060690781250000006,"risks":[0.03908050422764536,0.049236539495864554,0.054736980707089294,0.056546086760443814,0.05546983620117074,0.05218146291301773,0.047246991810624195,0.04115077453190791,0.03432102513045154,0.027155355767888967,0.020046312406292843,0.02214449095613911,0.03812881332084961,0.04890887255726749,0.05529645532316804,0.05798565811194112,0.05757931589356602,0.05461543075558695,0.04959360054408801,0.04300144750466828,0.03534104692341711,0.0271553557678893,0.0,0.021849739820622566,0.03814905155943217,0.04952516570685135,0.056525275752887766,0.05964484375000001,0.059355905875963955,0.05613537799673862,0.05049336122933229,0.04300144750466833,0.034321025130451654,0.022387035179377426,0.0,0.021927379525315878,0.03859066854251447,0.050364331505454274,0.05760668517343995,0.06069078124999999,0.06003528902166369,0.05613537799673862,0.04959360054408801,0.04115077453190813,0.03931934844056784,0.022466107974684152,0.0,0.022126750858463714,0.039032158399431804,0.05091596860004753,0.05802575218561945,0.06069078124999999,0.05935590587596393,0.054615430755587,0.04724699181062436,0.05103963429314867,0.03937518458248554,0.02236496164153628,0.0,0.02227179495087196,0.039209307380734436,0.05091596860004752,0.05760668517343995,0.059644843749999954,0.05757931589356602,0.052181462913017784,0.05797472424711228,0.051049730994545746,0.03921784160056818,0.022267267549128028,0.0,0.02227179495087199,0.039032158399431804,0.0503643315054543,0.056525275752887794,0.057985658111941174,0.05546983620117085,0.06069078125000004,0.05796240232656003,0.05090736889995247,0.03913313324426556,0.022267267549128045,0.0,0.022126750858463703,0.038590668542514486,0.04952516570685135,0.055296455323168126,0.056546086760443925,0.059848494124036075,0.06069078125000002,0.05789104781438056,0.05090736889995246,0.039217841600568175,0.022364961641536243,0.0,0.021927379525315892,0.038149051559432184,0.048908872557267544,0.05473698070708943,0.05615827200326141,0.05987215160333633,0.060690781250000006,0.05796240232656002,0.05104973099454572,0.0393751845824855,0.022466107974684138,0.0,0.021849739820622563,0.03812881332084964,0.04923653949586464,0.05033543877066781,0.05615827200326141,0.05984849412403606,0.060690781250000006,0.05797472424711224,0.0510396342931486,0.0393193484405678,0.022387035179377388,0.0,0.02214449095613915,0.03908050422764544],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0011576249999999998,0.0,0.0,0.0,0.0,0.004382437499999999,0.008599499999999996,0.0,0.0,0.0,0.0059403749999999995,0.014469,0.010647000000000004,0.0,0.0,0.0028437812500000004,0.007354750000000001,0.006717750000000003,0.002197000000000001,0.0,0.0],"upper":[0.0,-0.0011576249999999998,-0.004382437499999999,-0.0059403749999999995,-0.0028437812500000004,0.0,0.0,-0.008599499999999996,-0.014469,-0.007354750000000001,0.0,0.0,0.0,-0.010647000000000004,-0.006717750000000003,0.0,0.0,0.0,0.0,-0.002197000000000001,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":3,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3],[5,0],[5,1],[5,2],[5,3]],"q":[1.0,1.0,1.0,1.0,0.4122032135042378,1.0,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.9535970868395396,1.0,0.0,0.0,0.0,0.8540243583235528,0.0,0.0,0.0,0.0],"risk":0.06064770053475937,"risks":[0.029030667266674456,0.038556648952450576,0.044989385637768164,0.048552115519731986,0.04950687357438144,0.04815449155669016,0.04483459800056644,0.03992561821885304,0.033844774303327274,0.027048085124700805,0.020030366332619676,0.01857115352948229,0.03324169488992949,0.04410400825309245,0.05131736301770548,0.05510791380948654,0.055768700481136996,0.05365964811234197,0.04920756700976997,0.0429061527070731,0.03531598596488694,0.027064532770830874,0.0,0.020304669985533316,0.036249264329645606,0.0478965682704854,0.05540351845828412,0.059021202955355734,0.05909486123609711,0.05606388418698793,0.05046181410659045,0.04291634470554967,0.03414932110659358,0.023838146057338912,0.0,0.02144099944579784,0.038105435113684916,0.05005529331563731,0.05747025595665442,0.06064770053475935,0.06000270014099848,0.05606802345944184,0.049494134767182785,0.04104919393433826,0.0408867836232622,0.0228832621231144,0.0,0.022051989364617493,0.038989519373962035,0.05089817623132542,0.05799884318629611,0.060647700534759375,0.05933622561889698,0.054691192827187485,0.04747467359440616,0.05208053427049938,0.039664525226595554,0.022408935967738203,0.0,0.022269364552705236,0.03919409057842992,0.050896652753001675,0.05764493947549995,0.05985225286825574,0.05807730877685169,0.0530242367701223,0.05837200183537611,0.05109430336193705,0.03920258398545621,0.022265777598277532,0.0,0.02226854889747776,0.03908190390481997,0.050597726543391064,0.0571208602418104,0.05910333033595258,0.057144344068947195,0.060647700534759354,0.0578821225032001,0.05089133076144567,0.03914835004657008,0.02226662096649705,0.0,0.02224275949670209,0.03902958767707624,0.05053558863244492,0.05707628232498044,0.05910760458770481,0.05967535858731761,0.06064770053475936,0.057917956813703875,0.05089301551224075,0.039105372251372804,0.022213130185016108,0.0,0.022375299916066974,0.03937395568587276,0.05115650059498643,0.05800907546189016,0.05608259733909647,0.0599047404840015,0.06064770053475935,0.05768827267908588,0.050507178220514135,0.038689064578394564,0.02192250528789488,0.0,0.02281797448151223,0.04037678061505119,0.05278069639905368,0.05036698589340968,0.05607733699897678,0.059391602583465146,0.05969612824814663,0.05645447739687926,0.049207431236107324,0.03757298877486133,0.021246366824757893,0.0,0.023683540717376682,0.04222385919626325],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5133689839572191,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48663101604278086,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0049344385026738,0.0,0.0,0.0,0.010058663101604281,0.01195652406417113,0.0,0.0,0.0082593449197861,0.01218645721925134,0.004828596256684493,0.0,0.0025548409090909094,0.004002605614973262,0.001968581550802139,0.00026000133689839573,0.0],"upper":[-0.0006109304812834223,-0.0037360748663101597,-0.006135513368983957,-0.0031631363636363628,0.0,-0.007401657754010694,-0.015087994652406414,-0.008259344919786093,0.0,0.0,-0.011956524064171118,-0.00812430481283422,0.0,0.0,0.0,-0.0032190641711229914,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":2,"cost":0,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2],[6,0],[6,1],[6,2]],"q":[1.0,1.0,1.0,0.0,1.0,1.0,0.0,1.0,1.0,0.0,0.4999999999999995,1.0,0.0,0.0,1.0,0.0,0.0,1.0,0.0,0.0,0.0],"risk":0.06633983999999998,"risks":[0.038588159999999976,0.050715839999999957,0.058687999999999935,0.06297119999999992,0.06403199999999992,0.06233695999999994,0.058352639999999845,0.052545599999999915,0.04538239999999988,0.03732959999999974,0.02885375999999973,0.022314453124999994,0.039443359375,0.051848144531250015,0.059990234375000034,0.0643310546875,0.06533203125,0.06345458984375002,0.05916015625000004,0.05291015625000006,0.045166015625,0.03638916015624993,0.0,0.022354200000000008,0.039604140000000045,0.05216751000000004,0.06046200000000007,0.06490530000000008,0.06591510000000012,0.06390909000000011,0.05930496000000013,0.052520400000000134,0.043973100000000154,0.02240093374999999,0.0,0.022301231093750023,0.039646687500000014,0.05237842968750002,0.06083851812500002,0.06536901328125003,0.06631197562500002,0.0640094656250001,0.05880354375000002,0.051036270468750033,0.03991680000000001,0.022613760000000014,0.0,0.022317439999999994,0.03980799999999999,0.0527136,0.061276160000000024,0.06573760000000001,0.06633983999999998,0.06332480000000001,0.056934399999999996,0.05278941937500001,0.04030505875000001,0.02266686640625,0.0,0.02242961718749999,0.04008087562499999,0.053078932968749964,0.06154894687499998,0.06561607499999991,0.06540547499999994,0.061042304531249925,0.061249999999999985,0.05320312499999999,0.04031249999999999,0.022578124999999994,0.0,0.022578125000000025,0.0403125,0.05320312500000002,0.06125000000000003,0.064453125,0.0628125,0.06561607499999998,0.061548946874999996,0.05307893296875,0.040080875625000005,0.022429617187500014,0.0,0.02266686640624998,0.04030505874999999,0.052789419374999993,0.059994790625000016,0.061796014843750025,0.06633983999999998,0.06573759999999998,0.061276159999999975,0.052713599999999985,0.03980799999999998,0.02231743999999997,0.0,0.022613760000000024,0.0399168,0.051667200000000024,0.057623039999999986,0.06400946562499997,0.06631197562499998,0.06536901328124999,0.06083851812499999,0.05237842968749999,0.03964668749999999,0.022301231093750012,0.0,0.022400933749999977,0.03916197187500001,0.049941053906250005,0.059304959999999976,0.06390908999999999,0.06591509999999999,0.06490529999999999,0.06046199999999999,0.05216750999999998,0.03960413999999999,0.02235419999999997,0.0,0.02212385000000002,0.038308060000000026],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.00019008000000000002,0.0,0.0,0.0059615999999999975,0.0,0.0,0.016588799999999997,0.0,0.0,0.0209952,0.010886400000000001,0.0,0.013219199999999995,0.009434879999999996,0.0,0.003373919999999999,0.0026812799999999994,0.00032879999999999975,0.0],"upper":[-0.0003287999999999999,-0.0026812799999999986,-0.0033739199999999986,0.0,-0.00943488,-0.013219199999999995,0.0,-0.0108864,-0.0209952,0.0,0.0,-0.016588799999999994,0.0,0.0,-0.005961599999999998,0.0,0.0,-0.00019008000000000046,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":1,"cost":0,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1],[7,0],[7,1]],"q":[1.0,1.0,1.0,1.0,0.23067346574798034,1.0,0.0,1.0,0.0,1.0,0.0,0.7693265342520197,0.0,0.0,0.0,0.0],"risk":0.07806207578537004,"risks":[0.02522620203537429,0.0351511022682873,0.0432838686446842,0.04962450116456496,0.05417299982792967,0.05692936463477821,0.0578935955851107,0.05706569267892714,0.05444565591622735,0.05003348529701157,0.04382918082127962,0.016972322077971037,0.0315486248629545,0.0437289083549504,0.05351317255395871,0.06090141745997943,0.0658936430730126,0.06848984939305813,0.06869003642011617,0.06649420415418661,0.061902352595269494,0.054914481743364774,0.0,0.01957981501348325,0.036220879415730545,0.049923193206741864,0.06068675638651719,0.06851156895505658,0.07339763091235998,0.07534494225842736,0.07435350299325882,0.07042331311685435,0.06355437262921382,0.025296434259246152,0.0,0.021315605583614325,0.039243251010089096,0.05378293627942435,0.06493466139162007,0.07269842634667623,0.07707423114459291,0.07806207578537006,0.07566196026900762,0.0698738845955057,0.04422197863902761,0.023971993482595686,0.0,0.02230599819124059,0.04088998805631743,0.055751969595230544,0.06689194280797991,0.07430990769456558,0.07800586425498746,0.07797981248924557,0.07423175239734003,0.058114113180435835,0.04267007425548176,0.023298703195336473,0.0,0.02277396466947232,0.041620597203753454,0.056539897602843364,0.06753186586674209,0.0745965019954496,0.07773380598896595,0.07694377784729106,0.06802758923794225,0.05701551894634252,0.04200689730948555,0.023001724327371385,0.0,0.023001724327371405,0.04200689730948556,0.05701551894634252,0.06802758923794222,0.07504310818428475,0.07806207578537006,0.07459650199544969,0.06753186586674216,0.056539897602843406,0.04162059720375348,0.022773964669472353,0.0,0.023298703195336435,0.04267007425548173,0.05811411318043577,0.06963081997019868,0.07722019462477037,0.07800586425498747,0.07430990769456557,0.06689194280797993,0.05575196959523055,0.04088998805631744,0.02230599819124057,0.0,0.023971993482595683,0.04422197863902758,0.06074995546929579,0.07355592397340022,0.07806207578537003,0.07707423114459291,0.07269842634667625,0.06493466139162006,0.05378293627942434,0.03924325101008908,0.021315605583614325,0.0,0.025296434259246128,0.047204908361352785,0.06572542230631992,0.07435350299325873,0.07534494225842729,0.07339763091235987,0.06851156895505649,0.06068675638651713,0.049923193206741795,0.03622087941573051,0.01957981501348322,0.0,0.02748143437528081,0.052024118139325636],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.06669479722514737,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4028679555441165,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5304372472307362,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.01025934156987893,0.0,0.027192091741503853,0.0,0.034498152547464404,0.0,0.02263251054215047,0.0048669700158488725,0.006177444450284192,0.0019644498782569065,0.0],"upper":[-0.0004485316032021524,-0.0015205781421818317,-0.0015289147178367884,-0.007841081351237983,0.0,-0.018144802714465665,0.0,-0.02278180322127766,0.0,-0.013875778156464416,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":8,"n1":0,"cost":0,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0],[8,0]],"q":[0.13139198906129643,1.0,1.0,0.6384210451518507,1.0,0.0944846449686297,0.0,0.14490283719064181,1.0],"risk":0.12500000000000003,"risks":[0.02083333333333333,0.03125,0.041666666666666685,0.05208333333333334,0.0625,0.07291666666666669,0.08333333333333331,0.09375,0.10416666666666669,0.11458333333333337,0.12500000000000006,0.00935437402805886,0.01870874805611772,0.02806312208417658,0.03741749611223544,0.0467718701402943,0.05612624416835316,0.06548061819641199,0.07483499222447088,0.08418936625252971,0.0935437402805886,0.10289811430864748,0.0,0.009763654741602235,0.01952730948320447,0.029290964224806704,0.03905461896640894,0.04881827370801117,0.05858192844961341,0.06834558319121564,0.07810923793281788,0.08787289267442011,0.09763654741602235,0.03869212112831022,0.0,0.011307878871689776,0.022615757743379553,0.03392363661506931,0.045231515486759105,0.05653939435844885,0.06784727323013862,0.07915515210182839,0.09046303097351815,0.10177090984520792,0.07244692942787946,0.03622346471393975,0.0,0.013776535286060279,0.027553070572120558,0.04132960585818085,0.055106141144241116,0.06888267643030141,0.08265921171636167,0.09643574700242197,0.11021228228848229,0.09896870819941674,0.06597913879961118,0.03298956939980557,0.0,0.017010430600194422,0.03402086120038886,0.05103129180058327,0.06804172240077772,0.0850521530009721,0.10206258360116655,0.11907301420136099,0.11666666666666668,0.08750000000000002,0.05833333333333333,0.029166666666666664,0.0,0.02083333333333335,0.04166666666666665,0.0625,0.0833333333333333,0.10416666666666666,0.125,0.12500000000000003,0.10000000000000003,0.07500000000000001,0.05000000000000002,0.025000000000000022,0.0,0.024999999999999967,0.04999999999999999,0.07499999999999996,0.09999999999999998,0.125,0.125,0.10416666666666667,0.08333333333333331,0.062499999999999986,0.04166666666666666,0.020833333333333308,0.0,0.02916666666666669,0.05833333333333332,0.08750000000000001,0.1166666666666667,0.11979634583719725,0.10268258214616909,0.08556881845514089,0.06845505476411272,0.05134129107308454,0.034227527382056346,0.017113763691028194,0.0,0.03288623630897178,0.06577247261794364,0.09865870892691547,0.1149876871147752,0.1006142262254283,0.08624076533608138,0.07186730444673449,0.05749384355738759,0.04312038266804068,0.028746921778693795,0.014373460889346882,0.0,0.03562653911065313,0.07125307822130626],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,6.660892334659637e-19,0.0]}},{"n0":0,"n1":0,"cost":0.1,"outcomes":[[0,0]],"q":[0.5000000000000001],"risk":0.25,"risks":[1.387778780781446e-17,0.024999999999999974,0.04999999999999999,0.07499999999999998,0.09999999999999996,0.12499999999999997,0.14999999999999994,0.17499999999999996,0.1999999999999999,0.22499999999999998,0.25,0.025000000000000015,1.387778780781446e-17,0.025,0.04999999999999999,0.07499999999999998,0.09999999999999999,0.12499999999999997,0.15,0.17499999999999996,0.19999999999999996,0.22499999999999998,0.05000000000000002,0.025000000000000015,1.3877787807814454e-17,0.025,0.04999999999999999,0.07500000000000001,0.09999999999999996,0.12499999999999997,0.14999999999999994,0.17499999999999996,0.19999999999999996,0.07500000000000001,0.05000000000000002,0.024999999999999988,1.3877787807814454e-17,0.025,0.05000000000000002,0.07499999999999998,0.09999999999999999,0.12499999999999997,0.15,0.17500000000000002,0.10000000000000005,0.07500000000000004,0.05000000000000002,0.025000000000000015,1.387778780781446e-17,0.025,0.04999999999999996,0.07499999999999998,0.09999999999999994,0.12499999999999997,0.15,0.12500000000000003,0.10000000000000005,0.07500000000000001,0.05000000000000002,0.025000000000000015,1.3877787807814454e-17,0.024999999999999974,0.04999999999999999,0.07499999999999996,0.09999999999999996,0.12499999999999997,0.15000000000000005,0.12500000000000003,0.10000000000000002,0.07500000000000001,0.05000000000000002,0.024999999999999988,1.387778780781446e-17,0.025,0.04999999999999996,0.07499999999999998,0.09999999999999999,0.17500000000000007,0.15000000000000005,0.12500000000000003,0.10000000000000005,0.07500000000000004,0.05000000000000002,0.025000000000000043,1.387778780781446e-17,0.024999999999999946,0.04999999999999996,0.07499999999999998,0.20000000000000007,0.17500000000000002,0.15,0.125,0.10000000000000002,0.07499999999999998,0.05000000000000002,0.024999999999999988,1.387778780781446e-17,0.025,0.05000000000000002,0.2250000000000001,0.20000000000000007,0.17500000000000002,0.15000000000000005,0.12500000000000003,0.10000000000000002,0.07500000000000004,0.05000000000000002,0.025000000000000043,1.387778780781446e-17,0.025,0.25000000000000006,0.22500000000000003,0.2,0.17500000000000002,0.15,0.12499999999999999,0.10000000000000002,0.07499999999999998,0.05000000000000002,0.024999999999999988,4.163336342344336e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0],"upper":[0.0,0.0]}},{"n0":0,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1]],"q":[0.0,0.9090909090909091],"risk":0.14545454545454545,"risks":[7.569702440626067e-18,0.03409090909090906,0.06363636363636363,0.08863636363636364,0.10909090909090909,0.125,0.13636363636363635,0.14318181818181816,0.14545454545454545,0.14318181818181824,0.1363636363636364,0.01363636363636364,8.831319514063745e-18,0.03181818181818183,0.0590909090909091,0.08181818181818182,0.10000000000000002,0.11363636363636365,0.12272727272727274,0.12727272727272726,0.12727272727272732,0.12272727272727274,0.02727272727272727,0.015909090909090914,1.766263902812749e-17,0.029545454545454555,0.05454545454545455,0.07500000000000002,0.09090909090909091,0.10227272727272727,0.10909090909090907,0.11136363636363639,0.10909090909090907,0.0409090909090909,0.03181818181818182,0.018181818181818167,1.6401021954689813e-17,0.027272727272727282,0.05000000000000003,0.06818181818181819,0.08181818181818183,0.09090909090909091,0.09545454545454549,0.09545454545454546,0.05454545454545455,0.04772727272727274,0.03636363636363637,0.02045454545454546,1.2616170734376778e-17,0.02500000000000001,0.045454545454545435,0.061363636363636356,0.0727272727272727,0.07954545454545456,0.08181818181818182,0.06818181818181818,0.06363636363636364,0.05454545454545454,0.04090909090909091,0.022727272727272735,1.3877787807814457e-17,0.02272727272727271,0.04090909090909091,0.05454545454545452,0.06363636363636363,0.06818181818181818,0.08181818181818182,0.07954545454545454,0.07272727272727272,0.061363636363636356,0.045454545454545456,0.02499999999999998,1.5139404881252134e-17,0.02045454545454546,0.03636363636363635,0.04772727272727273,0.054545454545454564,0.09545454545454547,0.09545454545454547,0.09090909090909091,0.08181818181818183,0.0681818181818182,0.05,0.02727272727272731,1.6401021954689813e-17,0.018181818181818146,0.0318181818181818,0.04090909090909091,0.10909090909090909,0.11136363636363636,0.10909090909090907,0.10227272727272725,0.0909090909090909,0.07499999999999997,0.05454545454545454,0.029545454545454524,1.766263902812749e-17,0.015909090909090914,0.027272727272727282,0.12272727272727274,0.1272727272727273,0.12727272727272726,0.12272727272727274,0.11363636363636363,0.09999999999999999,0.08181818181818185,0.0590909090909091,0.031818181818181863,1.8924256101565167e-17,0.013636363636363641,0.13636363636363635,0.14318181818181816,0.14545454545454542,0.14318181818181816,0.13636363636363633,0.12499999999999996,0.10909090909090907,0.08863636363636361,0.06363636363636364,0.03409090909090906,2.2709107321878206e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.36363636363636365,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6363636363636364,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.10909090909090906,0.0,0.0],"upper":[0.0,0.0,0.0]}},{"n0":1,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0]],"q":[0.9090909090909092,0.0],"risk":0.14545454545454548,"risks":[2.018587317500285e-17,0.01363636363636362,0.027272727272727268,0.04090909090909088,0.05454545454545451,0.06818181818181815,0.08181818181818176,0.0954545454545454,0.10909090909090902,0.12272727272727268,0.13636363636363635,0.0340909090909091,1.892425610156517e-17,0.015909090909090914,0.031818181818181815,0.047727272727272715,0.06363636363636363,0.07954545454545453,0.09545454545454546,0.11136363636363633,0.12727272727272726,0.1431818181818182,0.06363636363636364,0.03181818181818183,1.0092936587501423e-17,0.018181818181818188,0.03636363636363636,0.054545454545454564,0.07272727272727272,0.09090909090909091,0.10909090909090907,0.12727272727272726,0.14545454545454545,0.08863636363636364,0.0590909090909091,0.029545454545454524,1.13545536609391e-17,0.02045454545454546,0.04090909090909093,0.061363636363636356,0.08181818181818183,0.10227272727272727,0.12272727272727274,0.14318181818181822,0.10909090909090913,0.08181818181818186,0.05454545454545456,0.027272727272727285,1.5139404881252137e-17,0.02272727272727273,0.04545454545454543,0.06818181818181816,0.09090909090909086,0.11363636363636362,0.13636363636363635,0.12500000000000003,0.10000000000000005,0.07500000000000001,0.05000000000000002,0.025000000000000015,1.3877787807814454e-17,0.024999999999999974,0.04999999999999999,0.07499999999999996,0.09999999999999996,0.12499999999999997,0.1363636363636364,0.11363636363636365,0.09090909090909091,0.06818181818181819,0.04545454545454546,0.02272727272727271,1.261617073437678e-17,0.02727272727272728,0.054545454545454515,0.0818181818181818,0.1090909090909091,0.14318181818181822,0.12272727272727274,0.10227272727272727,0.08181818181818183,0.06136363636363638,0.04090909090909091,0.020454545454545482,1.13545536609391e-17,0.029545454545454493,0.05909090909090906,0.08863636363636364,0.14545454545454548,0.1272727272727273,0.10909090909090909,0.09090909090909091,0.07272727272727274,0.054545454545454536,0.03636363636363637,0.01818181818181817,1.0092936587501425e-17,0.03181818181818183,0.06363636363636367,0.1431818181818182,0.1272727272727273,0.11136363636363636,0.09545454545454547,0.07954545454545454,0.06363636363636363,0.04772727272727274,0.03181818181818182,0.015909090909090932,8.831319514063745e-18,0.0340909090909091,0.1363636363636364,0.12272727272727275,0.1090909090909091,0.09545454545454549,0.08181818181818183,0.06818181818181818,0.05454545454545456,0.04090909090909091,0.027272727272727282,0.01363636363636363,6.055761952500853e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.36363636363636376,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6363636363636362,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.10909090909090904,0.0],"upper":[0.0,0.0,0.0]}},{"n0":0,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2]],"q":[0.0,0.393238434163701,1.0],"risk":0.1395017793594306,"risks":[7.08211662505549e-18,0.03492882562277577,0.06512455516014234,0.09042704626334519,0.11067615658362989,0.12571174377224198,0.13537366548042704,0.13950177935943062,0.13793594306049822,0.13051601423487547,0.11708185053380776,0.012758007117437725,8.366182400867504e-18,0.032562277580071186,0.0602846975088968,0.08300711743772242,0.1005693950177936,0.11281138790035589,0.11957295373665483,0.12069395017793594,0.11601423487544488,0.10537366548042698,0.025516014234875442,0.015071174377224203,1.807569515181527e-17,0.030142348754448406,0.05533807829181495,0.07542704626334522,0.0902491103202847,0.09964412811387902,0.10345195729537365,0.10151245551601423,0.0936654804270462,0.038274021352313156,0.030142348754448395,0.01743772241992881,1.673236480173501e-17,0.027669039145907483,0.050284697508896824,0.06768683274021353,0.07971530249110323,0.0862099644128114,0.08701067615658364,0.08195729537366547,0.05103202846975089,0.04521352313167261,0.034875444839857654,0.01985765124555161,1.2396173451108286e-17,0.025142348754448405,0.045124555160142334,0.0597864768683274,0.06896797153024908,0.07250889679715303,0.07024911032028466,0.0637900355871886,0.0602846975088968,0.05231316725978647,0.03971530249110321,0.022330960854092533,1.3956807240172118e-17,0.02256227758007116,0.03985765124555161,0.05172597864768681,0.05800711743772241,0.05854092526690388,0.07654804270462633,0.07535587188612099,0.0697508896797153,0.059572953736654805,0.04466192170818505,0.024857651245551584,1.5230995586939424e-17,0.01992882562277581,0.03448398576512454,0.04350533807829181,0.04683274021352313,0.08930604982206405,0.0904270462633452,0.08718861209964412,0.07943060498220643,0.06699288256227759,0.04971530249110321,0.027437722419928864,1.6692855085556178e-17,0.01724199288256225,0.02900355871886119,0.03512455516014233,0.10206405693950177,0.10549822064056938,0.10462633451957293,0.099288256227758,0.08932384341637009,0.07457295373665478,0.05487544483985765,0.030071174377224175,1.8184346871307056e-17,0.01450177935943061,0.023416370106761564,0.1148220640569395,0.12056939501779358,0.12206405693950177,0.11914590747330964,0.11165480427046262,0.0994306049822064,0.08231316725978649,0.0601423487544484,0.03275800711743777,1.9705470944192058e-17,0.011708185053380782,0.1275800711743772,0.13564056939501776,0.13950177935943056,0.13900355871886122,0.13398576512455512,0.12428825622775798,0.10975088967971529,0.09021352313167255,0.06551601423487545,0.035498220640569365,1.949804493425318e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5466192170818505,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4533807829181495,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.041850533807829174,0.0,0.0,0.0],"upper":[0.0,0.0,-0.051814946619217074,0.0]}},{"n0":1,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1]],"q":[0.3673469387755099,1.0,0.0,0.36734693877551033],"risk":0.12214285714285714,"risks":[1.298281210429009e-17,0.025163265306122437,0.047428571428571445,0.06679591836734694,0.08326530612244899,0.09683673469387755,0.10751020408163264,0.1152857142857143,0.12016326530612242,0.12214285714285711,0.12122448979591832,0.022270408163265303,1.3148495897505835e-17,0.024897959183673483,0.04696428571428573,0.06619897959183675,0.08260204081632655,0.09617346938775514,0.1069132653061225,0.1148214285714286,0.11989795918367346,0.12214285714285711,0.04230612244897958,0.022535714285714284,1.4478214545621943e-17,0.02469897959183675,0.04663265306122451,0.0658010204081633,0.08220408163265307,0.09584183673469393,0.10671428571428573,0.1148214285714286,0.12016326530612248,0.06010714285714283,0.0427704081632653,0.022734693877550997,1.4386167993835417e-17,0.024566326530612255,0.04643367346938779,0.06560204081632653,0.08207142857142859,0.0958418367346939,0.10691326530612247,0.11528571428571432,0.07567346938775509,0.06070408163265307,0.04310204081632653,0.022867346938775516,1.3424635552865411e-17,0.024500000000000015,0.046367346938775485,0.06560204081632653,0.08220408163265304,0.09617346938775509,0.10751020408163267,0.0890051020408163,0.07633673469387756,0.06110204081632652,0.04330102040816326,0.022933673469387763,1.4312530752406194e-17,0.02449999999999998,0.04643367346938775,0.06580102040816324,0.08260204081632651,0.09683673469387755,0.10010204081632651,0.08966836734693875,0.076734693877551,0.06130102040816326,0.04336734693877551,0.02293367346938774,1.3424635552865412e-17,0.024566326530612255,0.04663265306122447,0.06619897959183674,0.08326530612244898,0.10896428571428571,0.10069897959183671,0.08999999999999998,0.07686734693877552,0.06130102040816328,0.04330102040816326,0.022867346938775544,1.3369407621793498e-17,0.024698979591836694,0.04696428571428569,0.06679591836734694,0.11559183673469385,0.10942857142857139,0.10089795918367345,0.08999999999999998,0.07673469387755101,0.06110204081632652,0.043102040816326535,0.022734693877551004,1.3277361070006973e-17,0.024897959183673476,0.04742857142857145,0.11998469387755101,0.11585714285714284,0.10942857142857142,0.10069897959183675,0.08966836734693877,0.07633673469387754,0.060704081632653076,0.04277040816326531,0.022535714285714315,1.3148495897505841e-17,0.025163265306122458,0.12214285714285714,0.119984693877551,0.11559183673469386,0.10896428571428571,0.10010204081632651,0.08900510204081631,0.0756734693877551,0.06010714285714284,0.042306122448979605,0.022270408163265292,4.431829053401644e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.28571428571428603,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2857142857142854,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4285714285714286,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.09214285714285714,0.0,0.0],"upper":[0.0,-0.13500000000000004,0.0,0.0,0.0]}},{"n0":2,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0]],"q":[1.0,0.39323843416370097,0.0],"risk":0.13950177935943064,"risks":[2.1256227304211186e-17,0.011708185053380768,0.02341637010676155,0.03512455516014233,0.0468327402135231,0.05854092526690388,0.07024911032028464,0.08195729537366542,0.0936654804270462,0.10537366548042698,0.11708185053380776,0.03549822064056941,1.9705470944192058e-17,0.01450177935943061,0.02900355871886122,0.04350533807829181,0.05800711743772244,0.07250889679715303,0.08701067615658364,0.10151245551601423,0.11601423487544488,0.13051601423487547,0.06551601423487544,0.032758007117437725,9.57122874432186e-18,0.01724199288256229,0.03448398576512457,0.05172597864768687,0.06896797153024914,0.08620996441281142,0.10345195729537368,0.120693950177936,0.13793594306049828,0.0902135231316726,0.0601423487544484,0.030071174377224175,1.1062720530072736e-17,0.01992882562277581,0.03985765124555163,0.0597864768683274,0.07971530249110323,0.09964412811387902,0.11957295373665483,0.13950177935943064,0.10975088967971532,0.08231316725978649,0.05487544483985765,0.027437722419928832,1.5230995586939424e-17,0.022562277580071184,0.045124555160142334,0.06768683274021353,0.09024911032028468,0.11281138790035589,0.1353736654804271,0.12428825622775802,0.09943060498220643,0.0745729537366548,0.04971530249110321,0.024857651245551612,1.3956807240172118e-17,0.025142348754448377,0.050284697508896796,0.07542704626334516,0.10056939501779358,0.12571174377224198,0.13398576512455518,0.11165480427046262,0.08932384341637009,0.06699288256227758,0.04466192170818505,0.022330960854092505,1.2396173451108286e-17,0.027669039145907483,0.055338078291814925,0.08300711743772242,0.11067615658362992,0.13900355871886122,0.1191459074733096,0.09928825622775798,0.0794306049822064,0.05957295373665481,0.039715302491103194,0.019857651245551625,1.10232108138939e-17,0.030142348754448347,0.06028469750889678,0.0904270462633452,0.13950177935943062,0.12206405693950177,0.10462633451957293,0.08718861209964411,0.0697508896797153,0.05231316725978646,0.034875444839857654,0.01743772241992881,9.679880463813642e-18,0.032562277580071186,0.0651245551601424,0.13564056939501778,0.12056939501779357,0.10549822064056935,0.09042704626334518,0.07535587188612097,0.06028469750889677,0.0452135231316726,0.030142348754448392,0.015071174377224217,8.366182400867503e-18,0.034928825622775814,0.12758007117437722,0.1148220640569395,0.10206405693950175,0.08930604982206405,0.07654804270462631,0.06379003558718858,0.051032028469750884,0.03827402135231315,0.025516014234875446,0.012758007117437712,6.202037697172026e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5466192170818505,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4533807829181495,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.04185053380782918,0.0],"upper":[-0.051814946619217095,0.0,0.0,0.0]}},{"n0":0,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3]],"q":[0.0,0.0,0.8166047087980174,1.0],"risk":0.12936802973977693,"risks":[5.033148619072039e-18,0.03810292750929365,0.07008178438661711,0.09540404275092935,0.11375464684014869,0.12503601301115239,0.1293680297397769,0.12708805762081785,0.11875092936802972,0.1051289498141264,0.0872118959107806,0.009066914498141267,6.604201902408357e-18,0.03504089219330856,0.06360269516728624,0.08531598513011152,0.10002881040892193,0.10780669144981411,0.10893262081784388,0.103907063197026,0.09344795539033457,0.07849070631970256,0.01813382899628253,0.011897072490706323,1.9451602658209526e-17,0.03180134758364313,0.05687732342007435,0.07502160780669145,0.08624535315985128,0.0907771840148699,0.08906319702602228,0.08176696096654279,0.06976951672862447,0.02720074349442379,0.02379414498141264,0.01495910780669144,1.765329415073409e-17,0.028438661710037186,0.05001440520446099,0.06468401486988846,0.07262174721189593,0.07421933085501858,0.07008596654275095,0.06104832713754643,0.03626765799256506,0.035691217472118966,0.029918215613382905,0.018198652416356886,1.1968947105624364e-17,0.025007202602230487,0.04312267657992562,0.05446631040892193,0.059375464684014834,0.05840497211895912,0.052327137546468366,0.04533457249070632,0.047588289962825284,0.044877323420074354,0.036397304832713764,0.02156133828996283,1.3881786055231203e-17,0.021561338289962807,0.036310873605947966,0.044531598513011125,0.046723977695167285,0.0436059479553903,0.05440148698884759,0.059485362453531594,0.0598364312267658,0.05459595724907064,0.043122676579925655,0.024992797397769502,1.578662851000455e-17,0.018155436802973983,0.029687732342007417,0.03504298327137548,0.034884758364312235,0.06346840148698886,0.07138243494423792,0.07479553903345726,0.07279460966542754,0.06468401486988849,0.049985594795539046,0.028438661710037217,1.7677283635234587e-17,0.014843866171003688,0.023361988847583642,0.026163568773234183,0.07253531598513012,0.08327950743494422,0.0897546468401487,0.09099326208178439,0.0862453531598513,0.07497839219330854,0.05687732342007436,0.031844563197026,1.951557461687752e-17,0.011680994423791828,0.01744237918215613,0.08160223048327139,0.09517657992565055,0.10471375464684016,0.10919191449814131,0.10780669144981413,0.09997118959107808,0.08531598513011156,0.06368912639405204,0.035156133828996336,2.127132113572304e-17,0.008721189591078066,0.09066914498141264,0.10707365241635686,0.11967286245353159,0.12739056691449815,0.12936802973977693,0.12496398698884757,0.1137546468401487,0.09553368959107802,0.07031226765799257,0.03831900557620815,1.4523698229204174e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4646840148698884,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5353159851301116,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.011152416356877321,0.020074349442379187,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.01003717472118958,0.0]}},{"n0":1,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2]],"q":[0.0,0.9392102528576374,1.0,0.0,0.0,0.5209560096986499],"risk":0.0966373397990994,"risks":[1.1017627175445352e-17,0.027368202286110137,0.049467267059231046,0.06674610322133702,0.07965361967440251,0.08863872532040179,0.09415032906130932,0.09663733979909939,0.09654866643574644,0.09433321787322474,0.0904399030135088,0.018753636993418775,1.1888678280299875e-17,0.026052303429165233,0.047306979563560794,0.06416046068583305,0.07700917907862835,0.08624956702459302,0.09227805680637344,0.09549108070661588,0.09628507100796674,0.09505645999307238,0.035319362660200894,0.020201679944579148,1.519394239797019e-17,0.02505827848978179,0.04572047107724282,0.06233053342570144,0.07523242119847592,0.08477009005888467,0.09128749567024594,0.09512859369587806,0.09663733979909939,0.04969717700034637,0.03797324211984759,0.02131035677173535,1.4689953252590798e-17,0.02433365084863181,0.044602788361621085,0.06109889158295807,0.07411343955663321,0.08393791132663664,0.09086378593695874,0.09518254243158986,0.06188708001385521,0.05331468652580534,0.039983373744371324,0.022132144094215454,1.3429776091954288e-17,0.02382594388638726,0.04384897817803947,0.06030810529961898,0.07344232767578798,0.08349064773120884,0.09069206789054374,0.07188907170072739,0.06622601316245237,0.05601905091790787,0.04145471077242813,0.02271951853134743,1.4072350835705446e-17,0.023482680983720104,0.04335408728784205,0.059800744717699986,0.07300917907862828,0.08316591617596114,0.07970315206096293,0.07670722202978869,0.06941738829234499,0.05796770003463804,0.04249220644267406,0.023124956702459287,1.3855098802461883e-17,0.023251385521302393,0.04301316245237268,0.059419379979217146,0.07260408728784201,0.08532932109456183,0.08475831312781433,0.08017838586768271,0.07167111188084518,0.05931806373397993,0.04320081399376516,0.02340093522687915,1.3974528535085767e-17,0.023079580879805977,0.042721250432975366,0.05900658122618631,0.08876757880152408,0.09037928645652925,0.08830204364392102,0.08256494631104953,0.07319709040526498,0.06022757187391756,0.04368548666435748,0.02359993072393487,1.407064435331135e-17,0.02291479043990301,0.04237339799099411,0.09001792518184969,0.09357014201593349,0.09378836162105993,0.09064920332525116,0.08412928645652928,0.07420523034291654,0.06085365431243509,0.04405117769310705,0.023774419812954667,1.4172576632654857e-17,0.02270453758226532,0.08908036023553863,0.09433087980602702,0.09663733979909941,0.09592388292344999,0.09211465188777278,0.08513378940076205,0.0749054381711119,0.061353740907516455,0.04440284031866992,0.02397687911326636,4.0338359600989155e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.03546934534118473,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3467267059231034,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6178039487357119,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.02158919293384136,0.0,0.0,0.06030620020782818,0.06858884655351576,0.0,0.0],"upper":[0.0,0.0,-0.054467613439556625,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1]],"q":[0.520956009698648,1.0,0.0,0.939210252857638,0.0,0.0],"risk":0.09663733979909937,"risks":[1.4309455748632507e-17,0.022704537582265327,0.042373397990994134,0.05900658122618638,0.0726040872878421,0.08316591617596122,0.09069206789054382,0.09518254243158991,0.09663733979909939,0.09505645999307238,0.0904399030135088,0.023976879113266354,1.4172576632654842e-17,0.02291479043990304,0.042721250432975436,0.059419379979217216,0.07300917907862839,0.08349064773120893,0.09086378593695882,0.09512859369587817,0.09628507100796674,0.09433321787322474,0.04440284031866986,0.023774419812954615,1.3684931262317577e-17,0.023079580879806046,0.04301316245237274,0.05980074471770008,0.07344232767578807,0.0839379113266367,0.09128749567024594,0.09549108070661588,0.0965486664357465,0.06135374090751641,0.04405117769310701,0.02359993072393485,1.3781047080543152e-17,0.023251385521302407,0.04335408728784208,0.060308105299619,0.07411343955663321,0.08477009005888467,0.09227805680637344,0.09663733979909944,0.07490543817111185,0.060853654312435036,0.04368548666435745,0.023400935226879114,1.3855098802461878e-17,0.023482680983720135,0.043848978178039476,0.0610988915829581,0.07523242119847592,0.086249567024593,0.09415032906130935,0.085133789400762,0.07420523034291653,0.06022757187391755,0.04320081399376515,0.023124956702459305,1.4072350835705446e-17,0.023825943886387233,0.04460278836162105,0.062330533425701384,0.0770091790786283,0.08863872532040176,0.09211465188777275,0.08412928645652923,0.07319709040526495,0.05931806373397991,0.042492206442674055,0.0227195185313474,1.3429776091954288e-17,0.024333650848631802,0.04572047107724279,0.06416046068583305,0.07965361967440249,0.09592388292344992,0.09064920332525109,0.0825649463110495,0.07167111188084517,0.05796770003463804,0.04145471077242813,0.022132144094215475,1.3065622363038117e-17,0.025058278489781736,0.047306979563560766,0.06674610322133702,0.09663733979909939,0.09378836162105988,0.08830204364392101,0.08017838586768271,0.069417388292345,0.056019050917907855,0.039983373744371324,0.021310356771735352,1.2561633217658725e-17,0.026052303429165227,0.04946726705923105,0.09433087980602699,0.09357014201593347,0.09037928645652925,0.08475831312781436,0.07670722202978869,0.06622601316245236,0.05331468652580535,0.037973242119847594,0.02020167994457918,1.188867828029988e-17,0.027368202286110154,0.08908036023553861,0.09001792518184966,0.08876757880152407,0.08532932109456184,0.07970315206096294,0.07188907170072739,0.06188708001385522,0.04969717700034638,0.03531936266020091,0.018753636993418768,5.021384532055066e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3467267059231036,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.035469345341184524,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6178039487357119,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.06858884655351576,0.0,0.0603062002078282,0.021589192933841365,0.0],"upper":[0.0,-0.05446761343955664,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0]],"q":[1.0,0.8166047087980174,0.0,0.0],"risk":0.12936802973977699,"risks":[2.291434287256086e-17,0.008721189591078045,0.017442379182156104,0.02616356877323417,0.03488475836431221,0.04360594795539027,0.05232713754646831,0.061048327137546377,0.06976951672862441,0.07849070631970251,0.08721189591078055,0.03831900557620819,2.127132113572304e-17,0.011680994423791828,0.023361988847583642,0.03504298327137548,0.04672397769516731,0.05840497211895912,0.07008596654275095,0.08176696096654279,0.09344795539033457,0.1051289498141264,0.07031226765799255,0.03515613382899628,8.2400009987514e-18,0.014843866171003736,0.02968773234200746,0.044531598513011195,0.05937546468401492,0.07421933085501864,0.08906319702602233,0.10390706319702608,0.11875092936802983,0.09553368959107807,0.06368912639405204,0.031844563197026,1.0078291980394326e-17,0.018155436802973983,0.03631087360594798,0.05446631040892193,0.07262174721189593,0.0907771840148699,0.10893262081784388,0.12708805762081787,0.11375464684014873,0.08531598513011156,0.05687732342007436,0.028438661710037186,1.578662851000455e-17,0.02156133828996283,0.04312267657992562,0.06468401486988846,0.08624535315985125,0.10780669144981411,0.12936802973977696,0.12496398698884761,0.0999711895910781,0.07497839219330857,0.049985594795539046,0.02499279739776953,1.3881786055231203e-17,0.02500720260223046,0.05001440520446096,0.0750216078066914,0.1000288104089219,0.12503601301115239,0.12936802973977696,0.10780669144981413,0.0862453531598513,0.06468401486988848,0.043122676579925655,0.02156133828996281,1.1968947105624364e-17,0.028438661710037186,0.05687732342007432,0.08531598513011152,0.11375464684014872,0.12739056691449813,0.10919191449814125,0.09099326208178436,0.0727946096654275,0.05459595724907063,0.036397304832713744,0.0181986524163569,1.010228146489482e-17,0.03180134758364307,0.06360269516728623,0.09540404275092937,0.11967286245353162,0.10471375464684016,0.0897546468401487,0.07479553903345725,0.0598364312267658,0.04487732342007434,0.029918215613382905,0.01495910780669144,8.303972957419388e-18,0.03504089219330856,0.07008178438661714,0.1070736524163569,0.09517657992565057,0.08327950743494424,0.07138243494423793,0.0594853624535316,0.04758828996282528,0.03569121747211897,0.023794144981412642,0.011897072490706337,6.604201902408358e-18,0.03810292750929369,0.09066914498141267,0.08160223048327139,0.07253531598513012,0.06346840148698886,0.054401486988847586,0.04533457249070632,0.03626765799256507,0.02720074349442379,0.018133828996282533,0.00906691449814126,6.816728098967062e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4646840148698884,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5353159851301116,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.020074349442379194,0.011152416356877325,0.0],"upper":[-0.01003717472118958,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":4,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4]],"q":[0.0,0.0,0.2946155981126839,1.0,1.0],"risk":0.1268942547876769,"risks":[4.486835549228245e-18,0.03910147793505409,0.07189808492922564,0.0975354704412989,0.1154038301415487,0.12518411740216484,0.1268942547876769,0.12093534554537885,0.1081378850957535,0.08980797252289757,0.0677735220649458,0.00808276436303081,6.0498950654441085e-18,0.03594904246461283,0.06502364696086593,0.08655287260616153,0.1001472939217319,0.10574521232306411,0.10365886761032475,0.09462064945878434,0.07982930890924228,0.060996169858451244,0.016165528726061616,0.01089852206494588,1.9955727328720317e-17,0.03251182348043298,0.05770191507077436,0.07511047044129893,0.08459616985845128,0.08638238967527062,0.08110341382181516,0.06985064529558699,0.05421881765195663,0.02424829308909242,0.02179704412989175,0.014050957535387171,1.8047687500262736e-17,0.02885095753538719,0.05007364696086597,0.06344712739383847,0.06910591174021652,0.06758617818484597,0.059871981681931724,0.04744146544546207,0.03233105745212324,0.03269556619483764,0.028101915070774364,0.017488176519567036,1.1740076946494161e-17,0.025036823480432978,0.04229808492922562,0.051829433805162375,0.05406894254787675,0.04989331806827643,0.040664113238967514,0.04041382181515404,0.04359408825978351,0.042152872606161546,0.034976353039134066,0.021149042464612827,1.3898228945726214e-17,0.021149042464612806,0.034552955870108246,0.040551706910907565,0.03991465445462114,0.0338867610324729,0.04849658617818485,0.05449261032472938,0.05620383014154872,0.05246452955870109,0.04229808492922565,0.02496317651956701,1.6015498669134752e-17,0.01727647793505413,0.027034471273938376,0.029935990840965862,0.027109408825978315,0.05657935054121566,0.06539113238967527,0.07025478767693591,0.06995270607826813,0.06344712739383848,0.049926353039134064,0.02885095753538722,1.816520382166613e-17,0.013517235636969167,0.019957327227310556,0.02033205661948373,0.06466211490424646,0.07628965445462113,0.08430574521232308,0.08744088259783514,0.08459616985845128,0.07488952955870107,0.05770191507077436,0.03272352206494585,2.0252002498905467e-17,0.009978663613655292,0.013554704412989171,0.07274487926727728,0.087188176519567,0.09835670274771027,0.1049290591174022,0.10574521232306411,0.09985270607826811,0.08655287260616157,0.06544704412989176,0.036482764363030856,2.221630456619423e-17,0.006777352206494586,0.08082764363030807,0.09808669858451287,0.11240766028309743,0.12241723563696921,0.1268942547876769,0.12481588259783512,0.1154038301415487,0.09817056619483759,0.07296552872606162,0.04002133638634468,1.1286558698466587e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5203996669442131,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47960033305578686,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.004995836802664445,0.011990008326394663,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.017985012489591994,-0.011240632805994999,0.0]}},{"n0":1,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3]],"q":[0.0,0.6891298318377513,1.0,1.0,0.0,0.0,0.0,0.6685663325610088],"risk":0.0899451991619623,"risks":[1.1644442711960748e-17,0.02621474331895355,0.04716790810600922,0.06337149937915232,0.07530937842692986,0.08343726280845035,0.08818272635338392,0.08994519916196231,0.08909596760497873,0.08597817432378801,0.0809068182303066,0.019722125731256156,1.2427978413440263e-17,0.025101243658179624,0.045476417692878815,0.06154343053546514,0.07368753806158981,0.08226134359118781,0.08758479788847784,0.08994519916196231,0.08959719306442732,0.08676277269294269,0.036934976638205795,0.02099125448034409,1.477625425536346e-17,0.024352584566494716,0.04440321816715525,0.06046894940731451,0.0728296655103112,0.08172809231748998,0.08736979428820132,0.08992317449980153,0.08951947464765286,0.05163855272084894,0.03918850675998582,0.021864177131470347,1.441455859482743e-17,0.023888741322000202,0.04378149684562443,0.05988769211075408,0.07237508244899873,0.08136975298369581,0.08695611862991073,0.08917692409443706,0.06383285397918557,0.05459175683892523,0.040693775052590704,0.0224186639933947,1.355811376478734e-17,0.023625180376519592,0.04343542339251651,0.05952576828300411,0.07194507524844568,0.0806960254547549,0.08573512103329525,0.0735178804132157,0.06720100471716227,0.05648879376336102,0.041608576546678794,0.022736994201154655,1.4077412752292992e-17,0.02347285935559849,0.04318014981950613,0.059095761082451084,0.07114289497433396,0.07919406546422753,0.08069363202293936,0.07701625039469695,0.06924923326378131,0.05756973765985228,0.04209972392546414,0.022905955716065646,1.3751218488933935e-17,0.02333822705850476,0.04282181048571193,0.05829672718864805,0.06955375738723393,0.08536010880835646,0.08403749387152931,0.0789750935538516,0.07030214733291519,0.05808818917292849,0.04234304752471657,0.023016845325721052,1.3829837715441971e-17,0.023123223458228204,0.042157522097697055,0.05681419680231435,0.08751731076946707,0.08826473514765931,0.08566637463357184,0.07980580556586746,0.07070238994354766,0.05831127542595272,0.042523395332761574,0.023165468643991854,1.3969080518094465e-17,0.02272527970148107,0.04097538370946885,0.08716523790627119,0.08969797422308698,0.08932307650294208,0.08608071235870918,0.0799423262373217,0.07081063941977411,0.05851965002112166,0.04283463299048036,0.023452140111027236,1.422650977349972e-17,0.02203731810869739,0.08430389021876879,0.0883372110978123,0.08994519916196231,0.08912686771144028,0.08580799805425059,0.07984113950618077,0.07100560939080125,0.05900749303946546,0.04347964379130987,0.023981682993253886,3.92801530679671e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3468431495538856,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1050841237940409,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5480727266520735,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00929740933703708,0.0,0.0,0.0,0.03185821426285537,0.05875739730411293,0.029370870594861674,0.0,0.0],"upper":[0.0,0.0,-0.03630652926944789,-0.03192281724036406,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2]],"q":[0.3800277392510366,1.0,1.0,0.0,0.21241991942408225,1.0,0.0,0.0,0.380027739251037],"risk":0.08401456310679613,"risks":[1.3996971250402488e-17,0.022782501155802142,0.04165817317218154,0.056775163463443676,0.0682816194438941,0.0763256885278383,0.08105551812958192,0.08261925566343037,0.08116504854368922,0.07684104418466403,0.06979539000066032,0.02304819694868236,1.388475316767984e-17,0.023050425995641003,0.04228144813750746,0.05777503962750151,0.06961317366752529,0.07787782345948088,0.08265096220527046,0.08401456310679611,0.08205059936595999,0.07684104418466409,0.04194937586685153,0.022894174757281536,1.3985114499654095e-17,0.02328786407766992,0.042778779472954255,0.05849375866851597,0.07045381414701804,0.07867995839112343,0.08319320388349516,0.08401456310679617,0.08116504854368933,0.0569825242718446,0.041724760171058695,0.02274216366158111,1.4081222029817602e-17,0.023463534442903385,0.04309803224687935,0.058868758668515944,0.07074097896440129,0.07867995839112343,0.08265096220527046,0.08261925566343042,0.06842662968099857,0.05675149098474339,0.04151218545670694,0.02262344462056668,1.3610900927563522e-17,0.023556583118684374,0.04320792550029719,0.058868758668515944,0.07045381414701801,0.07787782345948088,0.08105551812958195,0.07656067961165045,0.06823410194174756,0.05654533386170002,0.04136378665543888,0.0225588716068952,1.4166790264172932e-17,0.023556583118684343,0.04309803224687933,0.05849375866851593,0.06961317366752526,0.0763256885278383,0.08166366158113729,0.07643232778548312,0.0680768773528829,0.05642661482068556,0.04131084472624002,0.02255887160689517,1.3610900927563522e-17,0.023463534442903385,0.04277877947295422,0.05777503962750151,0.0682816194438941,0.0840145631067961,0.08160590325936198,0.07634208440657816,0.0680175178323757,0.056426614820685575,0.04136378665543888,0.0226234446205667,1.3674353585811311e-17,0.02328786407766987,0.04228144813750744,0.056775163463443676,0.08389237170596395,0.08401456310679613,0.08157622349910838,0.07634208440657818,0.0680768773528829,0.0565453338617,0.04151218545670696,0.022742163661581116,1.377046111597482e-17,0.023050425995640996,0.04165817317218156,0.08157607489597783,0.08391804207119742,0.08401456310679613,0.08160590325936201,0.07643232778548312,0.06823410194174756,0.0567514909847434,0.041724760171058695,0.022894174757281567,1.388475316767984e-17,0.022782501155802163,0.07734466019417477,0.08157607489597782,0.08389237170596395,0.08401456310679613,0.08166366158113728,0.07656067961165043,0.06842662968099855,0.056982524271844595,0.041949375866851546,0.02304819694868234,4.127581309567926e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.019348127600556576,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5610957004160869,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.39944521497919744,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.020110957004159068,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.018410861650485454,0.0,0.0,0.02116504854368933,0.023254186893203868,0.0,0.0],"upper":[0.0,-0.02915115291262137,-0.053126213592233,0.0,0.0,-0.03686341019417473,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1]],"q":[0.6685663325610106,1.0,0.0,1.0,0.0,0.6891298318377508,0.0,0.0],"risk":0.08994519916196232,"risks":[1.4662191259639896e-17,0.02203731810869734,0.04097538370946877,0.056814196802314254,0.06955375738723382,0.07919406546422744,0.08573512103329514,0.08917692409443684,0.08951947464765264,0.08676277269294258,0.08090681823030643,0.023981682993253935,1.4226509773499732e-17,0.022725279701481044,0.042157522097697034,0.05829672718864799,0.07114289497433393,0.0806960254547548,0.0869561186299107,0.08992317449980147,0.0895971930644272,0.08597817432378796,0.043479643791309905,0.02345214011102723,1.378649509753444e-17,0.023123223458228245,0.042821810485711945,0.0590957610824511,0.0719450752484457,0.08136975298369575,0.0873697942882013,0.08994519916196231,0.08909596760497873,0.05900749303946551,0.04283463299048039,0.023165468643991865,1.3925737900186936e-17,0.023338227058504753,0.04318014981950614,0.0595257682830041,0.07237508244899873,0.08172809231748995,0.08758479788847784,0.08994519916196231,0.0710056093908013,0.058519650021121694,0.042523395332761595,0.023016845325721035,1.3751218488933938e-17,0.023472859355598504,0.04343542339251651,0.05988769211075408,0.07282966551031114,0.08226134359118781,0.08818272635338395,0.07984113950618082,0.07081063941977418,0.058311275425952755,0.0423430475247166,0.022905955716065674,1.4077412752292992e-17,0.02362518037651956,0.04378149684562441,0.06046894940731444,0.07368753806158979,0.08343726280845035,0.08580799805425063,0.07994232623732173,0.07070238994354767,0.05808818917292849,0.04209972392546415,0.02273699420115463,1.3558113764787339e-17,0.02388874132200021,0.044403218167155235,0.06154343053546514,0.07530937842692992,0.08912686771144028,0.08608071235870916,0.07980580556586746,0.07030214733291516,0.05756973765985229,0.04160857654667878,0.022418663993394716,1.3341017020801473e-17,0.024352584566494678,0.04547641769287882,0.06337149937915235,0.08994519916196232,0.08932307650294208,0.08566637463357184,0.07897509355385159,0.0692492332637813,0.056488793763360995,0.0406937750525907,0.02186417713147034,1.2979321360265453e-17,0.025101243658179635,0.04716790810600926,0.0883372110978123,0.08969797422308697,0.0882647351476593,0.0840374938715293,0.07701625039469694,0.06720100471716223,0.05459175683892521,0.03918850675998581,0.020991254480344106,1.242797841344026e-17,0.026214743318953588,0.08430389021876877,0.08716523790627115,0.08751731076946703,0.08536010880835644,0.08069363202293929,0.07351788041321566,0.06383285397918556,0.051638552720848906,0.03693497663820579,0.019722125731256132,4.833339871100451e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.10508412379404075,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3468431495538858,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5480727266520735,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.02937087059486168,0.0,0.05875739730411296,0.0,0.03185821426285538,0.00929740933703708,0.0],"upper":[0.0,-0.03192281724036407,0.0,-0.03630652926944791,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0]],"q":[1.0,1.0,0.2946155981126839,0.0,0.0],"risk":0.12689425478767694,"risks":[2.3993389382806718e-17,0.006777352206494572,0.013554704412989158,0.02033205661948373,0.027109408825978315,0.0338867610324729,0.04066411323896746,0.04744146544546207,0.05421881765195663,0.060996169858451244,0.0677735220649458,0.040021336386344725,2.221630456619423e-17,0.009978663613655292,0.01995732722731057,0.029935990840965862,0.03991465445462114,0.04989331806827643,0.059871981681931724,0.06985064529558699,0.07982930890924228,0.08980797252289757,0.0729655287260616,0.036482764363030815,7.50357311672345e-18,0.013517235636969202,0.027034471273938404,0.040551706910907606,0.05406894254787678,0.067586178184846,0.08110341382181518,0.0946206494587844,0.10813788509575362,0.09817056619483765,0.06544704412989176,0.03272352206494586,9.590371793962781e-18,0.017276477935054123,0.03455295587010826,0.05182943380516235,0.06910591174021649,0.0863823896752706,0.10365886761032472,0.12093534554537885,0.11540383014154873,0.08655287260616157,0.05770191507077436,0.02885095753538719,1.6015498669134752e-17,0.021149042464612827,0.04229808492922562,0.06344712739383847,0.08459616985845125,0.10574521232306411,0.12689425478767694,0.12481588259783517,0.09985270607826816,0.0748895295587011,0.04992635303913407,0.024963176519567042,1.3898228945726214e-17,0.025036823480432947,0.050073646960865935,0.07511047044129887,0.10014729392173186,0.12518411740216484,0.12689425478767694,0.10574521232306411,0.08459616985845128,0.06344712739383847,0.04229808492922565,0.021149042464612806,1.1740076946494161e-17,0.02885095753538719,0.05770191507077433,0.08655287260616153,0.11540383014154873,0.12241723563696921,0.10492905911740216,0.08744088259783513,0.06995270607826812,0.052464529558701095,0.03497635303913405,0.01748817651956705,9.707888115366173e-18,0.03251182348043291,0.06502364696086592,0.09753547044129893,0.11240766028309745,0.09835670274771027,0.08430574521232308,0.0702547876769359,0.05620383014154872,0.04215287260616153,0.028101915070774364,0.014050957535387171,7.799848286908596e-18,0.03594904246461283,0.07189808492922568,0.09808669858451291,0.08718817651956702,0.07628965445462113,0.06539113238967527,0.054492610324729386,0.0435940882597835,0.03269556619483764,0.021797044129891755,0.010898522064945893,6.049895065444109e-18,0.039101477935054134,0.08082764363030809,0.07274487926727727,0.06466211490424646,0.056579350541215656,0.04849658617818484,0.04041382181515403,0.03233105745212323,0.024248293089092418,0.01616552872606162,0.008082764363030803,6.980622019920201e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.520399666944213,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4796003330557869,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.01199000832639468,0.004995836802664449,0.0],"upper":[-0.011240632805994999,-0.017985012489591983,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":5,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5]],"q":[0.0,0.0,0.05361697785940456,0.6797163554739294,1.0,1.0],"risk":0.12499999999999999,"risks":[3.809675766364124e-18,0.04024057086011626,0.07378233241505965,0.09950249999999994,0.11666666666666663,0.125,0.12473300275482094,0.11662183731251916,0.10194321395775952,0.08246384297520676,0.060384450566268844,0.0068629017447199535,5.417571469148291e-18,0.03689116620752983,0.06633499999999998,0.08749999999999997,0.10000000000000002,0.10394416896235081,0.09996157483930215,0.08920031221303959,0.07330119375573935,0.05434600550964197,0.013725803489439903,0.009759429139883714,2.047871106443656e-17,0.033167499999999996,0.05833333333333332,0.07500000000000002,0.08315533516988065,0.08330131236608512,0.07645741046831964,0.06413854453627194,0.0483075604530151,0.020588705234159854,0.01951885827976742,0.013108833792470171,1.841166108462743e-17,0.029166666666666667,0.05000000000000003,0.06236650137741048,0.06664104989286812,0.06371450872359971,0.054975895316804496,0.042269115396388224,0.02745160697887981,0.02927828741965114,0.026217667584940364,0.01683250000000002,1.1564823173178719e-17,0.02500000000000001,0.0415776675849403,0.049980787419651077,0.05097160697887976,0.045813246097337085,0.036230670339761295,0.03431450872359976,0.03903771655953485,0.03932650137741054,0.033665000000000035,0.02083333333333335,1.3877787807814457e-17,0.020788833792470148,0.033320524946434046,0.038228705234159804,0.03665059687786967,0.030192225283134422,0.041177410468319714,0.04879714569941855,0.05243533516988072,0.05049750000000005,0.041666666666666685,0.02499999999999998,1.621545464987597e-17,0.01666026247321703,0.025485803489439865,0.027487947658402248,0.02415378022650755,0.04804031221303967,0.05855657483930227,0.06554416896235091,0.06733000000000008,0.06250000000000006,0.05,0.02921116620752988,1.8507272118596915e-17,0.012742901744719919,0.018325298438934823,0.018115335169880648,0.054903213957759614,0.06831600397918597,0.07865300275482107,0.08416250000000007,0.08333333333333336,0.07499999999999997,0.058422332415059675,0.03333973752678295,2.0681844156866834e-17,0.009162649219467418,0.012076890113253774,0.06176611570247957,0.07807543311906968,0.09176183654729127,0.10099500000000011,0.10416666666666671,0.09999999999999999,0.08763349862258954,0.06667947505356596,0.03725709825528011,2.266928355062069e-17,0.006038445056626887,0.06862901744719951,0.08783486225895339,0.10487067033976143,0.11782750000000011,0.12500000000000003,0.12499999999999996,0.11684466483011934,0.10001921258034889,0.07451419651056011,0.04083735078053255,1.0056031102201692e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":4,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4]],"q":[0.0,0.3292103084326394,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.9298929097158034],"risk":0.08364114392398907,"risks":[1.0784395512010132e-17,0.02731678261185019,0.048437888222679894,0.0639429765119852,0.0745068553884049,0.08084201202990923,0.08364114392398903,0.08351968990784508,0.08095836120857641,0.07624567248337027,0.06942047285969044,0.018236762767766517,1.182893960200118e-17,0.025755868671603944,0.045976038937934297,0.0612177735681856,0.07206787135906093,0.07908661054844196,0.08275169222905937,0.08340218376216241,0.08118246219118941,0.07598615765543776,0.03409217138362214,0.01993502899885871,1.5150543726176704e-17,0.024661713433939234,0.04437027039671169,0.05959659982064583,0.07077781426151444,0.07826256568568576,0.08225640125727463,0.0827671191252935,0.07955012421080371,0.047566225847566895,0.03712186960842633,0.021170282207868076,1.4619087828577517e-17,0.023964345873983155,0.043428197414663985,0.05871475506320646,0.07005231027772432,0.07752101369391315,0.08099964328568246,0.08011237252578818,0.05865892615960076,0.05156052182870288,0.0392667152952082,0.021990898636116626,1.3465031007070276e-17,0.02356266414111537,0.04289743295351805,0.05812092600517503,0.06919602107207795,0.07588003467235643,0.07767290260039122,0.06737027231972376,0.06325098565968836,0.05428929926202034,0.04063440934228909,0.022477232774762254,1.4106066079044156e-17,0.023325847932449226,0.042468412868037875,0.05728142339176902,0.06740829328531525,0.07223171443461285,0.07370026432793586,0.07219326110138272,0.06623803410830448,0.05593053211851739,0.04139604419826988,0.022740204991317865,1.3765111612696078e-17,0.023094770866312883,0.04177722065298639,0.055584419124559054,0.06378880802845313,0.07764890218423709,0.07838734815378602,0.07511291983406065,0.06787926696480155,0.05675643427052291,0.041783279115069,0.02291988915617036,1.3902581697751825e-17,0.022683412855730018,0.04040841219008775,0.05234418338191198,0.07921618588862743,0.08183324681689824,0.08091395643928885,0.07648061388114152,0.06855840299152131,0.05712922237125334,0.04208551540096023,0.02318410026909925,1.4167436454566908e-17,0.021880272481901428,0.03789784049498941,0.07840211544110687,0.08253095709071939,0.08364114392398907,0.08173457286753737,0.07680195036126511,0.06877803475987096,0.057496878734369705,0.04264707167361068,0.023726982085796256,1.4679180721644556e-17,0.02044977936768541,0.07520669084167546,0.08048047897524944,0.0832944822881613,0.08364114392398907,0.0814870763797543,0.0767297162809218,0.06915397915639875,0.05838891421353421,0.043864359113118735,0.02476759474438349,3.6555156381694775e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5019130026078981,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.26078458892149226,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.23730240847060968,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0033365012647816267,0.0,0.0,0.0,0.0,0.012238124558958409,0.033289501287629295,0.03146455531583638,0.010360622736040898,0.0,0.0],"upper":[0.0,0.0,-0.021432254666636195,-0.03172856322765741,-0.013771938964086725,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3]],"q":[0.0,0.9730705497366353,1.0,1.0,0.0,0.0,0.6493276836661053,1.0,0.0,0.0,0.0,0.30616931076514087],"risk":0.0759855639629655,"risks":[1.2798690804988755e-17,0.02397630605056874,0.04245796216465878,0.056072426706827064,0.06540257989388981,0.07098672379492227,0.07331858233125896,0.07284730127649369,0.06997744825647922,0.06506901274932747,0.058437406085409926,0.020977253676789778,1.3221857142919439e-17,0.02350958946674989,0.04199975922492884,0.05593714164885445,0.06576126433927243,0.07188455012335665,0.07469231705470908,0.07454277841335993,0.07176704270576745,0.06666911366481809,0.03797384380471641,0.021695714054905724,1.4276197285042748e-17,0.02325035928775758,0.04179847715623739,0.05598406643379904,0.06613486753910272,0.0725666484811093,0.0755832048590803,0.07547635986257784,0.07252596427146463,0.05125522899832899,0.039311390063501796,0.02214665519009678,1.412328472402976e-17,0.023111219058974078,0.041720925876658314,0.05607055290656861,0.0664023515460977,0.07295939213651467,0.07598556396296552,0.07572557525447265,0.06108686787217654,0.05309496987400409,0.040167016462727904,0.022424454466342867,1.3721437694115478e-17,0.023037638466006545,0.04169262455382585,0.05613148224007759,0.06653200478853744,0.07308325475013738,0.07598556396296549,0.06773421904080809,0.06329439533462845,0.05427854524358097,0.04069949579147289,0.02258945262225066,1.39848588603748e-17,0.023002100808945828,0.04168609655345238,0.056161707358022964,0.06655803196730031,0.07302354774606618,0.07146274111877271,0.07015760829359075,0.06469870295834361,0.05500089708007676,0.04100420956866149,0.02267380627679492,1.3790330045510948e-17,0.02299825047662541,0.041709164387845665,0.05619849535766119,0.06655714395289808,0.07253789272061942,0.07393255059910687,0.07164495103270349,0.06550443143684125,0.05536890348216803,0.041124853094547616,0.02268734045505977,1.3780032293173868e-17,0.023035040420879862,0.041793244664426854,0.056303969932584214,0.07122513246089729,0.07486716409939269,0.07533475089234824,0.07238587196645305,0.06580816700570569,0.055418936251414266,0.041065140502196514,0.0226234011139795,1.3732379788737774e-17,0.023130879630804187,0.04198164303424782,0.06778991895415534,0.07320939064266402,0.0759855639629655,0.0758209917735989,0.07244663278220996,0.06562185154555122,0.05513441846948175,0.0408005098089673,0.022464707668080387,1.3635979189319631e-17,0.023307780607012003,0.06249771081494266,0.06920717207713678,0.07381485167024292,0.07598556396296552,0.07540893345461636,0.07179939477511466,0.06489619268498685,0.05446338207536669,0.040289827967995344,0.022189205515221175,4.2830517877666176e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.38953515012793405,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.06856807696343754,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.12074804300840669,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4211487299002217,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0024947041439697185,0.0,0.0,0.0,0.01354378245212002,0.025163880382655126,0.0,0.0,0.015623573032411154,0.03488026335819781,0.02197210318570061,0.0,0.0],"upper":[0.0,0.0,-0.017749573572438827,-0.023080805826455372,0.0,0.0,0.0,-0.02061502476555179,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2]],"q":[0.3061693107651226,1.0,1.0,0.0,0.6493276836661148,1.0,0.0,0.0,0.973070549736621,0.0,0.0,0.0],"risk":0.0759855639629655,"risks":[1.3478736323073432e-17,0.0233077806070121,0.041981643034247965,0.05630396993258438,0.06655714395289825,0.07302354774606634,0.07598556396296549,0.0757255752544726,0.07252596427146452,0.06666911366481798,0.058437406085409926,0.02218920551522108,1.3635979189319585e-17,0.023130879630804242,0.041793244664426944,0.05619849535766126,0.06655803196730037,0.07308325475013738,0.07598556396296549,0.07547635986257778,0.0717670427057675,0.06506901274932775,0.040289827967995184,0.022464707668080303,1.4023195826891158e-17,0.023035040420879935,0.04170916438784572,0.05616170735802305,0.06653200478853749,0.0729593921365147,0.07558320485908038,0.0745427784133601,0.0699774482564795,0.05446338207536656,0.04080050980896724,0.02262340111397948,1.3975543322455045e-17,0.022998250476625418,0.0416860965534524,0.05613148224007761,0.06640235154609775,0.07256664848110939,0.07469231705470936,0.07284730127649408,0.06489619268498675,0.05513441846948171,0.04106514050219651,0.022687340455059754,1.379033004551095e-17,0.02300210080894586,0.04169262455382588,0.05607055290656868,0.06613486753910283,0.07188455012335693,0.07331858233125946,0.07179939477511461,0.06562185154555124,0.05541893625141431,0.041124853094547636,0.022673806276794953,1.3984858860374803e-17,0.023037638466006538,0.04172092587665835,0.055984066433799134,0.06576126433927271,0.07098672379492274,0.07540893345461634,0.07244663278220996,0.06580816700570569,0.05536890348216802,0.041004209568661486,0.02258945262225062,1.372143769411546e-17,0.023111219058974123,0.0417984771562375,0.055937141648854743,0.06540257989389031,0.0759855639629655,0.07582099177359888,0.07238587196645303,0.06550443143684122,0.05500089708007673,0.04069949579147281,0.022424454466342846,1.3632290891599114e-17,0.02325035928775761,0.04199975922492906,0.05607242670682752,0.07381485167024293,0.07598556396296552,0.07533475089234823,0.07164495103270344,0.06469870295834351,0.05427854524358083,0.04016701646272779,0.0221466551900967,1.3479378330586108e-17,0.02350958946675001,0.04245796216465913,0.06920717207713681,0.073209390642664,0.07486716409939262,0.07393255059910678,0.07015760829359059,0.06329439533462825,0.053094969874003896,0.03931139006350162,0.021695714054905637,1.3221857142919365e-17,0.023976306050568934,0.06249771081494263,0.06778991895415527,0.07122513246089715,0.07253789272061925,0.07146274111877246,0.0677342190408078,0.06108686787217624,0.051255228998328704,0.03797384380471619,0.020977253676789615,4.487065443192076e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.06856807696343727,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.38953515012793427,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4211487299002212,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.12074804300840729,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.02197210318570061,0.0,0.0,0.03488026335819783,0.02516388038265514,0.0,0.015623573032411162,0.01354378245212003,0.0024947041439697215,0.0],"upper":[0.0,-0.02061502476555178,-0.023080805826455372,0.0,0.0,-0.017749573572438827,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1]],"q":[0.9298929097158042,1.0,0.0,1.0,0.0,1.0,0.0,0.3292103084326395,0.0,0.0],"risk":0.08364114392398907,"risks":[1.5570523488397328e-17,0.020449779367685366,0.03789784049498936,0.05234418338191191,0.06378880802845308,0.07223171443461282,0.07767290260039114,0.08011237252578807,0.07955012421080354,0.07598615765543765,0.06942047285969033,0.024767594744383524,1.4679180721644565e-17,0.021880272481901428,0.04040841219008776,0.05558441912455904,0.06740829328531525,0.07588003467235638,0.08099964328568246,0.08276711912529344,0.08118246219118941,0.07624567248337027,0.04386435911311875,0.023726982085796235,1.3588139161062006e-17,0.022683412855730063,0.041777220652986405,0.05728142339176906,0.06919602107207792,0.07752101369391315,0.08225640125727463,0.08340218376216241,0.08095836120857641,0.05838891421353424,0.0426470716736107,0.023184100269099256,1.3852993917877085e-17,0.023094770866312876,0.0424684128680379,0.05812092600517503,0.07005231027772432,0.07826256568568576,0.08275169222905937,0.08351968990784508,0.06915397915639877,0.057496878734369726,0.042085515400960234,0.02291988915617034,1.3765111612696081e-17,0.023325847932449253,0.04289743295351805,0.05871475506320645,0.07077781426151442,0.07908661054844196,0.08364114392398905,0.07672971628092183,0.068778034759871,0.05712922237125338,0.041783279115069016,0.022740204991317892,1.4106066079044153e-17,0.02356266414111534,0.04342819741466395,0.05959659982064576,0.07206787135906087,0.08084201202990918,0.08148707637975432,0.07680195036126512,0.06855840299152133,0.056756434270522904,0.04139604419826988,0.02247723277476223,1.3465031007070276e-17,0.023964345873983148,0.04437027039671167,0.0612177735681856,0.07450685538840493,0.08364114392398905,0.08173457286753737,0.07648061388114152,0.06787926696480155,0.055930532118517395,0.04063440934228908,0.021990898636116644,1.3136487787051395e-17,0.024661713433939185,0.04597603893793428,0.06394297651198523,0.08329448228816133,0.08364114392398907,0.08091395643928885,0.07511291983406065,0.06623803410830448,0.05428929926202032,0.039266715295208206,0.021170282207868076,1.260503188945221e-17,0.02575586867160394,0.04843788822267991,0.08048047897524946,0.08253095709071939,0.08183324681689824,0.07838734815378605,0.07219326110138272,0.06325098565968834,0.051560521828702896,0.03712186960842634,0.019935028998858736,1.182893960200118e-17,0.02731678261185022,0.07520669084167547,0.07840211544110688,0.07921618588862743,0.0776489021842371,0.07370026432793585,0.06737027231972374,0.05865892615960076,0.04756622584756688,0.03409217138362215,0.018236762767766503,5.091354031085633e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5019130026078981,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.23730240847060938,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2607845889214926,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.010360622736040897,0.0,0.031464555315836376,0.0,0.0332895012876293,0.0,0.012238124558958414,0.0033365012647816284,0.0],"upper":[0.0,-0.01377193896408673,0.0,-0.03172856322765743,0.0,-0.02143225466663621,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0]],"q":[0.8903791644820327,1.0,0.7347105214398572,0.0,0.0,0.09584895445272754],"risk":0.125,"risks":[2.3643832199709565e-17,0.007407058446310982,0.014814116892621979,0.022221175338932975,0.029628233785243957,0.03703529223155494,0.044442350677865894,0.051849409124176904,0.059256467570487914,0.06666352601679892,0.07407058446310988,0.040030753257438885,2.222153197974856e-17,0.009969246742561132,0.01993849348512225,0.029907740227683388,0.03987698697024453,0.04984623371280564,0.059815480455366776,0.06978472719792789,0.079753973940489,0.08972322068305016,0.07368340771022991,0.03684170385511497,7.304321672443906e-18,0.013158296144885048,0.026316592289770097,0.039474888434655145,0.052633184579540165,0.06579148072442523,0.07894977686931026,0.09210807301419532,0.10526636915908039,0.09950509697536707,0.06633673131691138,0.03316836565845566,9.34343399402699e-18,0.01683163434154432,0.03366326868308864,0.05049490302463293,0.06732653736617725,0.08415817170772155,0.10098980604926588,0.11782144039081019,0.11666666666666672,0.08750000000000005,0.05833333333333335,0.029166666666666684,1.6190752442450204e-17,0.020833333333333332,0.04166666666666663,0.06249999999999997,0.08333333333333327,0.10416666666666663,0.12499999999999997,0.125,0.10000000000000002,0.075,0.05,0.02500000000000001,1.3877787807814457e-17,0.02499999999999998,0.05,0.07499999999999997,0.09999999999999999,0.125,0.125,0.10416666666666666,0.08333333333333331,0.06249999999999999,0.041666666666666664,0.020833333333333315,1.1564823173178713e-17,0.029166666666666678,0.058333333333333307,0.0875,0.1166666666666667,0.11779122830824447,0.10096390997849525,0.08413659164874603,0.06730927331899683,0.05048195498924763,0.03365463665949841,0.01682731832974923,9.34103812619225e-18,0.03317268167025073,0.06634536334050156,0.09951804501075237,0.10505920059291328,0.0919268005187991,0.07879440044468494,0.06566200037057078,0.05252960029645663,0.03939720022234246,0.02626480014822832,0.01313240007411415,7.289946465435326e-18,0.036867599925885855,0.07373519985177172,0.08894633855992146,0.0790634120532635,0.06918048554660557,0.059297559039947635,0.04941463253328969,0.03953170602663175,0.029648779519973825,0.019765853013315876,0.009882926506657952,5.486126279184954e-18,0.04011707349334208,0.07191257856552721,0.06472132070897449,0.05753006285242176,0.05033880499586905,0.04314754713931632,0.03595628928276359,0.028765031426210882,0.021573773569658155,0.014382515713105443,0.007191257856552715,7.129087677434466e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999996,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000004,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":6,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6]],"q":[0.08342130591580534,0.0,0.0,0.25035778223125177,1.0,1.0,0.34526577574172035],"risk":0.12499999999999999,"risks":[3.502154133224653e-18,0.04092655689866237,0.07503707673024576,0.10079259038418867,0.11738799148036698,0.12499999999999997,0.125,0.12011434163073217,0.11451469767715089,0.11382106484327936,0.12499999999999983,0.006308920019753838,5.036772721865647e-18,0.037518538365122894,0.06719506025612579,0.08804099361027524,0.09999999999999999,0.10416666666666669,0.10295514996919902,0.10020036046750702,0.10117427986069277,0.11249999999999988,0.012617840039507673,0.009073443101337605,2.082697257162085e-17,0.0335975301280629,0.0586939957401835,0.07500000000000001,0.08333333333333334,0.08579595830766584,0.08588602325786315,0.08852749487810618,0.09999999999999987,0.018926760059261506,0.018146886202675207,0.012481461634877112,1.8650375759356403e-17,0.02934699787009176,0.05000000000000002,0.06250000000000001,0.06863676664613269,0.07157168604821931,0.0758807098955196,0.08749999999999991,0.02523568007901535,0.027220329304012816,0.024962923269754245,0.016402469871937116,1.146471924612827e-17,0.025,0.04166666666666665,0.0514775749845995,0.05725734883857542,0.06323392491293298,0.0749999999999999,0.03154460009876918,0.036293772405350415,0.03744438490463136,0.03280493974387422,0.020653002129908258,1.3877787807814454e-17,0.020833333333333322,0.034318383323066345,0.04294301162893158,0.050587139930346386,0.06249999999999992,0.03785352011852302,0.04536721550668801,0.04992584653950848,0.049207409615811326,0.04130600425981651,0.024999999999999988,1.6190752442450197e-17,0.017159191661533173,0.02862867441928771,0.03794035494775978,0.04999999999999993,0.04416244013827686,0.054440658608025626,0.062407308174385605,0.06560987948774845,0.06195900638972478,0.05000000000000002,0.029166666666666705,1.8230310782333854e-17,0.014314337209643833,0.02529356996517318,0.03749999999999995,0.05047136015803069,0.06351410170936321,0.0748887698092627,0.08201234935968553,0.082612008519633,0.07499999999999998,0.05833333333333333,0.03284080833846681,1.9809522239431297e-17,0.012646784982586597,0.02499999999999998,0.05678028017778453,0.07258754481070083,0.08737023144413984,0.09841481923162267,0.10326501064954126,0.10000000000000002,0.08750000000000002,0.06568161667693366,0.03568566279035619,2.0735199678053265e-17,0.01249999999999999,0.06308920019753836,0.08166098791203842,0.09985169307901695,0.11481728910355975,0.12391801277944949,0.12499999999999999,0.11666666666666664,0.09852242501540046,0.07137132558071228,0.03735321501741338,2.081668171172166e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":5,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5]],"q":[0.0,0.0,0.8693939678028499,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.12617290814668447,1.0],"risk":0.08148375008887637,"risks":[9.613724668505282e-18,0.028780059601421475,0.050169193991273495,0.06504595830674066,0.07449172093394071,0.07962908922023801,0.08148375008887637,0.08086972555593042,0.07829804314957628,0.07390882123168069,0.06742676922170943,0.016254909444102225,1.1063004330737373e-17,0.02657952818545425,0.04669946783864794,0.06127419893575907,0.07126799117428831,0.07755817947894061,0.08082003143006145,0.08143330661462678,0.07941050789978743,0.07434682462896752,0.03038254430863053,0.018638733346627114,1.558445560116514e-17,0.025017481736401052,0.04445307144737507,0.05912453322928962,0.06977058710705403,0.0769359627006283,0.08087642183432084,0.08148375008887637,0.07823071729635256,0.04238290459358494,0.03469625964130283,0.02043060943491074,1.4813278133839546e-17,0.02402833846878872,0.04319871538524202,0.05812097297321668,0.06921751936763096,0.07662738880865849,0.08012854779894751,0.07907844722386437,0.052255990298965445,0.04817257888402718,0.03787135649018652,0.02164702262944481,1.3416966863139039e-17,0.023490537642145468,0.042609337077428554,0.057664701431069484,0.06868620753763965,0.0753449010300008,0.07689001441150309,0.06000180142477204,0.05906769107480011,0.05232224116582729,0.03995854962473547,0.022368056041008933,1.4089683637402663e-17,0.023235679419689657,0.04227750889094382,0.057052878021264394,0.06713280978203623,0.07166541885926869,0.06562033797100474,0.06738159621362165,0.06378326346183304,0.05493458098587195,0.041132506591815506,0.022727102458805593,1.3785256102924433e-17,0.023055941747254,0.04172740025953271,0.05549227405505393,0.06340466056716121,0.06911159993766353,0.07311429430049181,0.0722544233782038,0.0665751167128543,0.056293351652419735,0.0416718450185623,0.022902298818359573,1.389270418204132e-17,0.022709774252444543,0.04042329384905376,0.052107739535180594,0.07047558732474839,0.07626578533541058,0.07773572091493956,0.07488015680568245,0.06785059122282157,0.05683422767927002,0.0419425758747683,0.023109683649181825,1.412434148799612e-17,0.021925869164035803,0.03777465576332686,0.06971230013225937,0.07683606931837796,0.08022715607204033,0.0798497012643565,0.0758042253030211,0.06821425044092888,0.057120831169226303,0.04238499269479952,0.023598077502199,1.463268872539963e-17,0.02040540925159999,0.06682173836019642,0.07482514624939395,0.0797287288495061,0.08148375008887637,0.08015425389301822,0.07581191330353876,0.0684370647017335,0.057825927136853,0.04350400675904151,0.02464568635694637,3.6509946102275316e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.22924807376728884,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2563619348348253,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5143899913978859,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0020935500141055384,0.005974714242539468,0.0,0.0,0.0,0.0,0.006175531781528769,0.02449660009583258,0.03692422308145129,0.02288812768492609,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.020687346176760123,-0.03301172262248955,-0.018186458099298784,0.0,0.0,0.0,0.0,0.0,-0.005131822334950646,0.0]}},{"n0":2,"n1":4,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4]],"q":[0.0,0.9779509528325729,1.0,1.0,1.0,0.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.0,0.5044495317391217],"risk":0.06917329900447304,"risks":[1.408526610478109e-17,0.021944634045538952,0.03899603401281792,0.05170328778477934,0.0604533447434881,0.06552814238730531,0.06716173294806324,0.06559741000823938,0.06114483511813046,0.05423716441302723,0.04548817523038856,0.02269908609650022,1.4022820021654375e-17,0.022333960775928266,0.04008382132495817,0.05348983369118451,0.06270988762017882,0.0678797491170447,0.069173299004473,0.06686277148079711,0.061378992678048194,0.053371619220010214,0.04034258036797224,0.02260907362449791,1.3900314847003876e-17,0.022739488639562457,0.04092384796619774,0.05458386755871045,0.06374712002956082,0.06850026290272851,0.06905134049157588,0.06579208577671175,0.0593602222838549,0.05337111580446081,0.04019757279781466,0.02238212200301673,1.4059399862566657e-17,0.0230092744439841,0.04131416064207475,0.054828338129863055,0.06353826724802492,0.06756650571892023,0.0672350252231923,0.06312852797636725,0.06222532539601066,0.05319121539873225,0.039868297102962094,0.022195065677678656,1.3615777424211904e-17,0.0230648453094464,0.04118789586220274,0.05424727758538124,0.06226423073128373,0.06546639253166434,0.06435107985199198,0.06734584213266648,0.06201571930603261,0.05284649561781962,0.039654395944006215,0.022149911509701838,1.4109778614822107e-17,0.022890285670831272,0.04058725945981653,0.05300047909711991,0.060244769216302174,0.06270242146517369,0.06917329900447304,0.06709680239849772,0.06170468786557294,0.05270770107039046,0.03971289584854596,0.02228370315291015,1.3786124503565267e-17,0.022518178416349784,0.03963121438488235,0.05132873679128032,0.057857096370357075,0.06814832900147506,0.0688601825549096,0.06683084416420565,0.06168469132823925,0.05294283989198878,0.04008003320735149,0.022581531293960275,1.4013195092577985e-17,0.0220124001630245,0.03847687677077303,0.049489648121986765,0.06471156511371727,0.06773157765405018,0.0686129348317013,0.06691507698896036,0.062093630515486636,0.053553068602498595,0.040699371996963385,0.02299268975578619,1.4290121709583257e-17,0.021447770668954827,0.0372746202745074,0.059303640331244405,0.06413670557470143,0.06743893018604355,0.06872856832396163,0.06741915459449593,0.0628668877775261,0.054418014553260764,0.04145621322872742,0.0234499774642623,1.4578574025130493e-17,0.020886556382363586,0.0523651876441012,0.058501284195645355,0.06369680054521597,0.06745487560465083,0.06917329900447304,0.06818556917160859,0.06380195140710374,0.055350535963842616,0.042218296124264885,0.023892146278082973,3.870951577499046e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.535834628183449,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.28800524932897326,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.17616012248757779,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.004126628193315506,0.0,0.0,0.0,0.0,0.010855172325390135,0.016610619369545134,0.0010348602253342466,0.0,0.0,0.006653959370349021,0.014244628451139822,0.012306351940382739,0.004244092665035667,0.0,0.0],"upper":[0.0,0.0,-0.02058036544898593,-0.031942963810216406,-0.015668675433232606,0.0,0.0,0.0,-0.014361666214719295,-0.00902341854340745,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3]],"q":[0.0,1.0,1.0,1.0,0.0,0.2737929628017824,1.0,1.0,0.0,0.0,0.018426316216186258,1.0,0.0,0.0,0.0,0.6834334630639737],"risk":0.0675013614035088,"risks":[1.3010901917025291e-17,0.023450092561974487,0.04110016642629038,0.0535673425847627,0.061445406501939304,0.06530480811510059,0.06569266183425981,0.06313274654216294,0.05812550559428864,0.05114804681884816,0.04265414251678562,0.02119050677770882,1.3412285332109273e-17,0.02302107666297779,0.040708885089927954,0.053508347464498424,0.06185415983069917,0.06617079209290228,0.066872488015842,0.06436326522461461,0.05903691520467841,0.05127700330185386,0.03801139586347854,0.021817314412398852,1.4139112125617717e-17,0.022857766685595405,0.04068589356769923,0.05377662478402641,0.06241916951149262,0.06689970196621436,0.06750136140350885,0.06450425211789401,0.05818544344308857,0.050683318237196545,0.039063029487664186,0.022118216221108322,1.406941436605438e-17,0.022858492637774293,0.040842796198830425,0.05410100299853167,0.06278019560320555,0.06702644683014353,0.06698481974760132,0.0627993676747986,0.05946895983954944,0.05195389866332502,0.03952640337268653,0.02220379592125027,1.3678279892896623e-17,0.022925541037287098,0.04098754619883038,0.05418974438771636,0.06253246624439884,0.06601264414669944,0.06462381220980709,0.06467304157202303,0.060762435125946236,0.05244463776375079,0.039619563597328225,0.022177678478696502,1.4106716891106983e-17,0.02295809749350957,0.04091409203162253,0.05372065642686258,0.061221015231879894,0.06324894473945109,0.06664231929690237,0.06581691181112856,0.06116239396594973,0.052479910436089475,0.03955219839722765,0.022143587526000364,1.3655948780453897e-17,0.022848950497775085,0.0403995461988304,0.052342486783627004,0.05835006443358212,0.06576558383727177,0.06750136140350879,0.06603854481356454,0.06109964210526319,0.052377637578001145,0.03953599179274719,0.022208641572042383,1.3760398646985636e-17,0.022484956422305722,0.039208876446217546,0.04968760194056564,0.062473660977014824,0.06625557633675942,0.06750136140350879,0.06587576253245205,0.0610014813424684,0.05245917471612706,0.039787454799687344,0.02248288900309851,1.4024552389349197e-17,0.021751265727721167,0.03710711938728148,0.05723941146081424,0.06257510879358892,0.06604851309532851,0.06728747390513237,0.06586462251112463,0.061297371950454385,0.05304791700929559,0.04052323422284698,0.023075081875332314,1.45088595901836e-17,0.02053931037912353,0.05057773099415207,0.05701127070574164,0.062247067511202264,0.06589617667065394,0.06750136140350879,0.0665370928884712,0.06240955026353768,0.054456620625996835,0.041947899032429604,0.024084688498708904,3.7467534353422074e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5988304093567249,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.401169590643275,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.005347705263157897,0.0,0.0,0.0,0.010313431578947369,0.016043115789473695,0.0,0.0,0.005484126315789473,0.010313431578947369,0.005347705263157897,0.0,0.0],"upper":[0.0,-0.00831865263157894,-0.02495595789473682,-0.02064258245614033,0.0,0.0,-0.02495595789473681,-0.02495595789473681,0.0,0.0,0.0,-0.008318652631578936,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2]],"q":[0.5044495317391179,1.0,1.0,0.0,1.0,1.0,0.0,0.0,1.0,0.0,0.0,0.9779509528325723,0.0,0.0,0.0],"risk":0.06917329900447301,"risks":[1.4852403690632074e-17,0.020886556382363593,0.037274620274507425,0.04948964812198679,0.05785709637035713,0.06270242146517377,0.06435107985199198,0.06312852797636725,0.05936022228385485,0.05337161922001016,0.04548817523038856,0.023892146278082966,1.4578574025130478e-17,0.021447770668954848,0.038476876770773084,0.05132873679128036,0.06024476921630226,0.06546639253166436,0.06723502522319236,0.06579208577671175,0.061378992678048194,0.05423716441302723,0.04221829612426482,0.023449977464262247,1.3465453906045668e-17,0.02201240016302456,0.0396312143848824,0.05300047909711998,0.06226423073128379,0.06756650571892026,0.06905134049157591,0.06686277148079722,0.06114483511813057,0.05535053596384259,0.04145621322872739,0.02299268975578618,1.3742380523050934e-17,0.022518178416349795,0.040587259459816574,0.05424727758538128,0.06353826724802492,0.06850026290272854,0.06917329900447305,0.06559741000823943,0.0638019514071037,0.054418014553260736,0.04069937199696336,0.022581531293960243,1.3786124503565262e-17,0.022890285670831303,0.04118789586220275,0.05482833812986307,0.06374712002956082,0.06787974911704472,0.06716173294806332,0.06818556917160858,0.0628668877775261,0.05355306860249861,0.0400800332073515,0.022283703152910176,1.4109778614822107e-17,0.02306484530944638,0.04131416064207474,0.05458386755871039,0.06270988762017882,0.06552814238730531,0.06917329900447301,0.06741915459449589,0.0620936305154866,0.05294283989198875,0.039712895848545954,0.02214991150970181,1.3615777424211902e-17,0.023009274443984103,0.04092384796619771,0.053489833691184555,0.060453344743488124,0.06745487560465079,0.06872856832396157,0.06691507698896033,0.06168469132823923,0.052707701070390446,0.03965439594400619,0.02219506567767867,1.3696175753062254e-17,0.02273948863956242,0.040083821324958184,0.05170328778477941,0.06369680054521595,0.06743893018604352,0.06861293483170129,0.06683084416420561,0.06170468786557292,0.052846495617819594,0.03986829710296208,0.022382122003016723,1.3855260768625035e-17,0.02233396077592827,0.03899603401281795,0.058501284195645334,0.06413670557470141,0.06773157765405015,0.06886018255490958,0.0670968023984977,0.06201571930603257,0.05319121539873223,0.04019757279781464,0.022609073624497926,1.4022820021654372e-17,0.021944634045538983,0.05236518764410118,0.05930364033124439,0.06471156511371726,0.06814832900147505,0.06917329900447301,0.06734584213266644,0.06222532539601062,0.05337111580446078,0.04034258036797223,0.022699086096500197,4.101092853254347e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.535834628183449,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1761601224875777,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.28800524932897337,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.004244092665035668,0.0,0.0,0.012306351940382737,0.0010348602253342448,0.0,0.014244628451139824,0.016610619369545138,0.0,0.006653959370349021,0.010855172325390135,0.004126628193315506,0.0],"upper":[0.0,-0.00902341854340745,-0.015668675433232606,0.0,-0.014361666214719295,-0.0319429638102164,0.0,0.0,-0.020580365448985928,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1]],"q":[1.0,1.0,0.126172908146685,1.0,0.0,1.0,0.0,0.86939396780285,0.0,0.0,0.0,0.0],"risk":0.08148375008887637,"risks":[1.5585593581537144e-17,0.020405409251599956,0.037774655763326816,0.05210773953518054,0.06340466056716115,0.07166541885926864,0.07689001441150298,0.07907844722386426,0.07823071729635239,0.07434682462896747,0.06742676922170932,0.024645686356946403,1.4632688725399634e-17,0.021925869164035796,0.04042329384905376,0.055492274055053914,0.06713280978203626,0.07534490103000077,0.08012854779894743,0.08148375008887637,0.07941050789978743,0.07390882123168069,0.04350400675904151,0.023598077502198975,1.363123412763279e-17,0.022709774252444595,0.04172740025953273,0.057052878021264436,0.06868620753763968,0.07662738880865852,0.0808764218343209,0.08143330661462689,0.07829804314957634,0.05782592713685303,0.04238499269479953,0.023109683649181825,1.3862871433587592e-17,0.023055941747253995,0.04227750889094383,0.05766470143106946,0.06921751936763096,0.07693596270062827,0.08082003143006142,0.08086972555593042,0.06843706470173351,0.05712083116922632,0.04194257587476831,0.022902298818359552,1.3785256102924436e-17,0.023235679419689678,0.04260933707742855,0.05812097297321668,0.069770587107054,0.07755817947894059,0.08148375008887637,0.07581191330353883,0.06821425044092892,0.05683422767927008,0.041671845018562324,0.022727102458805635,1.4089683637402656e-17,0.02349053764214543,0.043198715385241976,0.05912453322928954,0.07126799117428823,0.07962908922023795,0.08015425389301828,0.07580422530302111,0.0678505912228216,0.05629335165241973,0.04113250659181551,0.022368056041008916,1.341696686313904e-17,0.02402833846878872,0.04445307144737505,0.06127419893575907,0.07449172093394074,0.08148375008887636,0.07984970126435649,0.07488015680568244,0.06657511671285427,0.05493458098587195,0.03995854962473544,0.021647022629444828,1.2942297481789363e-17,0.025017481736401007,0.04669946783864792,0.06504595830674069,0.07972872884950613,0.08022715607204034,0.07773572091493956,0.0722544233782038,0.06378326346183305,0.05232224116582726,0.037871356490186525,0.020430609434910745,1.2171120014463773e-17,0.026579528185454254,0.050169193991273515,0.07482514624939397,0.07683606931837797,0.07626578533541058,0.07311429430049182,0.06738159621362165,0.0590676910748001,0.04817257888402718,0.03469625964130284,0.018638733346627138,1.1063004330737372e-17,0.028780059601421507,0.06682173836019648,0.06971230013225939,0.07047558732474841,0.06911159993766355,0.06562033797100475,0.06000180142477205,0.05225599029896548,0.042382904593584944,0.03038254430863055,0.016254909444102215,5.442555284137088e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2563619348348254,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2292480737672886,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.514389991397886,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.022888127684926096,0.0,0.036924223081451296,0.0,0.024496600095832592,0.00597471424253947,0.006175531781528774,0.0020935500141055397,0.0],"upper":[-0.005131822334950648,-0.018186458099298787,0.0,-0.03301172262248955,0.0,-0.020687346176760123,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0]],"q":[0.34526577574171746,1.0,1.0,0.2503577822312542,0.0,0.0,0.08342130591568751],"risk":0.12499999999999999,"risks":[2.0816681711721685e-17,0.01249999999999999,0.024999999999999994,0.037500000000000006,0.04999999999999999,0.0625,0.07499999999999998,0.08750000000000002,0.09999999999999998,0.11250000000000004,0.125,0.0373532150174134,2.0735199678053256e-17,0.012646784982586617,0.02529356996517322,0.03794035494775984,0.05058713993034647,0.06323392491293306,0.07588070989551968,0.0885274948781063,0.10117427986069288,0.11382106484327953,0.07137132558071224,0.035685662790356135,7.946053376197626e-18,0.014314337209643882,0.028628674419287764,0.042943011628931646,0.0572573488385755,0.0715716860482194,0.08588602325786326,0.10020036046750716,0.11451469767715106,0.0985224250154005,0.06568161667693366,0.03284080833846681,9.52526483329506e-18,0.017159191661533173,0.03431838332306636,0.0514775749845995,0.06863676664613269,0.08579595830766584,0.10295514996919902,0.1201143416307322,0.1166666666666667,0.08750000000000004,0.05833333333333334,0.029166666666666678,1.61907524424502e-17,0.02083333333333334,0.041666666666666644,0.062499999999999986,0.0833333333333333,0.10416666666666666,0.125,0.125,0.10000000000000002,0.075,0.05,0.02500000000000001,1.3877787807814457e-17,0.02499999999999998,0.05,0.07499999999999997,0.09999999999999999,0.125,0.12391801277944918,0.10326501064954097,0.08261200851963277,0.061959006389724576,0.04130600425981639,0.020653002129908178,1.1464719246128237e-17,0.029346997870091818,0.05869399574018359,0.08804099361027543,0.11738799148036724,0.11481728910355883,0.09841481923162185,0.08201234935968486,0.06560987948774791,0.04920740961581094,0.03280493974387395,0.016402469871936998,9.105199856272435e-18,0.03359753012806296,0.06719506025612602,0.10079259038418908,0.09985169307901504,0.08737023144413814,0.07488876980926125,0.062407308174384384,0.04992584653950751,0.03744438490463062,0.02496292326975376,0.012481461634876869,6.9286030440079294e-18,0.03751853836512313,0.07503707673024629,0.08166098791203469,0.0725875448106975,0.0635141017093603,0.05444065860802313,0.04536721550668593,0.03629377240534874,0.027220329304011567,0.018146886202674375,0.0090734431013372,5.036772721865416e-18,0.04092655689866283,0.06308920019753168,0.05678028017777851,0.050471360158025336,0.044162440138272176,0.037853520118519,0.03154460009876583,0.02523568007901267,0.018926760059259497,0.012617840039506337,0.0063089200197531635,7.276026444721389e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.49999999999999994,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":7,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7]],"q":[0.0,0.0,0.0,0.0,0.8276172224316722,0.7748642519180926,1.0,0.3566661873636213],"risk":0.12499999999999997,"risks":[2.8727926585642086e-18,0.04179618484565808,0.07620530602143993,0.10173672385358773,0.11781965896444985,0.12499999999999997,0.12499999999999992,0.1206657729723982,0.11585795924856618,0.11537138521098478,0.12499999999999989,0.005175163178648988,4.5540322370595726e-18,0.03810265301071998,0.06782448256905849,0.0883647442233374,0.09999999999999999,0.10416666666666663,0.10342780540491275,0.1013757143424954,0.10255234240976424,0.11249999999999993,0.010350326357297974,0.00820381515434189,2.1151221335902174e-17,0.03391224128452926,0.05890982948222493,0.07500000000000001,0.0833333333333333,0.08618983783742729,0.08689346943642462,0.08973329960854365,0.09999999999999992,0.015525489535946959,0.016407630308683776,0.011897346989280026,1.882507554536408e-17,0.029454914741112476,0.05000000000000002,0.06249999999999997,0.06895187026994185,0.07241122453035387,0.07691425680732317,0.08749999999999997,0.020700652714595952,0.02461144546302567,0.023794693978560072,0.01608775871547076,1.1404813348651918e-17,0.025,0.04166666666666663,0.05171390270245636,0.05792897962428306,0.06409521400610263,0.07499999999999996,0.025875815893244933,0.03281526061736755,0.0356920409678401,0.03217551743094151,0.02054508525888754,1.3877787807814454e-17,0.02083333333333331,0.03447593513497092,0.04344673471821231,0.05127617120488209,0.062499999999999944,0.031050979071893924,0.041019075771709435,0.04758938795712014,0.04826327614641226,0.041090170517775075,0.024999999999999988,1.6190752442450204e-17,0.01723796756748546,0.02896448981214153,0.03845712840366157,0.04999999999999996,0.036226142250542916,0.04922289092605133,0.05948673494640017,0.06435103486188302,0.06163525577666263,0.05000000000000002,0.029166666666666716,1.8186581370046885e-17,0.014482244906070744,0.025638085602441033,0.037499999999999964,0.0414013054291919,0.05742670608039321,0.07138408193568019,0.08043879357735376,0.08218034103555014,0.07499999999999998,0.05833333333333335,0.03276203243251452,1.9716314744138833e-17,0.01281904280122053,0.024999999999999994,0.046576468607840885,0.0656305212347351,0.08328142892496024,0.09652655229282454,0.10272542629443768,0.10000000000000002,0.08750000000000005,0.06552406486502908,0.03551775509392928,2.0639577379843718e-17,0.01249999999999999,0.051751631786489866,0.07383433638907698,0.09517877591424026,0.11261431100829528,0.12327051155332519,0.12499999999999999,0.11666666666666668,0.09828609729754359,0.07103551018785846,0.037180957198779445,2.081668171172166e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":6,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6]],"q":[0.0,0.0,0.5057719261493776,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.3060295635414239,1.0],"risk":0.0800015936670051,"risks":[9.339006628335075e-18,0.02916650436539086,0.05065282653063198,0.06530441122223503,0.07426094190611798,0.07876810298355408,0.0800015936670051,0.07891165430201613,0.07609636590134827,0.07171198365752801,0.06542856519998774,0.015784218594659866,1.0856169300563142e-17,0.026820457830513778,0.04689688691428373,0.061174269106657894,0.07071025207539072,0.07650486284506097,0.07934890634708411,0.07969899922163876,0.07758718911782486,0.07257310973837244,0.0294895569615351,0.018279976378740636,1.571770624526156e-17,0.02512874984020539,0.044435221189151525,0.05880451632295365,0.06907338477409411,0.07588270988655724,0.07955458138251237,0.08000159366700504,0.07667600959711623,0.041116015100625715,0.034006433501612775,0.020191453039090656,1.488201574377174e-17,0.024043798153598896,0.04305089572624285,0.05770715945410461,0.06851306492043552,0.07566311238396908,0.07895519730506861,0.07773726477621934,0.05066359301193172,0.04717937136861645,0.03739481694778579,0.021510637393667577,1.3394848723190512e-17,0.02344939028525829,0.0424061868850924,0.05723997144871891,0.06802459222600898,0.07444800003201552,0.07575687527568167,0.05813229069545309,0.057798789979751616,0.051610091726085355,0.039660662021208104,0.022303826728354858,1.4085029091612326e-17,0.023170467067057526,0.04206342947140747,0.05663902090863199,0.06648000184784572,0.07073484109550324,0.06352210815118983,0.0658646893350183,0.06283727737398935,0.05445007388262158,0.04095527833866344,0.022702724870467973,1.3801270853059441e-17,0.02298343898850118,0.04150639843183819,0.0550512027525593,0.06267116223568411,0.06683304537914195,0.0713770694344165,0.07107637389149779,0.06587887297790804,0.05595435483092579,0.04155756489666224,0.022894785683919807,1.3913779438990638e-17,0.022626724795627485,0.04016160274615617,0.051565838696224206,0.06806510237930945,0.07433593027794622,0.07632738127861066,0.07394705930706741,0.06730105620514185,0.05656452007858274,0.041854824118816886,0.02311311250590396,1.415520457773936e-17,0.02181120182863643,0.037418870477123556,0.06721827915169233,0.07474127186560744,0.078590299535328,0.0786546328700998,0.07499538246131165,0.06772359041622955,0.05688011530469131,0.0423227765062131,0.023626224044955655,1.4687361169388315e-17,0.020230257578382156,0.0642925756962906,0.0725930941974002,0.0778651286616498,0.0800015936670051,0.07903733359943521,0.07503477590960259,0.06797065924154305,0.05762899200092733,0.04350539693049439,0.024727997260246895,3.622282460347546e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4240705878844181,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07350364742317125,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5024257646924106,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.001039009107297893,0.0033376234930731076,0.0,0.0,0.0,0.0,0.0,0.0033012255866791524,0.015754997128331557,0.030442308299136345,0.029272148549389112,0.012700111811431502,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.014517242819149003,-0.027182695456046395,-0.02219177432313295,-0.007515549420276789,0.0,0.0,0.0,0.0,0.0,0.0,-0.0015385972778250998,0.0]}},{"n0":2,"n1":5,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5]],"q":[0.0,0.7171437911598461,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.4399565799030488,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.5295784880816672],"risk":0.06846447105902502,"risks":[1.3760244390675828e-17,0.022395388618846507,0.0396182016700265,0.05224386919863086,0.06072559795672164,0.06543398557468111,0.06669794080888317,0.06484690986568664,0.06025440880175098,0.05338286200067349,0.044829746725949415,0.02220543261352827,1.3818100696207225e-17,0.022574462825644945,0.040327151782571874,0.053555143393225285,0.062497957109099334,0.06738181600359566,0.06846447105902498,0.06608058904775244,0.06068770400748624,0.05291273231071103,0.039521912096348324,0.022313081526439234,1.4000157242224808e-17,0.02281347472557283,0.04089849378793195,0.054360981453733026,0.06331441305479893,0.06792628944904244,0.06846447105902506,0.06534337148815256,0.059170010714507226,0.05236446872426263,0.03973284836956589,0.022252964114867144,1.4080025794766497e-17,0.022973996777853053,0.04114862147368947,0.054519130971266996,0.06314952962575854,0.06721892090347323,0.06706705304837812,0.0632390587754203,0.06114813277307362,0.052657515700781664,0.03969150609202186,0.02218388957821969,1.3641330223152142e-17,0.022986440034076034,0.04101936876177386,0.05405135617919282,0.062156804649001335,0.06557593729386876,0.06475735333153268,0.06628793451858367,0.06148529869148819,0.05267377685323956,0.03966230543259813,0.022194851091384225,1.4075804434764542e-17,0.022838525435093526,0.04054893369936481,0.053090988363513725,0.06058721283033025,0.06336237122092656,0.06819890423659526,0.06661441251308715,0.06155792732029566,0.05273240953550161,0.03977689768901709,0.022314864236568654,1.3789210429210982e-17,0.022559426776294047,0.03983433811491474,0.05181806826346842,0.058691589281684386,0.06729607220291084,0.06844307233698023,0.06670210841496567,0.061691363859296425,0.05296448742991004,0.040056595608889335,0.022527191465267257,1.3948842910598005e-17,0.022199719971108693,0.03898569219898889,0.05038248435188829,0.0639944686933328,0.06736949333456908,0.068464471059025,0.06683633037634878,0.06197596795107445,0.053350756982069286,0.04044349883966922,0.022787817960502204,1.4130558466593337e-17,0.021807273242597514,0.0380725332696207,0.05870912398366359,0.0637918906772554,0.06720316617424912,0.068464471059025,0.06702968688952174,0.062322911221215846,0.05377232113197995,0.04084004524782022,0.023048044269492945,1.43130114147098e-17,0.02139921287296381,0.05185506834970565,0.058108479536440834,0.06327634468241349,0.06687294787969135,0.0683439918822633,0.06709862119143628,0.06253705735097342,0.0540738464519735,0.04115671884749183,0.023281061076902115,3.9773185020613734e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4728699270501075,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.02322407334280568,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.03604670743411384,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.467859292172973,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0005724785344044012,0.0,0.0,0.0,0.0,0.0,0.0033312295311991786,0.011816651503385366,0.013286120680748775,0.0,0.0,0.0,0.003239166863435493,0.01276834880290709,0.01963549141111688,0.014067173026919205,0.003990668468984716,0.0,0.0],"upper":[0.0,0.0,-0.008515871291872527,-0.022760592872699957,-0.024085145969334556,-0.009497536427401221,0.0,0.0,0.0,0.0,-0.010071873050596885,-0.005432709446943822,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":4,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4]],"q":[0.0,0.7931286540017369,1.0,1.0,1.0,0.0,0.0,0.7167570182522436,1.0,1.0,0.0,0.0,0.0,0.4446681892212002,1.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06439368491891387,"risks":[1.2613399829909372e-17,0.023993965875514448,0.04180120955885809,0.054028298086235035,0.06131889702362911,0.06434115816297886,0.06377510721835275,0.06030003152212432,0.05458186772114726,0.04726058947293055,0.038937595141813386,0.020292425846403037,1.302719593059395e-17,0.02348269180490959,0.041155145818844455,0.053498937538913924,0.06104883393628438,0.06437905399083999,0.06408952922584299,0.060792164242594315,0.05509709725509426,0.04759896062470259,0.03598734215724773,0.021031599489858357,1.4431798783862878e-17,0.023118489566577863,0.04070074540851847,0.053134406182046456,0.06086730207796123,0.06439368491891387,0.06424045825668356,0.06095340746945466,0.05508342985909309,0.04748031833106433,0.03740376829642124,0.021560922984154733,1.4222937752307597e-17,0.02286926476701665,0.04040414662388467,0.052914354923200124,0.060770995129771244,0.06439368491891387,0.06423767027474761,0.060780941588491566,0.05516994764965101,0.04944823533340621,0.03840326839421539,0.021923010998939875,1.3668502271604423e-17,0.022720083187365056,0.04025115754054305,0.0528319074805708,0.060760543122003574,0.06438353852490519,0.06408436994683792,0.059457847278073836,0.05751345447691666,0.05079486266383965,0.03905251965249064,0.02213901574407767,1.4017431273011477e-17,0.022665096514479083,0.04023882068718962,0.05289149549589034,0.06085016776905533,0.06438952445850471,0.060748658264666786,0.06196460456544174,0.05903355102350139,0.051595186259009676,0.03938293688687636,0.022217437391248155,1.3743139322269549e-17,0.0227060845592261,0.040378768407731226,0.053122216251521984,0.06109515003829777,0.05945004554103182,0.06318358939985659,0.06344719750049072,0.05979933432611865,0.051878948567040464,0.03940169189251458,0.022156137722600246,1.3679240684449682e-17,0.0228563519619025,0.04070984491182499,0.05360292699145566,0.05597269792203879,0.06156903774342204,0.06439368491891387,0.06395495057070334,0.05982479617423195,0.05163781623715059,0.03909022097827695,0.021938819006552507,1.3533085297703341e-17,0.023148717384680363,0.041317471013650124,0.050730328105825444,0.05753630332178483,0.06226091489969321,0.06439368491891387,0.0634687853491304,0.059066619360453924,0.050815402633530064,0.03839274466964621,0.021527230100838755,1.3276927041295474e-17,0.023646333190985695,0.044139672673797495,0.05151746482297754,0.057466807860567334,0.061488850506164434,0.06310978198343303,0.061884666399668595,0.05740127712536216,0.04928393117376501,0.03719732358045318,0.02085036178289184,4.46804285825645e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.09669584407322862,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3898433713585298,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.348447717326535,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1650130672417065,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0007200448198300683,0.0,0.0,0.0,0.0,0.004473617073417774,0.009488909484920116,0.0,0.0,0.0,0.007605031025344248,0.019914356756502334,0.01609949571565205,0.0,0.0,0.004126679096817518,0.011486147561463707,0.011491768963648933,0.004222786879299972,1.571307466190041e-05,0.0],"upper":[0.0,0.0,-0.006564718721570511,-0.012751370590292292,-0.007648131352014751,0.0,0.0,0.0,-0.014899813653322958,-0.011028364410598901,0.0,0.0,0.0,0.0,-0.004348720211226324,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3]],"q":[0.0,1.0,1.0,1.0,0.0,0.4446681892212001,1.0,1.0,0.0,0.0,0.7167570182522454,1.0,0.0,0.0,0.0,0.7931286540017292,0.0,0.0,0.0,0.0],"risk":0.06439368491891387,"risks":[1.2862099421440747e-17,0.023646333190985663,0.04131747101365009,0.053602926991455635,0.06109515003829771,0.06438952445850465,0.06408436994683778,0.06078094158849151,0.055083429859093036,0.04759896062470248,0.03893759514181333,0.02085036178289186,1.3276927041295474e-17,0.023148717384680363,0.04070984491182499,0.053122216251521984,0.06085016776905536,0.06438353852490519,0.06423767027474761,0.060953407469454546,0.05509709725509426,0.04726058947293055,0.03719732358045318,0.02152723010083873,1.422249031792557e-17,0.022856351961902544,0.04037876840773125,0.052891495495890395,0.0607605431220036,0.06439368491891387,0.06424045825668356,0.060792164242594426,0.054581867721147426,0.049283931173765026,0.03839274466964623,0.02193881900655251,1.4076334931179226e-17,0.0227060845592261,0.040238820687189626,0.0528319074805708,0.060770995129771216,0.06439368491891384,0.06408952922584302,0.060300031522124486,0.05740127712536217,0.05081540263353007,0.039090220978276954,0.022156137722600236,1.3743139322269554e-17,0.02266509651447911,0.04025115754054305,0.052914354923200124,0.06086730207796123,0.06437905399084007,0.06377510721835292,0.06188466639966862,0.05906661936045395,0.05163781623715063,0.039401691892514606,0.022217437391248183,1.4017431273011477e-17,0.022720083187365032,0.040404146623884654,0.05313440618204644,0.061048833936284436,0.06434115816297897,0.06310978198343306,0.0634687853491304,0.05982479617423196,0.051878948567040485,0.03938293688687636,0.02213901574407764,1.366850227160442e-17,0.02286926476701666,0.04070074540851847,0.05349893753891401,0.061318897023629276,0.061488850506164434,0.06439368491891387,0.06395495057070336,0.05979933432611865,0.051595186259009676,0.03905251965249062,0.021923010998939882,1.3532637863321302e-17,0.023118489566577843,0.04115514581884452,0.0540282980862352,0.05746680786056735,0.06226091489969321,0.06439368491891385,0.06344719750049072,0.05903355102350137,0.050794862663839604,0.038403268394215366,0.021560922984154712,1.3323776831766018e-17,0.023482691804909635,0.041801209558858236,0.05151746482297754,0.05753630332178483,0.06156903774342203,0.06318358939985656,0.0619646045654417,0.057513454476916574,0.049448235333406164,0.03740376829642118,0.02103159948985834,1.3027195930593922e-17,0.023993965875514542,0.044139672673797495,0.05073032810582542,0.055972697922038746,0.05945004554103178,0.0607486582646667,0.05945784727807373,0.055169947649650906,0.047480318331064225,0.035987342157247644,0.02029242584640296,4.542652735715874e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.38984337135852803,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.09669584407323038,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.16501306724170464,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.34844771732653695,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[1.5713074661899374e-05,0.0,0.0,0.0,0.004222786879299963,0.0,0.0,0.0,0.01149176896364892,0.016099495715652046,0.0,0.0,0.011486147561463704,0.019914356756502345,0.009488909484920129,0.0,0.00412667909681752,0.007605031025344258,0.0044736170734177814,0.0007200448198300698,0.0],"upper":[0.0,-0.004348720211226319,-0.01102836441059889,-0.0076481313520147505,0.0,0.0,-0.014899813653322956,-0.0127513705902923,0.0,0.0,0.0,-0.006564718721570523,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2]],"q":[0.529578488081713,1.0,1.0,0.0,1.0,1.0,0.0,0.4399565799030454,1.0,0.0,0.0,1.0,0.0,0.0,0.7171437911598496,0.0,0.0,0.0],"risk":0.06846447105902498,"risks":[1.449784727542453e-17,0.021399212872963487,0.03807253326962015,0.050382484351887635,0.05869158928168364,0.06336237122092589,0.06475735333153199,0.06323905877541974,0.05917001071450667,0.052912732310710586,0.04482974672594919,0.023281061076902382,1.4313011414709916e-17,0.021807273242597344,0.03898569219898862,0.05181806826346806,0.060587212830329945,0.06557593729386843,0.06706705304837782,0.06534337148815228,0.06068770400748613,0.05338286200067338,0.04115671884749215,0.023048044269493057,1.3625017149035515e-17,0.022199719971108648,0.03983433811491463,0.05309098836351363,0.062156804649001224,0.06721892090347314,0.06846447105902498,0.06608058904775244,0.060254408801751036,0.054073846451973835,0.040840045247820395,0.022787817960502277,1.3806732705030874e-17,0.02255942677629401,0.04054893369936479,0.05405135617919277,0.06314952962575848,0.06792628944904242,0.068464471059025,0.0648469098656867,0.06253705735097367,0.05377232113198011,0.040443498839669294,0.02252719146526726,1.3789210429210994e-17,0.022838525435093546,0.041019368761773846,0.05451913097126698,0.0633144130547989,0.06738181600359566,0.06669794080888325,0.06709862119143647,0.06232291122121597,0.05335075698206936,0.04005659560888937,0.02231486423656869,1.407580443476454e-17,0.02298644003407601,0.04114862147368945,0.05436098145373294,0.06249795710909928,0.06543398557468108,0.06834399188226341,0.06702968688952177,0.06197596795107447,0.052964487429910036,0.03977689768901709,0.022194851091384197,1.364133022315214e-17,0.022973996777853053,0.040898493787931936,0.053555143393225285,0.060725597956721666,0.06687294787969136,0.06846447105902499,0.06683633037634876,0.061691363859296404,0.0527324095355016,0.03966230543259811,0.022183889578219703,1.3675549820862412e-17,0.022813474725572786,0.04032715178257186,0.05224386919863086,0.06327634468241349,0.06720316617424911,0.06846447105902499,0.06670210841496566,0.06155792732029565,0.05267377685323953,0.03969150609202186,0.022252964114867147,1.3755418373404108e-17,0.022574462825644934,0.0396182016700265,0.05810847953644082,0.06379189067725537,0.06736949333456907,0.06844307233698023,0.06661441251308714,0.06148529869148818,0.05265751570078168,0.039732848369565914,0.022313081526439276,1.3818100696207234e-17,0.022395388618846507,0.051855068349705664,0.058709123983663604,0.06399446869333282,0.06729607220291088,0.0681989042365953,0.06628793451858372,0.06114813277307367,0.05236446872426269,0.03952191209634839,0.02220543261352828,4.198599367485919e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0232240733428054,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.47286992705010766,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4678592921729731,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.03604670743411382,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.003990668468984716,0.0,0.0,0.014067173026919202,0.0,0.0,0.019635491411116878,0.01328612068074877,0.0,0.012768348802907092,0.011816651503385367,0.0,0.0032391668634354936,0.003331229531199179,0.0005724785344044013,0.0],"upper":[0.0,-0.005432709446943819,-0.009497536427401218,0.0,-0.010071873050596876,-0.02408514596933455,0.0,0.0,-0.022760592872699957,0.0,0.0,-0.008515871291872527,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1]],"q":[1.0,1.0,0.3060295635414233,1.0,0.0,1.0,0.0,1.0,0.0,0.5057719261493788,0.0,0.0,0.0,0.0],"risk":0.0800015936670051,"risks":[1.5681300747803758e-17,0.020230257578382132,0.03741887047712354,0.05156583869622418,0.06267116223568406,0.07073484109550321,0.07575687527568156,0.07773726477621923,0.07667600959711612,0.07257310973837222,0.06542856519998763,0.024727997260246912,1.4687361169388312e-17,0.021811201828636436,0.04016160274615619,0.0550512027525593,0.06648000184784575,0.07444800003201552,0.07895519730506861,0.0800015936670051,0.07758718911782492,0.07171198365752801,0.04350539693049437,0.023626224044955613,1.360037103788956e-17,0.02262672479562754,0.04150639843183823,0.0566390209086321,0.06802459222600901,0.07566311238396917,0.07955458138251245,0.07969899922163892,0.07609636590134844,0.057628992000927325,0.042322776506213085,0.023113112505903952,1.3841796176638275e-17,0.02298343898850118,0.0420634294714075,0.05723997144871894,0.06851306492043552,0.07588270988655724,0.07934890634708411,0.07891165430201613,0.06797065924154305,0.05688011530469132,0.041854824118816886,0.022894785683919786,1.3801270853059443e-17,0.02317046706705755,0.042406186885092394,0.05770715945410458,0.06907338477409411,0.07650486284506094,0.0800015936670051,0.07503477590960263,0.06772359041622959,0.056564520078582786,0.041557564896662263,0.022702724870468007,1.408502909161232e-17,0.023449390285258248,0.0430508957262428,0.05880451632295358,0.07071025207539064,0.07876810298355397,0.07903733359943524,0.07499538246131168,0.06730105620514186,0.05595435483092579,0.040955278338663456,0.02230382672835484,1.3394848723190515e-17,0.024043798153598892,0.044435221189151476,0.06117426910665785,0.07426094190611798,0.0800015936670051,0.07865463287009977,0.07394705930706742,0.06587887297790805,0.0544500738826216,0.039660662021208104,0.0215106373936676,1.2873559871857173e-17,0.025128749840205338,0.04689688691428371,0.065304411222235,0.07786512866164984,0.07859029953532803,0.0763273812786107,0.07107637389149783,0.06283727737398938,0.05161009172608536,0.03739481694778581,0.02019145303909067,1.2037869370367361e-17,0.026820457830513764,0.05065282653063199,0.07259309419740025,0.07474127186560749,0.07433593027794626,0.07137706943441656,0.06586468933501835,0.05779878997975165,0.04717937136861648,0.0340064335016128,0.018279976378740667,1.0856169300563148e-17,0.029166504365390877,0.06429257569629067,0.06721827915169241,0.06806510237930953,0.06683304537914204,0.0635221081511899,0.05813229069545314,0.05066359301193178,0.04111601510062576,0.029489556961535143,0.01578421859465987,5.5249706961881475e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07350364742317128,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.42407058788441787,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5024257646924108,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.012700111811431512,0.0,0.02927214854938913,0.0,0.03044230829913636,0.0,0.01575499712833157,0.003337623493073111,0.0033012255866791546,0.0010390091072978937,0.0],"upper":[-0.0015385972778251,-0.007515549420276789,0.0,-0.022191774323132952,0.0,-0.02718269545604639,0.0,-0.014517242819148997,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0]],"q":[0.7282876405293705,0.6431254298963757,1.0,0.7497536798636038,0.0,0.0,0.0,0.0],"risk":0.12499999999999999,"risks":[2.0816681711721688e-17,0.012499999999999983,0.024999999999999994,0.03749999999999998,0.04999999999999996,0.06249999999999997,0.07499999999999996,0.08749999999999997,0.09999999999999992,0.11249999999999999,0.12499999999999994,0.03693599188541339,2.050359431427694e-17,0.013064008114586627,0.026128016229173254,0.03919202434375986,0.05225603245834651,0.06532004057293311,0.07838404868751975,0.09144805680210633,0.10451206491669301,0.11757607303127965,0.07066373389242053,0.03533186694621028,8.142449522291336e-18,0.014668133053789736,0.029336266107579473,0.04400439916136921,0.05867253221515892,0.07334066526894867,0.08800879832273839,0.10267693137652814,0.11734506443031789,0.09807879494746813,0.06538586329831209,0.032692931649156015,9.607352885934149e-18,0.01730706835084396,0.034614136701687934,0.051921205052531866,0.06922827340337584,0.08653534175421979,0.10384241010506376,0.12114947845590773,0.11666666666666672,0.08750000000000005,0.05833333333333335,0.029166666666666684,1.6190752442450204e-17,0.020833333333333332,0.04166666666666663,0.06249999999999997,0.08333333333333327,0.10416666666666663,0.12499999999999997,0.12500000000000003,0.10000000000000005,0.07500000000000001,0.05000000000000002,0.025000000000000015,1.3877787807814454e-17,0.024999999999999974,0.04999999999999999,0.07499999999999996,0.09999999999999996,0.12499999999999997,0.12298018229303939,0.10248348524419948,0.08198678819535958,0.06149009114651968,0.0409933940976798,0.02049669704883988,1.1377952496194275e-17,0.029503302951160115,0.05900660590232018,0.08850990885348031,0.11801321180464044,0.11183649714529505,0.09585985469596718,0.0798832122466393,0.06390656979731145,0.0479299273479836,0.031953284898655725,0.015976642449327883,8.868818151723723e-18,0.034023357550672075,0.06804671510134425,0.10207007265201642,0.09391030802076766,0.08217151951817168,0.07043273101557572,0.058693942512979776,0.046955154010383825,0.03521636550778785,0.023477577005191916,0.011738788502595947,6.5163366383935476e-18,0.03826121149740406,0.07652242299480813,0.07226590514269814,0.06423636012684278,0.05620681511098742,0.048177270095132084,0.04014772507927673,0.03211818006342138,0.02408863504756605,0.016059090031710695,0.008029545015855358,4.457292876933387e-18,0.041970454984144666,0.05018385378094671,0.04516546840285204,0.04014708302475736,0.035128697646662696,0.03011031226856802,0.02509192689047335,0.02007354151237868,0.015055156134284008,0.010036770756189342,0.005018385378094667,7.490943635708235e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.49999999999999994,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":8,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[0,8]],"q":[0.0,0.8402763694352804,0.0,0.10238028613628268,0.0,1.0,1.0,1.0,0.0],"risk":0.12499999999999997,"risks":[6.938893903907226e-18,0.037513712788406324,0.07231808558355979,0.10034299281621965,0.11839413517256712,0.125,0.12102612727962384,0.11003446198317848,0.09837784472883526,0.09506630658756982,0.11152279066965204,0.0125,6.931281777196955e-18,0.0361590427917799,0.06689532854414644,0.08879560137942535,0.10000000000000002,0.10085510606635323,0.09431525312843872,0.08608061413773088,0.08450338363339538,0.10037051160268684,0.024999999999999994,0.012486287211593651,2.0072300927920166e-17,0.03344766427207323,0.05919706758628357,0.07500000000000002,0.08068408485308258,0.07859604427369893,0.07378338354662647,0.073940460679221,0.08921823253572164,0.037499999999999985,0.024972574423187295,0.0138409572082201,1.8567183497393957e-17,0.029598533793141795,0.05000000000000003,0.06051306363981193,0.06287683541895916,0.061486152955522066,0.06337753772504656,0.07806595346875644,0.049999999999999996,0.03745886163478095,0.027681914416440224,0.016552335727926786,1.1325088759483024e-17,0.02500000000000001,0.04034204242654127,0.04715762656421936,0.04918892236441763,0.052814614770872126,0.06691367440179125,0.06249999999999998,0.0499451488463746,0.04152287162466033,0.033104671455853565,0.02040146620685822,1.3877787807814457e-17,0.02017102121327063,0.03143841770947957,0.03689169177331322,0.04225169181669769,0.05576139533482602,0.07499999999999998,0.062431436057968234,0.05536382883288044,0.04965700718378034,0.040802932413716436,0.02499999999999998,1.6558409525041148e-17,0.01571920885473979,0.024594461182208815,0.03168876886252328,0.04460911626786082,0.0875,0.07491772326956189,0.06920478604110056,0.06620934291170714,0.06120439862057467,0.05,0.029828978786729396,1.902966181591704e-17,0.012297230591104387,0.021125845908348845,0.03345683720089561,0.09999999999999998,0.08740401048115552,0.08304574324932065,0.08276167863963389,0.08160586482743286,0.07499999999999997,0.05965795757345871,0.03428079114526019,2.0929241344944442e-17,0.01056292295417443,0.022304558133930424,0.11249999999999998,0.09989029769274918,0.09688670045754078,0.0993140143675607,0.10200733103429108,0.09999999999999999,0.08948693636018809,0.06856158229052044,0.037702769408895644,2.18919754800959e-17,0.011152279066965205,0.12499999999999996,0.11237658490434281,0.11072765766576087,0.11586635009548746,0.12240879724114927,0.12499999999999996,0.1193159151469174,0.1028423734357806,0.07540553881779118,0.039437077045825546,1.8572275495784888e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":7,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[1,7]],"q":[0.0,0.0,0.011506021212613012,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0,0.5134205974460374,1.0],"risk":0.07731620826826181,"risks":[7.929181456557841e-18,0.031104581102031178,0.05314240488884866,0.06707278674075892,0.0745123593862557,0.0773162082682618,0.07718375095087884,0.07534766320929787,0.07238637598726316,0.068182888948221,0.06203486788802237,0.013397611650278037,9.842063566895501e-18,0.028002780800329117,0.048044551130987004,0.06143003217230951,0.06973726173690903,0.07443941130686726,0.07659928758922827,0.07667816663932292,0.07448419663821604,0.06926919344732868,0.02502255967862657,0.016564352151973057,1.633935162516858e-17,0.02568695555073404,0.04465052986995149,0.05821616764440647,0.06764722412373506,0.07384571988016769,0.07715850367696331,0.0773162082682618,0.07351733848483305,0.03487484408504562,0.030797637557950366,0.019134062487861318,1.5183207766597293e-17,0.024173852479181666,0.042752925990754115,0.056807189401482217,0.06708696008211612,0.07382738710018438,0.07667892383835817,0.07477930300053554,0.042954464869535185,0.04269985621793193,0.03540496826391311,0.02098368447878492,1.3310219580182877e-17,0.023347536775951947,0.04191930714010874,0.05632300819507355,0.06668481690898614,0.07257234334850524,0.07305508699443619,0.049261422032095256,0.05227100813191775,0.04881271732815531,0.03863800898708878,0.02212897243240653,1.405465219568682e-17,0.022983577339614668,0.04155386421904002,0.05573079310336858,0.06499646679870288,0.06834469046653485,0.05379571557272583,0.05951109329990781,0.05935730968058795,0.052962973524911576,0.040560769776401225,0.02271031566289825,1.3873623855756303e-17,0.022779528154015502,0.040965315683331706,0.05395129418895121,0.06064811341683171,0.05655734549142692,0.06442011172190214,0.06703874532121104,0.06395857809225333,0.055295392031984116,0.04147848376464674,0.022968575121264732,1.3998733173475336e-17,0.022388384648875482,0.039436825519250145,0.04996535584532663,0.057546311788198516,0.06699806339790071,0.07185702425002455,0.071624822689114,0.06633283919915516,0.05630450430524541,0.041889302703408786,0.023215279756993504,1.4269634664951132e-17,0.021453060789599767,0.036296417752019666,0.056762614463040616,0.06724494832790355,0.07381214646702851,0.07596170731549365,0.0736731112779144,0.0671883772846943,0.056762182746432265,0.042425367424996065,0.023800161736705183,1.4883811505731238e-17,0.01964129913691078,0.054206253515953234,0.06516076651191063,0.07290411197222292,0.07696923197139223,0.07731620826826183,0.07413010270299339,0.06758721525033508,0.05763026300400761,0.04378886985899099,0.025077643150450864,3.5195828581266556e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.3195246368609509,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.14532934225200853,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5351460208870406,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00013530815452215405,0.0005452762212737894,0.0,0.0,0.0,0.0,0.0,0.0,0.0008173442714531363,0.005615506688120495,0.016388665925800905,0.026034065566666802,0.023426024142975625,0.010265407027037422,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.004143571119900786,-0.011641918458351296,-0.016865107868637024,-0.01402803895089668,-0.0053494223221087775,0.0,0.0,0.0,0.0,0.0,0.0,0.0,-0.001402162015284337,0.0]}},{"n0":2,"n1":6,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[2,6]],"q":[0.0,0.47745689506417044,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.8753546773387751,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0,0.12476241880342526],"risk":0.06517356926148099,"risks":[1.3425677094175581e-17,0.022798176375089102,0.04004215231607516,0.052328328745472955,0.06012460179679788,0.06383545258256443,0.06388225197838021,0.060783135717904446,0.05521680509344262,0.04805460855694743,0.040345259516197496,0.021552498493191064,1.354640018785954e-17,0.0228914079665644,0.04059200043784783,0.05336581703426391,0.061455307631326284,0.06517356926148096,0.06499240634477688,0.06160944935503199,0.055977567028150876,0.049279807219251515,0.03813802478344802,0.021750813475128083,1.422675327809924e-17,0.023039672858776467,0.04093799006810117,0.05376950119841248,0.06171818158407025,0.06517356926148102,0.06480239519095496,0.06157809731803038,0.05675060903000001,0.05020527431702747,0.038490377288776245,0.02176722682732791,1.4251818707427324e-17,0.02307231851708733,0.040890221982861276,0.05349460988268247,0.061164973948231754,0.06449624254286332,0.06443055870908465,0.06222581352016815,0.05820294254018597,0.050658451929247346,0.0385923868594941,0.02180163585325959,1.3545511308611272e-17,0.02292965868371101,0.04048137509385193,0.05280496988524411,0.060391591352408874,0.06410931048381219,0.06517356926148105,0.0625797248991801,0.05869479788484425,0.05087477850744448,0.038773234410296356,0.021952232135616857,1.4086959456138033e-17,0.022656998154113,0.03993190655273298,0.05218904156124353,0.06018871192471159,0.06506202482566359,0.0637843168402664,0.06303917564386982,0.059013700182124956,0.05124344966285142,0.03916021254271551,0.02221343463076652,1.383311884532892e-17,0.02238413343091331,0.039589193111019064,0.052243122314281534,0.061359328784441086,0.062265413809701485,0.06413134569462693,0.06340845029448151,0.05954093560266595,0.051855138840073624,0.039682151275048906,0.022488901568047243,1.395761445751868e-17,0.022292645943387247,0.03984690093502048,0.0535336297095384,0.05847171125374191,0.062411068525418466,0.06445832725546008,0.06399434622148104,0.0602682086464688,0.052518338631885396,0.040102223794789,0.02261785574020799,1.3938575099284624e-17,0.02257440706942714,0.04105307617268063,0.05285190461864423,0.058318104624547264,0.06256262947600658,0.06493233551103784,0.06463061958067871,0.06083418540031433,0.05281848761675966,0.04007605013175225,0.022411855222509058,1.3673926485263027e-17,0.0233858167455928,0.045854689350665064,0.05229221448031624,0.058120655367066974,0.06268355746307752,0.065173569261481,0.064741880279374,0.06061621397049352,0.05221293265484766,0.0392288115525662,0.02169803900923769,4.400210065359e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.10366750815190373,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3178347714986447,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04797256546374955,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5305251548857021,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[9.219879862715178e-05,0.0,0.0,0.0,0.0,0.0,0.0,0.0009428731632256335,0.005214352980190287,0.011043622929138942,0.009777501880702378,0.0,0.0,0.0,0.001198621916350567,0.0071015668690941666,0.017338856409197773,0.022050457677349703,0.014862859932107788,0.0043610646482452,0.0,0.0],"upper":[0.0,0.0,-0.002440425349383103,-0.00914750029739274,-0.015221283899094612,-0.012901908611516966,-0.0047509413718561586,0.0,0.0,0.0,0.0,0.0,-0.006394908453938178,-0.0037368023070992076,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":5,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[3,0],[3,1],[3,2],[3,3],[3,4],[3,5]],"q":[0.0,1.0,1.0,1.0,1.0,1.0,0.0,0.0,0.18920103391555235,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.7440768553460154,1.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06013405816039184,"risks":[1.424575128668688e-17,0.021433611434108952,0.03743382452695582,0.048483712678493926,0.05502694461998864,0.05753039243159952,0.0565261710596468,0.05263310933356208,0.04655765248252236,0.039074196151768936,0.030984851918609557,0.02238590852126896,1.401188750177974e-17,0.02199742296086878,0.038642146531767674,0.05020255827775123,0.05701223337693226,0.05951076453151152,0.0582646526139409,0.0539682580482197,0.04742481292632433,0.03950749385977209,0.03874736197963235,0.02214163576178624,1.393631881370721e-17,0.022368729349988698,0.03932647128790761,0.05104412256461155,0.0578262503632776,0.06013405816039186,0.058589896290098725,0.05396331721191494,0.04713867548180628,0.04985176441638614,0.03852474635086647,0.021959939671702976,1.4043427334142637e-17,0.022533906436231623,0.03955627319882219,0.051210380261385705,0.0578149229886247,0.059874480770887806,0.05807370465738673,0.053255223988072586,0.056430813173970584,0.04979873908788175,0.03839923925200503,0.0218957620214157,1.3691148161553432e-17,0.02253045615903366,0.0394574291710652,0.050934417959104486,0.057315945461115625,0.059161801609815434,0.057227705527776174,0.059180498895970234,0.05659620098271534,0.04984350926560715,0.03843908362662094,0.02193980174799232,1.4021437778390774e-17,0.0224181952763343,0.03917328777705109,0.050450244739111194,0.05665526511450561,0.05842042519596585,0.05876110552711393,0.05953289873449273,0.05682197348588418,0.05003629770077197,0.03860827494049094,0.022049790951759834,1.3808710832284198e-17,0.022265850992439603,0.038855353391003926,0.05000358291499131,0.05619142703353469,0.05579721031327487,0.05920777873158175,0.05986746893488477,0.057117001801796144,0.05030029632928119,0.03881627291963646,0.022166688003658064,1.3876473764354389e-17,0.022151266610723443,0.0386780734530357,0.04989249402721946,0.05087768380147049,0.05620296705159242,0.059516445883331354,0.06013405816039184,0.057350656157651156,0.0504874474842377,0.03893862718769302,0.022217201039217458,1.3890548217163146e-17,0.022171885868631353,0.03886914810960124,0.04455568983986258,0.05108376946137695,0.05630896785062013,0.0595635936800286,0.06013405816039184,0.057302873901456074,0.050392708691278355,0.03881249419433223,0.022105589568364007,1.3788442208314026e-17,0.022460650159105065,0.03734868557775721,0.04439867141702991,0.0507887116048211,0.05590499993694696,0.0590651195637971,0.05955366910246859,0.05666234689237623,0.04973449339433949,0.03821409173314628,0.02169922638359269,4.2816791643627494e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5100790947293645,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1865933525442337,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.30332755272640183,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[2.2131199395156506e-05,0.0,0.0,0.0,0.0,0.0,0.0009468585592569361,0.0028537701405723045,0.0,0.0,0.0,0.0,0.0019389173798826404,0.00823006238255251,0.012936349505445918,0.007959739550324184,0.0,0.0,0.0011398195761625444,0.005160586974769214,0.00927893420000285,0.008127118142987933,0.0033146496101341596,0.0004372309357807347,0.0],"upper":[0.0,-0.0010104835759199382,-0.005901364705753841,-0.012875588550541862,-0.012818856601364437,-0.004918334292364216,0.0,0.0,0.0,-0.009554688265962256,-0.01322204263878831,-0.005711054316426459,0.0,0.0,0.0,0.0,0.0,-0.001373302574827973,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":4,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4],[4,0],[4,1],[4,2],[4,3],[4,4]],"q":[0.36606999150207276,1.0,1.0,1.0,1.0,0.0,0.11786146865252882,1.0,1.0,1.0,0.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.11786146865248459,1.0,0.0,0.0,0.0,0.0,0.36606999150236536],"risk":0.05770521798036588,"risks":[1.451857558072034e-17,0.020951494650722376,0.03637504321277145,0.04672178567796066,0.05251373468580034,0.054331424720901966,0.052801561310383244,0.04858467022127255,0.04236274665791362,0.03482690445937031,0.026665025296831235,0.022705825622410417,1.4213808438708226e-17,0.021555971535399062,0.037610166544239654,0.048501297207407895,0.05466062852890277,0.05660224529369523,0.05491331902558688,0.05024437494506895,0.04329955892718107,0.03482690445937042,0.039033994395915345,0.02235489208963765,1.3768331166066055e-17,0.021986188616756105,0.03844845623749469,0.04963476633732275,0.05590088493854872,0.057705217980365875,0.055603648688535234,0.050244374945069004,0.042362746657913786,0.04977500126891294,0.038624863972054474,0.02209673617884448,1.39251424608243e-17,0.02226364390392683,0.03893656996218022,0.05018790109492542,0.05630728831639831,0.057705217980365875,0.05491331902558691,0.04858467022127255,0.05572551822558615,0.049470671036533485,0.03832848770780759,0.02192627661564901,1.373789943485705e-17,0.02240006890392683,0.03909713811304177,0.05018790109492542,0.05590088493854875,0.05660224529369523,0.052801561310383105,0.05767705691621952,0.05559048001376097,0.04925396734694701,0.03814810060512106,0.02184121707737571,1.404832645557023e-17,0.02240006890392681,0.03893656996218023,0.04963476633732271,0.05466062852890263,0.05433142472090158,0.056404631287515966,0.057705217980365875,0.055491998041080896,0.0491408387321271,0.03808738553901744,0.021841217077375675,1.3737899434857043e-17,0.02226364390392683,0.03844845623749461,0.048501297207407645,0.05251373468579973,0.05265542021291363,0.05654392136345936,0.05770521798036586,0.05545602078522373,0.049140838732127066,0.03814810060512103,0.021926276615649023,1.3830433154804623e-17,0.021986188616755983,0.03761016654423932,0.04672178567795984,0.04713743012290256,0.052829084945174014,0.056583785660874644,0.05770521798036584,0.055491998041080855,0.049253967346946974,0.03832848770780764,0.022096736178844556,1.398724444956295e-17,0.021555971535398774,0.03637504321277053,0.040508157635341484,0.047262010867203386,0.052829084945173965,0.05654392136345931,0.05770521798036586,0.05559048001376105,0.04947067103653372,0.03862486397205481,0.022354892089637965,1.421380843870849e-17,0.020951494650721676,0.03336325218577474,0.04050815763534144,0.0471374301229025,0.052655420212913646,0.05640463128751612,0.05767705691621989,0.055725518225586794,0.049775001268913814,0.03903399439591631,0.02270582562241113,3.9711000104723936e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5758556664118181,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.030666283150019284,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.007514131781116842,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.38234134749536985,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0036225711616760027,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0016605192489369722,0.0,0.0,0.0,0.0,0.004105413921298453,0.008056107623530496,6.3552406528109e-06,0.0,0.0,0.003645203437160812,0.00888268876626527,0.006563433653944723,0.0,0.0,0.0011461978505163065,0.002969711132995292,0.002727366015212947,0.0009012977386607615,0.0,0.0],"upper":[0.0,-0.0025535258022998447,-0.009699902110317403,-0.013234413125052689,-0.00639583130894979,0.0,0.0,-0.012374758787455096,-0.020974564030319325,-0.010781289132299206,0.0,0.0,0.0,-0.010080680053844705,-0.006443925136924273,0.0,0.0,0.0,0.0,-0.001386379922631136,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":3,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3],[5,0],[5,1],[5,2],[5,3]],"q":[0.0,1.0,1.0,1.0,0.0,0.7440768553460129,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.189201033915553,1.0,0.0,0.0,0.0,1.0,0.0,0.0,0.0,0.0],"risk":0.06013405816039181,"risks":[1.3483311734419737e-17,0.02246065015910506,0.03886914810960125,0.04989249402721946,0.05619142703353472,0.058420425195965936,0.057227705527776174,0.053255223988072586,0.047138675481806114,0.03950749385977209,0.030984851918609446,0.021699226383592687,1.3788442208314013e-17,0.022171885868631377,0.03867807345303575,0.05000358291499135,0.05665526511450569,0.05916180160981552,0.05807370465738684,0.05396331721191494,0.04742481292632439,0.03907419615176905,0.03821409173314622,0.022105589568363955,1.3865027398465783e-17,0.02215126661072351,0.03885535339100399,0.05045024473911132,0.057315945461115736,0.05987448077088792,0.05858989629009881,0.05396825804821975,0.04655765248252253,0.04973449339433946,0.03881249419433219,0.022217201039217444,1.3879101851274526e-17,0.022265850992439613,0.03917328777705116,0.0509344179591045,0.05781492298862473,0.0601340581603918,0.0582646526139409,0.052633109333562134,0.05666234689237618,0.050392708691278314,0.038938627187692997,0.022166688003658033,1.3808710832284192e-17,0.022418195276334336,0.039457429171065206,0.051210380261385705,0.05782625036327757,0.059510764531511495,0.05652617105964686,0.05955366910246857,0.05730287390145604,0.05048744748423771,0.038816272919636484,0.02204979095175986,1.4021437778390774e-17,0.022530456159033624,0.03955627319882215,0.05104412256461148,0.057012233376932175,0.057530392431599464,0.05906511956379707,0.060134058160391815,0.057350656157651135,0.050300296329281166,0.03860827494049093,0.021939801747992285,1.369114816155343e-17,0.022533906436231623,0.03932647128790759,0.05020255827775122,0.055026944619988694,0.05590499993694691,0.059563593680028545,0.06013405816039181,0.057117001801796116,0.05003629770077196,0.038439083626620935,0.021895762021415716,1.3712148281486272e-17,0.022368729349988657,0.038642146531767674,0.048483712678493954,0.05078871160482108,0.05630896785062011,0.059516445883331354,0.059867468934884774,0.056821973485884164,0.04984350926560712,0.03839923925200502,0.021959939671702976,1.3819256801921704e-17,0.021997422960868776,0.037433824526955845,0.0443986714170299,0.05108376946137694,0.05620296705159242,0.059207778731581784,0.059532898734492745,0.05659620098271533,0.04979873908788176,0.03852474635086648,0.022141635761786266,1.4011887501779742e-17,0.02143361143410898,0.037348685577757224,0.0445556898398626,0.05087768380147052,0.0557972103132749,0.05876110552711395,0.05918049889597025,0.05643081317397061,0.04985176441638615,0.038747361979632376,0.022385908521268955,4.052947298682608e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5100790947293644,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.30332755272640166,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.18659335254423393,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0004372309357807344,0.0,0.0,0.0,0.0033146496101341587,0.0,0.0,0.0,0.008127118142987931,0.007959739550324182,0.0,0.0,0.009278934200002848,0.012936349505445921,0.0,0.0,0.005160586974769214,0.008230062382552514,0.0028537701405723062,0.0,0.0011398195761625446,0.0019389173798826413,0.0009468585592569366,2.2131199395156726e-05,0.0],"upper":[0.0,-0.001373302574827973,-0.005711054316426458,-0.004918334292364214,0.0,0.0,-0.013222042638788303,-0.01281885660136443,0.0,0.0,-0.009554688265962256,-0.012875588550541859,0.0,0.0,0.0,-0.005901364705753839,0.0,0.0,0.0,-0.001010483575919937,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":2,"cost":0.1,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2],[6,0],[6,1],[6,2]],"q":[0.12476241880340676,1.0,1.0,0.0,1.0,1.0,0.0,0.8753546773387794,1.0,0.0,0.0,1.0,0.0,0.0,1.0,0.0,0.0,0.4774568950641357,0.0,0.0,0.0],"risk":0.065173569261481,"risks":[1.3088208731098861e-17,0.023385816745592845,0.041053076172680704,0.05353362970953848,0.06135932878444114,0.06506202482566367,0.06517356926148105,0.062225813520168094,0.05675060902999984,0.04927980721925129,0.040345259516197274,0.021698039009237655,1.3673926485263005e-17,0.022574407069427167,0.03984690093502055,0.05224312231428156,0.060188711924711646,0.06410931048381222,0.0644305587090846,0.06157809731803038,0.055977567028150765,0.04805460855694732,0.03922881155256613,0.02241185522250901,1.3817000516344295e-17,0.022292645943387302,0.0395891931110191,0.05218904156124357,0.06039159135240893,0.06449624254286332,0.06480239519095499,0.06160944935503199,0.05521680509344273,0.05221293265484763,0.04007605013175225,0.022617855740207988,1.3797961158110232e-17,0.022384133430913302,0.03993190655273298,0.052804969885244094,0.06116497394823173,0.06517356926148099,0.06499240634477693,0.06078313571790456,0.060616213970493535,0.052818487616759675,0.040102223794789005,0.02248890156804723,1.3833118845328923e-17,0.02265699815411302,0.040481375093851926,0.05349460988268247,0.06171818158407025,0.06517356926148105,0.0638822519783804,0.06474188027937404,0.06083418540031439,0.05251833863188544,0.03968215127504893,0.022213434630766547,1.4086959456138033e-17,0.02292965868371099,0.040890221982861276,0.05376950119841248,0.061455307631326395,0.06383545258256462,0.065173569261481,0.0646306195806787,0.06026820864646877,0.05185513884007357,0.03916021254271547,0.021952232135616805,1.354551130861125e-17,0.02307231851708737,0.040937990068101275,0.05336581703426413,0.06012460179679824,0.06268355746307744,0.06493233551103775,0.06399434622148092,0.05954093560266581,0.0512434496628513,0.03877323441029623,0.021801635853259543,1.3503756908201538e-17,0.02303967285877653,0.04059200043784807,0.052328328745473426,0.058120655367066815,0.06256262947600638,0.06445832725545984,0.06340845029448125,0.05901370018212468,0.05087477850744419,0.03859238685949389,0.021767226827327783,1.3528822337529589e-17,0.02289140796656457,0.04004215231607558,0.052292214480315964,0.058318104624546924,0.06241106852541807,0.06413134569462649,0.06303917564386934,0.05869479788484377,0.05065845192924691,0.038490377288775905,0.021750813475127913,1.354640018785941e-17,0.022798176375089386,0.045854689350664654,0.05285190461864372,0.058471711253741294,0.062265413809700805,0.06378431684026566,0.06257972489917932,0.05820294254018525,0.05020527431702682,0.038138024783447536,0.02155249849319076,4.2989695564360536e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04797256546374962,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3178347714986446,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1036675081519038,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.530525154885702,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.004361064648245201,0.0,0.0,0.014862859932107791,0.0,0.0,0.022050457677349703,0.00977750188070238,0.0,0.017338856409197776,0.01104362292913894,0.0,0.007101566869094167,0.005214352980190287,0.0,0.0011986219163505672,0.0009428731632256335,9.219879862715177e-05,0.0],"upper":[0.0,-0.0037368023070992085,-0.0047509413718561586,0.0,-0.006394908453938181,-0.012901908611516964,0.0,0.0,-0.015221283899094608,0.0,0.0,-0.009147500297392742,0.0,0.0,-0.0024404253493831036,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":1,"cost":0.1,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1],[7,0],[7,1]],"q":[1.0,1.0,0.5134205974460381,1.0,0.0,1.0,0.0,1.0,0.0,1.0,0.0,0.011506021212610133,0.0,0.0,0.0,0.0],"risk":0.0773162082682618,"risks":[1.6023632755206738e-17,0.01964129913691074,0.036296417752019625,0.04996535584532656,0.06064811341683163,0.0683446904665348,0.07305508699443602,0.07477930300053542,0.07351733848483288,0.06926919344732851,0.06203486788802215,0.0250776431504509,1.488381150573124e-17,0.02145306078959976,0.039436825519250145,0.053951294188951185,0.06499646679870288,0.07257234334850521,0.0766789238383582,0.0773162082682618,0.07448419663821604,0.068182888948221,0.043788869858990984,0.02380016173670516,1.3485940950677782e-17,0.022388384648875534,0.04096531568333173,0.055730793103368634,0.0666848169089862,0.07382738710018444,0.07715850367696336,0.07667816663932298,0.07238637598726327,0.05763026300400763,0.042425367424996065,0.023215279756993504,1.3756842442153578e-17,0.022779528154015505,0.04155386421904004,0.05632300819507356,0.06708696008211612,0.07384571988016769,0.0765992875892283,0.07534766320929792,0.0675872152503351,0.05676218274643226,0.041889302703408786,0.0229685751212647,1.38736238557563e-17,0.022983577339614692,0.04191930714010874,0.056807189401482217,0.06764722412373508,0.07443941130686732,0.07718375095087893,0.07413010270299342,0.06718837728469433,0.056304504305245424,0.041478483764646745,0.022710315662898276,1.4054652195686822e-17,0.023347536775951926,0.04275292599075409,0.058216167644406416,0.069737261736909,0.0773162082682618,0.0773162082682618,0.07367311127791437,0.06633283919915513,0.05529539203198408,0.040560769776401204,0.022128972432406496,1.331021958018287e-17,0.024173852479181683,0.04465052986995151,0.061430032172309565,0.0745123593862558,0.07696923197139215,0.07596170731549355,0.07162482268911392,0.06395857809225325,0.05296297352491152,0.038638008987088725,0.020983684478784917,1.2572367849031602e-17,0.02568695555073402,0.04804455113098705,0.06707278674075902,0.07290411197222284,0.07381214646702842,0.07185702425002446,0.06703874532121094,0.059357309680587875,0.04881271732815523,0.03540496826391305,0.019134062487861293,1.1416223990460317e-17,0.028002780800329148,0.05314240488884875,0.06516076651191052,0.06724494832790343,0.06699806339790058,0.06442011172190203,0.0595110932999077,0.05227100813191764,0.042699856217931854,0.03079763755795031,0.016564352151973046,9.842063566895484e-18,0.031104581102031247,0.05420625351595311,0.0567626144630405,0.05754631178819839,0.056557345491426804,0.053795715572725715,0.04926142203209514,0.04295446486953509,0.03487484408504554,0.025022559678626523,0.013397611650277997,5.947918247721327e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.14532934225200855,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.31952463686095084,-0.5351460208870407,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.01026540702703743,0.0,0.023426024142975642,0.0,0.02603406556666682,0.0,0.016388665925800915,0.0,0.005615506688120498,0.000545276221273789,0.0008173442714531369,0.00013530815452215405,0.0],"upper":[-0.0014021620152843371,-0.005349422322108778,0.0,-0.014028038950896682,0.0,-0.016865107868637024,0.0,-0.0116419184583513,0.0,-0.004143571119900781,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":8,"n1":0,"cost":0.1,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0],[8,0]],"q":[1.0,1.0,1.0,0.7772213964458353,0.0,0.46682622260178336,0.0,0.0,0.0],"risk":0.125,"risks":[2.5404609185357782e-17,0.00423512461573184,0.008470249231463695,0.012705373847195528,0.01694049846292739,0.021175623078659223,0.025410747694391056,0.02964587231012289,0.03388099692585472,0.03811612154158661,0.042351246157318445,0.042534843453528474,2.3611581275466953e-17,0.007465156546471542,0.014930313092943084,0.022395469639414634,0.02986062618588617,0.037325782732357704,0.04479093927882927,0.052256095825300775,0.05972125237177234,0.0671864089182439,0.07710720606956611,0.038553603034783064,6.3540267298916866e-18,0.011446396965216953,0.02289279393043389,0.03433919089565085,0.04578558786086778,0.05723198482608474,0.06867838179130167,0.08012477875651863,0.09157117572173556,0.10230654338596146,0.06820436225730764,0.03410218112865379,8.825062276144425e-18,0.015897818871346184,0.03179563774269238,0.04769345661403854,0.06359127548538474,0.0794890943567309,0.0953869132280771,0.1112847320994233,0.11796446722920659,0.08847335042190496,0.05898223361460329,0.029491116807301654,1.637085845068811e-17,0.020508883192698363,0.04101776638539669,0.061526649578095075,0.0820355327707934,0.10254441596349179,0.12305329915619015,0.125,0.10000000000000002,0.075,0.05,0.02500000000000001,1.3877787807814457e-17,0.02499999999999998,0.05,0.07499999999999997,0.09999999999999999,0.125,0.125,0.10416666666666666,0.08333333333333331,0.06249999999999999,0.041666666666666664,0.020833333333333315,1.1564823173178713e-17,0.029166666666666678,0.058333333333333307,0.0875,0.1166666666666667,0.11969043017968756,0.10259179729687504,0.08549316441406252,0.06839453153125002,0.051295898648437525,0.034197265765625005,0.017098632882812527,9.491647958055629e-18,0.032901367117187434,0.06580273423437497,0.09870410135156249,0.11047080954158679,0.09666195834888844,0.08285310715619007,0.06904425596349173,0.05523540477079339,0.04142655357809503,0.027617702385396698,0.013808851192698339,7.66545226887813e-18,0.03619114880730166,0.07238229761460335,0.09816636078742809,0.08725898736660274,0.07635161394577739,0.06544424052495205,0.05453686710412671,0.043629493683301365,0.032722120262476034,0.021814746841650686,0.010907373420825357,6.054808554992376e-18,0.03909262657917467,0.08310004965216931,0.07479004468695237,0.06648003972173544,0.05817003475651852,0.04986002979130158,0.04155002482608464,0.03324001986086772,0.024930014895650783,0.016620009930433863,0.008310004965216925,6.942778857618693e-17],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":0,"cost":0.3,"outcomes":[[0,0]],"q":[0.3000000000000001],"risk":0.21000000000000005,"risks":[0.060000000000000026,0.04500000000000002,0.030000000000000002,0.015000000000000001,0.0,0.035000000000000024,0.06999999999999998,0.10500000000000001,0.13999999999999996,0.17500000000000002,0.21000000000000002,0.07500000000000002,0.060000000000000026,0.045000000000000005,0.030000000000000002,0.015000000000000001,3.8857805861880476e-17,0.03499999999999999,0.07,0.10499999999999995,0.13999999999999999,0.17500000000000002,0.09000000000000002,0.07500000000000002,0.060000000000000005,0.045000000000000005,0.030000000000000002,0.014999999999999986,0.0,0.035000000000000024,0.06999999999999998,0.10500000000000001,0.13999999999999999,0.10500000000000002,0.09000000000000002,0.07500000000000001,0.060000000000000005,0.045000000000000005,0.029999999999999985,0.015000000000000001,3.8857805861880476e-17,0.03499999999999999,0.07,0.10500000000000004,0.12000000000000005,0.10500000000000005,0.09000000000000002,0.07500000000000002,0.060000000000000026,0.045000000000000005,0.03000000000000002,0.015000000000000001,1.6653345369377354e-17,0.03499999999999999,0.07,0.13500000000000004,0.12000000000000005,0.10500000000000002,0.09000000000000002,0.07500000000000002,0.060000000000000005,0.04500000000000002,0.030000000000000002,0.015000000000000019,0.0,0.035000000000000024,0.15000000000000005,0.13500000000000004,0.12000000000000002,0.10500000000000002,0.09000000000000002,0.07500000000000001,0.060000000000000026,0.045000000000000005,0.03000000000000002,0.015000000000000001,3.8857805861880476e-17,0.16500000000000006,0.15000000000000005,0.13500000000000004,0.12000000000000005,0.10500000000000005,0.09000000000000002,0.07500000000000004,0.060000000000000026,0.04500000000000004,0.03000000000000002,0.015000000000000001,0.18000000000000005,0.16500000000000006,0.15000000000000002,0.13500000000000004,0.12000000000000002,0.10500000000000001,0.09000000000000002,0.07500000000000001,0.060000000000000026,0.045000000000000005,0.029999999999999985,0.19500000000000006,0.18000000000000008,0.16500000000000006,0.15000000000000005,0.13500000000000004,0.12000000000000002,0.10500000000000005,0.09000000000000002,0.07500000000000004,0.060000000000000026,0.045000000000000005,0.21000000000000005,0.19500000000000003,0.18000000000000002,0.16500000000000004,0.15000000000000002,0.135,0.12000000000000002,0.10500000000000001,0.09000000000000002,0.07500000000000001,0.05999999999999999],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.7,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0],"upper":[0.0,0.0]}},{"n0":0,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1]],"q":[0.0,0.6122448979591838],"risk":0.15306122448979592,"risks":[0.03673469387755103,0.032142857142857154,0.024489795918367346,0.013775510204081633,0.0,0.03316326530612247,0.06326530612244896,0.09030612244897959,0.11428571428571424,0.13520408163265307,0.15306122448979595,0.045918367346938785,0.04285714285714287,0.03673469387755102,0.027551020408163266,0.015306122448979591,3.681862071460978e-17,0.03163265306122448,0.06020408163265307,0.08571428571428569,0.10816326530612244,0.12755102040816327,0.05510204081632654,0.05357142857142858,0.04897959183673469,0.0413265306122449,0.030612244897959183,0.016836734693877534,0.0,0.03010204081632655,0.05714285714285712,0.08112244897959184,0.1020408163265306,0.0642857142857143,0.0642857142857143,0.061224489795918366,0.05510204081632653,0.04591836734693878,0.03367346938775508,0.01836734693877551,3.341997880249195e-17,0.02857142857142856,0.054081632653061235,0.07653061224489799,0.07346938775510206,0.07500000000000002,0.07346938775510205,0.06887755102040818,0.06122448979591838,0.050510204081632655,0.03673469387755104,0.019897959183673472,2.3790493384824788e-17,0.027040816326530603,0.051020408163265314,0.08265306122448982,0.08571428571428574,0.08571428571428573,0.08265306122448982,0.07653061224489797,0.0673469387755102,0.05510204081632655,0.039795918367346944,0.021428571428571453,0.0,0.02551020408163267,0.09183673469387757,0.09642857142857145,0.0979591836734694,0.09642857142857145,0.09183673469387757,0.08418367346938777,0.07346938775510206,0.05969387755102041,0.04285714285714288,0.022959183673469385,2.832201593431521e-17,0.10102040816326534,0.10714285714285716,0.11020408163265309,0.1102040816326531,0.10714285714285718,0.10102040816326534,0.09183673469387758,0.0795918367346939,0.06428571428571433,0.0459183673469388,0.024489795918367346,0.11020408163265308,0.1178571428571429,0.12244897959183675,0.12397959183673472,0.12244897959183675,0.11785714285714287,0.11020408163265308,0.09948979591836735,0.08571428571428574,0.06887755102040816,0.048979591836734664,0.11938775510204085,0.12857142857142861,0.13469387755102044,0.13775510204081637,0.13775510204081637,0.13469387755102044,0.12857142857142861,0.11938775510204085,0.10714285714285719,0.09183673469387757,0.07346938775510203,0.1285714285714286,0.1392857142857143,0.14693877551020407,0.151530612244898,0.15306122448979592,0.15153061224489797,0.1469387755102041,0.1392857142857143,0.1285714285714286,0.11479591836734693,0.09795918367346935],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.510204081632653,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48979591836734704,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.09183673469387757,0.0,0.0],"upper":[0.0,0.0,0.0]}},{"n0":1,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0]],"q":[0.6122448979591838,0.0],"risk":0.15306122448979592,"risks":[0.09795918367346941,0.07346938775510206,0.04897959183673469,0.024489795918367346,0.0,0.02551020408163267,0.051020408163265286,0.07653061224489796,0.10204081632653057,0.12755102040816327,0.15306122448979595,0.11479591836734696,0.09183673469387757,0.06887755102040816,0.04591836734693877,0.022959183673469385,3.002133689037413e-17,0.027040816326530603,0.054081632653061235,0.08112244897959181,0.10816326530612244,0.13520408163265307,0.1285714285714286,0.10714285714285716,0.08571428571428572,0.06428571428571428,0.04285714285714286,0.021428571428571404,0.0,0.02857142857142859,0.05714285714285712,0.08571428571428572,0.11428571428571427,0.13928571428571432,0.11938775510204085,0.09948979591836735,0.07959183673469389,0.05969387755102041,0.039795918367346916,0.019897959183673472,3.341997880249195e-17,0.030102040816326517,0.06020408163265307,0.09030612244897962,0.14693877551020412,0.12857142857142861,0.11020408163265308,0.09183673469387757,0.07346938775510206,0.05510204081632653,0.03673469387755104,0.01836734693877551,2.039185147270696e-17,0.03163265306122448,0.06326530612244899,0.151530612244898,0.13469387755102044,0.11785714285714288,0.10102040816326534,0.08418367346938778,0.0673469387755102,0.050510204081632676,0.0336734693877551,0.016836734693877572,0.0,0.03316326530612247,0.15306122448979595,0.13775510204081637,0.12244897959183675,0.10714285714285716,0.09183673469387757,0.07653061224489796,0.06122448979591838,0.04591836734693878,0.0306122448979592,0.015306122448979591,3.851794167066869e-17,0.151530612244898,0.13775510204081634,0.12397959183673471,0.11020408163265308,0.09642857142857145,0.0826530612244898,0.06887755102040818,0.05510204081632654,0.04132653061224492,0.027551020408163276,0.013775510204081631,0.1469387755102041,0.13469387755102044,0.12244897959183675,0.11020408163265308,0.0979591836734694,0.08571428571428572,0.07346938775510205,0.061224489795918366,0.048979591836734705,0.03673469387755102,0.024489795918367332,0.13928571428571432,0.12857142857142861,0.1178571428571429,0.10714285714285716,0.09642857142857145,0.08571428571428573,0.07500000000000002,0.0642857142857143,0.053571428571428596,0.04285714285714287,0.03214285714285714,0.12857142857142861,0.11938775510204085,0.11020408163265308,0.10102040816326532,0.09183673469387757,0.0826530612244898,0.07346938775510206,0.0642857142857143,0.055102040816326546,0.045918367346938785,0.03673469387755102],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.510204081632653,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48979591836734704,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.09183673469387757,0.0],"upper":[0.0,0.0,0.0]}},{"n0":0,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2]],"q":[0.0,0.0,0.8826774549466716],"risk":0.13052592865023904,"risks":[0.01588819418904009,0.01621919823464509,0.014122839279146746,0.008937109231335049,0.0,0.036649503493931625,0.06822361162191981,0.09406031629275469,0.11349760941522617,0.12587348289812433,0.13052592865023907,0.01986024273630011,0.021625597646193453,0.02118425891872012,0.017874218462670097,0.011033468186833392,4.068912262004297e-17,0.034111805810959905,0.06270687752850314,0.08512320706141963,0.10069878631849945,0.10877160720853254,0.023832291283560132,0.027031997057741813,0.02824567855829349,0.026811327694005148,0.022066936373666784,0.013350496506068392,0.0,0.03135343876425159,0.056748804707613086,0.07552408973887459,0.08701728576682602,0.027804339830820153,0.03243839646929018,0.035307098197866864,0.035748436925340195,0.03310040456050018,0.026700993012136798,0.015888194189040087,3.4809309617247e-17,0.028374402353806543,0.05034939315924974,0.06526296432511955,0.03177638837808018,0.03784479588083854,0.042368517837440244,0.044685546156675256,0.04413387274733358,0.040051489518205224,0.03177638837808019,0.018646561235748437,2.400923642808356e-17,0.025174696579624855,0.04350864288341302,0.0357484369253402,0.043251195292386906,0.049429937477013616,0.0536226553880103,0.055167340934166975,0.05340198602427363,0.04766458256712027,0.037293122471496874,0.02162559764619347,0.0,0.021754321441706522,0.03972048547260022,0.04865759470393526,0.05649135711658699,0.06255976461934536,0.06620080912100036,0.06675248253034204,0.06355277675616036,0.05593968370724531,0.04325119529238691,0.024825303420375134,2.415214854967929e-17,0.04369253401986025,0.05406399411548363,0.06355277675616038,0.07149687385068042,0.07723427730783378,0.08010297903641046,0.07944097094520046,0.07458624494299376,0.06487679293858038,0.049650606840750296,0.02824567855829349,0.047664582567120264,0.05947039352703199,0.07061419639573373,0.08043398308201545,0.08826774549466715,0.09345347554247885,0.09532916513424053,0.09323280617874219,0.08650239058477381,0.0744759102611254,0.05649135711658695,0.05163663111438029,0.06487679293858035,0.07767561603530712,0.08937109231335051,0.09930121368150056,0.10680397204854727,0.11121735932328064,0.11187936741449064,0.10812798823096728,0.09930121368150056,0.08473703567488047,0.055608679661640306,0.07028319235012871,0.08473703567488047,0.09830820154468554,0.11033468186833394,0.12015446855461566,0.1271055535123207,0.13052592865023904,0.1297535858771607,0.12412651710187567,0.11298271423317394],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.43508642883412996,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.56491357116587,-0.0,-0.0,-0.0],"lower":[0.01899963221772711,0.048194189040088285,0.0,0.0],"upper":[0.0,0.0,0.0,0.0]}},{"n0":1,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1]],"q":[0.10416666666666682,1.0,0.0,0.06249999999999975],"risk":0.09999999999999999,"risks":[0.060416666666666674,0.05078125000000001,0.037500000000000006,0.020572916666666666,0.0,0.02578125000000002,0.04791666666666665,0.06640625000000001,0.08125,0.09244791666666669,0.09999999999999998,0.07109375000000001,0.06375,0.05296875,0.03875,0.021093749999999994,3.018418848199644e-17,0.025468749999999995,0.047500000000000014,0.06609375,0.08125,0.09296875000000002,0.08000000000000002,0.07473958333333335,0.06624999999999999,0.054531249999999996,0.039583333333333325,0.02140624999999997,0.0,0.025364583333333357,0.04749999999999999,0.06640625000000001,0.08208333333333336,0.08713541666666669,0.08375,0.07734375,0.06791666666666667,0.05546874999999999,0.03999999999999997,0.02151041666666666,2.995289201853287e-17,0.02546875,0.04791666666666668,0.06734375000000004,0.09250000000000003,0.09078125000000002,0.08625,0.07890625000000001,0.06875,0.055781249999999984,0.04000000000000001,0.021406249999999995,2.532696274926138e-17,0.02578125,0.04875000000000002,0.09609375,0.09583333333333335,0.09296875000000002,0.08750000000000001,0.07942708333333333,0.06874999999999998,0.055468750000000004,0.039583333333333325,0.021093750000000015,0.0,0.026302083333333358,0.09791666666666668,0.09890625,0.0975,0.09369791666666666,0.08749999999999998,0.07890624999999998,0.06791666666666667,0.054531249999999976,0.03875,0.02057291666666666,3.134067079931432e-17,0.09796875,0.09999999999999998,0.09984375,0.09749999999999999,0.09296874999999999,0.08624999999999998,0.07734374999999999,0.06624999999999998,0.05296875000000001,0.0375,0.019843749999999993,0.09624999999999999,0.09911458333333333,0.09999999999999999,0.09890624999999999,0.09583333333333331,0.09078124999999997,0.08374999999999998,0.0747395833333333,0.06374999999999997,0.050781249999999986,0.0358333333333333,0.09276041666666666,0.09624999999999999,0.09796874999999998,0.09791666666666665,0.09609374999999998,0.09249999999999996,0.08713541666666665,0.07999999999999996,0.07109374999999998,0.060416666666666646,0.04796874999999997,0.08749999999999998,0.09140624999999997,0.09374999999999997,0.09453124999999997,0.09374999999999997,0.09140624999999997,0.08749999999999995,0.08203124999999996,0.07499999999999997,0.06640624999999996,0.05624999999999996],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.7142857142857142,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.28571428571428586,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.04285714285714287,0.0,0.0],"upper":[0.0,-0.11428571428571434,0.0,0.0,0.0]}},{"n0":2,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0]],"q":[0.8826774549466715,0.0,0.0],"risk":0.13052592865023907,"risks":[0.11298271423317396,0.08473703567488049,0.05649135711658697,0.028245678558293484,0.0,0.02175432144170653,0.04350864288341301,0.06526296432511954,0.08701728576682602,0.10877160720853257,0.1305259286502391,0.12412651710187568,0.09930121368150055,0.07447591026112539,0.04965060684075026,0.02482530342037513,2.79495277806517e-17,0.02517469657962486,0.050349393159249745,0.07552408973887458,0.10069878631849946,0.12587348289812433,0.12975358587716068,0.10812798823096724,0.08650239058477377,0.06487679293858033,0.043251195292386885,0.021625597646193418,0.0,0.028374402353806578,0.05674880470761309,0.08512320706141967,0.11349760941522621,0.13052592865023907,0.11187936741449063,0.09323280617874218,0.07458624494299373,0.0559396837072453,0.037293122471496847,0.018646561235748434,3.4809309617247e-17,0.031353438764251555,0.06270687752850315,0.09406031629275474,0.1271055535123207,0.11121735932328061,0.09532916513424051,0.07944097094520043,0.06355277675616035,0.04766458256712025,0.03177638837808018,0.015888194189040084,1.763943900838792e-17,0.034111805810959905,0.06822361162191985,0.12015446855461567,0.10680397204854726,0.09345347554247885,0.08010297903641043,0.06675248253034204,0.053401986024273616,0.040051489518205224,0.026700993012136808,0.01335049650606842,0.0,0.036649503493931625,0.11033468186833394,0.09930121368150055,0.08826774549466714,0.07723427730783375,0.06620080912100036,0.055167340934166954,0.044133872747333575,0.033100404560500174,0.022066936373666794,0.011033468186833392,4.3261540808766213e-17,0.09830820154468553,0.08937109231335047,0.08043398308201542,0.07149687385068038,0.06255976461934533,0.05362265538801028,0.04468554615667524,0.03574843692534019,0.026811327694005155,0.0178742184626701,0.008937109231335045,0.08473703567488047,0.07767561603530711,0.07061419639573371,0.06355277675616035,0.056491357116586975,0.049429937477013595,0.04236851783744024,0.03530709819786686,0.02824567855829349,0.021184258918720115,0.014122839279146735,0.07028319235012871,0.06487679293858035,0.059470393527031984,0.05406399411548362,0.048657594703935256,0.04325119529238689,0.037844795880838535,0.03243839646929017,0.027031997057741817,0.02162559764619345,0.016219198234645082,0.05560867966164032,0.05163663111438029,0.047664582567120264,0.04369253401986025,0.03972048547260022,0.0357484369253402,0.03177638837808018,0.027804339830820153,0.023832291283560136,0.01986024273630011,0.015888194189040084],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.43508642883413007,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5649135711658699,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.04819418904008826,0.018999632217727103,0.0],"upper":[0.0,0.0,0.0,0.0]}},{"n0":0,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3]],"q":[0.0,0.0,0.1757575757575758,1.0],"risk":0.12615272727272725,"risks":[0.012043636363636366,0.012728863636363639,0.011461818181818182,0.0074925,0.0,0.03809250000000003,0.07080727272727272,0.09711068181818183,0.1158981818181818,0.12599431818181822,0.12615272727272725,0.015054545454545456,0.01697181818181818,0.017192727272727273,0.014985,0.009545454545454544,4.229117056553377e-17,0.03540363636363636,0.06474045454545456,0.08692363636363636,0.10079545454545455,0.10512727272727271,0.018065454545454548,0.021214772727272728,0.022923636363636365,0.0224775,0.01909090909090909,0.011907499999999988,0.0,0.0323702272727273,0.0579490909090909,0.07559659090909092,0.08410181818181815,0.021076363636363636,0.025457727272727274,0.028654545454545457,0.02997,0.02863636363636363,0.02381499999999999,0.014596363636363631,3.5938171630531e-17,0.02897454545454545,0.05039772727272729,0.06307636363636364,0.02408727272727273,0.02970068181818182,0.03438545454545455,0.03746250000000001,0.038181818181818185,0.035722500000000004,0.02919272727272728,0.017629772727272727,2.3342943739573287e-17,0.02519886363636363,0.04205090909090908,0.02709818181818182,0.03394363636363636,0.040116363636363644,0.04495500000000001,0.04772727272727273,0.047630000000000006,0.04378909090909091,0.03525954545454545,0.02102545454545456,0.0,0.021025454545454555,0.030109090909090912,0.03818659090909091,0.045847272727272737,0.05244750000000001,0.057272727272727274,0.05953750000000001,0.058385454545454546,0.052889318181818176,0.0420509090909091,0.02480113636363636,2.334294373957328e-17,0.033120000000000004,0.042429545454545456,0.051578181818181836,0.05994000000000002,0.06681818181818183,0.07144500000000002,0.07298181818181819,0.07051909090909092,0.06307636363636365,0.049602272727272745,0.028974545454545458,0.036130909090909095,0.046672500000000006,0.05730909090909092,0.0674325,0.07636363636363636,0.08335250000000001,0.0875781818181818,0.08814886363636364,0.08410181818181817,0.07440340909090908,0.05794909090909088,0.03914181818181819,0.050915454545454555,0.06304000000000003,0.07492500000000002,0.08590909090909092,0.09526000000000003,0.10217454545454546,0.10577863636363638,0.10512727272727274,0.09920454545454546,0.08692363636363637,0.04215272727272727,0.055158409090909084,0.06877090909090909,0.0824175,0.09545454545454544,0.10716750000000001,0.11677090909090906,0.12340840909090908,0.12615272727272725,0.12400568181818179,0.1158981818181818],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5345454545454544,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4654545454545455,-0.0,-0.0],"lower":[0.00248727272727273,0.010996363636363646,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,-0.03421090909090913,0.0]}},{"n0":1,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2]],"q":[0.0,0.6250518457071759,1.0,0.0,0.0,0.06719203649937687],"risk":0.09581584404811282,"risks":[0.056645375362919984,0.04907476150974702,0.03701700539195355,0.02061209041891332,0.0,0.02532071754458732,0.046714226462048924,0.06432051016175859,0.07827955205308997,0.08873133554541685,0.09581584404811283,0.0664757880547491,0.06144633969307343,0.05215595188718375,0.038732709456656994,0.021304697221070097,2.9753594283973596e-17,0.024946702613023636,0.04627288987971798,0.06410664661965988,0.07857605765242637,0.08980920779759438,0.07457382828701785,0.0718245800497719,0.06504852758191622,0.05436185711323103,0.039880754873496474,0.021721407092492716,0.0,0.024832719825798443,0.04633575279966819,0.06462528515138949,0.07981750311074243,0.08093949605972628,0.08020948257984241,0.075694732476151,0.06749953338863543,0.05572817295727913,0.04048493882206551,0.02187411862297801,2.9453100749130393e-17,0.024966870593114886,0.04687901804230611,0.06584072998755708,0.08557279137287435,0.08660104728328497,0.08409456656988802,0.07814573828287019,0.06884695147241808,0.05629059518871836,0.0405690584819577,0.021774730402322678,2.579507187139763e-17,0.025337256325176277,0.04787888842803818,0.08847371422646207,0.09099927416009956,0.09024802986312735,0.08630047179593532,0.07923709041891333,0.06913837619245125,0.05608481957693903,0.040156911032766474,0.02143514102032353,0.0,0.025931978432185844,0.08964226462048944,0.09340416321028622,0.09415512235586894,0.09196373392783078,0.08689858979676482,0.07902828183326419,0.06842140190792201,0.05514654189133137,0.03927229365408543,0.020867249066777255,3.100243689585787e-17,0.08907844255495646,0.09381571443384487,0.09581584404811282,0.09513552467855663,0.09183144960597261,0.08596031211115718,0.07757880547490666,0.06674362297801739,0.05351145790128577,0.037939003525508073,0.020082953131480695,0.08678224802986315,0.09223392783077561,0.09523019493985897,0.09581584404811282,0.09403566984653668,0.0899344670261302,0.08355703027789295,0.0749481542928245,0.06415263376192447,0.0512152633761924,0.036180837826627905,0.08275368104520946,0.08865880340107839,0.09239817503110742,0.09400469203649936,0.09351125051845703,0.09095074657818328,0.08635607631688091,0.07976013583575274,0.0711958212360016,0.060696028618830306,0.04829365408544166,0.07699274160099542,0.0830903411447532,0.08731978432185811,0.08970206864371627,0.09025819162173367,0.0890091507673164,0.08597594359187052,0.08117956760680206,0.07464102032351713,0.06638129925342172,0.05642140190792193],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5487349647449191,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.23890501866445402,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.21236001659062692,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.02371132310244711,0.0,0.0,0.03731397760265451,0.046228121111571985,0.0,0.0],"upper":[0.0,0.0,-0.06880464537536297,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1]],"q":[0.06719203649937831,1.0,0.0,0.625051845707175,0.0,0.0],"risk":0.0958158440481128,"risks":[0.05642140190792207,0.048293654085441756,0.03618083782662797,0.02008295313148072,0.0,0.02593197843218583,0.047878888428038134,0.06584072998755701,0.07981750311074241,0.08980920779759435,0.09581584404811283,0.06638129925342184,0.06069602861883038,0.051215263376192456,0.03793900352550808,0.02086724906677727,3.0236928104886984e-17,0.025337256325176274,0.046879018042306105,0.06462528515138946,0.0785760576524264,0.08873133554541687,0.07464102032351723,0.07119582123600167,0.0641526337619245,0.05351145790128576,0.03927229365408544,0.021435141020323487,0.0,0.024966870593114913,0.046335752799668194,0.06410664661965991,0.07827955205309003,0.08117956760680217,0.07976013583575282,0.07494815429282456,0.0667436229780174,0.05514654189133139,0.04015691103276646,0.021774730402322678,2.94531007491304e-17,0.024832719825798422,0.046272889879717984,0.06432051016175865,0.08597594359187062,0.08635607631688097,0.08355703027789298,0.07757880547490667,0.06842140190792202,0.056084819576939005,0.0405690584819577,0.021874118622978007,2.6049948870207265e-17,0.02494670261302364,0.04671422646204897,0.0890091507673165,0.09095074657818335,0.08993446702613024,0.0859603121111572,0.0790282818332642,0.06913837619245125,0.05629059518871838,0.040484938822065525,0.021721407092492755,0.0,0.025320717544587333,0.09025819162173372,0.09351125051845706,0.0940356698465367,0.09183144960597261,0.0868985897967648,0.07923709041891329,0.06884695147241807,0.055728172957279117,0.039880754873496474,0.021304697221070083,3.0343486606252473e-17,0.0897020686437163,0.09400469203649936,0.0958158440481128,0.0951355246785566,0.09196373392783075,0.08630047179593525,0.07814573828287015,0.06749953338863539,0.05436185711323102,0.03873270945665699,0.0206120904189133,0.08731978432185815,0.09239817503110742,0.09523019493985894,0.09581584404811279,0.09415512235586891,0.09024802986312729,0.08409456656988798,0.07569473247615094,0.06504852758191619,0.05215595188718371,0.0370170053919535,0.08309034114475318,0.08865880340107836,0.0922339278307756,0.09381571443384483,0.09340416321028615,0.0909992741600995,0.0866010472832849,0.08020948257984234,0.07182458004977184,0.06144633969307337,0.04907476150974696,0.07699274160099542,0.08275368104520942,0.0867822480298631,0.08907844255495644,0.08964226462048938,0.08847371422646201,0.08557279137287428,0.08093949605972621,0.0745738282870178,0.06647578805474903,0.05664537536291991],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.548734964744919,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.21236001659062614,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.23890501866445488,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.04622812111157197,0.0,0.037313977602654515,0.02371132310244713,0.0],"upper":[0.0,-0.06880464537536296,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0]],"q":[1.0,0.1757575757575758,0.0,0.0],"risk":0.12615272727272725,"risks":[0.11589818181818186,0.08692363636363641,0.057949090909090915,0.028974545454545458,0.0,0.021025454545454555,0.04205090909090906,0.06307636363636361,0.08410181818181812,0.10512727272727271,0.12615272727272725,0.12400568181818182,0.09920454545454546,0.07440340909090908,0.04960227272727272,0.02480113636363636,2.7976358603480504e-17,0.02519886363636363,0.05039772727272729,0.07559659090909089,0.10079545454545455,0.12599431818181822,0.12615272727272725,0.10512727272727271,0.08410181818181815,0.06307636363636361,0.042050909090909076,0.021025454545454514,0.0,0.028974545454545485,0.0579490909090909,0.08692363636363638,0.11589818181818184,0.1234084090909091,0.10577863636363638,0.08814886363636364,0.0705190909090909,0.052889318181818176,0.03525954545454543,0.017629772727272727,3.5938171630531e-17,0.03237022727272726,0.06474045454545456,0.09711068181818186,0.11677090909090909,0.10217454545454546,0.0875781818181818,0.07298181818181818,0.058385454545454546,0.043789090909090896,0.02919272727272728,0.014596363636363631,1.6205218984892284e-17,0.03540363636363636,0.07080727272727275,0.10716750000000004,0.09526000000000004,0.08335250000000002,0.07144500000000002,0.05953750000000002,0.047630000000000006,0.03572250000000002,0.023815000000000003,0.011907500000000015,0.0,0.03809250000000003,0.09545454545454546,0.08590909090909092,0.07636363636363636,0.06681818181818182,0.057272727272727274,0.047727272727272715,0.038181818181818185,0.02863636363636363,0.0190909090909091,0.009545454545454544,4.491356781438133e-17,0.08241749999999999,0.07492499999999999,0.06743249999999999,0.05993999999999999,0.0524475,0.044954999999999995,0.0374625,0.029969999999999997,0.022477500000000008,0.014985000000000004,0.007492499999999997,0.0687709090909091,0.06304000000000003,0.05730909090909092,0.05157818181818183,0.045847272727272737,0.04011636363636364,0.03438545454545455,0.028654545454545457,0.02292363636363637,0.017192727272727273,0.011461818181818177,0.05515840909090909,0.050915454545454555,0.046672500000000006,0.042429545454545456,0.03818659090909091,0.03394363636363636,0.02970068181818182,0.025457727272727274,0.02121477272727273,0.01697181818181818,0.012728863636363634,0.04215272727272729,0.0391418181818182,0.0361309090909091,0.03312000000000002,0.030109090909090922,0.027098181818181827,0.02408727272727274,0.021076363636363643,0.018065454545454555,0.01505454545454546,0.012043636363636364],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5345454545454543,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4654545454545457,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.010996363636363646,0.0024872727272727277,0.0],"upper":[-0.034210909090909104,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":4,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4]],"q":[0.0,0.0,0.0,0.43183654638865715,1.0],"risk":0.12535317674807137,"risks":[0.008149368581396496,0.009471784351301332,0.009193009352529775,0.006378934081863302,0.0,0.03895847501351288,0.072115728956808,0.09831950907408316,0.11643121550128573,0.12535317674807134,0.12405592517976183,0.01018671072674562,0.012629045801735109,0.013789514028794662,0.012757868163726604,0.008522956829858212,4.325259596428581e-17,0.036057864478404,0.06554633938272211,0.0873234116259643,0.10028254139845705,0.10337993764980152,0.012224052872094745,0.015786307252168886,0.01838601870505955,0.019136802245589907,0.017045913659716423,0.011041524986487144,0.0,0.03277316969136108,0.05821560775064286,0.0752119060488428,0.0827039501198412,0.014261395017443867,0.01894356870260266,0.02298252338132444,0.025515736327453208,0.025568870489574635,0.0220830499729743,0.013942135521595992,3.638552758129637e-17,0.02910780387532143,0.05014127069922854,0.06202796258988093,0.01629873716279299,0.022100830153036443,0.02757902805758933,0.03189467040931652,0.03409182731943285,0.033124574959461466,0.027884271043191997,0.017226830308638946,2.3194997172602606e-17,0.025070635349614255,0.04135197505992061,0.018336079308142118,0.025258091603470218,0.03217553273385422,0.03827360449117982,0.04261478414929107,0.044166099945948625,0.04182640656478799,0.03445366061727789,0.020892196124678578,0.0,0.02067598752996032,0.02037342145349124,0.028415353053903997,0.036772037410119106,0.044652538573043125,0.05113774097914928,0.05520762493243578,0.05576854208638398,0.051680490925916846,0.041784392249357136,0.024929364650385734,2.2954957412624543e-17,0.022410763598840366,0.03157261450433777,0.041368542086384,0.05103147265490643,0.0596606978090075,0.06624914991892294,0.06971067760797998,0.06890732123455581,0.06267658837403571,0.049858729300771495,0.029324012470039695,0.02444810574418949,0.034729875954771554,0.04596504676264888,0.057410406736769726,0.0681836546388657,0.0772906749054101,0.08365281312957597,0.08613415154319475,0.08356878449871424,0.0747880939511572,0.058648024940079355,0.02648544788953861,0.03788713740520533,0.05056155143891378,0.06378934081863304,0.07670661146872393,0.08833219989189726,0.09759494865117196,0.1033609818518337,0.10446098062339283,0.09971745860154296,0.08797203741011908,0.028522790034887734,0.0410443988556391,0.05515805611517865,0.07016827490049633,0.08522956829858212,0.0993737248783844,0.11153708417276795,0.12058781216047264,0.12535317674807137,0.12464682325192866,0.11729604988015875],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5393346764286766,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4606653235713234,-0.0,-0.0],"lower":[0.0005927227163284367,0.004127561299199063,0.008126136307798145,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,-0.00948049235909783,0.0]}},{"n0":1,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3]],"q":[0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.06076171808995937],"risk":0.08309340002027643,"risks":[0.03462562265553716,0.033888154759893215,0.028237774999155144,0.017065369115609474,0.0,0.026908907691527848,0.04789750937785135,0.06330939939508635,0.07372634922780577,0.07996830750903994,0.08309340002027643,0.0406025353992768,0.04239275793315535,0.0397458281234159,0.032032172789023684,0.01884494018451556,3.1442081843035856e-17,0.025535943361157103,0.04571408282923864,0.06101845240106789,0.07215580750903991,0.08005562502112129,0.045507650974958604,0.04950163689973302,0.049513324997465434,0.044900411020242635,0.03522785644283733,0.020267888462708227,0.0,0.024610949697543193,0.044494761920854324,0.06025272675813595,0.07269340002027644,0.04934096938258254,0.05521479165962623,0.05754026562130377,0.05567008380926632,0.049148748774965355,0.03771257307965257,0.021289679294380044,2.927087237088681e-17,0.024155277787165013,0.04425906525632796,0.0610067250177419,0.052102490622148626,0.059532222212834975,0.06382664999493089,0.06434119115609477,0.06060761718089959,0.052334053850833014,0.03940498124429726,0.021881233736609097,2.6575214680076974e-17,0.024174823003615963,0.044995600013517635,0.053792214693656866,0.062453928559359266,0.0683724781183468,0.07091373306072793,0.06960446166064006,0.06413233077624954,0.054345905849751616,0.04025465090737047,0.022028928559359277,0.0,0.024660025007603687,0.05441014159710723,0.06397991069919906,0.07117774999155148,0.07538770952316583,0.07613928221418674,0.07310740385590213,0.06611245311074312,0.05512025151228412,0.04024206346524281,0.021734596245480034,2.9778679531631843e-17,0.053956271332499736,0.06411016863235441,0.07224246561454496,0.07776312054340848,0.08021207884153965,0.0792592730897908,0.07470462302727181,0.06647803555135005,0.05463940471765064,0.0393786117400561,0.021015524990706625,0.0524306038998344,0.0628447023588253,0.07156662498732723,0.07803996612145583,0.08182285154269879,0.08258793847791557,0.08012241559933762,0.07432800302456825,0.06522095231658272,0.05293204648372814,0.03770659997972353,0.049833139299111213,0.060183511878611734,0.06915022810989828,0.07621824625730797,0.08097160031766414,0.08309340002027643,0.0823658308269406,0.07867015393193874,0.07198670626203911,0.06239490047649621,0.05007322496705076,0.04616387753033016,0.05612659719171368,0.06499327498225811,0.07229796095096483,0.07765832516643571,0.08077565771687337,0.08143486871008074,0.07950448827346149,0.07493666655401977,0.06776717371836029,0.05811539995268828],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5847386029536006,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.41526139704639936,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.004174999155148524,0.005952512588286982,0.0,0.0,0.009557906120104084,0.03270670136190058,0.03061903957284311,0.0,0.0],"upper":[0.0,0.0,-0.03014797742556858,-0.062180203440235234,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2]],"q":[0.0,0.790563160244011,1.0,0.0,0.0,0.7905631602440111,0.0,0.0,0.0],"risk":0.07997559886921587,"risks":[0.05857431929772355,0.050940310221693194,0.03857378366314535,0.02156394509745573,0.0,0.023971153846153864,0.04356661211129296,0.05887558027079305,0.06998726380002973,0.07699086817437883,0.07997559886921587,0.06601926331647073,0.06151150079973216,0.052632876432078535,0.039406206991147136,0.0218543092545752,2.8868119649160147e-17,0.02386609600505877,0.043475414047388805,0.0588507709046273,0.07001498335441156,0.07699086817437883,0.07100435575063231,0.06923888279273914,0.06349325993155777,0.05373202369439069,0.039919710608540375,0.022020857201309293,0.0,0.02382167553191492,0.04345042032435651,0.05885077090462733,0.06998726380002976,0.0737393979690522,0.07433884489845258,0.07136980174081235,0.06474663322050288,0.05438370406189553,0.040195378989361666,0.022096022727272718,2.872935106286078e-17,0.023821675531914895,0.043475414047388805,0.05887558027079308,0.0744341913405743,0.0770277758146109,0.07647736943907155,0.07265527358280016,0.06543378961464066,0.054685218903436965,0.04028186281803303,0.022096022727272718,2.674935856807258e-17,0.02386609600505877,0.04356661211129298,0.07329853723404255,0.07752206423895253,0.07903083060556464,0.07766318279459901,0.07325746726677576,0.06565203048281504,0.05468521890343699,0.04019537898936169,0.022020857201309342,0.0,0.023971153846153868,0.07054223701830083,0.07603809886921585,0.07924505281952088,0.07997559886921587,0.07804223701830083,0.07325746726677575,0.06543378961464066,0.05438370406189553,0.039919710608540396,0.0218543092545752,2.907533857579001e-17,0.0663750920621931,0.07279226840313938,0.07733490366016958,0.07979775981996724,0.07997559886921587,0.077663182794599,0.07265527358280016,0.06474663322050288,0.053732023694390715,0.03940620699114716,0.02156394509745573,0.0610069037345633,0.06800096153846152,0.07351525070674005,0.07733490366016961,0.07924505281952088,0.07903083060556464,0.07647736943907155,0.07136980174081235,0.06349325993155779,0.05263287643207855,0.03857378366314533,0.05464747340425529,0.061880566972920666,0.06800096153846152,0.07279226840313939,0.07603809886921585,0.07752206423895251,0.0770277758146109,0.07433884489845259,0.06923888279273915,0.061511500799732166,0.05094031022169318,0.047506602440113066,0.0546474734042553,0.06100690373456329,0.06637509206219311,0.07054223701830083,0.07329853723404253,0.0744341913405743,0.0737393979690522,0.07100435575063233,0.06601926331647075,0.058574319297723526],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.39056687992858197,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3047165600357085,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.30471656003570957,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.010465109358726379,0.0,0.0,0.027829192084511237,0.040793929474780555,0.0,0.01594346079452463,0.02782919208451125,0.010465109358726387,0.0],"upper":[0.0,0.0,-0.037194465109358754,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1]],"q":[0.060761718089958436,1.0,0.0,1.0,0.0,0.0,0.0,0.0],"risk":0.0830934000202764,"risks":[0.05811539995268823,0.05007322496705074,0.03770659997972353,0.021015524990706618,0.0,0.02466002500760369,0.044995600013517635,0.06100672501774189,0.07269340002027644,0.08005562502112132,0.0830934000202764,0.0677671737183602,0.06239490047649615,0.0529320464837281,0.03937861174005606,0.021734596245480027,2.911017358172338e-17,0.02417482300361597,0.04425906525632797,0.060252726758135935,0.07215580750903994,0.07996830750903997,0.07493666655401969,0.07198670626203904,0.06522095231658266,0.054639404717650567,0.04024206346524277,0.022028928559359222,0.0,0.024155277787165048,0.04449476192085433,0.061018452401067944,0.0737263492278058,0.07950448827346143,0.07867015393193869,0.07432800302456821,0.06647803555135003,0.055120251512284106,0.04025465090737044,0.02188123373660909,2.927087237088682e-17,0.024610949697543173,0.045714082829238646,0.06330939939508638,0.0814348687100807,0.08236583082694057,0.0801224155993376,0.07470462302727177,0.06611245311074311,0.05434590584975159,0.039404981244297255,0.021289679294380037,2.5398425547841737e-17,0.025535943361157103,0.04789750937785138,0.08077565771687333,0.0830934000202764,0.08258793847791555,0.0792592730897908,0.07310740385590211,0.06413233077624954,0.052334053850833034,0.03771257307965259,0.020267888462708276,0.0,0.026908907691527848,0.07765832516643568,0.0809716003176641,0.08182285154269875,0.08021207884153962,0.07613928221418671,0.06960446166064004,0.06060761718089959,0.04914874877496534,0.03522785644283735,0.018844940184515557,3.322236691570562e-17,0.07229796095096476,0.0762182462573079,0.0780399661214558,0.07776312054340843,0.0753877095231658,0.0709137330607279,0.06434119115609474,0.055670083809266316,0.04490041102024265,0.03203217278902369,0.017065369115609467,0.06499327498225808,0.06915022810989827,0.0715666249873272,0.07224246561454495,0.07117774999155146,0.06837247811834679,0.06382664999493089,0.057540265621303766,0.04951332499746544,0.03974582812341589,0.02823777499915513,0.05612659719171367,0.06018351187861172,0.0628447023588253,0.06411016863235441,0.06397991069919906,0.062453928559359245,0.05953222221283499,0.055214791659626235,0.04950163689973303,0.042392757933155355,0.0338881547598932,0.046163877530330154,0.0498331392991112,0.0524306038998344,0.05395627133249974,0.05441014159710723,0.05379221469365686,0.05210249062214863,0.04934096938258254,0.045507650974958604,0.04060253539927681,0.03462562265553715],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5847386029536008,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.41526139704639925,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.030619039572843103,0.0,0.032706701361900584,0.00595251258828697,0.009557906120104088,0.0041749991551485255,0.0],"upper":[0.0,-0.06218020344023526,0.0,-0.03014797742556863,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0]],"q":[1.0,0.4318365463886572,0.0,0.0,0.0],"risk":0.12535317674807137,"risks":[0.11729604988015883,0.08797203741011914,0.0586480249400794,0.0293240124700397,0.0,0.02067598752996031,0.041351975059920575,0.062027962589880886,0.08270395011984115,0.1033799376498015,0.1240559251797618,0.12464682325192869,0.09971745860154296,0.0747880939511572,0.04985872930077147,0.024929364650385734,2.7833996607123115e-17,0.025070635349614255,0.05014127069922854,0.07521190604884277,0.10028254139845705,0.12535317674807134,0.12535317674807137,0.1044609806233928,0.08356878449871423,0.06267658837403567,0.041784392249357115,0.020892196124678533,0.0,0.029107803875321466,0.05821560775064286,0.08732341162596433,0.11643121550128577,0.12058781216047265,0.1033609818518337,0.08613415154319475,0.06890732123455579,0.051680490925916846,0.03445366061727788,0.017226830308638946,3.638552758129637e-17,0.03277316969136104,0.06554633938272211,0.0983195090740832,0.11153708417276796,0.09759494865117196,0.08365281312957597,0.06971067760797997,0.05576854208638398,0.04182640656478797,0.027884271043191997,0.013942135521595992,1.547887986852014e-17,0.036057864478404,0.07211572895680804,0.09937372487838443,0.08833219989189728,0.0772906749054101,0.06624914991892294,0.05520762493243579,0.044166099945948625,0.03312457495946148,0.022083049972974313,0.011041524986487168,0.0,0.03895847501351288,0.08522956829858215,0.07670661146872394,0.06818365463886572,0.0596606978090075,0.05113774097914929,0.04261478414929107,0.03409182731943286,0.025568870489574638,0.017045913659716437,0.008522956829858213,4.6048768320863005e-17,0.07016827490049632,0.06378934081863301,0.05741040673676971,0.05103147265490641,0.04465253857304311,0.0382736044911798,0.03189467040931651,0.025515736327453204,0.01913680224558991,0.012757868163726606,0.006378934081863299,0.05515805611517866,0.05056155143891378,0.04596504676264888,0.04136854208638399,0.036772037410119106,0.03217553273385421,0.02757902805758933,0.02298252338132444,0.018386018705059553,0.013789514028794662,0.00919300935252977,0.041044398855639104,0.03788713740520533,0.034729875954771554,0.03157261450433777,0.028415353053903997,0.025258091603470215,0.022100830153036443,0.01894356870260266,0.01578630725216889,0.012629045801735109,0.009471784351301329,0.028522790034887748,0.026485447889538622,0.024448105744189496,0.022410763598840373,0.020373421453491247,0.01833607930814212,0.016298737162793,0.014261395017443872,0.01222405287209475,0.010186710726745624,0.008149368581396496],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5393346764286766,-0.46066532357132345,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.00812613630779815,0.004127561299199058,0.0005927227163284363,0.0],"upper":[-0.009480492359097826,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":5,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5]],"q":[0.0,0.0,0.0,0.0,0.6641975308641979,1.0],"risk":0.125,"risks":[0.0042520000000000014,0.005646796296296298,0.00612503703703704,0.004667625000000001,0.0,0.04064602777777781,0.07500799999999998,0.10147274537037036,0.11854385185185182,0.125,0.12007940740740738,0.005315000000000001,0.007529061728395063,0.00918755555555556,0.009335250000000002,0.006751543209876544,4.512615589844257e-17,0.03750399999999999,0.06764849691358026,0.08890788888888887,0.09999999999999998,0.10006617283950614,0.006378000000000001,0.009411327160493829,0.01225007407407408,0.014002875000000001,0.013503086419753087,0.009353972222222215,0.0,0.03382424845679015,0.05927192592592591,0.075,0.0800529382716049,0.007441000000000001,0.011293592592592595,0.0153125925925926,0.018670500000000003,0.020254629629629633,0.01870794444444444,0.012495999999999998,3.755245942737031e-17,0.029635962962962954,0.05,0.06003970370370369,0.008504000000000003,0.013175858024691362,0.018375111111111123,0.023338125000000008,0.027006172839506182,0.028061916666666676,0.02499200000000001,0.016175751543209882,2.2608622792837972e-17,0.024999999999999988,0.04002646913580246,0.009567000000000003,0.015058123456790126,0.021437629629629643,0.02800575000000001,0.03375771604938273,0.0374158888888889,0.03748800000000001,0.032351503086419764,0.020364037037037055,0.0,0.02001323456790124,0.010630000000000002,0.016940388888888894,0.024500148148148163,0.03267337500000001,0.04050925925925927,0.04676986111111113,0.04998400000000001,0.048527254629629646,0.04072807407407409,0.025,2.2219153814508033e-17,0.011693000000000004,0.018822654320987658,0.027562666666666687,0.03734100000000001,0.047260802469135825,0.056123833333333366,0.06248000000000002,0.06470300617283954,0.061092111111111146,0.05000000000000003,0.029986765432098772,0.012756000000000002,0.020704919753086425,0.030625185185185203,0.04200862500000001,0.05401234567901236,0.06547780555555557,0.074976,0.08087875771604941,0.08145614814814817,0.075,0.05997353086419751,0.013819000000000003,0.022587185185185193,0.03368770370370373,0.046676250000000016,0.06076388888888891,0.07483177777777782,0.08747200000000002,0.0970545092592593,0.10182018518518522,0.10000000000000003,0.08996029629629632,0.014882000000000003,0.024469450617283953,0.03675022222222224,0.05134387500000001,0.06751543209876544,0.08418575000000003,0.099968,0.11323026080246917,0.12218422222222222,0.125,0.11994706172839505],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":4,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4]],"q":[0.0,0.0,0.47150773558113707,1.0,1.0,0.0,0.0,0.0,0.0,0.14496092012530368],"risk":0.08244777926253748,"risks":[0.03340071883168362,0.0328135096067922,0.027446465864451434,0.016650564011954968,0.0,0.027296230723381772,0.04857201542168792,0.0640954570799932,0.07437404382955357,0.08015869034850095,0.08244777926253749,0.03915981399733259,0.041044078506085616,0.0386313832427149,0.031256959420733615,0.01846257825045763,3.183427267217552e-17,0.025834423056265467,0.04614793298594503,0.06134295159651029,0.07204568599720826,0.0791095776600555,0.043882475346072806,0.04792101358722705,0.04812409025167019,0.043819186226335946,0.03452387978423978,0.019948703305773544,0.0,0.024782780625947305,0.044603580213903614,0.05997331478671182,0.07161013808106376,0.04756870287790425,0.053444314850216515,0.05592458689131734,0.05433724442876196,0.04818390460134646,0.03714234064070244,0.021068746252891516,2.941157846039439e-17,0.024155929681733513,0.043941576717011634,0.05994946052556238,0.050218496592826914,0.05761398229505399,0.062032873161656316,0.06281113402801165,0.05944265270177769,0.05158091200478665,0.039040661814940036,0.02179959110810317,2.663417347057969e-17,0.023950471788107674,0.044127544993551274,0.05183185649084083,0.06043001592173948,0.06644894906268713,0.06924085502408503,0.06830012408553343,0.06326441739802618,0.053915746686145544,0.04018155395025679,0.022135791168703085,0.0,0.024144391485030493,0.05240878257194595,0.06189241573027297,0.06917281459440976,0.07362640741698208,0.07475631875261368,0.07219285682042102,0.06569400086650803,0.05514588852646085,0.04056330318784272,0.02209016135268857,2.9115610448477237e-17,0.05194927483614232,0.06200118172065448,0.07020446975682423,0.07596779120670281,0.07881123670301847,0.07836623027197119,0.07437542435602752,0.0666925948367154,0.05528253605741897,0.04022095584617341,0.021694370538459823,0.050453333283429914,0.06075631389288403,0.06954391454993053,0.07626500639324722,0.08046487793674778,0.08178453775267666,0.07996001715470401,0.07482167288102036,0.06629348977743175,0.05439238348045447,0.03922750310040995,0.04792095791380874,0.058157812246961565,0.06719114897372869,0.07451805297661532,0.07971724245380161,0.08244777926253749,0.08244777926253748,0.07953312265937577,0.07359616434788116,0.06460444425553183,0.0525993976858504,0.0443521487272788,0.05420567678288713,0.06314617302821865,0.07072693095680709,0.07656833025417997,0.08035595480155362,0.08183871067952794,0.08082694417178166,0.07719055976876713,0.0708571381714054,0.06181005429478116],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5402119754995733,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04921330806439312,-0.41057471643603344,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0013626483620857379,0.005787556797780319,0.0,0.0,0.0,0.002864020634467535,0.016082527159667806,0.03200524435416902,0.022836697407661047,0.0,0.0],"upper":[0.0,0.0,0.0,-0.03365956508391239,-0.04595624830342219,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3]],"q":[0.0,0.48071106193716223,1.0,1.0,0.0,0.0,0.0010907700969788455,1.0,0.0,0.0,0.0,0.0],"risk":0.0703971876156408,"risks":[0.056524371979322,0.04959102947571183,0.037876751977652424,0.021353763414333288,0.0,0.023799110233954212,0.04274045490055357,0.056819107069211935,0.066035852094399,0.07039718761564079,0.06991532355751912,0.06273717403310267,0.058923279373854456,0.050839588683180614,0.0383936258788701,0.021483918958612885,2.907663376892247e-17,0.023822405160523454,0.042822674677576326,0.056863352868452635,0.06579798813034751,0.06947113294035706,0.06634303161128983,0.06516740055358067,0.0602497714283578,0.0514485234982114,0.038600245392122756,0.021519735105464382,0.0,0.023812256803884435,0.04270593161166371,0.0564086598842751,0.064626286449047,0.0676221306642968,0.06862994376196899,0.06643057938456974,0.06084739237695816,0.05167106572851991,0.03865961057316719,0.021538366189338798,2.902396184688876e-17,0.02370450757264267,0.04227921261928526,0.05531876699647269,0.06685465714253673,0.06961745974609793,0.06970529172320215,0.06691916861971135,0.06101846639579461,0.0517209214259282,0.03870263049889546,0.021598050817786842,2.663527592196751e-17,0.023459656077239644,0.041486557495517655,0.06432079699642282,0.06843649925304605,0.0703971876156408,0.06999278833107192,0.06696453382193715,0.06100496268656716,0.051757919699025545,0.03881855580910873,0.021733328142346138,0.0,0.023067640859065562,0.060300736176368316,0.06539361302989183,0.0688295462332714,0.07039718761564079,0.06983135443493774,0.06681302937790386,0.06096936056008462,0.05187366152582939,0.03904541124829148,0.021950254129427988,2.82137372717366e-17,0.05507466063278645,0.06079535182371385,0.06532564674747972,0.068461302578019,0.06994101466278674,0.06944641652275811,0.06660207985242832,0.060975514519812646,0.052077168566446515,0.03936042820738533,0.022221617831204604,0.04892275631609046,0.054948266381590664,0.06020876832965151,0.06451406932280745,0.06761560093347438,0.06920641914394968,0.06892120434641219,0.06633626134292224,0.060969519345421656,0.05228053197573365,0.03967047726556297,0.042125209176693525,0.04815890745060073,0.05380219015117251,0.05888442395460713,0.06317719967499093,0.06639433226429835,0.06819186081239184,0.06816804854702196,0.06586338283382735,0.0607605751763347,0.05228456121595877,0.034962205165008906,0.04073382577782262,0.046429191383428464,0.051901302578019004,0.0569478973153267,0.061311450906623904,0.06467917602072283,0.06668302268397557,0.06689967828027406,0.06485056755105016,0.06000185259527555],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6268656716417911,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07709386949549751,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2960404588627115,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.004505597014925373,0.0,0.0,0.0,0.010720827679782906,0.019874491180461338,0.0,0.0,0.00539198377944986,0.01205728845442211,0.007584070864684845,6.556833600592143e-05,0.0],"upper":[0.0,0.0,-0.031307666214382655,-0.039430584679906275,0.0,0.0,0.0,-0.015580979400518079,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2]],"q":[0.0,1.0,1.0,0.0,0.0010907700969789694,1.0,0.0,0.0,0.48071106193716223,0.0,0.0,0.0],"risk":0.07039718761564079,"risks":[0.06000185259527559,0.05228456121595879,0.039670477265563,0.022221617831204615,0.0,0.023067640859065562,0.04148655749551763,0.05531876699647266,0.06462628644904697,0.06947113294035703,0.06991532355751912,0.06485056755105016,0.06076057517633471,0.05228053197573365,0.03936042820738531,0.021950254129427988,2.8602715674711256e-17,0.023459656077239637,0.04227921261928526,0.056408659884275084,0.06579798813034751,0.07039718761564082,0.06689967828027406,0.06586338283382734,0.060969519345421636,0.05207716856644649,0.039045411248291466,0.02173332814234609,0.0,0.023704507572642697,0.04270593161166371,0.05686335286845266,0.06603585209439905,0.06668302268397558,0.06816804854702198,0.06633626134292224,0.06097551451981265,0.05187366152582939,0.038818555809108694,0.021598050817786842,2.902396184688876e-17,0.023812256803884407,0.042822674677576326,0.05681910706921196,0.06467917602072284,0.06819186081239183,0.0689212043464122,0.06660207985242833,0.06096936056008463,0.051757919699025524,0.03870263049889546,0.021538366189338805,2.6438620980671522e-17,0.023822405160523454,0.042740454900553594,0.06131145090662393,0.06639433226429836,0.06920641914394969,0.06944641652275814,0.0668130293779039,0.061004962686567174,0.05172092142592823,0.038659610573167226,0.021519735105464434,0.0,0.023799110233954212,0.0569478973153267,0.06317719967499094,0.06761560093347438,0.06994101466278674,0.06983135443493775,0.06696453382193714,0.06101846639579463,0.05167106572851992,0.03860024539212278,0.021483918958612885,2.911551292969181e-17,0.051901302578019,0.058884423954607114,0.06451406932280745,0.068461302578019,0.0703971876156408,0.0699927883310719,0.06691916861971135,0.060847392376958166,0.05144852349821142,0.03839362587887011,0.02135376341433328,0.04642919138342847,0.05380219015117252,0.06020876832965152,0.06532564674747973,0.06882954623327141,0.07039718761564079,0.06970529172320215,0.06643057938456974,0.06024977142835783,0.05083958868318063,0.0378767519776524,0.04073382577782263,0.04815890745060073,0.05494826638159068,0.06079535182371387,0.06539361302989184,0.06843649925304604,0.06961745974609794,0.068629943761969,0.06516740055358068,0.05892327937385447,0.049591029475711826,0.03496220516500891,0.04212520917669353,0.048922756316090464,0.05507466063278647,0.06030073617636832,0.06432079699642282,0.06685465714253673,0.06762213066429681,0.06634303161128988,0.06273717403310267,0.05652437197932198],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.6268656716417911,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.29604045886271124,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07709386949549772,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[6.556833600592098e-05,0.0,0.0,0.007584070864684841,0.0,0.0,0.012057288454422107,0.019874491180461334,0.0,0.00539198377944986,0.010720827679782908,0.004505597014925374,0.0],"upper":[0.0,-0.015580979400518075,-0.039430584679906275,0.0,0.0,-0.031307666214382655,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1]],"q":[0.14496092012530634,1.0,0.0,1.0,0.0,0.4715077355811351,0.0,0.0,0.0,0.0],"risk":0.08244777926253748,"risks":[0.06181005429478133,0.05259939768585052,0.039227503100410024,0.021694370538459858,0.0,0.024144391485030475,0.04412754499355122,0.05994946052556231,0.0716101380810637,0.07910957766005547,0.08244777926253749,0.07085713817140551,0.0646044442555319,0.05439238348045453,0.040220955846173426,0.02209016135268858,2.8788255354805274e-17,0.02395047178810767,0.04394157671701163,0.05997331478671179,0.07204568599720826,0.08015869034850101,0.0771905597687672,0.0735961643478812,0.06629348977743178,0.055282536057418945,0.04056330318784271,0.022135791168703036,0.0,0.024155929681733544,0.04460358021390364,0.06134295159651035,0.07437404382955362,0.0808269441717817,0.0795331226593758,0.07482167288102036,0.06669259483671537,0.05514588852646085,0.04018155395025676,0.021799591108103155,2.94115784603944e-17,0.024782780625947288,0.04614793298594506,0.06409545707999328,0.08183871067952796,0.08244777926253748,0.07996001715470398,0.0743754243560275,0.065694000866508,0.053915746686145495,0.039040661814940016,0.0210687462528915,2.5110093558115003e-17,0.025834423056265488,0.048572015421688,0.08035595480155362,0.08244777926253748,0.08178453775267665,0.07836623027197116,0.07219285682042098,0.06326441739802614,0.05158091200478663,0.037142340640702425,0.01994870330577357,0.0,0.027296230723381793,0.07656833025417992,0.07971724245380155,0.0804648779367477,0.07881123670301839,0.0747563187526136,0.06830012408553333,0.059442652701777614,0.0481839046013464,0.03452387978423975,0.018462578250457606,3.368059541398145e-17,0.07072693095680699,0.0745180529766152,0.07626500639324711,0.0759677912067027,0.07362640741698197,0.06924085502408492,0.06281113402801157,0.054337244428761866,0.0438191862263359,0.031256959420733574,0.016650564011954933,0.06314617302821855,0.06719114897372858,0.06954391454993042,0.07020446975682412,0.06917281459440965,0.06644894906268699,0.062032873161656205,0.055924586891317234,0.04812409025167012,0.03863138324271482,0.027446465864451364,0.054205676782887034,0.05815781224696146,0.060756313892883905,0.062001181720654365,0.06189241573027285,0.06043001592173935,0.057613982295053864,0.0534443148502164,0.04792101358722696,0.041044078506085525,0.03281350960679211,0.04435214872727869,0.04792095791380863,0.050453333283429797,0.0519492748361422,0.05240878257194583,0.051831856490840704,0.050218496592826796,0.04756870287790414,0.04388247534607271,0.03915981399733251,0.033400718831683524],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5402119754995734,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.41057471643603216,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.049213308064394404,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.022836697407661047,0.0,0.03200524435416904,0.0,0.01608252715966783,0.005787556797780329,0.002864020634467542,0.001362648362085741,0.0],"upper":[0.0,-0.0459562483034222,0.0,-0.033659565083912414,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0]],"q":[1.0,0.6641975308641977,0.0,0.0,0.0,0.0],"risk":0.12500000000000003,"risks":[0.11994706172839512,0.08996029629629634,0.059973530864197544,0.029986765432098772,0.0,0.02001323456790124,0.040026469135802434,0.06003970370370368,0.08005293827160487,0.10006617283950614,0.12007940740740738,0.12500000000000003,0.10000000000000003,0.075,0.05,0.025,2.7755575615628907e-17,0.024999999999999988,0.05,0.07499999999999997,0.09999999999999998,0.125,0.12218422222222221,0.10182018518518518,0.08145614814814812,0.0610921111111111,0.04072807407407406,0.02036403703703701,0.0,0.02963596296296299,0.059271925925925915,0.0889078888888889,0.11854385185185186,0.11323026080246916,0.09705450925925929,0.0808787577160494,0.06470300617283951,0.04852725462962963,0.032351503086419736,0.01617575154320988,3.755245942737031e-17,0.03382424845679011,0.06764849691358026,0.1014727453703704,0.09996800000000002,0.08747200000000002,0.074976,0.06248000000000001,0.04998400000000001,0.037487999999999994,0.02499200000000001,0.012495999999999998,1.3873346915715958e-17,0.03750399999999999,0.07500800000000002,0.08418575000000005,0.07483177777777782,0.06547780555555559,0.056123833333333366,0.04676986111111114,0.0374158888888889,0.028061916666666686,0.01870794444444445,0.009353972222222236,0.0,0.04064602777777781,0.06751543209876545,0.06076388888888891,0.05401234567901236,0.04726080246913582,0.04050925925925927,0.03375771604938272,0.027006172839506182,0.020254629629629633,0.013503086419753096,0.006751543209876544,4.8015432507901254e-17,0.051343875000000004,0.04667625,0.042008625,0.037341000000000006,0.032673375000000004,0.02800575,0.023338125000000005,0.018670500000000003,0.014002875000000008,0.009335250000000003,0.004667624999999999,0.03675022222222224,0.03368770370370372,0.030625185185185196,0.027562666666666676,0.024500148148148156,0.021437629629629636,0.01837511111111112,0.015312592592592596,0.01225007407407408,0.009187555555555558,0.006125037037037036,0.02446945061728395,0.02258718518518519,0.020704919753086422,0.018822654320987654,0.01694038888888889,0.015058123456790123,0.013175858024691359,0.011293592592592593,0.009411327160493829,0.007529061728395062,0.005646796296296295,0.014882000000000012,0.01381900000000001,0.012756000000000009,0.011693000000000009,0.010630000000000007,0.009567000000000006,0.008504000000000006,0.007441000000000005,0.006378000000000005,0.005315000000000004,0.0042520000000000014],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.49999999999999994,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":6,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6]],"q":[0.0,0.0,0.0,0.0,0.0,0.904663923182442,1.0],"risk":0.125,"risks":[0.0019924,0.0030553466049382714,0.0037445530864197545,0.003169631250000001,0.0,0.04246937453703707,0.07845119999999998,0.10562246473765431,0.1217333283950617,0.125,0.11463830123456789,0.0024905,0.0040737954732510285,0.005616829629629632,0.006339262500000002,0.0050218621399176966,4.715047745244786e-17,0.03922559999999999,0.07041497649176956,0.09129999629629627,0.09999999999999998,0.09553191769547323,0.0029886,0.005092244341563785,0.007489106172839509,0.009508893750000004,0.010043724279835393,0.007530625462962957,0.0,0.035207488245884794,0.06086666419753085,0.075,0.07642553415637857,0.0034866999999999997,0.006110693209876542,0.009361382716049386,0.012678525000000005,0.015065586419753089,0.015061250925925923,0.010774399999999998,3.908816408980083e-17,0.030433332098765423,0.05,0.057319150617283945,0.0039848,0.0071291420781893,0.011233659259259265,0.01584815625000001,0.02008744855967079,0.022591876388888897,0.021548800000000007,0.014792511754115232,2.1723365219144607e-17,0.024999999999999988,0.03821276707818929,0.004482900000000001,0.008147590946502057,0.013105935802469142,0.01901778750000001,0.025109310699588487,0.030122501851851863,0.0323232,0.029585023508230463,0.019566667901234586,0.0,0.019106383539094655,0.004981,0.009166039814814814,0.01497821234567902,0.02218741875000001,0.030131172839506185,0.03765312731481483,0.04309760000000001,0.04437753526234569,0.03913333580246915,0.025,2.1212346922421954e-17,0.005479100000000001,0.01018448868312757,0.0168504888888889,0.025357050000000016,0.03515303497942388,0.0451837527777778,0.05387200000000002,0.05917004701646094,0.058700003703703735,0.05000000000000003,0.030893616460905354,0.0059772,0.011202937551440329,0.018722765432098772,0.028526681250000012,0.04017489711934158,0.05271437824074076,0.0646464,0.07396255877057616,0.07826667160493828,0.075,0.061787232921810674,0.006475300000000001,0.012221386419753085,0.020595041975308655,0.03169631250000002,0.04519675925925928,0.06024500370370373,0.07542080000000001,0.0887550705246914,0.09783333950617287,0.10000000000000003,0.09268084938271606,0.006973399999999999,0.01323983528806584,0.022467318518518527,0.03486594375000002,0.05021862139917697,0.06777562916666668,0.0861952,0.10354758227880662,0.11740000740740741,0.125,0.12357446584362138],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4999999999999999,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":5,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5]],"q":[0.0,0.0,0.0,0.8938352570828962,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.07911900944386151,"risks":[0.023845504721930744,0.0259125556302466,0.023438371458551942,0.01510433927400315,0.0,0.027705640887329505,0.04833044281217208,0.06250618240097063,0.07133648898216158,0.07630165636476918,0.0791190094438615,0.02794395084601259,0.03239069453780823,0.03296020986358867,0.0283206361387559,0.01750588191894019,3.2306422350493625e-17,0.025779895068205664,0.04531636400060665,0.05953346881558237,0.06972624227357685,0.0774367261280168,0.0312972249475341,0.037789143627442935,0.0410171500524659,0.03964889059425827,0.032677646248688345,0.01950756422358668,0.0,0.024480969866949785,0.04370971392969569,0.05880836959150382,0.07115275550891922,0.03390532702649528,0.04210790289915071,0.047609192025183635,0.04908910264051024,0.045515292989244484,0.03622833355808956,0.020990757607555085,2.920303747000053e-17,0.023865224324501572,0.043548038318549975,0.060267097586568744,0.03576825708289612,0.04534697235293153,0.05273633578174189,0.05664127227751181,0.056018822140608604,0.050162308003508654,0.03875216789087095,0.021873454399757342,2.6783473567709382e-17,0.02394524845471537,0.04477975236096539,0.03688601511673662,0.04750635198878542,0.056398581322140616,0.06230539950526301,0.0641882337027807,0.06130948755984391,0.05328423084994755,0.040101333066221795,0.022114040956190996,0.0,0.02469071983210915,0.03725860112801679,0.04858604180671236,0.058595928646379865,0.06608148432376378,0.07002352767576075,0.06966987222709535,0.0645869464847849,0.05468363599939335,0.04020734719307451,0.021712292954403852,2.996665525027483e-17,0.03688601511673662,0.04858604180671235,0.05932837775445962,0.06796952673301418,0.0735247040595488,0.07524346200526298,0.072660314795383,0.06562036319927204,0.054279918710650604,0.03908212731792695,0.02070759286463798,0.03576825708289611,0.04750635198878543,0.058595928646379865,0.06796952673301418,0.0746917628541448,0.0780302568943468,0.07750433578174186,0.07291151466585781,0.06433175550891922,0.05210950309056924,0.03681349842602306,0.03390532702649527,0.04534697235293153,0.05639858132214063,0.06608148432376379,0.07352470405954879,0.07803025689434681,0.0791190094438615,0.0765570903991507,0.07036285758788038,0.0607944202723308,0.048317716684155285,0.0312972249475341,0.04210790289915071,0.052736335781741875,0.062305399505263,0.07002352767576075,0.07524346200526298,0.07750433578174187,0.0765570903991507,0.0723732249475341,0.06513687886321157,0.05522024763903461],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4627492130115426,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5372507869884574,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0006383882476390348,0.004343672612801679,0.00947710388247639,0.0,0.0,0.0,0.0012426946484784894,0.009209150052465899,0.026738971668415535,0.03655454354669465,0.02030807974816368,0.0004061615949632629,0.0],"upper":[0.0,0.0,0.0,0.0,-0.028431311647429205,-0.03127444281217212,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":4,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4]],"q":[0.0,0.0,1.0,1.0,1.0,0.0,0.0,0.0,0.18258640995160766,1.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06778868185785827,"risks":[0.04598422608590987,0.043651083362369066,0.03530384872219415,0.020730364168560778,0.0,0.02338841895807589,0.041302340375063154,0.054204304321625055,0.06253743575449075,0.06665020866413321,0.06672121022244687,0.05103314368053202,0.05181661462870166,0.04729754658198189,0.037167689457564324,0.021363686296648154,2.878327215210548e-17,0.023301840063513574,0.0415380893137696,0.05495423064359542,0.06370527374762491,0.06778868185785827,0.05395994510663503,0.05724760423018231,0.055936602895759614,0.049652324538708055,0.03822965730449187,0.021653621992525383,0.0,0.023375961265710992,0.04186069221388457,0.05544602369800494,0.06397705894464101,0.054993000065330394,0.06021877612423702,0.061534149754674486,0.05852461808368942,0.0509513181197993,0.038698894525471705,0.021723367389603516,2.8742398757742003e-17,0.02347116661585414,0.0419942202402258,0.05528936039252083,0.05436067825772957,0.06100485426829172,0.06440331924987365,0.06412491876420584,0.05988207383883859,0.05148542718865855,0.038798489437405236,0.021692285339187458,2.6711368219596253e-17,0.023471625099239966,0.04172860511122344,0.052291349384944084,0.059880562619772384,0.06485724347250424,0.06679357525195473,0.06537532955787788,0.060362829571905516,0.051551913348486224,0.038734897105824145,0.021661538516818037,0.0,0.023297812010474594,0.049013383148085385,0.057120625136104976,0.06320905451371339,0.0668709362186335,0.06778449037318529,0.06568071126503221,0.06031018632792756,0.05140991512246083,0.038670128316804095,0.021701106667458357,2.856638832382023e-17,0.04475514924826498,0.05299976577471546,0.059771884464648296,0.06469735033593961,0.067462961381029,0.06778868185785826,0.06539985558081036,0.05999941921164829,0.05124011555045408,0.03869670682656756,0.02183818798952541,0.03974501738659437,0.04779270849302984,0.05485886541645608,0.0606131662755705,0.06476414767767717,0.0670363509402033,0.0671474683122157,0.06478548919593731,0.05958584636826384,0.05110856220228007,0.03881539488877655,0.03421135726418501,0.041774177248474036,0.04878312946028389,0.05495873270922355,0.060041454359397915,0.0637733281018869,0.06587957172722464,0.0660502048978787,0.06392166692072929,0.05905843451954843,0.050934639607479175,0.028382538582148415,0.03521889599847404,0.041857808687278876,0.04807439830859622,0.053648286522459405,0.05834922293272871,0.061922713030918314,0.06407564614002322,0.0644619233583463,0.06266808550332512,0.05819894105535898],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5366350199848773,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4633649800151227,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0010335593783669184,0.0037113694109427425,0.0,0.0,0.0,0.0027411324884464186,0.012506700465763253,0.01756260065405053,0.0,0.0,0.001710912188716248,0.008215394305950302,0.014167164527600763,0.009158571007741909,0.0004134077190994612,0.0],"upper":[0.0,0.0,-0.001245348046378128,-0.02248012883718469,-0.028334329055201536,0.0,0.0,0.0,0.0,-0.014310267199596733,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3]],"q":[0.0,0.6523001073832213,1.0,1.0,0.0,0.0,0.3869462610393792,1.0,0.0,0.0,0.0,0.6523001073832255,0.0,0.0,0.0,0.0],"risk":0.06748273590775196,"risks":[0.05960358391316073,0.05205892665978075,0.039587923971208,0.022223059963416402,0.0,0.02295759069217308,0.041137859898770036,0.054586016726245606,0.06335045152867455,0.06748273590775197,0.06703762271279301,0.06430091044839878,0.06039190228598565,0.05208995493799885,0.03931284761370721,0.02197750554772262,2.8503003258808974e-17,0.023295548255837305,0.041778513625875605,0.055362405446098856,0.06395987907783426,0.06748273590775197,0.06607324275073678,0.06521314044740238,0.06053014270652261,0.05185001646780671,0.038992892926848266,0.021773267535125245,0.0,0.023476314284719135,0.04199979860841362,0.055362405446098883,0.06335045152867455,0.06543157078424838,0.06706554925954483,0.06546443656921015,0.06038391274167931,0.051568763330293185,0.0387528794132985,0.02165925759384794,2.882054033522376e-17,0.023476314284719097,0.041778513625875584,0.05458601672624558,0.06284846919410052,0.06645467058210686,0.06741387876387185,0.06543257535031952,0.0602008813704433,0.051392557271306136,0.03866500291804043,0.021659257593847948,2.6773262466733356e-17,0.02329554825583729,0.041137859898770016,0.05875809730655344,0.06384868001896253,0.06686460447369784,0.06748273590775195,0.0653581750791544,0.06012425826697143,0.051392557271306184,0.03875287941329854,0.021773267535125315,0.0,0.022957590692173045,0.05355619912896061,0.05967838691816591,0.06426784182725774,0.06698981872703139,0.06748273590775197,0.0653581750791544,0.06020088137044333,0.05156876333029321,0.03899289292684834,0.02197750554772265,2.8155839687746336e-17,0.04760010334976892,0.05433723437195126,0.06003991189850097,0.06437794082024273,0.0669898187270314,0.06748273590775197,0.06543257535031957,0.06038391274167938,0.05185001646780681,0.03931284761370729,0.022223059963416437,0.04120872333851849,0.048181299216732906,0.05456222870675651,0.06003991189850101,0.06426784182725778,0.06686460447369788,0.06741387876387193,0.06546443656921026,0.06053014270652275,0.05208995493799895,0.03958792397120807,0.034662557145842675,0.04152929203310522,0.04818129921673295,0.05433723437195133,0.05967838691816598,0.06384868001896261,0.066454670582107,0.06706554925954497,0.06521314044740258,0.060391902285985816,0.05205892665978088,0.028203687503468224,0.034662557145842696,0.041208723338518535,0.047600103349769,0.05355619912896071,0.058758097306553556,0.06284846919410068,0.06543157078424856,0.06607324275073698,0.06430091044839899,0.0596035839131609],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.43580459018276313,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.07052439426194104,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2557217093155068,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2379493062397891,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.002307835455646951,0.0,0.0,0.0,0.007845330272259232,0.016235088524645384,0.0,0.0,0.0074275749541335735,0.018797463547509646,0.01323847988768849,0.0,0.0022626576492372724,0.0060520102064379275,0.005208463857955799,0.001243664403322527,0.0],"upper":[0.0,0.0,-0.01877884917613955,-0.02506328473001287,0.0,0.0,0.0,-0.015257376297271679,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2]],"q":[0.0,1.0,1.0,0.0,0.182586409951607,1.0,0.0,0.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06778868185785826,"risks":[0.05819894105535898,0.050934639607479175,0.038815394888776555,0.021838187989525415,0.0,0.023297812010474598,0.04172860511122343,0.05528936039252083,0.06397705894464098,0.06778868185785827,0.06672121022244687,0.06266808550332509,0.05905843451954841,0.05110856220228006,0.038696706826567534,0.02170110666745835,2.8760941224965895e-17,0.023471625099239973,0.04199422024022581,0.05544602369800494,0.06370527374762494,0.06665020866413326,0.06446192335834623,0.06392166692072924,0.059585846368263806,0.05124011555045403,0.03867012831680405,0.021661538516817985,0.0,0.02347116661585417,0.041860692213884575,0.05495423064359545,0.06253743575449078,0.06407564614002317,0.06605020489787866,0.06478548919593728,0.05999941921164826,0.0514099151224608,0.03873489710582411,0.021692285339187455,2.8742398757742003e-17,0.02337596126571097,0.0415380893137696,0.054204304321625096,0.061922713030918265,0.06587957172722461,0.06714746831221566,0.06539985558081032,0.06031018632792754,0.051551913348486196,0.038798489437405236,0.02172336738960351,2.681892389151928e-17,0.02330184006351358,0.04130234037506319,0.05834922293272869,0.06377332810188688,0.06703635094020328,0.06778868185785826,0.06568071126503221,0.0603628295719055,0.051485427188658554,0.03869889452547172,0.021653621992525428,0.0,0.02338841895807589,0.05364828652245937,0.060041454359397874,0.06476414767767714,0.06746296138102899,0.06778449037318526,0.06537532955787784,0.05988207383883858,0.05095131811979929,0.03822965730449188,0.021363686296648154,2.9165175119631534e-17,0.04807439830859618,0.054958732709223496,0.06061316627557047,0.06469735033593958,0.06687093621863348,0.06679357525195469,0.06412491876420581,0.05852461808368941,0.04965232453870807,0.037167689457564324,0.02073036416856077,0.04185780868727885,0.04878312946028386,0.05485886541645606,0.059771884464648276,0.06320905451371338,0.06485724347250421,0.06440331924987364,0.06153414975467448,0.055936602895759614,0.04729754658198189,0.03530384872219412,0.03521889599847402,0.041774177248474015,0.04779270849302983,0.052999765774715456,0.05712062513610495,0.059880562619772364,0.0610048542682917,0.06021877612423701,0.05724760423018232,0.05181661462870164,0.04365108336236905,0.0283825385821484,0.03421135726418499,0.03974501738659435,0.04475514924826498,0.04901338314808537,0.05229134938494407,0.05436067825772956,0.05499300006533039,0.05395994510663503,0.051033143680532016,0.04598422608590984],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5366350199848773,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4633649800151228,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00041340771909946164,0.0,0.0,0.009158571007741912,0.0,0.0,0.014167164527600766,0.017562600654050534,0.0,0.008215394305950308,0.012506700465763262,0.003711369410942745,0.0017109121887162488,0.0027411324884464203,0.001033559378366919,0.0],"upper":[0.0,-0.014310267199596731,-0.028334329055201536,0.0,0.0,-0.02248012883718469,0.0,0.0,-0.0012453480463781306,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1]],"q":[0.0,1.0,0.0,1.0,0.0,0.8938352570828956,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.07911900944386147,"risks":[0.05522024763903464,0.048317716684155305,0.036813498426023085,0.020707592864637983,0.0,0.02469071983210915,0.044779752360965354,0.060267097586568716,0.07115275550891917,0.0774367261280168,0.07911900944386147,0.06513687886321155,0.060794420272330785,0.052109503090569234,0.03908212731792693,0.02171229295440385,2.899511492033353e-17,0.023945248454715372,0.04354803831855,0.058808369591503803,0.0697262422735769,0.07630165636476921,0.07237322494753406,0.07036285758788033,0.06433175550891916,0.054279918710650535,0.04020734719307448,0.022114040956190937,0.0,0.02386522432450161,0.04370971392969573,0.05953346881558243,0.07133648898216166,0.07655709039915069,0.07655709039915069,0.0729115146658578,0.06562036319927202,0.05468363599939334,0.04010133306622177,0.021873454399757335,2.920303747000054e-17,0.024480969866949764,0.04531636400060665,0.06250618240097067,0.07750433578174185,0.07911900944386147,0.07750433578174185,0.07266031479538299,0.06458694648478487,0.05328423084994751,0.03875216789087093,0.020990757607555078,2.509707027717434e-17,0.02577989506820567,0.04833044281217212,0.07524346200526298,0.0780302568943468,0.07803025689434681,0.07524346200526298,0.06966987222709536,0.06130948755984391,0.05016230800350866,0.036228333558089576,0.019507564223586717,0.0,0.027705640887329505,0.07002352767576073,0.07352470405954876,0.07469176285414478,0.07352470405954876,0.07002352767576073,0.06418823370278066,0.05601882214060858,0.04551529298924446,0.03267764624868835,0.01750588191894018,3.478002251362944e-17,0.062305399505262954,0.06608148432376372,0.06796952673301412,0.06796952673301412,0.06608148432376373,0.06230539950526293,0.056641272277511784,0.04908910264051021,0.03964889059425825,0.028320636138755892,0.015104339274003136,0.05273633578174185,0.056398581322140595,0.05859592864637984,0.05932837775445957,0.05859592864637983,0.05639858132214058,0.05273633578174185,0.0476091920251836,0.04101715005246589,0.03296020986358865,0.023438371458551918,0.04210790289915069,0.0453469723529315,0.047506351988785396,0.04858604180671233,0.04858604180671233,0.04750635198878538,0.04534697235293151,0.04210790289915068,0.03778914362744292,0.03239069453780822,0.025912555630246574,0.0312972249475341,0.03390532702649527,0.03576825708289611,0.03688601511673661,0.03725860112801678,0.036886015116736615,0.03576825708289611,0.03390532702649527,0.0312972249475341,0.027943950846012585,0.023845504721930734],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.46274921301154226,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5372507869884577,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00040616159496327915,0.0,0.02030807974816371,0.0,0.03655454354669467,0.0,0.026738971668415552,0.0094771038824764,0.009209150052465904,0.0043436726128016825,0.0012426946484784902,0.0006383882476390351,0.0],"upper":[0.0,-0.03127444281217209,0.0,-0.028431311647429163,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0]],"q":[1.0,0.904663923182442,0.0,0.0,0.0,0.0,0.0],"risk":0.12500000000000003,"risks":[0.12357446584362149,0.09268084938271613,0.06178723292181073,0.030893616460905365,0.0,0.019106383539094645,0.03821276707818925,0.05731915061728389,0.0764255341563785,0.09553191769547317,0.11463830123456781,0.12500000000000003,0.10000000000000003,0.075,0.05,0.025,2.7755575615628907e-17,0.024999999999999988,0.05,0.07499999999999997,0.09999999999999998,0.125,0.11740000740740737,0.09783333950617282,0.07826667160493823,0.05870000370370368,0.03913333580246912,0.019566667901234538,0.0,0.030433332098765465,0.06086666419753086,0.09129999629629632,0.12173332839506175,0.10354758227880662,0.08875507052469138,0.07396255877057614,0.05917004701646091,0.04437753526234568,0.02958502350823044,0.014792511754115228,3.908816408980083e-17,0.03520748824588476,0.07041497649176956,0.10562246473765435,0.08619520000000001,0.07542080000000001,0.0646464,0.053872,0.04309760000000001,0.032323199999999996,0.021548800000000007,0.010774399999999998,1.1961986956521287e-17,0.03922559999999999,0.07845120000000003,0.06777562916666671,0.06024500370370375,0.052714378240740774,0.04518375277777781,0.03765312731481484,0.030122501851851866,0.022591876388888908,0.015061250925925933,0.007530625462962975,0.0,0.04246937453703707,0.050218621399176974,0.04519675925925928,0.04017489711934158,0.03515303497942388,0.030131172839506185,0.02510931069958848,0.02008744855967079,0.015065586419753089,0.010043724279835398,0.0050218621399176966,4.993576425702784e-17,0.03486594375,0.0316963125,0.028526681249999998,0.02535705,0.02218741875,0.019017787499999998,0.015848156250000002,0.012678525,0.009508893750000004,0.0063392625000000015,0.003169631249999999,0.02246731851851853,0.020595041975308655,0.018722765432098772,0.016850488888888897,0.01497821234567902,0.01310593580246914,0.011233659259259265,0.009361382716049386,0.007489106172839511,0.005616829629629632,0.0037445530864197523,0.013239835288065844,0.012221386419753089,0.01120293755144033,0.010184488683127572,0.009166039814814815,0.008147590946502057,0.007129142078189301,0.006110693209876543,0.005092244341563787,0.004073795473251029,0.003055346604938271,0.0069734000000000055,0.006475300000000005,0.005977200000000004,0.005479100000000004,0.004981000000000004,0.004482900000000003,0.003984800000000004,0.0034867000000000023,0.0029886000000000027,0.002490500000000002,0.001992400000000001],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":7,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7]],"q":[0.0,0.0,0.0,0.0,0.0,0.17848642257989863,1.0,0.9959688091334155],"risk":0.125,"risks":[0.0016505835658482135,0.0025983571816338424,0.00326524146090535,0.002830678675460815,0.0,0.04297215189281066,0.07948486573660712,0.10696853694492119,0.12284363265014143,0.125,0.11249999999999993,0.0020632294573102667,0.0034644762421784563,0.004897862191358025,0.00566135735092163,0.0045875717512934705,4.770867244908785e-17,0.03974243286830356,0.07131235796328081,0.09213272448760608,0.09999999999999998,0.09374999999999994,0.00247587534877232,0.00433059530272307,0.0065304829218107,0.008492036026382446,0.009175143502586941,0.007027848107189371,0.0,0.03565617898164042,0.06142181632507072,0.075,0.07499999999999993,0.002888521240234373,0.005196714363267684,0.008163103652263375,0.01132271470184326,0.013762715253880413,0.014055696214378749,0.010257567131696425,3.958631087557273e-17,0.03071090816253536,0.05,0.05624999999999998,0.003301167131696427,0.006062833423812299,0.009795724382716052,0.014153393377304079,0.01835028700517389,0.021083544321568136,0.02051513426339286,0.014343821018359607,2.1415193882062404e-17,0.024999999999999988,0.03749999999999998,0.00371381302315848,0.006928952484356913,0.011428345113168727,0.016984072052764893,0.02293785875646736,0.028111392428757515,0.030772701395089284,0.028687642036719214,0.01928909183746465,0.0,0.018750000000000003,0.004126458914620533,0.0077950715449015264,0.013060965843621401,0.019814750728225708,0.02752543050776083,0.03513924053594689,0.04103026852678571,0.043031463055078815,0.03857818367492928,0.025,2.0816681711721667e-17,0.004539104806082587,0.00866119060544614,0.014693586574074078,0.022645429403686527,0.03211300225905431,0.04216708864313628,0.05128783565848215,0.05737528407343844,0.05786727551239393,0.05000000000000003,0.03125000000000001,0.00495175069754464,0.009527309665990755,0.01632620730452675,0.02547610807914734,0.03670057401034777,0.04919493675032565,0.06154540279017856,0.07171910509179803,0.07715636734985853,0.075,0.062499999999999986,0.005364396589006694,0.01039342872653537,0.01795882803497943,0.028306786754608158,0.04128814576164125,0.056222784857515036,0.07180296992187499,0.08606292611015766,0.0964454591873232,0.10000000000000003,0.09375000000000003,0.005777042480468746,0.011259547787079981,0.0195914487654321,0.03113746543006897,0.04587571751293471,0.0632506329647044,0.08206053705357141,0.10040674712851724,0.1157345510247878,0.125,0.125],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":6,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6]],"q":[0.0,0.0,0.0,0.21245227574626135,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0,0.18584504354906778],"risk":0.0766311285112403,"risks":[0.017576684923665493,0.02010478799739346,0.019050328841833646,0.012802766270646016,0.0,0.029711072767571813,0.051581879857097376,0.06592562416888176,0.07373975497666421,0.07663112851124032,0.07663112851124029,0.020599794536119674,0.025135255403680987,0.026796661383500845,0.024014831842987524,0.015416597966469674,3.437589629759873e-17,0.027276909975664936,0.047365913686722196,0.061018285684887305,0.06955989107109115,0.07473184785102951,0.023074479501188978,0.029330158513546686,0.033357106005668304,0.03363619671702453,0.028797008396113082,0.017784963265014785,0.0,0.02539070563042829,0.04448783675818429,0.05836115949989254,0.06848353755415368,0.025000739818873408,0.032689497326990585,0.038731662708336015,0.04166686089275702,0.04014123128893024,0.03306596256261618,0.019751149930102546,3.0085328026058726e-17,0.02414840819655519,0.04303493379764448,0.057886197620612825,0.026378575489172964,0.03521327184401268,0.04292033149150399,0.04810682437018502,0.049449266644921136,0.04584299789280419,0.0365303597659726,0.021193796795437377,2.658662399788376e-17,0.02358121396434696,0.042939828050406914,0.027207986512087647,0.036901482064612946,0.0459231123551722,0.05295608714930852,0.056721114464085766,0.05611606925557878,0.05033762950761014,0.038972096016740405,0.022042612168518737,0.0,0.02364442884353599,0.027488972887617445,0.0377541279887914,0.04774000529934066,0.05621464923012749,0.06195677474642412,0.06388517665093997,0.061172959155015166,0.05333489766390907,0.04027624470211136,0.02229129190460358,2.866478572490614e-17,0.027221534615762367,0.03777120961654804,0.04837101032400939,0.05788251061264196,0.06515624749193623,0.06915032007888774,0.0690363487081877,0.0642822017369434,0.054700897600777884,0.04045508967815773,0.02200654151979899,0.026405671696522418,0.036952726947882875,0.04781612742917836,0.05795967129685193,0.06631953270062207,0.0719114995394221,0.07392779816712772,0.07181400823584339,0.06531657086451831,0.054491393320662385,0.03966405340293293,0.02504138412989759,0.0352986799827959,0.0460753566148476,0.056446131282757404,0.06544663037248165,0.07216871503254307,0.07584730753183523,0.07593031716060902,0.07212326449333267,0.06440020283211763,0.052972535649401874,0.023128671915887893,0.0328090687212871,0.04314869788101708,0.05334189057035836,0.06253754050751496,0.06992196655825061,0.07479487680231026,0.07663112851124029,0.07512097848722094,0.07018151821252341,0.06193198825920576],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04812667897054851,-0.5016649427028519,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4502083783265996,-0.0,-0.0,-0.0],"lower":[7.684276250977758e-05,0.000741062422161858,0.0023290765390795703,0.0,0.0,0.0,0.0,0.0002002487563072406,0.0022025469088296223,0.009948218042898124,0.023191873486793715,0.02806817915318411,0.014183755831305506,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,-0.016939149956542884,-0.039250934697671186,-0.02970993938803838,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":5,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5]],"q":[0.0,0.0,0.541910211730004,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.4350600207855221,1.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.0661919416773799,"risks":[0.04323195624392794,0.041348307639169433,0.03369923033421142,0.019942541102685146,0.0,0.024001363616378633,0.0422284869455106,0.05505947386882501,0.06291287625538142,0.0661919416773799,0.06522890974128939,0.04784207579351698,0.04895136427721354,0.04504156106384037,0.035688185289291935,0.020685910124928316,2.941407433988805e-17,0.023719030126971928,0.042008888329747286,0.05506805917479046,0.06308419040514987,0.06619194167737993,0.05042430720732261,0.053920234673042834,0.05312978778513272,0.04757774841546889,0.03696558150352067,0.02112935318267925,0.0,0.023565949229356852,0.04183809027800985,0.054817097186585395,0.062463102222468564,0.05120428031973176,0.05652832085383217,0.058276974710574386,0.05595204633686461,0.049192182149279666,0.03773644894719989,0.021391167313100336,2.8907624238488434e-17,0.02341729530606968,0.04148468543639791,0.054010939851915074,0.05040762496513127,0.05704902484675634,0.0607961860526513,0.0611518949091276,0.05771888007570791,0.050168313076345346,0.03821230281477851,0.021580384074023126,2.6811030921920016e-17,0.02318097856929894,0.04080400304107928,0.048259970977908025,0.055755748678990184,0.061000486023849394,0.06351810998790638,0.06289884329630804,0.05877197135289903,0.05078317725354001,0.038576444883772536,0.021780530100830867,0.0,0.02281084026532099,0.0449869481924489,0.052921894377708494,0.05920293883665457,0.06339150742884953,0.06508523982458264,0.06389444955964439,0.05942356137789038,0.05125752586159456,0.03895321134959228,0.022035773143212558,2.8011107712943075e-17,0.04081418644314081,0.04882086397008613,0.05571660870355276,0.06111290308760558,0.06463123767403434,0.06588277347936493,0.06445322593633518,0.059892970439835505,0.05171236948731436,0.039382321413648134,0.022340030720476137,0.03596731556437064,0.04372605948329792,0.050854559837029904,0.05702311281982307,0.061890004858165745,0.06508396889484405,0.06619194167737992,0.06475212205084172,0.0602523302550271,0.052133668226018184,0.03979948090210919,0.030671965390525243,0.03791088294451865,0.04492985644957191,0.05146295248115053,0.05721470939047946,0.061845061588865186,0.06495947934953013,0.0661043241269595,0.06476741939376059,0.060383836995034246,0.052346899020259005,0.025153765755991535,0.03164873638092318,0.03825556275366471,0.04477323792723653,0.05095851928447813,0.05651307734421185,0.061075609701291375,0.06421892010053523,0.06545196264454488,0.0642268511354078,0.05995083355028533],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.24248022282438514,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.2720647446915881,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4854550324840268,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0001884804092391173,0.0009764101392820352,0.0,0.0,0.0,0.0,0.0006887268629507439,0.004921348937310071,0.013095383044488467,0.013820889030332708,0.0,0.0,0.0005331461348752577,0.003963832183076063,0.011648905485211521,0.016609552663421488,0.010889391406280835,0.002108501771359812,0.0],"upper":[0.0,0.0,0.0,-0.01001198260465046,-0.024975543562687837,-0.01993146319610578,0.0,0.0,0.0,0.0,0.0,-0.007525310838169338,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":4,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4]],"q":[0.0,0.0,0.8993279419489191,1.0,1.0,0.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.0,0.14507264656848431,0.0,0.0,0.0,0.0,0.0],"risk":0.060541841229841326,"risks":[0.039388928258217985,0.03847875264756051,0.032005329174583055,0.01930865528170378,0.0,0.02395857910876803,0.041328230295082945,0.052514088313358645,0.05817926014490735,0.05924150015749971,0.05686988526492456,0.04279435343283715,0.04496877137029094,0.042426641319569844,0.03440315553195236,0.020361170918693418,2.9354162279439644e-17,0.023264201854006846,0.04035237306575216,0.05172593867615319,0.058117943130982064,0.0605418412298413,0.04423917516133297,0.04884102368380286,0.04956035463882706,0.04557296134702385,0.036238972717076975,0.021120619409433234,0.0,0.022896847143842644,0.0400862937388822,0.05211663908959294,0.05982711507069968,0.04401200514595867,0.05041832959400649,0.05373828073746107,0.053127720188330736,0.04788536104495666,0.03747670144783303,0.02155795813542725,2.8463720824872393e-17,0.02291228164342553,0.04066677693301182,0.053921912557320664,0.04239034197315468,0.05001858257581484,0.05529769882317906,0.057397266382419876,0.05559137418721904,0.04928625031520572,0.038047887865394946,0.021629670835625815,2.6852577322045518e-17,0.023369918786319954,0.042220739153527365,0.039640571113548816,0.04795474957314392,0.05458135570628914,0.05873162112097253,0.05968713306383132,0.05682901030079877,0.04966707899775088,0.03786904860115325,0.021289687718707904,0.0,0.024316400017144812,0.03601796492195613,0.04453487099891253,0.05193746579970031,0.05750099246080428,0.060541841229841326,0.060446465783100714,0.05670029954308434,0.04891667199604704,0.03686572500953705,0.020503329149936113,3.057830350048704e-17,0.031766682637379064,0.0400620607350425,0.04771971111892252,0.054095775323865204,0.058563784875377604,0.060541841229841326,0.05951979571472615,0.055086429468803634,0.0469566333823609,0.034998588037414034,0.019260943647921976,0.02711977038300733,0.03483450613245851,0.04228724128206658,0.0489265514972397,0.05420033282564926,0.057580101197991417,0.058585291928748603,0.05680755921695107,0.0519350756469384,0.04377683168912101,0.03228693520074174,0.022299161166217902,0.02914546801108808,0.0360046735098442,0.042424089633146554,0.04793793654094603,0.05208795033376291,0.054443990803965496,0.05462464918704899,0.0523178559129141,0.04730148835714585,0.03946397859229233,0.017515674878575128,0.0232832806598617,0.029242092625567994,0.035039345248938945,0.04030213011663833,0.044653833372608864,0.04773057316193211,0.04919763707468867,0.04876591958981807,0.046208359518978864,0.041376377450408695],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4093784993824049,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.17375806944875694,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.41686343116883817,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0008054702445577555,0.0028082738645887743,0.0,0.0,0.0,0.0028661142379201696,0.012158541431657423,0.016056169272237797,0.0,0.0,0.0032929383044072195,0.014756959992044339,0.023890275378315177,0.014286377380378034,0.0,0.0012578914378362355,0.005759266433390685,0.00984508678611289,0.007205061589130328,0.0016561826028603675,0.0],"upper":[0.0,0.0,0.0,-0.012643350959490396,-0.016235100102487663,0.0,0.0,0.0,-0.0002845383233331222,-0.012639794230448732,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3]],"q":[0.0,0.14507264656847987,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.0,0.8993279419489218,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06054184122984134,"risks":[0.041376377450408564,0.039463978592292226,0.03228693520074169,0.019260943647921955,0.0,0.02431640001714484,0.042220739153527365,0.05392191255732068,0.059827115070699655,0.0605418412298413,0.05686988526492451,0.046208359518978705,0.04730148835714573,0.04377683168912093,0.03499858803741398,0.02050332914993609,2.935286534162096e-17,0.02336991878631997,0.04066677693301184,0.052116639089592895,0.058117943130982064,0.05924150015749968,0.04876591958981791,0.05231785591291396,0.0519350756469383,0.04695663338236082,0.03686572500953699,0.02128968771870784,0.0,0.022912281643425562,0.04008629373888219,0.051725938676153174,0.05817926014490735,0.04919763707468855,0.05462464918704889,0.05680755921695099,0.0550864294688036,0.048916671996047004,0.037869048601153206,0.021629670835625812,2.846372082487239e-17,0.02289684714384261,0.04035237306575214,0.0525140883133586,0.04773057316193202,0.05444399080396541,0.058585291928748555,0.05951979571472611,0.05670029954308431,0.04966707899775085,0.03804788786539495,0.02155795813542726,2.679619421547739e-17,0.02326420185400683,0.04132823029508294,0.044653833372608795,0.05208795033376286,0.057580101197991396,0.06054184122984133,0.06044646578310073,0.056829010300798774,0.04928625031520576,0.03747670144783308,0.021120619409433303,0.0,0.023958579108768006,0.04030213011663828,0.04793793654094599,0.05420033282564924,0.058563784875377604,0.06054184122984133,0.05968713306383132,0.05559137418721906,0.04788536104495669,0.03623897271707704,0.020361170918693435,3.033454594549822e-17,0.0350393452489389,0.04242408963314651,0.04892655149723969,0.054095775323865204,0.057500992460804284,0.058731621120972535,0.05739726638241992,0.053127720188330785,0.04557296134702392,0.03440315553195241,0.0193086552817038,0.02924209262556798,0.0360046735098442,0.04228724128206659,0.04771971111892255,0.05193746579970034,0.05458135570628917,0.05529769882317911,0.05373828073746113,0.049560354638827145,0.042426641319569906,0.03200532917458308,0.02328328065986169,0.02914546801108808,0.03483450613245853,0.040062060735042544,0.04453487099891257,0.04795474957314396,0.0500185825758149,0.05041832959400655,0.04884102368380295,0.04496877137029101,0.038478752647560566,0.017515674878575128,0.022299161166217916,0.02711977038300736,0.03176668263737911,0.03601796492195617,0.03964057111354886,0.04239034197315474,0.04401200514595874,0.04423917516133306,0.042794353432837225,0.03938892825821805],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4093784993824049,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.416863431168838,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.17375806944875716,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0016561826028603673,0.0,0.0,0.0,0.00720506158913033,0.014286377380378036,0.0,0.0,0.009845086786112891,0.023890275378315184,0.0160561692722378,0.0,0.005759266433390688,0.014756959992044346,0.012158541431657432,0.0028082738645887765,0.0012578914378362357,0.0032929383044072212,0.0028661142379201713,0.0008054702445577561,0.0],"upper":[0.0,0.0,-0.01263979423044873,-0.016235100102487663,0.0,0.0,-0.00028453832333311644,-0.012643350959490396,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2]],"q":[0.0,1.0,1.0,0.0,0.4350600207855206,1.0,0.0,0.0,1.0,0.0,0.0,0.5419102117300078,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.0661919416773799,"risks":[0.059950833550285326,0.052346899020258984,0.03979948090210919,0.02234003072047613,0.0,0.022810840265320997,0.04080400304107926,0.05401093985191506,0.062463102222468536,0.0661919416773799,0.06522890974128936,0.06422685113540774,0.060383836995034204,0.05213366822601816,0.0393823214136481,0.022035773143212548,2.8408690158256736e-17,0.02318097856929895,0.04148468543639792,0.054817097186585395,0.06308419040514987,0.0661919416773799,0.0654519626445448,0.06476741939376052,0.06025233025502704,0.051712369487314294,0.038953211349592246,0.021780530100830805,0.0,0.023417295306069716,0.041838090278009867,0.05506805917479049,0.06291287625538144,0.06421892010053519,0.06610432412695948,0.06475212205084169,0.05989297043983549,0.05125752586159454,0.038576444883772515,0.021580384074023126,2.890762423848843e-17,0.023565949229356814,0.04200888832974725,0.05505947386882498,0.061075609701291333,0.06495947934953011,0.06619194167737989,0.06445322593633518,0.05942356137789038,0.05078317725354,0.03821230281477852,0.02139116731310035,2.6404182693965708e-17,0.023719030126971914,0.04222848694551058,0.05651307734421185,0.061845061588865206,0.06508396889484407,0.06588277347936497,0.06389444955964446,0.05877197135289908,0.0501683130763454,0.037736448947199956,0.021129353182679323,0.0,0.024001363616378602,0.050958519284478115,0.05721470939047948,0.06189000485816577,0.06463123767403438,0.0650852398245827,0.0628988432963081,0.05771888007570798,0.04919218214927972,0.036965581503520736,0.020685910124928344,2.99685252510963e-17,0.04477323792723654,0.05146295248115054,0.057023112819823106,0.06111290308760562,0.06339150742884958,0.06351810998790647,0.061151894909127674,0.055952046336864694,0.047577748415469,0.035688185289292004,0.019942541102685174,0.03825556275366475,0.04492985644957197,0.050854559837029974,0.05571660870355284,0.059202938836654666,0.061000486023849505,0.06079618605265142,0.05827697471057451,0.05312978778513283,0.04504156106384047,0.03369923033421148,0.03164873638092323,0.03791088294451872,0.043726059483298,0.04882086397008624,0.05292189437770862,0.05575574867899031,0.057049024846756474,0.056528320853832324,0.053920234673042994,0.04895136427721367,0.041348307639169524,0.025153765755991604,0.030671965390525333,0.03596731556437075,0.04081418644314096,0.044986948192449056,0.048259970977908184,0.050407624965131445,0.05120428031973195,0.05042430720732281,0.04784207579351715,0.04323195624392808],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.27206474469158837,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.24248022282438486,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48545503248402677,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.002108501771359811,0.0,0.0,0.010889391406280834,0.0,0.0,0.016609552663421484,0.013820889030332703,0.0,0.011648905485211521,0.013095383044488469,0.0,0.0039638321830760635,0.004921348937310071,0.0009764101392820352,0.0005331461348752577,0.0006887268629507439,0.0001884804092391173,0.0],"upper":[0.0,-0.007525310838169341,-0.019931463196105784,0.0,0.0,-0.024975543562687837,0.0,0.0,-0.010011982604650466,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1]],"q":[0.18584504354905731,1.0,0.0,1.0,0.0,1.0,0.0,0.21245227574626782,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.07663112851124025,"risks":[0.061931988259205456,0.052972535649401666,0.03966405340293283,0.022006541519798934,0.0,0.023644428843536024,0.04293982805040696,0.05788619762061288,0.0684835375541537,0.07473184785102951,0.07663112851124024,0.07018151821252316,0.06440020283211745,0.05449139332066228,0.04045508967815764,0.022291291904603557,2.8471626200978433e-17,0.023581213964346964,0.043034933797644497,0.058361159499892526,0.06955989107109112,0.07663112851124024,0.07512097848722075,0.07212326449333253,0.06531657086451821,0.05470089760077782,0.04027624470211131,0.022042612168518688,0.0,0.024148408196555202,0.04448783675818426,0.06101828568488725,0.07373975497666413,0.07663112851124025,0.07593031716060902,0.0718140082358434,0.06428220173694345,0.05333489766390912,0.038972096016740426,0.021193796795437404,3.008532802605869e-17,0.025390705630428223,0.04736591368672211,0.06592562416888163,0.07479487680231033,0.07584730753183534,0.07392779816712786,0.06903634870818783,0.0611729591550153,0.05033762950761024,0.03653035976597269,0.019751149930102598,2.3577939575435252e-17,0.027276909975664877,0.051581879857097265,0.06992196655825082,0.0721687150325433,0.07191149953942234,0.06915032007888798,0.0638851766509402,0.05611606925557898,0.04584299789280438,0.033065962562616326,0.01778496326501489,0.0,0.02971107276757173,0.06253754050751521,0.06544663037248193,0.06631953270062235,0.06515624749193652,0.06195677474642441,0.056721114464086016,0.049449266644921365,0.040141231288930435,0.02879700839611324,0.015416597966469749,3.7264978064574085e-17,0.05334189057035863,0.05644613128275769,0.05795967129685225,0.05788251061264228,0.05621464923012781,0.05295608714930881,0.048106824370185305,0.041666860892757264,0.03363619671702474,0.024014831842987673,0.012802766270646087,0.04314869788101738,0.04607535661484792,0.047816127429178706,0.048371010324009735,0.04774000529934101,0.045923112355172525,0.042920331491504295,0.0387316627083363,0.03335710600566855,0.026796661383501043,0.019050328841833778,0.03280906872128738,0.035298679982796205,0.036952726947883215,0.03777120961654838,0.037754127988791734,0.03690148206461327,0.03521327184401299,0.03268949732699088,0.029330158513546957,0.02513525540368121,0.020104787997393635,0.023128671915888147,0.02504138412989787,0.026405671696522717,0.027221534615762676,0.027488972887617754,0.02720798651208795,0.02637857548917326,0.02500073981887369,0.02307447950118924,0.020599794536119907,0.017576684923665688],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5016649427028529,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04812667897054749,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.45020837832659966,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.014183755831305501,0.0,0.028068179153184113,0.0,0.023191873486793725,0.0,0.00994821804289813,0.0023290765390795716,0.0022025469088296223,0.0007410624221618582,0.00020024875630724064,7.68427625097776e-05,0.0],"upper":[0.0,-0.029709939388038408,0.0,-0.039250934697671234,0.0,-0.016939149956542894,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0]],"q":[0.9959688091334117,1.0,0.17848642257990016,0.0,0.0,0.0,0.0,0.0],"risk":0.12500000000000003,"risks":[0.12500000000000003,0.09375000000000003,0.0625,0.03125,0.0,0.01875000000000001,0.03749999999999998,0.056249999999999994,0.07499999999999996,0.09375,0.11250000000000002,0.12500000000000003,0.10000000000000003,0.075,0.05,0.025,2.7755575615628907e-17,0.024999999999999988,0.05,0.07499999999999997,0.09999999999999998,0.125,0.11573455102478783,0.0964454591873232,0.07715636734985853,0.05786727551239391,0.03857818367492927,0.019289091837464613,0.0,0.030710908162535386,0.06142181632507071,0.0921327244876061,0.12284363265014145,0.10040674712851735,0.08606292611015774,0.0717191050917981,0.05737528407343848,0.04303146305507886,0.028687642036719224,0.01434382101835962,3.958631087557271e-17,0.03565617898164037,0.07131235796328078,0.10696853694492119,0.08206053705357154,0.0718029699218751,0.06154540279017865,0.05128783565848221,0.04103026852678577,0.03077270139508932,0.02051513426339289,0.010257567131696439,1.1388187206247615e-17,0.03974243286830355,0.07948486573660714,0.06325063296470455,0.056222784857515154,0.049194936750325755,0.04216708864313636,0.03513924053594697,0.02811139242875757,0.021083544321568184,0.014055696214378785,0.0070278481071894,0.0,0.042972151892810645,0.04587571751293482,0.04128814576164134,0.036700574010347854,0.03211300225905438,0.027525430507760892,0.022937858756467408,0.01835028700517393,0.013762715253880444,0.009175143502586967,0.004587571751293481,5.041792344585185e-17,0.03113746543006905,0.028306786754608224,0.0254761080791474,0.02264542940368658,0.01981475072822576,0.016984072052764934,0.014153393377304115,0.01132271470184329,0.008492036026382472,0.0056613573509216465,0.002830678675460822,0.01959144876543217,0.01795882803497949,0.016326207304526805,0.014693586574074127,0.013060965843621446,0.011428345113168764,0.009795724382716085,0.008163103652263403,0.006530482921810724,0.004897862191358042,0.0032652414609053593,0.011259547787080028,0.010393428726535411,0.009527309665990793,0.008661190605446175,0.007795071544901558,0.0069289524843569395,0.006062833423812323,0.005196714363267705,0.004330595302723088,0.00346447624217847,0.002598357181633852,0.005777042480468778,0.005364396589006722,0.004951750697544666,0.004539104806082611,0.004126458914620555,0.0037138130231584993,0.0033011671316964444,0.0028885212402343886,0.0024758753487723333,0.0020632294573102775,0.0016505835658482215],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":0,"n1":8,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[0,8]],"q":[0.0,0.0,0.0,0.0,0.0,0.0,0.4425822739331352,1.0,0.950771319078929],"risk":0.125,"risks":[0.0011427509800502225,0.001977666211987954,0.00267606127914952,0.0024584141182279586,0.0,0.04338841003808748,0.0801943121595982,0.10769273913856664,0.12326496267724138,0.125,0.1124999999999999,0.001428438725062778,0.0026368882826506047,0.00401409191872428,0.004916828236455917,0.004168569333829435,4.8170811826161945e-17,0.0400971560797991,0.0717951594257111,0.09244872200793103,0.09999999999999998,0.09374999999999992,0.0017141264700753335,0.003296110353313256,0.00535212255829904,0.007375242354683876,0.00833713866765887,0.00661158996191255,0.0,0.03589757971285558,0.06163248133862069,0.075,0.07499999999999993,0.0019998142150878893,0.003955332423975907,0.0066901531978738,0.009833656472911834,0.012505708001488305,0.013223179923825108,0.00990284392020089,3.985431952552914e-17,0.030816240669310345,0.05,0.05624999999999997,0.002285501960100445,0.004614554494638559,0.008028183837448561,0.012292070591139796,0.016674277335317744,0.019834769885737673,0.019805687840401792,0.014102420287144453,2.129825130779933e-17,0.024999999999999988,0.037499999999999964,0.0025711897051130003,0.0052737765653012095,0.009366214477023321,0.014750484709367753,0.02084284666914718,0.02644635984765023,0.02970853176060268,0.028204840574288906,0.019183759330689665,0.0,0.018749999999999996,0.002856877450125556,0.005932998635963861,0.010704245116598081,0.01720889882759571,0.025011416002976617,0.03305794980956279,0.03961137568080357,0.04230726086143336,0.03836751866137931,0.025,2.081668171172166e-17,0.0031425651951381118,0.006592220706626512,0.012042275756172843,0.019667312945823676,0.029179985336806054,0.03966953977147535,0.049514219601004474,0.056409681148577834,0.057551277992068973,0.05000000000000003,0.031250000000000014,0.003428252940150667,0.007251442777289164,0.013380306395747601,0.02212572706405163,0.03334855467063549,0.0462811297333879,0.05941706352120535,0.07051210143572227,0.0767350373227586,0.075,0.06249999999999999,0.003713940685163223,0.007910664847951816,0.014718337035322365,0.02458414118227959,0.03751712400446493,0.05289271969530047,0.06931990744140624,0.08461452172286674,0.09591879665344827,0.10000000000000003,0.09375000000000004,0.0039996284301757785,0.008569886918614465,0.01605636767489712,0.027042555300507545,0.041685693338294354,0.05950430965721302,0.07922275136160713,0.09871694201001117,0.11510255598413788,0.125,0.12500000000000003],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":1,"n1":7,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[0,7],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[1,7]],"q":[0.0,0.0,0.0,0.0,0.6216293515932886,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.2050667407933477],"risk":0.07583692074834307,"risks":[0.014280681758025604,0.017436386164364746,0.01733181228215901,0.012062188703307674,0.0,0.03005433287886298,0.051855949890903495,0.06584244317085688,0.07322626993793394,0.07583692074834311,0.07583692074834306,0.01673587468668956,0.021797131936695316,0.024376010846924697,0.022621393017257286,0.014890248892391466,3.4740189389589417e-17,0.027414537272876408,0.04733869673827576,0.06070389485112872,0.0690355267412843,0.0742006316384114,0.018745076611016532,0.02543218623446371,0.030339071027481165,0.031677612941848836,0.02780581182521372,0.01747197128296878,0.0,0.025391215681323475,0.04432539149920463,0.05805113766292058,0.06816306345589615,0.020308287531006535,0.028341549057669946,0.03522099282382842,0.03923084847708233,0.038746688798466766,0.032470246727769346,0.019612338072274253,3.01015690079665e-17,0.02409075988216173,0.04288375351325196,0.05772421620079743,0.021425507446659556,0.03052522040631401,0.03902177623596647,0.04528109962295776,0.047712879812150624,0.04499482633440169,0.036251551489699205,0.02116504969430537,2.6624453736444456e-17,0.023533374292278426,0.04288408987311514,0.022096736357975603,0.03198320028039589,0.041741421263895295,0.049828366379475145,0.05470438486626526,0.055045710102865776,0.049917640252274804,0.038886364764239574,0.022053111852719458,0.0,0.02364268447284935,0.02232197426495466,0.03271548867991561,0.043379927907614906,0.05287264874663445,0.05972120396081068,0.06262289803316161,0.060610604360001076,0.0531639452098026,0.040250095440320065,0.022283630636416658,2.869185334779655e-17,0.022101221167596746,0.032722085604873156,0.04393729616712531,0.054413946724435704,0.0627633370957869,0.06772639012528921,0.06833044381287803,0.06399779103099448,0.05459095076280185,0.04038426620152843,0.021956036454567132,0.021434477065901857,0.032002991055268534,0.04341352604242649,0.05445226031287889,0.0638307842711939,0.07035618637924856,0.07307715861090563,0.07138790222781516,0.06507567782016478,0.05430190669533525,0.03951079383655072,0.020321741959869983,0.030558205031101737,0.04180861753351847,0.052987589511964014,0.0629235454870317,0.07051228679503968,0.07485074875408394,0.0753342788002647,0.07170427661240891,0.06403655211783721,0.05266427214595082,0.01876301584950114,0.028387727532372762,0.039122570640401214,0.050019934321691085,0.06004162074330029,0.06819469137266258,0.07365121424241292,0.07583692074834307,0.07447674713953421,0.06958820246903423,0.061416471382767346],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04636889140012057,-0.45313316357891814,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5004979450209612,-0.0,-0.0,-0.0],"lower":[3.185371857866902e-05,0.00038868975329418783,0.0018742387743350248,0.0039270156173911155,0.0,0.0,0.0,0.0,7.840461748536013e-05,0.0010129078802525546,0.0055705142986167975,0.016773518158021482,0.029327562185394028,0.028395162469803236,0.011957492535820891,0.0,0.0],"upper":[0.0,0.0,0.0,0.0,0.0,-0.017136484432829006,-0.033090160621313855,-0.02146860612121972,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":2,"n1":6,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[0,6],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[1,6],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[2,6]],"q":[0.0,0.0,0.11923871838833519,1.0,1.0,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.6243300841735113,1.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06391114014530888,"risks":[0.03812990699575558,0.0383365577019631,0.032404714437055615,0.01967314310893957,0.0,0.02365818331333956,0.041192380848358245,0.05326196651755573,0.06049389841643679,0.06336977115840173,0.06217117518650295,0.04205719460777618,0.04519990512725955,0.04310231178792565,0.035015964658965615,0.020633452637337478,2.9221714588271396e-17,0.023391944032366198,0.04118433535536362,0.053729902573487795,0.061271622866236275,0.06391114014530891,0.04416261298948946,0.04955896531490944,0.05056861462954543,0.04640270038413737,0.036640181862924226,0.02115249330498208,0.0,0.023320639430718958,0.04123113153426039,0.053761142154569855,0.060840783758201206,0.04465626535312541,0.05168581746493221,0.05513253201380611,0.05420758601851406,0.04842210118964005,0.03752207672025281,0.021399754955138958,2.8798523674985086e-17,0.02324026933201198,0.04096275847314599,0.05293729878764823,0.043748254910914,0.051852540777347286,0.05712297299259886,0.05880485729615488,0.05638112413036476,0.04951516373777911,0.037974415101662405,0.021551538319585044,2.688507392363116e-17,0.02300090127170821,0.040177877996118175,0.04164868487508523,0.05033121445217408,0.05686884661781485,0.06056874995111905,0.060919164197978125,0.05753816784952792,0.050107186643449625,0.038304375645852345,0.02175300757148189,0.0,0.022539714146079345,0.03856765845786908,0.04739391768943204,0.05469906194134524,0.059873499717465736,0.06243813490535995,0.06199750254746619,0.058181275784379906,0.05058763323518012,0.03874197607971504,0.02208448410776484,2.7753456984369766e-17,0.034715278871495545,0.043312729689140565,0.05094252801508123,0.057093342329254206,0.061339949765390055,0.0632995813235609,0.0625798887283326,0.05873043234394663,0.05120958955795689,0.03937878304474625,0.022535928320348442,0.030301649328194645,0.03835972965131914,0.04592815389091398,0.052602513520543674,0.05802652229094824,0.06185081766977899,0.06368623167918698,0.06306189422853013,0.05939853203946485,0.05200732626068767,0.04012469186959292,0.02553687304019632,0.03280699677598715,0.03998484862073466,0.0467752490253933,0.05289976599491426,0.05805762507808742,0.06188351084082238,0.06391114014530888,0.06355148755749637,0.06009454320533267,0.05274348341020176,0.020631053219730595,0.026926610263164043,0.03344152125643445,0.039985784577862366,0.04636159439016798,0.05232641704045315,0.057554932417118086,0.06160729135066114,0.06391114014530888,0.06376486332842465,0.060369495704643186],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.49900807054816,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.1443878968064474,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.35660403264539264,-0.0,-0.0],"lower":[1.2282271085302059e-05,9.917162157153375e-05,0.0,0.0,0.0,0.0,0.0,6.59917398466898e-05,0.0007904287837482852,0.0038308239551281464,0.009131221704364551,0.009531560997723705,0.0,0.0,7.135815408838686e-05,0.0008979029216503434,0.004741589445383849,0.01338040763180056,0.02107810089995428,0.017252028138021347,0.005503570425876148,0.0],"upper":[0.0,0.0,0.0,-0.002715642588236471,-0.012384367535828996,-0.0233874088804004,-0.016862480719963432,0.0,0.0,0.0,0.0,0.0,0.0,-0.005490977767301838,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":3,"n1":5,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[0,5],[1,0],[1,1],[1,2],[1,3],[1,4],[1,5],[2,0],[2,1],[2,2],[2,3],[2,4],[2,5],[3,0],[3,1],[3,2],[3,3],[3,4],[3,5]],"q":[0.0,0.0,0.9617768805405581,1.0,1.0,1.0,0.0,0.0,0.0,0.08892824342106394,1.0,1.0,0.0,0.0,0.0,0.0,0.0,0.7376285051344834,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.05726807440803677,"risks":[0.05040389222031127,0.04700553454283593,0.03747292861992116,0.0217665768052719,0.0,0.022356145567893126,0.039037275260101346,0.05024833314924185,0.05621379357292092,0.05722798908667426,0.05373891842632475,0.05306377591933269,0.05316883086183786,0.04808596192361017,0.03759645492051104,0.021590064453511915,2.842040361830148e-17,0.022768679080851045,0.03984424750326968,0.05120786667939674,0.05693176802068414,0.05726807440803677,0.053062357845908736,0.05582582714480046,0.054347923243363426,0.048292692475638846,0.03738900012878568,0.021379928552712292,0.0,0.022980224196118646,0.04008097063993448,0.05115266563451011,0.05622431404819625,0.05096855290358751,0.05564331829784517,0.056991617312663743,0.0546126667971349,0.048130025096368115,0.03715189215676232,0.021256129490605107,2.877367938728711e-17,0.022954627660121598,0.03976417706179852,0.05022975281342419,0.04730061766366535,0.05323410613986799,0.05669736343963282,0.057268074408036794,0.05451278176890833,0.04795518974718761,0.037065987040496996,0.0212741891399215,2.686816780175046e-17,0.02270919305792612,0.03898901160195974,0.04252615036518691,0.04915699940253965,0.05409299550703145,0.056924931027940245,0.05720333690115769,0.0544124582633311,0.04796252015227994,0.03720028329368724,0.021437889974066,0.0,0.02228921674365999,0.037062090914945056,0.043916813730305454,0.04975386197225938,0.054203571572999015,0.05683418158996986,0.057129672648840925,0.05448270434333189,0.04820265159189768,0.03753873995127027,0.0217182798868576,2.787410014797749e-17,0.031274720887481004,0.03796437168038547,0.04420282586735546,0.04967865015592502,0.054004231274300867,0.05669614585167068,0.05716754314580462,0.05473254061794977,0.048622632355018035,0.038015110339066786,0.02207349856407295,0.02547966352508425,0.03169650272277436,0.0379102647989975,0.04387914008598827,0.04927882573520898,0.05368452882407922,0.05656206810662343,0.05726807440803678,0.05505928966316886,0.04911096459892574,0.03854435506058996,0.019941883737792498,0.025456043240241418,0.03129407094850229,0.03728833386901677,0.04318972909585476,0.04865081052263067,0.05321533878748746,0.05631425445114843,0.057268074408036794,0.05529571153046308,0.04952971754588028,0.01487568810339181,0.019531836528330626,0.024719651071825714,0.030343843207396717,0.03623512982150107,0.04213431790819456,0.04768044276486946,0.05240295968907083,0.05571798917639029,0.05692861561943776,0.05522923950789104],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5179802203774954,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.10987965884821929,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.18261155443969743,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.18952856633458795,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00030142436050282085,0.0010720960788929595,0.0,0.0,0.0,0.0,0.0006763255571316224,0.003055760028276506,0.0050801618409526805,0.0,0.0,0.0,0.0005470001301749112,0.003070076562476649,0.00808655913150323,0.01157497573337778,0.007164432196425617,0.0,0.0001712455552206274,0.001198843322699914,0.003996539441581241,0.007404540476118633,0.007136317252753267,0.0027005728295009506,0.0],"upper":[0.0,0.0,0.0,-0.00794272349732787,-0.02006326864749877,-0.01711145889327025,0.0,0.0,0.0,0.0,-0.012854951646047602,-0.014254578002192599,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":4,"n1":4,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[0,4],[1,0],[1,1],[1,2],[1,3],[1,4],[2,0],[2,1],[2,2],[2,3],[2,4],[3,0],[3,1],[3,2],[3,3],[3,4],[4,0],[4,1],[4,2],[4,3],[4,4]],"q":[0.0,0.4237634660724703,1.0,1.0,1.0,0.0,0.0,0.15239647998476558,1.0,1.0,0.0,0.0,0.0,0.1523964799848235,1.0,0.0,0.0,0.0,0.0,0.42376346607236876,0.0,0.0,0.0,0.0,0.0],"risk":0.05639722740063048,"risks":[0.053601699569800536,0.04830085430205816,0.03777236730471311,0.0217362077706389,0.0,0.02246835896998339,0.03915222590452997,0.050178203844066294,0.05579789321523576,0.05639722740063047,0.0525058083085225,0.05550365369286196,0.05403956081290776,0.048158115586139784,0.03742648859047689,0.021472840372402324,2.8521528932108184e-17,0.022799143615990787,0.03976347299076888,0.050901894075438034,0.056352695554847954,0.05639722740063047,0.05460147115341159,0.05613298888500285,0.05407848018481317,0.04790873674103346,0.03712733582648364,0.02128600719869627,0.0,0.022963449657602962,0.039964744783676356,0.050901894075438034,0.055797893215235816,0.05161411105221747,0.055368743250485054,0.05634962528562978,0.05398085609363531,0.047692060300395155,0.03693340513024685,0.021190617314505927,2.8806457001953385e-17,0.022963449657602924,0.03976347299076887,0.050178203844066335,0.04716627452333124,0.052449034938365974,0.05571945205664689,0.05639722740063048,0.05388314105035143,0.04757223861087728,0.03686701817976306,0.021190617314505937,2.677596316205735e-17,0.02279914361599079,0.03915222590453008,0.04179330304840976,0.047993353239699464,0.05286738996071923,0.055865175586602776,0.05639722740063047,0.05384519515154671,0.047572238610877324,0.0369334051302469,0.021286007198696322,0.0,0.02246835896998349,0.03594607677103641,0.04254113767275372,0.04840418806713525,0.05304143703958579,0.05590445949357362,0.05639722740063047,0.05388314105035147,0.04769206030039516,0.03712733582648362,0.02147284037240224,2.817015928143704e-17,0.029995912811042864,0.03655444994818366,0.042871706363253735,0.0485286269022774,0.05304143703958582,0.05586517558660278,0.05639722740063048,0.05398085609363521,0.047908736741033284,0.03742648859047661,0.021736207770638623,0.024239463578830344,0.03042064593420292,0.03674270706614012,0.04287170636325379,0.04840418806713529,0.05286738996071922,0.055719452056646794,0.05634962528562952,0.05407848018481273,0.048158115586139125,0.03777236730471234,0.018903615089691184,0.02445504762175613,0.030420645934202947,0.036554449948183715,0.042541137672753734,0.04799335323969935,0.05244903493836568,0.05536874325048449,0.05613298888500197,0.05403956081290656,0.04830085430205671,0.014150385278130412,0.01890361508969121,0.024239463578830375,0.029995912811042875,0.035946076771036305,0.04179330304840945,0.04716627452333065,0.051614111052216485,0.05460147115341016,0.055503653692860054,0.05360169956979822],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.08599595694070018,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.48731042266394436,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.018486938719517114,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.37067259397257984,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.03753408770325843,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.00020608528897431779,0.0,0.0,0.0,0.0,0.001027679361010647,0.003683182332173095,0.0,0.0,0.0,0.0016054232717487942,0.007162033836670869,0.009907311824353681,0.0,0.0,0.0010756058252940506,0.005116652693907105,0.008753596911486592,0.005480167228147696,0.0,0.000269410691705291,0.001314629342026058,0.0023885717232963273,0.0018455203578336447,0.0004403070095801827,0.0],"upper":[0.0,0.0,-0.0052965181169598785,-0.017516335025949265,-0.017970714850741944,0.0,0.0,0.0,-0.016858544716914548,-0.021408853920604588,0.0,0.0,0.0,0.0,-0.00787840086936046,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":5,"n1":3,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[0,3],[1,0],[1,1],[1,2],[1,3],[2,0],[2,1],[2,2],[2,3],[3,0],[3,1],[3,2],[3,3],[4,0],[4,1],[4,2],[4,3],[5,0],[5,1],[5,2],[5,3]],"q":[0.0,0.7376285051344854,1.0,1.0,0.0,0.0,1.0,1.0,0.0,0.0,0.08892824342106169,1.0,0.0,0.0,0.0,0.9617768805405605,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.057268074408036766,"risks":[0.055229239507891104,0.04952971754588033,0.03854435506059001,0.022073498564072962,0.0,0.02228921674365998,0.0389890116019597,0.050229752813424164,0.05622431404819617,0.05726807440803672,0.053738918426324694,0.056928615619437795,0.0552957115304631,0.04911096459892575,0.03801511033906679,0.0217182798868576,2.8327177515313435e-17,0.02270919305792612,0.03976417706179852,0.05115266563451011,0.05693176802068414,0.057227989086674286,0.055717989176390266,0.05726807440803677,0.05505928966316883,0.04862263235501799,0.03753873995127023,0.02143788997406594,0.0,0.022954627660121633,0.04008097063993449,0.051207866679396793,0.056213793572921,0.05240295968907082,0.05631425445114841,0.05726807440803676,0.05473254061794975,0.04820265159189766,0.0372002832936872,0.021274189139921497,2.877367938728712e-17,0.022980224196118622,0.039844247503269696,0.05024833314924189,0.047680442764869435,0.05321533878748743,0.05656206810662341,0.05716754314580458,0.05448270434333187,0.04796252015227989,0.03706598704049698,0.021256129490605097,2.6818444825774738e-17,0.02276867908085105,0.03903727526010137,0.042134317908194524,0.04865081052263064,0.05368452882407919,0.05669614585167067,0.05712967264884092,0.054412458263331076,0.04795518974718763,0.03715189215676234,0.021379928552712344,0.0,0.022356145567893112,0.036235129821501025,0.04318972909585471,0.04927882573520893,0.05400423127430082,0.056834181589969814,0.057203336901157635,0.05451278176890831,0.04813002509636811,0.0373890001287857,0.021590064453511915,2.8045978005962724e-17,0.030343843207396654,0.0372883338690167,0.0438791400859882,0.04967865015592498,0.05420357157299895,0.05692493102794018,0.05726807440803676,0.05461266679713488,0.04829269247563886,0.03759645492051105,0.0217665768052719,0.024719651071825666,0.03129407094850225,0.037910264798997444,0.044202825867355425,0.049753861972259346,0.05409299550703142,0.05669736343963282,0.056991617312663743,0.05434792324336346,0.048085961923610185,0.03747292861992115,0.019531836528330588,0.025456043240241377,0.03169650272277433,0.037964371680385446,0.043916813730305426,0.04915699940253962,0.053234106139867975,0.055643318297845176,0.0558258271448005,0.05316883086183788,0.047005534542835944,0.014875688103391788,0.019941883737792484,0.02547966352508424,0.03127472088748101,0.037062090914945056,0.04252615036518692,0.04730061766366538,0.050968552903587566,0.05306235784590879,0.053063775919332756,0.05040389222031133],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5179802203774951,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.18952856633458756,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.18261155443969793,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.10987965884821939,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.002700572829500949,0.0,0.0,0.0,0.007136317252753263,0.007164432196425619,0.0,0.0,0.007404540476118633,0.011574975733377782,0.0,0.0,0.003996539441581241,0.008086559131503234,0.005080161840952685,0.0,0.0011988433226999148,0.0030700765624766513,0.003055760028276509,0.0010720960788929606,0.00017124555522062755,0.0005470001301749118,0.000676325557131623,0.0003014243605028212,0.0],"upper":[0.0,0.0,-0.014254578002192592,-0.017111458893270242,0.0,0.0,-0.012854951646047592,-0.020063268647498755,0.0,0.0,0.0,-0.007942723497327872,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":6,"n1":2,"cost":0.3,"outcomes":[[0,0],[0,1],[0,2],[1,0],[1,1],[1,2],[2,0],[2,1],[2,2],[3,0],[3,1],[3,2],[4,0],[4,1],[4,2],[5,0],[5,1],[5,2],[6,0],[6,1],[6,2]],"q":[0.0,1.0,1.0,0.0,0.6243300841735119,1.0,0.0,0.0,1.0,0.0,0.0,1.0,0.0,0.0,0.11923871838831718,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.06391114014530884,"risks":[0.06036949570464324,0.05274348341020182,0.040124691869592964,0.022535928320348456,0.0,0.022539714146079335,0.04017787799611812,0.05293729878764816,0.06084078375820118,0.06391114014530883,0.062171175186502836,0.06376486332842467,0.060094543205332654,0.05200732626068768,0.03937878304474623,0.022084484107764837,2.828731340675583e-17,0.023000901271708212,0.04096275847314601,0.05376114215456987,0.0612716228662363,0.06336977115840187,0.06391114014530884,0.06355148755749633,0.059398532039464796,0.051209589557956826,0.03874197607971498,0.021753007571481825,0.0,0.02324026933201203,0.04123113153426046,0.05372990257348795,0.06049389841643696,0.06160729135066109,0.06391114014530884,0.06306189422853008,0.05873043234394657,0.05058763323518005,0.03830437564585227,0.021551538319585017,2.879852367498512e-17,0.023320639430718975,0.04118433535536371,0.053261966517555936,0.05755493241711801,0.06188351084082229,0.06368623167918688,0.06257988872833249,0.058181275784379795,0.05010718664344951,0.03797441510166232,0.021399754955138912,2.6578781132368965e-17,0.023391944032366264,0.041192380848358426,0.05232641704045304,0.058057625078087295,0.061850817669778846,0.06329958132356074,0.06199750254746603,0.05753816784952774,0.04951516373777897,0.0375220767202527,0.021152493304982055,0.0,0.02365818331333966,0.04636159439016779,0.05289976599491404,0.05802652229094798,0.06133994976538978,0.06243813490535964,0.0609191641979778,0.05638112413036446,0.04842210118963979,0.03664018186292404,0.02063345263733736,2.988633172698857e-17,0.039985784577862095,0.046775249025392984,0.0526025135205433,0.057093342329253796,0.05987349971746529,0.06056874995111858,0.05880485729615443,0.054207586018513644,0.046402700384137026,0.03501596465896535,0.019673143108939403,0.03344152125643415,0.039984848620734294,0.04592815389091354,0.05094252801508073,0.05469906194134468,0.05686884661781426,0.05712297299259825,0.05513253201380551,0.0505686146295449,0.04310231178792518,0.03240471443705523,0.026926610263163696,0.03280699677598672,0.038359729651318626,0.043312729689139975,0.04739391768943137,0.05033121445217336,0.051852540777346544,0.05168581746493146,0.04955896531490873,0.04519990512725888,0.03833655770196251,0.020631053219730237,0.025536873040195866,0.030301649328194097,0.03471527887149493,0.038567658457868366,0.04164868487508445,0.043748254910913185,0.044656265353124565,0.04416261298948863,0.042057194607775385,0.03812990699575483],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.4990080705481598,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.3566040326453926,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.14438789680644765,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0055035704258761505,0.0,0.0,0.017252028138021347,0.0,0.0,0.02107810089995428,0.009531560997723702,0.0,0.01338040763180056,0.00913122170436455,0.0,0.00474158944538385,0.003830823955128147,0.0,0.0008979029216503434,0.0007904287837482853,9.91716215715337e-05,7.135815408838687e-05,6.599173984668981e-05,1.2282271085302057e-05,0.0],"upper":[0.0,-0.005490977767301834,-0.016862480719963425,0.0,0.0,-0.023387408880400404,0.0,0.0,-0.012384367535829006,0.0,0.0,-0.0027156425882364724,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":7,"n1":1,"cost":0.3,"outcomes":[[0,0],[0,1],[1,0],[1,1],[2,0],[2,1],[3,0],[3,1],[4,0],[4,1],[5,0],[5,1],[6,0],[6,1],[7,0],[7,1]],"q":[0.2050667407933355,1.0,0.0,1.0,0.0,1.0,0.0,0.6216293515932925,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"risk":0.07583692074834301,"risks":[0.06141647138276707,0.05266427214595063,0.03951079383655062,0.021956036454567084,0.0,0.023642684472849382,0.04288408987311517,0.05772421620079747,0.06816306345589615,0.07420063163841137,0.075836920748343,0.069588202469034,0.06403655211783704,0.054301906695335155,0.04038426620152835,0.022283630636416637,2.844932270643741e-17,0.023533374292278437,0.042883753513251965,0.058051137662920554,0.06903552674128424,0.07583692074834306,0.07447674713953403,0.0717042766124088,0.0650756778201647,0.05459095076280177,0.04025009544032002,0.02205311185271941,0.0,0.02409075988216175,0.044325391499204614,0.06070389485112869,0.07322626993793388,0.07583692074834301,0.07533427880026469,0.07138790222781519,0.0639977910309945,0.05316394520980263,0.03888636476423958,0.02116504969430539,3.0101569007966477e-17,0.025391215681323426,0.04733869673827569,0.06584244317085679,0.07365121424241294,0.07485074875408401,0.07307715861090572,0.0683304438128781,0.060610604360001145,0.04991764025227485,0.03625155148969925,0.019612338072274284,2.34244850180187e-17,0.02741453727287637,0.05185594989090343,0.06819469137266268,0.07051228679503983,0.07035618637924873,0.06772639012528936,0.06262289803316176,0.055045710102865894,0.044994826334401807,0.03247024672776944,0.01747197128296886,0.0,0.030054332878862926,0.06004162074330041,0.06292354548703183,0.06383078427119404,0.06276333709578705,0.05972120396081083,0.05470438486626539,0.04771287981215075,0.03874668879846688,0.02780581182521381,0.014890248892391504,3.7883483159166657e-17,0.0500199343216912,0.05298758951196414,0.05445226031287903,0.054413946724435835,0.05287264874663459,0.04982836637947527,0.04528109962295789,0.03923084847708244,0.03167761294184894,0.02262139301725736,0.012062188703307705,0.03912257064040134,0.0418086175335186,0.04341352604242663,0.04393729616712545,0.04337992790761505,0.041741421263895434,0.0390217762359666,0.03522099282382855,0.030339071027481276,0.02437601084692478,0.017331812282159062,0.028387727532372873,0.030558205031101852,0.03200299105526865,0.03272208560487328,0.032715488679915736,0.03198320028039601,0.03052522040631412,0.028341549057670053,0.02543218623446382,0.0217971319366954,0.017436386164364805,0.018763015849501227,0.020321741959870084,0.021434477065901958,0.022101221167596857,0.02232197426495477,0.022096736357975703,0.02142550744665966,0.020308287531006632,0.01874507661101663,0.016735874686689637,0.014280681758025668],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.45313316357891875,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.04636889140012005,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5004979450209612,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.011957492535820883,0.0,0.028395162469803236,0.0,0.02932756218539403,0.0,0.016773518158021486,0.003927015617391115,0.005570514298616799,0.001874238774335025,0.0010129078802525548,0.00038868975329418783,7.840461748536014e-05,3.185371857866902e-05,0.0],"upper":[0.0,-0.02146860612121974,0.0,-0.03309016062131388,0.0,-0.017136484432829037,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}},{"n0":8,"n1":0,"cost":0.3,"outcomes":[[0,0],[1,0],[2,0],[3,0],[4,0],[5,0],[6,0],[7,0],[8,0]],"q":[1.0,1.0,0.37753008843028607,0.07384302138161407,0.0,0.0,0.0,0.0,0.0],"risk":0.125,"risks":[0.125,0.09375000000000001,0.062499999999999986,0.031249999999999993,0.0,0.018750000000000017,0.03749999999999999,0.05625000000000001,0.07499999999999998,0.09375000000000003,0.11250000000000004,0.125,0.1,0.07499999999999998,0.04999999999999999,0.024999999999999994,2.7755575615628914e-17,0.024999999999999994,0.05000000000000002,0.07499999999999998,0.1,0.12500000000000003,0.11579756059393995,0.09649796716161663,0.07719837372929328,0.057898780296969966,0.03859918686464664,0.0192995934323233,0.0,0.0307004065676767,0.06140081313535334,0.09210121970303004,0.1228016262707067,0.1005761842398588,0.08620815791987897,0.07184013159989913,0.057472105279919306,0.04310407895993948,0.028736052639959635,0.014368026319979826,3.955943759239596e-17,0.03563197368002016,0.07126394736004037,0.10689592104006057,0.08234641750000028,0.07205311531250025,0.06175981312500021,0.051466510937500175,0.04117320875000014,0.030879906562500097,0.020586604375000078,0.010293302187500032,1.1427861087987029e-17,0.039706697812499955,0.07941339562499995,0.06362951797113457,0.05655957152989739,0.049489625088660213,0.04241967864742304,0.03534973220618587,0.02827978576494869,0.021209839323711524,0.014139892882474345,0.00706994644123718,0.0,0.042930053558762865,0.046300882174645314,0.041670793957180784,0.03704070573971625,0.03241061752225172,0.027780529304787187,0.023150441087322653,0.018520352869858127,0.013890264652393592,0.009260176434929065,0.00463008821746453,5.037072068618305e-17,0.031554161738577224,0.028685601580524744,0.02581704142247227,0.0229484812644198,0.020079921106367322,0.017211360948314845,0.014342800790262376,0.0114742406322099,0.008605680474157428,0.0057371203161049504,0.002868560158052474,0.019952065555555846,0.018289393425926195,0.016626721296296536,0.014964049166666885,0.01330137703703723,0.011638704907407576,0.009976032777777923,0.008313360648148268,0.006650688518518616,0.004988016388888961,0.0033253442592593055,0.011534515957301317,0.01064724549904737,0.009759975040793421,0.008872704582539474,0.007985434124285526,0.007098163666031578,0.006210893207777632,0.005323622749523684,0.004436352291269738,0.0035490818330157895,0.0026618113747618414,0.005959097308349752,0.005533447500610483,0.005107797692871215,0.004682147885131947,0.004256498077392679,0.003830848269653411,0.0034051984619141436,0.002979548654174875,0.002553898846435608,0.0021282490386963396,0.0017025992309570711],"dual":{"inequality":[-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000007,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.5000000000000001,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0,-0.0],"lower":[0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0],"upper":[1.1099096224346724e-17,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0,0.0]}}]}
