Toy scenario
| Task | Status | Chosen start (UTC) | Delay (h) | Notes |
|---|
Write inputs above outputs. For a prospective stepwise version, let S contain current time, completed tasks and crew-ready time. Tasks and rules are fixed parameters. The readout O is the current time, remaining task identifiers and crew-ready time. At o, I(o) supplies a forecast valid for that context together with a proposed wait or visit.
This is the dependent deterministic convention, not a smooth tangent bundle. Weather eligibility is computed from the supplied forecast and rules; it is not falsely declared to be a readout of a state that excludes the weather. The batch functions below implement the two whole-schedule heuristics directly rather than exposing these maps as reusable components.
The batch input is a time series Hs(t) on a regular grid with a declared step length. If you have wave NetCDF, convert a single regular-grid series to the JSON format below. CSV is not accepted.
Import replaces active weather only after validation; rejected data leave the prior result unchanged.
The preset “Hornsea Two” tasks are taken from a Notice to Mariners (non‑routine operations). These notices often give: a start date, an estimated duration (or end date), safety zone notes, and sometimes coordinates.
The “Export output JSON” button writes: