Foray 247 · Essai 3
Score the work you can inspect.
Name the reviewer, rate the answer and explain the evidence. Your assessment is saved only in this browser. It does not change the model answer or the published AI scores.
Your assessment
Scores: 0 absent or fundamentally wrong; 1 major defects; 2 an important defect remains; 3 usable with minor defects; 4 thorough, coherent and useful. Use the dimension-specific rubric and inspect the answer before rating it.
Retained unsaved entries
Opening History does not discard these entries. Restore one to continue editing. They remain in this tab until reload.
Your whole-run score
The latest assessment by the selected reviewer for each case is used only when it identifies the matching answer version. Unbound older records and ratings of a changed answer remain in History and are excluded from totals. The score stays pending until all twenty matching versions are assessed; earlier revisions remain in History.
See assessed and missing cases
| Case | Project work /100 | Browser /4 | Readiness |
|---|
Your saved assessments
Open any revision to inspect or correct it. Saving with the same reviewer, case and answer version supersedes that reviewer’s previous assessment; history remains. No file is created and nothing is uploaded. Clearing this browser’s site data removes these local assessments. An optional backup creates a real JSON file. Saving and restoring require an HTTPS browser with Web Locks support so concurrent tabs cannot overwrite one another. Without safe saving, your entry stays on screen.