{
  "run_id": "essai-03-2026-11-14",
  "suite": "BPB2 v0.3-pilot",
  "date": "2026-11-14",
  "model": "gpt-6-astra",
  "reasoning": "ultra",
  "status": "completed-development-run",
  "context": "Fresh per-case agents; no case-specific answers or evaluator files supplied. Shared host access is governed by instructions, not technically isolated.",
  "case_budget_minutes": 45,
  "token_cap": null,
  "measured_cost": null,
  "comparison": "New suite; not directly comparable with Essais 1/2.",
  "case_count": 20,
  "rubric": {
    "C": 30,
    "D": 25,
    "E": 20,
    "F": 15,
    "M": 10,
    "browser": "Separate 0-4; readiness gate"
  },
  "cases": [
    {
      "id": "BPB2-01",
      "input_sha256": "a2eae472ca2c57e9fd21dee310f6ee4d9fc821ef79fbb260b0387c15988fd31e",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:54:41Z",
      "finished_at": "2026-11-14T18:04:51Z",
      "raw_first_sha256": "d61ef2074b254aa4dad98c3f2e96173e205b3d47fff55b555a3e861d35daa31a",
      "served_first_sha256": "efc96f47e4f2944ad12efe3696f5f188d15e09ab1587e404b668c1d871239896",
      "served_current_sha256": "819492eed4aa399300fbcb5fbdcf3e052e5bbd205c9c4b77166ff39eda62ca98",
      "current_raw_sha256": "d61ef2074b254aa4dad98c3f2e96173e205b3d47fff55b555a3e861d35daa31a",
      "initial_page": "first/01.html",
      "current_page": "q01/index.html",
      "first_attempt_wall_seconds": 610.0
    },
    {
      "id": "BPB2-02",
      "input_sha256": "b2df8a07b9f285d606c98e59cd65d3533bc15198f9afb0af5dbe1fb7ce871461",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:35:52Z",
      "finished_at": "2026-11-14T17:45:00Z",
      "raw_first_sha256": "98d04a7026d0981c983fda1786239d1a89b7dd6098fceb6fbf8dbc1b3d485902",
      "served_first_sha256": "1c0c3af62af2ffee34db7d8d736e7535af1202d63c8c747d1ea3bb43845fb7fa",
      "served_current_sha256": "39829590366bc605ebc53e1bfd952b7aaf93f13a8fc6415d18dd140618c7498f",
      "current_raw_sha256": "98d04a7026d0981c983fda1786239d1a89b7dd6098fceb6fbf8dbc1b3d485902",
      "initial_page": "first/02.html",
      "current_page": "q02/index.html",
      "first_attempt_wall_seconds": 548.0
    },
    {
      "id": "BPB2-03",
      "input_sha256": "51ef4b7b2630dacc1291178c8ef50dd1854a7ef99807ab3c80cba2b7b1623ca7",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:35:57Z",
      "finished_at": "2026-11-14T17:44:59Z",
      "raw_first_sha256": "2dabd75026df55f7a0fdfb4ea1c864ece9d936096696f71a5d503af6601d045c",
      "served_first_sha256": "11d88704ec6df655af09d9adf8d952057dea3c6be1ff551d9855706ebebfa889",
      "served_current_sha256": "91feaf9c51876af5115f4b3cb82a656348e651509efff6095f4c96368fe1850c",
      "current_raw_sha256": "2dabd75026df55f7a0fdfb4ea1c864ece9d936096696f71a5d503af6601d045c",
      "initial_page": "first/03.html",
      "current_page": "q03/index.html",
      "first_attempt_wall_seconds": 542.0
    },
    {
      "id": "BPB2-04",
      "input_sha256": "3bf2c39f46202ae7ebd5c577fe5591dda1bcf595bf706a8667fb2bf15241a99d",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:55:21Z",
      "finished_at": "2026-11-14T18:03:00Z",
      "raw_first_sha256": "c13dfda819de7f19f23e7b802d661a4617fa17fcbd4bc0f0adf92ce7769cb842",
      "served_first_sha256": "e17ed77df9b51b254f70c6a3d233f0c7a47753830a544ecc0de5fbea98e087ee",
      "served_current_sha256": "684f30b6917d32ef92d252458db04f52c1d71c6d9de1e28f9a3267742b084669",
      "current_raw_sha256": "c13dfda819de7f19f23e7b802d661a4617fa17fcbd4bc0f0adf92ce7769cb842",
      "initial_page": "first/04.html",
      "current_page": "q04/index.html",
      "first_attempt_wall_seconds": 459.0
    },
    {
      "id": "BPB2-05",
      "input_sha256": "8afd12acee039cc2d00dd5548718a887e2df87e46607cdae39b8d8172f587a2a",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:59:09Z",
      "finished_at": "2026-11-14T18:06:03Z",
      "raw_first_sha256": "42719cb599272cccc1322aced06fd0322eadca8dd6be4087574630089a99de4b",
      "served_first_sha256": "9b7febb319128527bfb71764174004fe6958c71eb4efbf81cbbf67b483e6a8d4",
      "served_current_sha256": "0779d6e2732e9f2d9381f24df61b5536469dd8e8a694b28288be0d5a02aec6cb",
      "current_raw_sha256": "42719cb599272cccc1322aced06fd0322eadca8dd6be4087574630089a99de4b",
      "initial_page": "first/05.html",
      "current_page": "q05/index.html",
      "first_attempt_wall_seconds": 414.0
    },
    {
      "id": "BPB2-06",
      "input_sha256": "40eec5f5b755bbb89dc48521987e8d36c3771255aabe76d01db1ddf13cbb418d",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:08:29Z",
      "finished_at": "2026-11-14T18:17:30Z",
      "raw_first_sha256": "7edca985ec1f55a13a9d2b7393e75ff24757bcdf61175a0b3e6ec09eedae6e75",
      "served_first_sha256": "38c1b817a672889c772fc2a28f6cbfcd45cd690bee6d2236c5c8e69f9f141100",
      "served_current_sha256": "15bf77c4530e8882502111931b2b472201be9d4c01fb2a675095cff218b35666",
      "current_raw_sha256": "7edca985ec1f55a13a9d2b7393e75ff24757bcdf61175a0b3e6ec09eedae6e75",
      "initial_page": "first/06.html",
      "current_page": "q06/index.html",
      "first_attempt_wall_seconds": 541.0
    },
    {
      "id": "BPB2-07",
      "input_sha256": "1296f2eb56423e5e886735610754d8464edd8c32d6c45872c69bcf710c965ccd",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:13:00Z",
      "finished_at": "2026-11-14T18:21:50Z",
      "raw_first_sha256": "c6e498edeec684c184271d908d2bb277ff32b2ccb632b896fd00f748a2391ea3",
      "served_first_sha256": "9f894ff3be9fca185037319d160196d03cb7366a73b46653702b7b563b5f14de",
      "served_current_sha256": "dfaef025d1a7a21d17c2632fd6146cc5c4e9bbe0e58d57ed3da61234ebb3c546",
      "current_raw_sha256": "c6e498edeec684c184271d908d2bb277ff32b2ccb632b896fd00f748a2391ea3",
      "initial_page": "first/07.html",
      "current_page": "q07/index.html",
      "first_attempt_wall_seconds": 530.0
    },
    {
      "id": "BPB2-08",
      "input_sha256": "b23fe52682e52ba58bb12b71178fb81c5bbc45fc37724265f39495da85916bbc",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:36:05Z",
      "finished_at": "2026-11-14T17:44:45Z",
      "raw_first_sha256": "8b55c18a3f057b6fcdf3ad3b160622d4899f134d8ff28fb124e3a354cecd61b1",
      "served_first_sha256": "13d6883d7eaaf19b7ff4df8ed8b9ca3e54b8d8e7b8cddf96ecc40b78c930e1cd",
      "served_current_sha256": "42531cfca0122c6dbe9fd62b1d7b7484a8d713fa4c9de9aa50b0843a8eade91c",
      "current_raw_sha256": "8b55c18a3f057b6fcdf3ad3b160622d4899f134d8ff28fb124e3a354cecd61b1",
      "initial_page": "first/08.html",
      "current_page": "q08/index.html",
      "first_attempt_wall_seconds": 520.0
    },
    {
      "id": "BPB2-09",
      "input_sha256": "5a9eaea54395e37da0797cd96fd234b899fcf51e8a9fa0d9f62004ee39398333",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:17:49Z",
      "finished_at": "2026-11-14T18:27:10Z",
      "raw_first_sha256": "70cb09db1d4169eb5e6cac59cd73dead234eb5a8019fe68ba121583587ef2181",
      "served_first_sha256": "249dfafa0489e9cd463e3bacfeffafdf24fd9d46391049cd097231ec78725f69",
      "served_current_sha256": "fdbb99223b5e55fd52a65df956eff0f43a323946d38ae365576e8b7dc231bb53",
      "current_raw_sha256": "70cb09db1d4169eb5e6cac59cd73dead234eb5a8019fe68ba121583587ef2181",
      "initial_page": "first/09.html",
      "current_page": "q09/index.html",
      "first_attempt_wall_seconds": 561.0
    },
    {
      "id": "BPB2-10",
      "input_sha256": "39719127f9cf49fbfc4e304820f42964e227de50209727c5db0f05387c98f726",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:19:08Z",
      "finished_at": "2026-11-14T18:26:52Z",
      "raw_first_sha256": "72f2dedaa839cc1276a998b3676a9982c2fc79babe661a831e0e07a0fa0b6b7d",
      "served_first_sha256": "4e201f099397e5036433a8e05b5f23074f1cce6dec0c81bad277c1eb01fd6643",
      "served_current_sha256": "6972b4615f811360aefaa55dedafc594f42679bd33e270dde795c049a49b0503",
      "current_raw_sha256": "72f2dedaa839cc1276a998b3676a9982c2fc79babe661a831e0e07a0fa0b6b7d",
      "initial_page": "first/10.html",
      "current_page": "q10/index.html",
      "first_attempt_wall_seconds": 464.0
    },
    {
      "id": "BPB2-11",
      "input_sha256": "56e03717117707491bf7fff84bc7b1b3ae445068fe46fd78d80da8857ab1fa40",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:27:17Z",
      "finished_at": "2026-11-14T18:36:36.955165Z",
      "raw_first_sha256": "98b1d6bca616a70f07dbbecece72a3f641916480f49467cc76659af012927846",
      "served_first_sha256": "6198d9dec78003d2ed1c7c5acc547c04f5595b6bcc33b1685d26026568c2980a",
      "served_current_sha256": "8f38bfcafae4d67be4086e46f89e205c46e80ac0777ca0feb1ad7c7290ee6ba9",
      "current_raw_sha256": "8329b9f75487de996fc84528d3169b85e85da2f5ab0b26f1cae1d945c25fb248",
      "repairs": [
        {
          "cycle": 1,
          "started_at": "2026-11-14T18:47:42Z",
          "finished_at": "2026-11-14T18:50:15.220460Z",
          "wall_seconds": 153.22046,
          "current_raw_sha256": "8329b9f75487de996fc84528d3169b85e85da2f5ab0b26f1cae1d945c25fb248",
          "served_current_sha256": "8f38bfcafae4d67be4086e46f89e205c46e80ac0777ca0feb1ad7c7290ee6ba9",
          "change": "Correct expected-funding summary propagation when scenario assumptions change. Confirmed defect feedback supplied by the separate review; original first artifact and score retained."
        }
      ],
      "initial_page": "first/11.html",
      "current_page": "q11/index.html",
      "first_attempt_wall_seconds": 559.955165
    },
    {
      "id": "BPB2-12",
      "input_sha256": "d238e061ae189fbaaa6bbb10d57418aab38c3d83a0cb77b4086343ff023a260c",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:45:31.604743+00:00",
      "finished_at": "2026-11-14T17:58:35.186318+00:00",
      "raw_first_sha256": "6cf97242a865f9b14091efc874e3e326de9b231a7f9d9ea2340c993f76f3ec1b",
      "served_first_sha256": "dd31917e0001d0be98c85cc7673e14e269bf7ba7d96109dfe3c674476f0ad414",
      "served_current_sha256": "a0c00b43e0ec953bf0296254935ccc1c813dd7830406add815e56e382c2ef4f2",
      "current_raw_sha256": "6cf97242a865f9b14091efc874e3e326de9b231a7f9d9ea2340c993f76f3ec1b",
      "initial_page": "first/12.html",
      "current_page": "q12/index.html",
      "first_attempt_wall_seconds": 783.581575
    },
    {
      "id": "BPB2-13",
      "input_sha256": "70c8e6b3fe8f5888a536c45d214acb4488dc8f825743c39aa202e61ced26c019",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:27:42Z",
      "finished_at": "2026-11-14T18:36:30Z",
      "raw_first_sha256": "d8c7f69530875f185efc88319697eff8e062dedd8dbb403cc5b62ed97fda0ef7",
      "served_first_sha256": "c09c465f05f5348051d15ab3f214a82eb220632c6930bdde9d43f375cb0005cb",
      "served_current_sha256": "d2346bef1508fb2026e010ceaf60b66382532c82d6efb570249404faeb602cd6",
      "current_raw_sha256": "d8c7f69530875f185efc88319697eff8e062dedd8dbb403cc5b62ed97fda0ef7",
      "initial_page": "first/13.html",
      "current_page": "q13/index.html",
      "first_attempt_wall_seconds": 528.0
    },
    {
      "id": "BPB2-14",
      "input_sha256": "55a14c96ca5890f041c917368dfe1af1310ebe22426671fbfb90a06d0d1c9006",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:32:52.561268+00:00",
      "finished_at": "2026-11-14T18:41:11.178137+00:00",
      "raw_first_sha256": "96880b2e2d37a09cc06bdd53ff0d95b53c0b13197e3ea0bc1e0f8b2f534b76c9",
      "served_first_sha256": "e20eb35910c4f9d35b8c32b405784e4133f78a59a82e973c9cbb6ea229c1480d",
      "served_current_sha256": "05531018668667a5f9384b87cd6d638c4f9a4a70f1f9940a975680c3e089e9b3",
      "current_raw_sha256": "96880b2e2d37a09cc06bdd53ff0d95b53c0b13197e3ea0bc1e0f8b2f534b76c9",
      "initial_page": "first/14.html",
      "current_page": "q14/index.html",
      "first_attempt_wall_seconds": 498.616869
    },
    {
      "id": "BPB2-15",
      "input_sha256": "d4a9884d36299fc1f87d4c976a7ae495ef9fe0abeca32cd7158e5d01f4d00904",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:36:55Z",
      "finished_at": "2026-11-14T18:51:26Z",
      "raw_first_sha256": "4e67b77411b2dc64133d146d17c82cd8952c527dd5baf181d007dec4ef37d245",
      "served_first_sha256": "bf53de0b0ace6fe306a1f7ec49f4af3d88a9f3cd6be15c31dfe768d43bc339c7",
      "served_current_sha256": "fb8d68053141bfa6596f31595f2af46ba1acaef4971bf2635b02680f4ebd9619",
      "current_raw_sha256": "4e67b77411b2dc64133d146d17c82cd8952c527dd5baf181d007dec4ef37d245",
      "initial_page": "first/15.html",
      "current_page": "q15/index.html",
      "first_attempt_wall_seconds": 871.0
    },
    {
      "id": "BPB2-16",
      "input_sha256": "b04748b86d46d25d36117c5bc385b82f823f046b2c167288f4b657a1416502b2",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:45:36Z",
      "finished_at": "2026-11-14T17:53:53Z",
      "raw_first_sha256": "65b8303be9f43b309148ffe3e7a4e4534311ff482d16f09a64e94a87d4fda83e",
      "served_first_sha256": "b62f1e066bf2e51175929c1643739e9eaa7c506dfcd7d4366ae39a6ebca9541f",
      "served_current_sha256": "f9ca4acb73b4fbffa122e397db0ab5ac1d3327938edb7428845096115047aa0b",
      "current_raw_sha256": "65b8303be9f43b309148ffe3e7a4e4534311ff482d16f09a64e94a87d4fda83e",
      "initial_page": "first/16.html",
      "current_page": "q16/index.html",
      "first_attempt_wall_seconds": 497.0
    },
    {
      "id": "BPB2-17",
      "input_sha256": "1c0fecd42c7bca1c18e899c57adc2e2c4d95fb991d13da20b1b99efdffe9460a",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:03:38.415304Z",
      "finished_at": "2026-11-14T18:12:30.987730Z",
      "raw_first_sha256": "1c0bb4b447652944865051d9421418ff0007852a241e6c9c557c1d0d60962e59",
      "served_first_sha256": "c8a715094f426eb9f55286f6e766b32565144e61e2a7882729086f09862a1ef4",
      "served_current_sha256": "4c12983b4ca1a1b44ed97fbaa7b58c2468bb08ee31cce703199c4675ecfca625",
      "current_raw_sha256": "1c0bb4b447652944865051d9421418ff0007852a241e6c9c557c1d0d60962e59",
      "initial_page": "first/17.html",
      "current_page": "q17/index.html",
      "first_attempt_wall_seconds": 532.572426
    },
    {
      "id": "BPB2-18",
      "input_sha256": "9820027e3738914c93decfc33ca98c40709ad4683e6e61f1bbe0bdc751dd1992",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:08:24Z",
      "finished_at": "2026-11-14T18:18:49Z",
      "raw_first_sha256": "099891c7789460f865e4889dfa4ad9f6d369acf873042ac6b59e296da6992080",
      "served_first_sha256": "651a05430891a839c0491a02c3d837833a36630cd874d809abdc2c8de9f4a3e4",
      "served_current_sha256": "c54fa7c432be6bdd51dc597f54073ca255a1a6b3a09200421e682b0ebdb75c5e",
      "current_raw_sha256": "099891c7789460f865e4889dfa4ad9f6d369acf873042ac6b59e296da6992080",
      "initial_page": "first/18.html",
      "current_page": "q18/index.html",
      "first_attempt_wall_seconds": 625.0
    },
    {
      "id": "BPB2-19",
      "input_sha256": "3d1737d6d1d8ce0e7b5159fb3cbcc30bb75662a271507378c9e983b02686fd88",
      "status": "first attempt retained",
      "started_at": "2026-11-14T18:37:02Z",
      "finished_at": "2026-11-14T18:46:49Z",
      "raw_first_sha256": "7f2f504654d160affa77a72bab6321441de8ed24fb616fa3605d121bb32c6d04",
      "served_first_sha256": "3b7e646442e4a3a88db90f02746a52b7c56b7fdde43717d12cf6649350f262fb",
      "served_current_sha256": "a269176930cd240688bcf0f9a8a9abe42fd8ba896a87f8c8862bd6f7177c0e62",
      "current_raw_sha256": "7f2f504654d160affa77a72bab6321441de8ed24fb616fa3605d121bb32c6d04",
      "initial_page": "first/19.html",
      "current_page": "q19/index.html",
      "first_attempt_wall_seconds": 587.0
    },
    {
      "id": "BPB2-20",
      "input_sha256": "6aa5a267b5b8d39ed1393ffa82e930d583144ccb3cd71dcd1d2ddbf773f1f2ea",
      "status": "first attempt retained",
      "started_at": "2026-11-14T17:45:42Z",
      "finished_at": "2026-11-14T17:54:55Z",
      "raw_first_sha256": "8591ec89140854ce595c1c66d7fcca9a7332ad35c63ad9ed093f2570e35c27e5",
      "served_first_sha256": "5800ed688595830d3eab6b14ad42e5837572f37818e0364285b9b21570d69d90",
      "served_current_sha256": "fc5f6f8262cf6e8ba5c8f37312532d6895beb727f478212834a84b3d93fcce69",
      "current_raw_sha256": "8591ec89140854ce595c1c66d7fcca9a7332ad35c63ad9ed093f2570e35c27e5",
      "initial_page": "first/20.html",
      "current_page": "q20/index.html",
      "first_attempt_wall_seconds": 553.0
    }
  ],
  "completed_at": "2026-11-14T19:03:21.101013+00:00",
  "results": "results.json",
  "first_attempt_order": [
    "BPB2-02",
    "BPB2-03",
    "BPB2-08",
    "BPB2-12",
    "BPB2-16",
    "BPB2-20",
    "BPB2-01",
    "BPB2-04",
    "BPB2-05",
    "BPB2-17",
    "BPB2-18",
    "BPB2-06",
    "BPB2-07",
    "BPB2-09",
    "BPB2-10",
    "BPB2-11",
    "BPB2-13",
    "BPB2-14",
    "BPB2-15",
    "BPB2-19"
  ],
  "neutral_shell_sha256": "c012e11d86805a19475f1978fa74ca291e30651ca967e8998fa064e998f8eb81",
  "suite_snapshot_sha256": "c2a53260f60acd024429b5c96d117308f813de4c6abaa9aec748980988e23c21",
  "rubric_sha256": "08b3582cb9f1e4a72881d82bf675e1c6488fe771c1dcca39acc3264b16f2504c",
  "run_conditions": {
    "replicates_per_case": 1,
    "maximum_wall_minutes_per_first_attempt": 45,
    "maximum_wall_minutes_per_repair_cycle": 15,
    "token_cap": null,
    "temperature": null,
    "seed": null,
    "billed_cost": null,
    "model_active_time": null,
    "author_tools": "Local file/code tools and JSDOM self-tests; no external research or shared browser; native browser checks performed by coordinator after retention.",
    "context_boundary": "Fresh fork_turns=none case agents instructed to read only own input/task/neutral shell; shared filesystem is not technically isolated.",
    "case_order": "Six predeclared pilot cases first; later dispatch chosen for workflow availability, not randomized.",
    "node_version": "24.22.1",
    "python_version": "3.9.6"
  },
  "assessment": {
    "type": "Separate same-family AI reviews plus independent numerical/constraint/DOM checks and coordinator native-browser journeys",
    "human_practitioner_review": false,
    "claude_review": false,
    "initial_checked_score": 98.8125,
    "current_checked_score": 99.875,
    "initial_ready_count": 19,
    "current_ready_count": 20
  },
  "limitations": [
    "Development suite, not a frozen comparative benchmark.",
    "Equal token cap and billed cost unavailable; no measured practitioner checking or time-saving baseline.",
    "Targeted desktop browser journeys; not an exhaustive accessibility/device audit.",
    "Five adaptation tests and repeated/contrasting-model trials not run."
  ]
}
