{"schema":"pw120-open-interface-v1","foray":120,"baselineCommit":"90e3b73f05ac568a6be55a3b518851ebfc296374","complete":true,"parameters":{"bricks":2,"courses":2,"cureA":1,"cureB":2,"duration":2,"capacity":1,"blockedB":false},"semantics":"Fixed one/two-hoist contexts. Start reservations precede the common tick; releases occur at its end. Commands name course and brick. Both fronts fully placed and cured is terminal. No capacity switching during work.","guarantee":"Readout, exact labelled legal steps and projected successors, terminal completion; rank-decreasing policy lifts to every represented state.","originalContext":"one-hoist","extendedContext":"two-hoists","partitionExtension":"Keep old one-hoist classes on shared concrete states; give every newly reachable state its own fresh singleton. This is an explicit conservative extension, not an original total mapping.","novelty":"The closed-wiring counterexample is prior evidence. New result: derive the open component refinement, compose it in declared contexts, check preservation, and find no local state compression in this case.","concreteStates":{"s0":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s1":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s2":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s3":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s4":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s5":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s6":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s7":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s8":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s9":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s10":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s11":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s12":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s13":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s14":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s15":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s16":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s17":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s18":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s19":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s20":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s21":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s22":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s23":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s24":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s25":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s26":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s27":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s28":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s29":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s30":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s31":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s32":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s33":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s34":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s35":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s36":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s37":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s38":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s39":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s40":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s41":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s42":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s43":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s44":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s45":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s46":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s47":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s48":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s49":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s50":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s51":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s52":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s53":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s54":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s55":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s56":{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s57":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s58":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s59":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s60":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s61":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s62":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s63":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s64":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s65":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s66":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s67":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s68":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s69":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s70":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s71":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s72":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s73":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s74":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s75":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s76":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s77":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s78":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s79":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s80":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s81":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s82":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s83":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s84":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s85":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s86":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s87":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s88":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s89":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s90":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s91":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s92":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s93":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s94":{"fronts":[{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s95":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s96":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s97":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s98":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s99":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s100":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s101":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s102":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s103":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s104":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s105":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s106":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s107":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s108":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s109":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s110":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s111":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s112":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s113":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s114":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s115":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s116":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s117":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s118":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s119":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s120":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s121":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s122":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s123":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s124":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s125":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s126":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s127":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s128":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s129":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s130":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s131":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s132":{"fronts":[{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s133":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s134":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s135":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s136":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s137":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s138":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s139":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s140":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s141":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s142":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s143":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s144":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s145":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s146":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s147":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s148":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s149":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s150":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s151":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s152":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s153":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s154":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s155":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s156":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s157":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s158":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s159":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s160":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s161":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s162":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s163":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s164":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s165":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s166":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s167":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s168":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s169":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s170":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s171":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s172":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s173":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s174":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s175":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s176":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s177":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s178":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s179":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s180":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s181":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s182":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s183":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s184":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s185":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s186":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s187":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s188":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s189":{"fronts":[{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s190":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s191":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s192":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s193":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s194":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s195":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s196":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s197":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s198":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s199":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s200":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s201":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s202":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s203":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s204":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s205":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s206":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s207":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s208":{"fronts":[{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s209":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s210":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s211":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s212":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s213":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s214":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s215":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s216":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s217":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s218":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s219":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s220":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s221":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s222":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s223":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s224":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s225":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s226":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s227":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s228":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s229":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s230":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s231":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s232":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s233":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s234":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s235":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s236":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s237":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s238":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s239":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s240":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s241":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s242":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s243":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s244":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s245":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s246":{"fronts":[{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s247":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s248":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s249":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s250":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s251":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s252":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s253":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s254":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s255":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s256":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s257":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s258":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s259":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s260":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s261":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s262":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s263":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s264":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s265":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s266":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":1},"s267":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s268":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s269":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":1},"s270":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":3},"s271":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":1},"s272":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":3},"s273":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1},"s274":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s275":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s276":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},"s277":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":1},"s278":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":1},"s279":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":3},"s280":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":1},"s281":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":3},"s282":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":1},"s283":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":1},"s284":{"fronts":[{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":1},"s285":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s286":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s287":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s288":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s289":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s290":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s291":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s292":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s293":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s294":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s295":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s296":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s297":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s298":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s299":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s300":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s301":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s302":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s303":{"fronts":[{"masks":[3,3],"cool":[0,0],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0},"s304":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[0,0],"cool":[0,0],"job":null}],"owners":0},"s305":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s306":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s307":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[1,0],"cool":[0,0],"job":null}],"owners":0},"s308":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}}],"owners":2},"s309":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[2,0],"cool":[0,0],"job":null}],"owners":0},"s310":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}}],"owners":2},"s311":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":0},"s312":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s313":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s314":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":0},"s315":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,0],"cool":[2,0],"job":null}],"owners":0},"s316":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,1],"cool":[0,0],"job":null}],"owners":0},"s317":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}}],"owners":2},"s318":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,2],"cool":[0,0],"job":null}],"owners":0},"s319":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}}],"owners":2},"s320":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"owners":0},"s321":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,3],"cool":[0,1],"job":null}],"owners":0},"s322":{"fronts":[{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,3],"cool":[0,2],"job":null}],"owners":0}},"components":[{"site":0,"states":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"edges":[[{"action":"wait","to":0},{"action":"0:0","to":1},{"action":"0:1","to":2}],[{"action":"wait","to":3}],[{"action":"wait","to":4}],[{"action":"wait","to":3},{"action":"0:1","to":5}],[{"action":"wait","to":4},{"action":"0:0","to":6}],[{"action":"wait","to":7}],[{"action":"wait","to":7}],[{"action":"wait","to":8}],[{"action":"wait","to":8},{"action":"1:0","to":9},{"action":"1:1","to":10}],[{"action":"wait","to":11}],[{"action":"wait","to":12}],[{"action":"wait","to":11},{"action":"1:1","to":13}],[{"action":"wait","to":12},{"action":"1:0","to":14}],[{"action":"wait","to":15}],[{"action":"wait","to":15}],[{"action":"wait","to":16}],[{"action":"wait","to":16}]],"outputs":[{"masks":[0,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:0","0:1"]},{"masks":[0,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[0,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[1,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:1"]},{"masks":[2,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:0"]},{"masks":[1,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[2,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":false,"release":false,"complete":false,"commands":["wait","1:0","1:1"]},{"masks":[3,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,1],"busy":false,"release":false,"complete":false,"commands":["wait","1:1"]},{"masks":[3,2],"busy":false,"release":false,"complete":false,"commands":["wait","1:0"]},{"masks":[3,1],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,2],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,3],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,3],"busy":false,"release":false,"complete":true,"commands":["wait"]}],"summaryMap":[0,1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16],"rounds":[15,17]},{"site":1,"states":[{"masks":[0,0],"cool":[0,0],"job":null},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[1,0],"cool":[0,0],"job":null},{"masks":[2,0],"cool":[0,0],"job":null},{"masks":[1,0],"cool":[0,0],"job":{"course":0,"brick":1,"remaining":1}},{"masks":[2,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[2,0],"job":null},{"masks":[3,0],"cool":[1,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":null},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,1],"cool":[0,0],"job":null},{"masks":[3,2],"cool":[0,0],"job":null},{"masks":[3,1],"cool":[0,0],"job":{"course":1,"brick":1,"remaining":1}},{"masks":[3,2],"cool":[0,0],"job":{"course":1,"brick":0,"remaining":1}},{"masks":[3,3],"cool":[0,2],"job":null},{"masks":[3,3],"cool":[0,1],"job":null},{"masks":[3,3],"cool":[0,0],"job":null}],"edges":[[{"action":"wait","to":0},{"action":"0:0","to":1},{"action":"0:1","to":2}],[{"action":"wait","to":3}],[{"action":"wait","to":4}],[{"action":"wait","to":3},{"action":"0:1","to":5}],[{"action":"wait","to":4},{"action":"0:0","to":6}],[{"action":"wait","to":7}],[{"action":"wait","to":7}],[{"action":"wait","to":8}],[{"action":"wait","to":9}],[{"action":"wait","to":9},{"action":"1:0","to":10},{"action":"1:1","to":11}],[{"action":"wait","to":12}],[{"action":"wait","to":13}],[{"action":"wait","to":12},{"action":"1:1","to":14}],[{"action":"wait","to":13},{"action":"1:0","to":15}],[{"action":"wait","to":16}],[{"action":"wait","to":16}],[{"action":"wait","to":17}],[{"action":"wait","to":18}],[{"action":"wait","to":18}]],"outputs":[{"masks":[0,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:0","0:1"]},{"masks":[0,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[0,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[1,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:1"]},{"masks":[2,0],"busy":false,"release":false,"complete":false,"commands":["wait","0:0"]},{"masks":[1,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[2,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":false,"release":false,"complete":false,"commands":["wait","1:0","1:1"]},{"masks":[3,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,0],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,1],"busy":false,"release":false,"complete":false,"commands":["wait","1:1"]},{"masks":[3,2],"busy":false,"release":false,"complete":false,"commands":["wait","1:0"]},{"masks":[3,1],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,2],"busy":true,"release":true,"complete":false,"commands":["wait"]},{"masks":[3,3],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,3],"busy":false,"release":false,"complete":false,"commands":["wait"]},{"masks":[3,3],"busy":false,"release":false,"complete":true,"commands":["wait"]}],"summaryMap":[0,1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18],"rounds":[15,19]}],"contexts":[{"id":"one-hoist","capacity":1,"complete":true,"initial":"s0","states":[{"id":"s0","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s1"},{"action":"-|0:1","to":"s2"},{"action":"0:0|-","to":"s19"},{"action":"0:1|-","to":"s38"},{"action":"wait","to":"s0"}]},{"id":"s1","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s3"}]},{"id":"s2","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s5"}]},{"id":"s19","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s57"}]},{"id":"s38","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s95"}]},{"id":"s3","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s4"},{"action":"0:0|-","to":"s22"},{"action":"0:1|-","to":"s41"},{"action":"wait","to":"s3"}]},{"id":"s5","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s6"},{"action":"0:0|-","to":"s24"},{"action":"0:1|-","to":"s43"},{"action":"wait","to":"s5"}]},{"id":"s57","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s58"},{"action":"-|0:1","to":"s59"},{"action":"0:1|-","to":"s76"},{"action":"wait","to":"s57"}]},{"id":"s95","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s96"},{"action":"-|0:1","to":"s97"},{"action":"0:0|-","to":"s114"},{"action":"wait","to":"s95"}]},{"id":"s4","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s11"}]},{"id":"s22","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s60"}]},{"id":"s41","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s98"}]},{"id":"s6","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s11"}]},{"id":"s24","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s62"}]},{"id":"s43","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s100"}]},{"id":"s58","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s60"}]},{"id":"s59","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s62"}]},{"id":"s76","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s190"}]},{"id":"s96","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s98"}]},{"id":"s97","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s100"}]},{"id":"s114","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s190"}]},{"id":"s11","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s29"},{"action":"0:1|-","to":"s48"},{"action":"wait","to":"s10"}]},{"id":"s60","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s61"},{"action":"0:1|-","to":"s79"},{"action":"wait","to":"s60"}]},{"id":"s98","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s99"},{"action":"0:0|-","to":"s117"},{"action":"wait","to":"s98"}]},{"id":"s62","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s63"},{"action":"0:1|-","to":"s81"},{"action":"wait","to":"s62"}]},{"id":"s100","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s101"},{"action":"0:0|-","to":"s119"},{"action":"wait","to":"s100"}]},{"id":"s190","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s134"},{"action":"-|0:1","to":"s135"},{"action":"wait","to":"s133"}]},{"id":"s10","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s26"},{"action":"0:1|-","to":"s45"},{"action":"wait","to":"s7"}]},{"id":"s29","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s64"}]},{"id":"s48","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s102"}]},{"id":"s61","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s68"}]},{"id":"s79","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s193"}]},{"id":"s99","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s106"}]},{"id":"s117","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s193"}]},{"id":"s63","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s68"}]},{"id":"s81","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s195"}]},{"id":"s101","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s106"}]},{"id":"s119","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s195"}]},{"id":"s133","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s134"},{"action":"-|0:1","to":"s135"},{"action":"1:0|-","to":"s152"},{"action":"1:1|-","to":"s171"},{"action":"wait","to":"s133"}]},{"id":"s134","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s136"}]},{"id":"s135","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s138"}]},{"id":"s7","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s8"},{"action":"-|1:1","to":"s9"},{"action":"0:0|-","to":"s26"},{"action":"0:1|-","to":"s45"},{"action":"wait","to":"s7"}]},{"id":"s26","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s64"}]},{"id":"s45","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s102"}]},{"id":"s64","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s65"},{"action":"-|1:1","to":"s66"},{"action":"0:1|-","to":"s83"},{"action":"wait","to":"s64"}]},{"id":"s102","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s103"},{"action":"-|1:1","to":"s104"},{"action":"0:0|-","to":"s121"},{"action":"wait","to":"s102"}]},{"id":"s68","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s86"},{"action":"wait","to":"s67"}]},{"id":"s193","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s137"},{"action":"wait","to":"s136"}]},{"id":"s106","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s124"},{"action":"wait","to":"s105"}]},{"id":"s195","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s139"},{"action":"wait","to":"s138"}]},{"id":"s152","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s209"}]},{"id":"s171","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s247"}]},{"id":"s136","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s137"},{"action":"1:0|-","to":"s155"},{"action":"1:1|-","to":"s174"},{"action":"wait","to":"s136"}]},{"id":"s138","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s139"},{"action":"1:0|-","to":"s157"},{"action":"1:1|-","to":"s176"},{"action":"wait","to":"s138"}]},{"id":"s8","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s12"}]},{"id":"s9","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s14"}]},{"id":"s65","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s69"}]},{"id":"s66","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s71"}]},{"id":"s83","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s103","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s107"}]},{"id":"s104","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s109"}]},{"id":"s121","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s67","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s83"},{"action":"wait","to":"s64"}]},{"id":"s86","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s137","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s144"}]},{"id":"s105","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s121"},{"action":"wait","to":"s102"}]},{"id":"s124","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s139","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s144"}]},{"id":"s209","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s210"},{"action":"-|0:1","to":"s211"},{"action":"1:1|-","to":"s228"},{"action":"wait","to":"s209"}]},{"id":"s247","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s248"},{"action":"-|0:1","to":"s249"},{"action":"1:0|-","to":"s266"},{"action":"wait","to":"s247"}]},{"id":"s155","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s212"}]},{"id":"s174","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s250"}]},{"id":"s157","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s214"}]},{"id":"s176","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s252"}]},{"id":"s12","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s13"},{"action":"0:0|-","to":"s31"},{"action":"0:1|-","to":"s50"},{"action":"wait","to":"s12"}]},{"id":"s14","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s15"},{"action":"0:0|-","to":"s33"},{"action":"0:1|-","to":"s52"},{"action":"wait","to":"s14"}]},{"id":"s69","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s70"},{"action":"0:1|-","to":"s88"},{"action":"wait","to":"s69"}]},{"id":"s71","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s72"},{"action":"0:1|-","to":"s90"},{"action":"wait","to":"s71"}]},{"id":"s197","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s141"},{"action":"-|1:1","to":"s142"},{"action":"wait","to":"s140"}]},{"id":"s107","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s108"},{"action":"0:0|-","to":"s126"},{"action":"wait","to":"s107"}]},{"id":"s109","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s110"},{"action":"0:0|-","to":"s128"},{"action":"wait","to":"s109"}]},{"id":"s144","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s162"},{"action":"1:1|-","to":"s181"},{"action":"wait","to":"s143"}]},{"id":"s210","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s212"}]},{"id":"s211","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s214"}]},{"id":"s228","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s304"}]},{"id":"s248","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s250"}]},{"id":"s249","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s252"}]},{"id":"s266","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s304"}]},{"id":"s212","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s213"},{"action":"1:1|-","to":"s231"},{"action":"wait","to":"s212"}]},{"id":"s250","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s251"},{"action":"1:0|-","to":"s269"},{"action":"wait","to":"s250"}]},{"id":"s214","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s215"},{"action":"1:1|-","to":"s233"},{"action":"wait","to":"s214"}]},{"id":"s252","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s253"},{"action":"1:0|-","to":"s271"},{"action":"wait","to":"s252"}]},{"id":"s13","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s18"}]},{"id":"s31","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s69"}]},{"id":"s50","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s107"}]},{"id":"s15","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s18"}]},{"id":"s33","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s71"}]},{"id":"s52","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s109"}]},{"id":"s70","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s75"}]},{"id":"s88","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s202"}]},{"id":"s72","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s75"}]},{"id":"s90","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s204"}]},{"id":"s140","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s141"},{"action":"-|1:1","to":"s142"},{"action":"1:0|-","to":"s159"},{"action":"1:1|-","to":"s178"},{"action":"wait","to":"s140"}]},{"id":"s141","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s145"}]},{"id":"s142","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s147"}]},{"id":"s108","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s113"}]},{"id":"s126","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s202"}]},{"id":"s110","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s113"}]},{"id":"s128","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s204"}]},{"id":"s143","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s159"},{"action":"1:1|-","to":"s178"},{"action":"wait","to":"s140"}]},{"id":"s162","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s216"}]},{"id":"s181","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s254"}]},{"id":"s304","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s286"},{"action":"-|0:1","to":"s287"},{"action":"wait","to":"s285"}]},{"id":"s213","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s220"}]},{"id":"s231","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s307"}]},{"id":"s251","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s258"}]},{"id":"s269","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s307"}]},{"id":"s215","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s220"}]},{"id":"s233","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s309"}]},{"id":"s253","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s258"}]},{"id":"s271","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s309"}]},{"id":"s18","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s36"},{"action":"0:1|-","to":"s55"},{"action":"wait","to":"s17"}]},{"id":"s75","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s93"},{"action":"wait","to":"s74"}]},{"id":"s202","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s146"},{"action":"wait","to":"s145"}]},{"id":"s204","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s148"},{"action":"wait","to":"s147"}]},{"id":"s159","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s216"}]},{"id":"s178","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s254"}]},{"id":"s145","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s146"},{"action":"1:0|-","to":"s164"},{"action":"1:1|-","to":"s183"},{"action":"wait","to":"s145"}]},{"id":"s147","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s148"},{"action":"1:0|-","to":"s166"},{"action":"1:1|-","to":"s185"},{"action":"wait","to":"s147"}]},{"id":"s113","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s131"},{"action":"wait","to":"s112"}]},{"id":"s216","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s217"},{"action":"-|1:1","to":"s218"},{"action":"1:1|-","to":"s235"},{"action":"wait","to":"s216"}]},{"id":"s254","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s255"},{"action":"-|1:1","to":"s256"},{"action":"1:0|-","to":"s273"},{"action":"wait","to":"s254"}]},{"id":"s285","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s286"},{"action":"-|0:1","to":"s287"},{"action":"wait","to":"s285"}]},{"id":"s286","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s288"}]},{"id":"s287","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s290"}]},{"id":"s220","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s238"},{"action":"wait","to":"s219"}]},{"id":"s307","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s289"},{"action":"wait","to":"s288"}]},{"id":"s258","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s276"},{"action":"wait","to":"s257"}]},{"id":"s309","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s291"},{"action":"wait","to":"s290"}]},{"id":"s17","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s35"},{"action":"0:1|-","to":"s54"},{"action":"wait","to":"s16"}]},{"id":"s36","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s73"}]},{"id":"s55","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s111"}]},{"id":"s74","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s92"},{"action":"wait","to":"s73"}]},{"id":"s93","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s146","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s151"}]},{"id":"s148","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s151"}]},{"id":"s164","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s221"}]},{"id":"s183","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s259"}]},{"id":"s166","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s223"}]},{"id":"s185","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s261"}]},{"id":"s112","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s130"},{"action":"wait","to":"s111"}]},{"id":"s131","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s217","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s221"}]},{"id":"s218","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s223"}]},{"id":"s235","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s255","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s259"}]},{"id":"s256","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s261"}]},{"id":"s273","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s288","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s289"},{"action":"wait","to":"s288"}]},{"id":"s290","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s291"},{"action":"wait","to":"s290"}]},{"id":"s219","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s235"},{"action":"wait","to":"s216"}]},{"id":"s238","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s289","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s257","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s273"},{"action":"wait","to":"s254"}]},{"id":"s276","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s291","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s16","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s35"},{"action":"0:1|-","to":"s54"},{"action":"wait","to":"s16"}]},{"id":"s35","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s73"}]},{"id":"s54","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s111"}]},{"id":"s73","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s92"},{"action":"wait","to":"s73"}]},{"id":"s111","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s130"},{"action":"wait","to":"s111"}]},{"id":"s92","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s206","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s149"}]},{"id":"s151","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s169"},{"action":"1:1|-","to":"s188"},{"action":"wait","to":"s150"}]},{"id":"s221","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s222"},{"action":"1:1|-","to":"s240"},{"action":"wait","to":"s221"}]},{"id":"s259","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s260"},{"action":"1:0|-","to":"s278"},{"action":"wait","to":"s259"}]},{"id":"s223","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s224"},{"action":"1:1|-","to":"s242"},{"action":"wait","to":"s223"}]},{"id":"s261","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s262"},{"action":"1:0|-","to":"s280"},{"action":"wait","to":"s261"}]},{"id":"s130","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s311","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s293"},{"action":"-|1:1","to":"s294"},{"action":"wait","to":"s292"}]},{"id":"s296","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s295"}]},{"id":"s149","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s168"},{"action":"1:1|-","to":"s187"},{"action":"wait","to":"s149"}]},{"id":"s150","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s168"},{"action":"1:1|-","to":"s187"},{"action":"wait","to":"s149"}]},{"id":"s169","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s225"}]},{"id":"s188","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s263"}]},{"id":"s222","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s227"}]},{"id":"s240","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s316"}]},{"id":"s260","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s265"}]},{"id":"s278","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s316"}]},{"id":"s224","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s227"}]},{"id":"s242","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s318"}]},{"id":"s262","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s265"}]},{"id":"s280","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s318"}]},{"id":"s292","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s293"},{"action":"-|1:1","to":"s294"},{"action":"wait","to":"s292"}]},{"id":"s293","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s297"}]},{"id":"s294","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s299"}]},{"id":"s295","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s292"}]},{"id":"s168","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s225"}]},{"id":"s187","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s263"}]},{"id":"s225","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s244"},{"action":"wait","to":"s225"}]},{"id":"s263","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s282"},{"action":"wait","to":"s263"}]},{"id":"s227","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s245"},{"action":"wait","to":"s226"}]},{"id":"s316","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s298"},{"action":"wait","to":"s297"}]},{"id":"s265","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s283"},{"action":"wait","to":"s264"}]},{"id":"s318","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s300"},{"action":"wait","to":"s299"}]},{"id":"s297","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s298"},{"action":"wait","to":"s297"}]},{"id":"s299","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s300"},{"action":"wait","to":"s299"}]},{"id":"s244","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s282","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s226","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s244"},{"action":"wait","to":"s225"}]},{"id":"s245","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s298","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s264","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s282"},{"action":"wait","to":"s263"}]},{"id":"s283","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s300","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s320","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s301"}]},{"id":"s303","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s302"}]},{"id":"s301","observation":{"masks":[[3,3],[3,3]],"complete":true},"edges":[]},{"id":"s302","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s301"}]}],"partitions":{"oldClosedConservativeExtension":{"s0":"closed:0","s1":"closed:1","s2":"closed:2","s19":"closed:3","s38":"closed:4","s3":"closed:5","s5":"closed:6","s57":"closed:7","s95":"closed:8","s4":"closed:9","s22":"closed:10","s41":"closed:11","s6":"closed:12","s24":"closed:13","s43":"closed:14","s58":"closed:15","s59":"closed:16","s76":"closed:17","s96":"closed:18","s97":"closed:19","s114":"closed:20","s11":"closed:21","s60":"closed:22","s98":"closed:23","s62":"closed:24","s100":"closed:25","s190":"closed:26","s10":"closed:27","s29":"closed:28","s48":"closed:29","s61":"closed:30","s79":"closed:31","s99":"closed:32","s117":"closed:33","s63":"closed:34","s81":"closed:35","s101":"closed:36","s119":"closed:37","s133":"closed:38","s134":"closed:39","s135":"closed:40","s7":"closed:41","s26":"closed:28","s45":"closed:29","s64":"closed:42","s102":"closed:43","s68":"closed:44","s193":"closed:45","s106":"closed:46","s195":"closed:47","s152":"closed:48","s171":"closed:49","s136":"closed:50","s138":"closed:51","s8":"closed:52","s9":"closed:53","s65":"closed:54","s66":"closed:55","s83":"closed:56","s103":"closed:57","s104":"closed:58","s121":"closed:59","s67":"closed:60","s86":"closed:56","s137":"closed:61","s105":"closed:62","s124":"closed:59","s139":"closed:63","s209":"closed:64","s247":"closed:65","s155":"closed:66","s174":"closed:67","s157":"closed:68","s176":"closed:69","s12":"closed:70","s14":"closed:71","s69":"closed:72","s71":"closed:73","s197":"closed:74","s107":"closed:75","s109":"closed:76","s144":"closed:77","s210":"closed:78","s211":"closed:79","s228":"closed:80","s248":"closed:81","s249":"closed:82","s266":"closed:83","s212":"closed:84","s250":"closed:85","s214":"closed:86","s252":"closed:87","s13":"closed:88","s31":"closed:89","s50":"closed:90","s15":"closed:91","s33":"closed:92","s52":"closed:93","s70":"closed:94","s88":"closed:95","s72":"closed:96","s90":"closed:97","s140":"closed:98","s141":"closed:99","s142":"closed:100","s108":"closed:101","s126":"closed:102","s110":"closed:103","s128":"closed:104","s143":"closed:105","s162":"closed:106","s181":"closed:107","s304":"closed:108","s213":"closed:109","s231":"closed:110","s251":"closed:111","s269":"closed:112","s215":"closed:113","s233":"closed:114","s253":"closed:115","s271":"closed:116","s18":"closed:117","s75":"closed:118","s202":"closed:119","s204":"closed:120","s159":"closed:106","s178":"closed:107","s145":"closed:121","s147":"closed:122","s113":"closed:123","s216":"closed:124","s254":"closed:125","s285":"closed:108","s286":"closed:126","s287":"closed:127","s220":"closed:128","s307":"closed:129","s258":"closed:130","s309":"closed:131","s17":"closed:117","s36":"closed:132","s55":"closed:133","s74":"closed:118","s93":"closed:134","s146":"closed:135","s148":"closed:136","s164":"closed:137","s183":"closed:138","s166":"closed:139","s185":"closed:140","s112":"closed:123","s131":"closed:141","s217":"closed:142","s218":"closed:143","s235":"closed:144","s255":"closed:145","s256":"closed:146","s273":"closed:147","s288":"closed:129","s290":"closed:131","s219":"closed:148","s238":"closed:144","s289":"closed:149","s257":"closed:150","s276":"closed:147","s291":"closed:151","s16":"closed:117","s35":"closed:132","s54":"closed:133","s73":"closed:118","s111":"closed:123","s92":"closed:134","s206":"closed:152","s151":"closed:153","s221":"closed:154","s259":"closed:155","s223":"closed:156","s261":"closed:157","s130":"closed:141","s311":"closed:158","s296":"closed:159","s149":"closed:153","s150":"closed:153","s169":"closed:160","s188":"closed:161","s222":"closed:162","s240":"closed:163","s260":"closed:164","s278":"closed:165","s224":"closed:166","s242":"closed:167","s262":"closed:168","s280":"closed:169","s292":"closed:158","s293":"closed:170","s294":"closed:171","s295":"closed:172","s168":"closed:160","s187":"closed:161","s225":"closed:173","s263":"closed:174","s227":"closed:173","s316":"closed:175","s265":"closed:174","s318":"closed:176","s297":"closed:175","s299":"closed:176","s244":"closed:177","s282":"closed:178","s226":"closed:173","s245":"closed:177","s298":"closed:179","s264":"closed:174","s283":"closed:178","s300":"closed:180","s320":"closed:181","s303":"closed:182","s301":"closed:183","s302":"closed:181"},"openInterface":{"s0":"open:0:0:0","s1":"open:0:1:2","s2":"open:0:2:2","s19":"open:1:0:1","s38":"open:2:0:1","s3":"open:0:3:0","s5":"open:0:4:0","s57":"open:3:0:0","s95":"open:4:0:0","s4":"open:0:5:2","s22":"open:1:3:1","s41":"open:2:3:1","s6":"open:0:6:2","s24":"open:1:4:1","s43":"open:2:4:1","s58":"open:3:1:2","s59":"open:3:2:2","s76":"open:5:0:1","s96":"open:4:1:2","s97":"open:4:2:2","s114":"open:6:0:1","s11":"open:0:7:0","s60":"open:3:3:0","s98":"open:4:3:0","s62":"open:3:4:0","s100":"open:4:4:0","s190":"open:7:0:0","s10":"open:0:8:0","s29":"open:1:8:1","s48":"open:2:8:1","s61":"open:3:5:2","s79":"open:5:3:1","s99":"open:4:5:2","s117":"open:6:3:1","s63":"open:3:6:2","s81":"open:5:4:1","s101":"open:4:6:2","s119":"open:6:4:1","s133":"open:8:0:0","s134":"open:8:1:2","s135":"open:8:2:2","s7":"open:0:9:0","s26":"open:1:9:1","s45":"open:2:9:1","s64":"open:3:9:0","s102":"open:4:9:0","s68":"open:3:7:0","s193":"open:7:3:0","s106":"open:4:7:0","s195":"open:7:4:0","s152":"open:9:0:1","s171":"open:10:0:1","s136":"open:8:3:0","s138":"open:8:4:0","s8":"open:0:10:2","s9":"open:0:11:2","s65":"open:3:10:2","s66":"open:3:11:2","s83":"open:5:9:1","s103":"open:4:10:2","s104":"open:4:11:2","s121":"open:6:9:1","s67":"open:3:8:0","s86":"open:5:8:1","s137":"open:8:5:2","s105":"open:4:8:0","s124":"open:6:8:1","s139":"open:8:6:2","s209":"open:11:0:0","s247":"open:12:0:0","s155":"open:9:3:1","s174":"open:10:3:1","s157":"open:9:4:1","s176":"open:10:4:1","s12":"open:0:12:0","s14":"open:0:13:0","s69":"open:3:12:0","s71":"open:3:13:0","s197":"open:7:9:0","s107":"open:4:12:0","s109":"open:4:13:0","s144":"open:8:7:0","s210":"open:11:1:2","s211":"open:11:2:2","s228":"open:13:0:1","s248":"open:12:1:2","s249":"open:12:2:2","s266":"open:14:0:1","s212":"open:11:3:0","s250":"open:12:3:0","s214":"open:11:4:0","s252":"open:12:4:0","s13":"open:0:14:2","s31":"open:1:12:1","s50":"open:2:12:1","s15":"open:0:15:2","s33":"open:1:13:1","s52":"open:2:13:1","s70":"open:3:14:2","s88":"open:5:12:1","s72":"open:3:15:2","s90":"open:5:13:1","s140":"open:8:9:0","s141":"open:8:10:2","s142":"open:8:11:2","s108":"open:4:14:2","s126":"open:6:12:1","s110":"open:4:15:2","s128":"open:6:13:1","s143":"open:8:8:0","s162":"open:9:8:1","s181":"open:10:8:1","s304":"open:15:0:0","s213":"open:11:5:2","s231":"open:13:3:1","s251":"open:12:5:2","s269":"open:14:3:1","s215":"open:11:6:2","s233":"open:13:4:1","s253":"open:12:6:2","s271":"open:14:4:1","s18":"open:0:16:0","s75":"open:3:16:0","s202":"open:7:12:0","s204":"open:7:13:0","s159":"open:9:9:1","s178":"open:10:9:1","s145":"open:8:12:0","s147":"open:8:13:0","s113":"open:4:16:0","s216":"open:11:9:0","s254":"open:12:9:0","s285":"open:16:0:0","s286":"open:16:1:2","s287":"open:16:2:2","s220":"open:11:7:0","s307":"open:15:3:0","s258":"open:12:7:0","s309":"open:15:4:0","s17":"open:0:17:0","s36":"open:1:17:1","s55":"open:2:17:1","s74":"open:3:17:0","s93":"open:5:17:1","s146":"open:8:14:2","s148":"open:8:15:2","s164":"open:9:12:1","s183":"open:10:12:1","s166":"open:9:13:1","s185":"open:10:13:1","s112":"open:4:17:0","s131":"open:6:17:1","s217":"open:11:10:2","s218":"open:11:11:2","s235":"open:13:9:1","s255":"open:12:10:2","s256":"open:12:11:2","s273":"open:14:9:1","s288":"open:16:3:0","s290":"open:16:4:0","s219":"open:11:8:0","s238":"open:13:8:1","s289":"open:16:5:2","s257":"open:12:8:0","s276":"open:14:8:1","s291":"open:16:6:2","s16":"open:0:18:0","s35":"open:1:18:1","s54":"open:2:18:1","s73":"open:3:18:0","s111":"open:4:18:0","s92":"open:5:18:1","s206":"open:7:18:0","s151":"open:8:16:0","s221":"open:11:12:0","s259":"open:12:12:0","s223":"open:11:13:0","s261":"open:12:13:0","s130":"open:6:18:1","s311":"open:15:9:0","s296":"open:16:7:0","s149":"open:8:18:0","s150":"open:8:17:0","s169":"open:9:17:1","s188":"open:10:17:1","s222":"open:11:14:2","s240":"open:13:12:1","s260":"open:12:14:2","s278":"open:14:12:1","s224":"open:11:15:2","s242":"open:13:13:1","s262":"open:12:15:2","s280":"open:14:13:1","s292":"open:16:9:0","s293":"open:16:10:2","s294":"open:16:11:2","s295":"open:16:8:0","s168":"open:9:18:1","s187":"open:10:18:1","s225":"open:11:18:0","s263":"open:12:18:0","s227":"open:11:16:0","s316":"open:15:12:0","s265":"open:12:16:0","s318":"open:15:13:0","s297":"open:16:12:0","s299":"open:16:13:0","s244":"open:13:18:1","s282":"open:14:18:1","s226":"open:11:17:0","s245":"open:13:17:1","s298":"open:16:14:2","s264":"open:12:17:0","s283":"open:14:17:1","s300":"open:16:15:2","s320":"open:15:18:0","s303":"open:16:16:0","s301":"open:16:18:0","s302":"open:16:17:0"},"full":{"s0":"s0","s1":"s1","s2":"s2","s19":"s19","s38":"s38","s3":"s3","s5":"s5","s57":"s57","s95":"s95","s4":"s4","s22":"s22","s41":"s41","s6":"s6","s24":"s24","s43":"s43","s58":"s58","s59":"s59","s76":"s76","s96":"s96","s97":"s97","s114":"s114","s11":"s11","s60":"s60","s98":"s98","s62":"s62","s100":"s100","s190":"s190","s10":"s10","s29":"s29","s48":"s48","s61":"s61","s79":"s79","s99":"s99","s117":"s117","s63":"s63","s81":"s81","s101":"s101","s119":"s119","s133":"s133","s134":"s134","s135":"s135","s7":"s7","s26":"s26","s45":"s45","s64":"s64","s102":"s102","s68":"s68","s193":"s193","s106":"s106","s195":"s195","s152":"s152","s171":"s171","s136":"s136","s138":"s138","s8":"s8","s9":"s9","s65":"s65","s66":"s66","s83":"s83","s103":"s103","s104":"s104","s121":"s121","s67":"s67","s86":"s86","s137":"s137","s105":"s105","s124":"s124","s139":"s139","s209":"s209","s247":"s247","s155":"s155","s174":"s174","s157":"s157","s176":"s176","s12":"s12","s14":"s14","s69":"s69","s71":"s71","s197":"s197","s107":"s107","s109":"s109","s144":"s144","s210":"s210","s211":"s211","s228":"s228","s248":"s248","s249":"s249","s266":"s266","s212":"s212","s250":"s250","s214":"s214","s252":"s252","s13":"s13","s31":"s31","s50":"s50","s15":"s15","s33":"s33","s52":"s52","s70":"s70","s88":"s88","s72":"s72","s90":"s90","s140":"s140","s141":"s141","s142":"s142","s108":"s108","s126":"s126","s110":"s110","s128":"s128","s143":"s143","s162":"s162","s181":"s181","s304":"s304","s213":"s213","s231":"s231","s251":"s251","s269":"s269","s215":"s215","s233":"s233","s253":"s253","s271":"s271","s18":"s18","s75":"s75","s202":"s202","s204":"s204","s159":"s159","s178":"s178","s145":"s145","s147":"s147","s113":"s113","s216":"s216","s254":"s254","s285":"s285","s286":"s286","s287":"s287","s220":"s220","s307":"s307","s258":"s258","s309":"s309","s17":"s17","s36":"s36","s55":"s55","s74":"s74","s93":"s93","s146":"s146","s148":"s148","s164":"s164","s183":"s183","s166":"s166","s185":"s185","s112":"s112","s131":"s131","s217":"s217","s218":"s218","s235":"s235","s255":"s255","s256":"s256","s273":"s273","s288":"s288","s290":"s290","s219":"s219","s238":"s238","s289":"s289","s257":"s257","s276":"s276","s291":"s291","s16":"s16","s35":"s35","s54":"s54","s73":"s73","s111":"s111","s92":"s92","s206":"s206","s151":"s151","s221":"s221","s259":"s259","s223":"s223","s261":"s261","s130":"s130","s311":"s311","s296":"s296","s149":"s149","s150":"s150","s169":"s169","s188":"s188","s222":"s222","s240":"s240","s260":"s260","s278":"s278","s224":"s224","s242":"s242","s262":"s262","s280":"s280","s292":"s292","s293":"s293","s294":"s294","s295":"s295","s168":"s168","s187":"s187","s225":"s225","s263":"s263","s227":"s227","s316":"s316","s265":"s265","s318":"s318","s297":"s297","s299":"s299","s244":"s244","s282":"s282","s226":"s226","s245":"s245","s298":"s298","s264":"s264","s283":"s283","s300":"s300","s320":"s320","s303":"s303","s301":"s301","s302":"s302"}},"result":{"states":219,"composedStates":219,"transitions":378,"policyLifts":218,"shortest":17,"route":[{"state":0,"action":null},{"state":3,"action":"0:0|-"},{"state":7,"action":"wait"},{"state":17,"action":"0:1|-"},{"state":26,"action":"wait"},{"state":39,"action":"-|0:0"},{"state":52,"action":"wait"},{"state":64,"action":"-|0:1"},{"state":81,"action":"wait"},{"state":110,"action":"1:0|-"},{"state":130,"action":"wait"},{"state":152,"action":"-|1:0"},{"state":174,"action":"wait"},{"state":185,"action":"-|1:1"},{"state":201,"action":"wait"},{"state":210,"action":"1:1|-"},{"state":215,"action":"wait"},{"state":217,"action":"wait"}]}},{"id":"two-hoists","capacity":2,"complete":true,"initial":"s0","states":[{"id":"s0","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s1"},{"action":"-|0:1","to":"s2"},{"action":"0:0|-","to":"s19"},{"action":"0:0|0:0","to":"s20"},{"action":"0:0|0:1","to":"s21"},{"action":"0:1|-","to":"s38"},{"action":"0:1|0:0","to":"s39"},{"action":"0:1|0:1","to":"s40"},{"action":"wait","to":"s0"}]},{"id":"s1","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s22"},{"action":"0:1|-","to":"s41"},{"action":"wait","to":"s3"}]},{"id":"s2","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s24"},{"action":"0:1|-","to":"s43"},{"action":"wait","to":"s5"}]},{"id":"s19","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s58"},{"action":"-|0:1","to":"s59"},{"action":"wait","to":"s57"}]},{"id":"s20","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s60"}]},{"id":"s21","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s62"}]},{"id":"s38","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s96"},{"action":"-|0:1","to":"s97"},{"action":"wait","to":"s95"}]},{"id":"s39","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s98"}]},{"id":"s40","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s100"}]},{"id":"s3","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s4"},{"action":"0:0|-","to":"s22"},{"action":"0:0|0:1","to":"s23"},{"action":"0:1|-","to":"s41"},{"action":"0:1|0:1","to":"s42"},{"action":"wait","to":"s3"}]},{"id":"s22","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s61"},{"action":"wait","to":"s60"}]},{"id":"s41","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s99"},{"action":"wait","to":"s98"}]},{"id":"s5","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s6"},{"action":"0:0|-","to":"s24"},{"action":"0:0|0:0","to":"s25"},{"action":"0:1|-","to":"s43"},{"action":"0:1|0:0","to":"s44"},{"action":"wait","to":"s5"}]},{"id":"s24","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s63"},{"action":"wait","to":"s62"}]},{"id":"s43","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s101"},{"action":"wait","to":"s100"}]},{"id":"s57","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s58"},{"action":"-|0:1","to":"s59"},{"action":"0:1|-","to":"s76"},{"action":"0:1|0:0","to":"s77"},{"action":"0:1|0:1","to":"s78"},{"action":"wait","to":"s57"}]},{"id":"s58","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s79"},{"action":"wait","to":"s60"}]},{"id":"s59","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s81"},{"action":"wait","to":"s62"}]},{"id":"s60","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s61"},{"action":"0:1|-","to":"s79"},{"action":"0:1|0:1","to":"s80"},{"action":"wait","to":"s60"}]},{"id":"s62","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s63"},{"action":"0:1|-","to":"s81"},{"action":"0:1|0:0","to":"s82"},{"action":"wait","to":"s62"}]},{"id":"s95","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s96"},{"action":"-|0:1","to":"s97"},{"action":"0:0|-","to":"s114"},{"action":"0:0|0:0","to":"s115"},{"action":"0:0|0:1","to":"s116"},{"action":"wait","to":"s95"}]},{"id":"s96","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s117"},{"action":"wait","to":"s98"}]},{"id":"s97","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s119"},{"action":"wait","to":"s100"}]},{"id":"s98","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s99"},{"action":"0:0|-","to":"s117"},{"action":"0:0|0:1","to":"s118"},{"action":"wait","to":"s98"}]},{"id":"s100","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s101"},{"action":"0:0|-","to":"s119"},{"action":"0:0|0:0","to":"s120"},{"action":"wait","to":"s100"}]},{"id":"s4","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s30"},{"action":"0:1|-","to":"s49"},{"action":"wait","to":"s11"}]},{"id":"s23","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s68"}]},{"id":"s42","observation":{"masks":[[0,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s106"}]},{"id":"s61","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s87"},{"action":"wait","to":"s68"}]},{"id":"s99","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s125"},{"action":"wait","to":"s106"}]},{"id":"s6","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s30"},{"action":"0:1|-","to":"s49"},{"action":"wait","to":"s11"}]},{"id":"s25","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s68"}]},{"id":"s44","observation":{"masks":[[0,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s106"}]},{"id":"s63","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s87"},{"action":"wait","to":"s68"}]},{"id":"s101","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s125"},{"action":"wait","to":"s106"}]},{"id":"s76","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s191"},{"action":"-|0:1","to":"s192"},{"action":"wait","to":"s190"}]},{"id":"s77","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s193"}]},{"id":"s78","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s195"}]},{"id":"s79","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s194"},{"action":"wait","to":"s193"}]},{"id":"s81","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s196"},{"action":"wait","to":"s195"}]},{"id":"s80","observation":{"masks":[[1,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s201"}]},{"id":"s82","observation":{"masks":[[1,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s201"}]},{"id":"s114","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s191"},{"action":"-|0:1","to":"s192"},{"action":"wait","to":"s190"}]},{"id":"s115","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s193"}]},{"id":"s116","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s195"}]},{"id":"s117","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s194"},{"action":"wait","to":"s193"}]},{"id":"s119","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s196"},{"action":"wait","to":"s195"}]},{"id":"s118","observation":{"masks":[[2,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s201"}]},{"id":"s120","observation":{"masks":[[2,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s201"}]},{"id":"s11","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s29"},{"action":"0:1|-","to":"s48"},{"action":"wait","to":"s10"}]},{"id":"s30","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s67"}]},{"id":"s49","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s105"}]},{"id":"s68","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s86"},{"action":"wait","to":"s67"}]},{"id":"s106","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s124"},{"action":"wait","to":"s105"}]},{"id":"s87","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s200"}]},{"id":"s125","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s200"}]},{"id":"s190","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s134"},{"action":"-|0:1","to":"s135"},{"action":"wait","to":"s133"}]},{"id":"s191","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s136"}]},{"id":"s192","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s138"}]},{"id":"s193","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s137"},{"action":"wait","to":"s136"}]},{"id":"s195","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s139"},{"action":"wait","to":"s138"}]},{"id":"s194","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s144"}]},{"id":"s196","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s144"}]},{"id":"s201","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s143"}]},{"id":"s10","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s26"},{"action":"0:1|-","to":"s45"},{"action":"wait","to":"s7"}]},{"id":"s29","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s64"}]},{"id":"s48","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s102"}]},{"id":"s67","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s83"},{"action":"wait","to":"s64"}]},{"id":"s105","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s121"},{"action":"wait","to":"s102"}]},{"id":"s86","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s124","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s197"}]},{"id":"s200","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s140"}]},{"id":"s133","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s134"},{"action":"-|0:1","to":"s135"},{"action":"1:0|-","to":"s152"},{"action":"1:0|0:0","to":"s153"},{"action":"1:0|0:1","to":"s154"},{"action":"1:1|-","to":"s171"},{"action":"1:1|0:0","to":"s172"},{"action":"1:1|0:1","to":"s173"},{"action":"wait","to":"s133"}]},{"id":"s134","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s155"},{"action":"1:1|-","to":"s174"},{"action":"wait","to":"s136"}]},{"id":"s135","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s157"},{"action":"1:1|-","to":"s176"},{"action":"wait","to":"s138"}]},{"id":"s136","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s137"},{"action":"1:0|-","to":"s155"},{"action":"1:0|0:1","to":"s156"},{"action":"1:1|-","to":"s174"},{"action":"1:1|0:1","to":"s175"},{"action":"wait","to":"s136"}]},{"id":"s138","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s139"},{"action":"1:0|-","to":"s157"},{"action":"1:0|0:0","to":"s158"},{"action":"1:1|-","to":"s176"},{"action":"1:1|0:0","to":"s177"},{"action":"wait","to":"s138"}]},{"id":"s137","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s163"},{"action":"1:1|-","to":"s182"},{"action":"wait","to":"s144"}]},{"id":"s139","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s163"},{"action":"1:1|-","to":"s182"},{"action":"wait","to":"s144"}]},{"id":"s144","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s162"},{"action":"1:1|-","to":"s181"},{"action":"wait","to":"s143"}]},{"id":"s143","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s159"},{"action":"1:1|-","to":"s178"},{"action":"wait","to":"s140"}]},{"id":"s7","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s8"},{"action":"-|1:1","to":"s9"},{"action":"0:0|-","to":"s26"},{"action":"0:0|1:0","to":"s27"},{"action":"0:0|1:1","to":"s28"},{"action":"0:1|-","to":"s45"},{"action":"0:1|1:0","to":"s46"},{"action":"0:1|1:1","to":"s47"},{"action":"wait","to":"s7"}]},{"id":"s26","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s65"},{"action":"-|1:1","to":"s66"},{"action":"wait","to":"s64"}]},{"id":"s45","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s103"},{"action":"-|1:1","to":"s104"},{"action":"wait","to":"s102"}]},{"id":"s64","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s65"},{"action":"-|1:1","to":"s66"},{"action":"0:1|-","to":"s83"},{"action":"0:1|1:0","to":"s84"},{"action":"0:1|1:1","to":"s85"},{"action":"wait","to":"s64"}]},{"id":"s102","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s103"},{"action":"-|1:1","to":"s104"},{"action":"0:0|-","to":"s121"},{"action":"0:0|1:0","to":"s122"},{"action":"0:0|1:1","to":"s123"},{"action":"wait","to":"s102"}]},{"id":"s83","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s198"},{"action":"-|1:1","to":"s199"},{"action":"wait","to":"s197"}]},{"id":"s121","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s198"},{"action":"-|1:1","to":"s199"},{"action":"wait","to":"s197"}]},{"id":"s197","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s141"},{"action":"-|1:1","to":"s142"},{"action":"wait","to":"s140"}]},{"id":"s140","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s141"},{"action":"-|1:1","to":"s142"},{"action":"1:0|-","to":"s159"},{"action":"1:0|1:0","to":"s160"},{"action":"1:0|1:1","to":"s161"},{"action":"1:1|-","to":"s178"},{"action":"1:1|1:0","to":"s179"},{"action":"1:1|1:1","to":"s180"},{"action":"wait","to":"s140"}]},{"id":"s152","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s210"},{"action":"-|0:1","to":"s211"},{"action":"wait","to":"s209"}]},{"id":"s153","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s212"}]},{"id":"s154","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s214"}]},{"id":"s171","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s248"},{"action":"-|0:1","to":"s249"},{"action":"wait","to":"s247"}]},{"id":"s172","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s250"}]},{"id":"s173","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s252"}]},{"id":"s155","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s213"},{"action":"wait","to":"s212"}]},{"id":"s174","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s251"},{"action":"wait","to":"s250"}]},{"id":"s157","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s215"},{"action":"wait","to":"s214"}]},{"id":"s176","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s253"},{"action":"wait","to":"s252"}]},{"id":"s156","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s220"}]},{"id":"s175","observation":{"masks":[[3,0],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s258"}]},{"id":"s158","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s220"}]},{"id":"s177","observation":{"masks":[[3,0],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s258"}]},{"id":"s163","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s219"}]},{"id":"s182","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s257"}]},{"id":"s162","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s216"}]},{"id":"s181","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s254"}]},{"id":"s159","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s217"},{"action":"-|1:1","to":"s218"},{"action":"wait","to":"s216"}]},{"id":"s178","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s255"},{"action":"-|1:1","to":"s256"},{"action":"wait","to":"s254"}]},{"id":"s8","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s31"},{"action":"0:1|-","to":"s50"},{"action":"wait","to":"s12"}]},{"id":"s9","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s33"},{"action":"0:1|-","to":"s52"},{"action":"wait","to":"s14"}]},{"id":"s27","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s69"}]},{"id":"s28","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s71"}]},{"id":"s46","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s107"}]},{"id":"s47","observation":{"masks":[[0,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s109"}]},{"id":"s65","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s88"},{"action":"wait","to":"s69"}]},{"id":"s66","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s90"},{"action":"wait","to":"s71"}]},{"id":"s103","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s126"},{"action":"wait","to":"s107"}]},{"id":"s104","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s128"},{"action":"wait","to":"s109"}]},{"id":"s84","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s202"}]},{"id":"s85","observation":{"masks":[[1,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s204"}]},{"id":"s122","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s202"}]},{"id":"s123","observation":{"masks":[[2,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s204"}]},{"id":"s198","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s145"}]},{"id":"s199","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s147"}]},{"id":"s141","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s164"},{"action":"1:1|-","to":"s183"},{"action":"wait","to":"s145"}]},{"id":"s142","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s166"},{"action":"1:1|-","to":"s185"},{"action":"wait","to":"s147"}]},{"id":"s160","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s221"}]},{"id":"s161","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s223"}]},{"id":"s179","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s259"}]},{"id":"s180","observation":{"masks":[[3,0],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s261"}]},{"id":"s209","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s210"},{"action":"-|0:1","to":"s211"},{"action":"1:1|-","to":"s228"},{"action":"1:1|0:0","to":"s229"},{"action":"1:1|0:1","to":"s230"},{"action":"wait","to":"s209"}]},{"id":"s210","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s231"},{"action":"wait","to":"s212"}]},{"id":"s211","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s233"},{"action":"wait","to":"s214"}]},{"id":"s212","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s213"},{"action":"1:1|-","to":"s231"},{"action":"1:1|0:1","to":"s232"},{"action":"wait","to":"s212"}]},{"id":"s214","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s215"},{"action":"1:1|-","to":"s233"},{"action":"1:1|0:0","to":"s234"},{"action":"wait","to":"s214"}]},{"id":"s247","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s248"},{"action":"-|0:1","to":"s249"},{"action":"1:0|-","to":"s266"},{"action":"1:0|0:0","to":"s267"},{"action":"1:0|0:1","to":"s268"},{"action":"wait","to":"s247"}]},{"id":"s248","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s269"},{"action":"wait","to":"s250"}]},{"id":"s249","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s271"},{"action":"wait","to":"s252"}]},{"id":"s250","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s251"},{"action":"1:0|-","to":"s269"},{"action":"1:0|0:1","to":"s270"},{"action":"wait","to":"s250"}]},{"id":"s252","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s253"},{"action":"1:0|-","to":"s271"},{"action":"1:0|0:0","to":"s272"},{"action":"wait","to":"s252"}]},{"id":"s213","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s239"},{"action":"wait","to":"s220"}]},{"id":"s251","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s277"},{"action":"wait","to":"s258"}]},{"id":"s215","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s239"},{"action":"wait","to":"s220"}]},{"id":"s253","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s277"},{"action":"wait","to":"s258"}]},{"id":"s220","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s238"},{"action":"wait","to":"s219"}]},{"id":"s258","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s276"},{"action":"wait","to":"s257"}]},{"id":"s219","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s235"},{"action":"wait","to":"s216"}]},{"id":"s257","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s273"},{"action":"wait","to":"s254"}]},{"id":"s216","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s217"},{"action":"-|1:1","to":"s218"},{"action":"1:1|-","to":"s235"},{"action":"1:1|1:0","to":"s236"},{"action":"1:1|1:1","to":"s237"},{"action":"wait","to":"s216"}]},{"id":"s254","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s255"},{"action":"-|1:1","to":"s256"},{"action":"1:0|-","to":"s273"},{"action":"1:0|1:0","to":"s274"},{"action":"1:0|1:1","to":"s275"},{"action":"wait","to":"s254"}]},{"id":"s217","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s240"},{"action":"wait","to":"s221"}]},{"id":"s218","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s242"},{"action":"wait","to":"s223"}]},{"id":"s255","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s278"},{"action":"wait","to":"s259"}]},{"id":"s256","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s280"},{"action":"wait","to":"s261"}]},{"id":"s12","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s13"},{"action":"0:0|-","to":"s31"},{"action":"0:0|1:1","to":"s32"},{"action":"0:1|-","to":"s50"},{"action":"0:1|1:1","to":"s51"},{"action":"wait","to":"s12"}]},{"id":"s31","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s70"},{"action":"wait","to":"s69"}]},{"id":"s50","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s108"},{"action":"wait","to":"s107"}]},{"id":"s14","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s15"},{"action":"0:0|-","to":"s33"},{"action":"0:0|1:0","to":"s34"},{"action":"0:1|-","to":"s52"},{"action":"0:1|1:0","to":"s53"},{"action":"wait","to":"s14"}]},{"id":"s33","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s72"},{"action":"wait","to":"s71"}]},{"id":"s52","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s110"},{"action":"wait","to":"s109"}]},{"id":"s69","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s70"},{"action":"0:1|-","to":"s88"},{"action":"0:1|1:1","to":"s89"},{"action":"wait","to":"s69"}]},{"id":"s71","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s72"},{"action":"0:1|-","to":"s90"},{"action":"0:1|1:0","to":"s91"},{"action":"wait","to":"s71"}]},{"id":"s107","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s108"},{"action":"0:0|-","to":"s126"},{"action":"0:0|1:1","to":"s127"},{"action":"wait","to":"s107"}]},{"id":"s109","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s110"},{"action":"0:0|-","to":"s128"},{"action":"0:0|1:0","to":"s129"},{"action":"wait","to":"s109"}]},{"id":"s88","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s203"},{"action":"wait","to":"s202"}]},{"id":"s90","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s205"},{"action":"wait","to":"s204"}]},{"id":"s126","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s203"},{"action":"wait","to":"s202"}]},{"id":"s128","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s205"},{"action":"wait","to":"s204"}]},{"id":"s202","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s146"},{"action":"wait","to":"s145"}]},{"id":"s204","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s148"},{"action":"wait","to":"s147"}]},{"id":"s145","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s146"},{"action":"1:0|-","to":"s164"},{"action":"1:0|1:1","to":"s165"},{"action":"1:1|-","to":"s183"},{"action":"1:1|1:1","to":"s184"},{"action":"wait","to":"s145"}]},{"id":"s147","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s148"},{"action":"1:0|-","to":"s166"},{"action":"1:0|1:0","to":"s167"},{"action":"1:1|-","to":"s185"},{"action":"1:1|1:0","to":"s186"},{"action":"wait","to":"s147"}]},{"id":"s164","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s222"},{"action":"wait","to":"s221"}]},{"id":"s183","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s260"},{"action":"wait","to":"s259"}]},{"id":"s166","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s224"},{"action":"wait","to":"s223"}]},{"id":"s185","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s262"},{"action":"wait","to":"s261"}]},{"id":"s221","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s222"},{"action":"1:1|-","to":"s240"},{"action":"1:1|1:1","to":"s241"},{"action":"wait","to":"s221"}]},{"id":"s223","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s224"},{"action":"1:1|-","to":"s242"},{"action":"1:1|1:0","to":"s243"},{"action":"wait","to":"s223"}]},{"id":"s259","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s260"},{"action":"1:0|-","to":"s278"},{"action":"1:0|1:1","to":"s279"},{"action":"wait","to":"s259"}]},{"id":"s261","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s262"},{"action":"1:0|-","to":"s280"},{"action":"1:0|1:0","to":"s281"},{"action":"wait","to":"s261"}]},{"id":"s228","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s305"},{"action":"-|0:1","to":"s306"},{"action":"wait","to":"s304"}]},{"id":"s229","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s307"}]},{"id":"s230","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s309"}]},{"id":"s231","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s308"},{"action":"wait","to":"s307"}]},{"id":"s233","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s310"},{"action":"wait","to":"s309"}]},{"id":"s232","observation":{"masks":[[3,1],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s315"}]},{"id":"s234","observation":{"masks":[[3,1],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s315"}]},{"id":"s266","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s305"},{"action":"-|0:1","to":"s306"},{"action":"wait","to":"s304"}]},{"id":"s267","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s307"}]},{"id":"s268","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s309"}]},{"id":"s269","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s308"},{"action":"wait","to":"s307"}]},{"id":"s271","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s310"},{"action":"wait","to":"s309"}]},{"id":"s270","observation":{"masks":[[3,2],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s315"}]},{"id":"s272","observation":{"masks":[[3,2],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s315"}]},{"id":"s239","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s314"}]},{"id":"s277","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s314"}]},{"id":"s238","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s276","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s311"}]},{"id":"s235","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s312"},{"action":"-|1:1","to":"s313"},{"action":"wait","to":"s311"}]},{"id":"s273","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s312"},{"action":"-|1:1","to":"s313"},{"action":"wait","to":"s311"}]},{"id":"s236","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s316"}]},{"id":"s237","observation":{"masks":[[3,1],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s318"}]},{"id":"s274","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s316"}]},{"id":"s275","observation":{"masks":[[3,2],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s318"}]},{"id":"s240","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s317"},{"action":"wait","to":"s316"}]},{"id":"s242","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s319"},{"action":"wait","to":"s318"}]},{"id":"s278","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s317"},{"action":"wait","to":"s316"}]},{"id":"s280","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s319"},{"action":"wait","to":"s318"}]},{"id":"s13","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"0:0|-","to":"s37"},{"action":"0:1|-","to":"s56"},{"action":"wait","to":"s18"}]},{"id":"s32","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s75"}]},{"id":"s51","observation":{"masks":[[0,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s113"}]},{"id":"s70","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"0:1|-","to":"s94"},{"action":"wait","to":"s75"}]},{"id":"s108","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"0:0|-","to":"s132"},{"action":"wait","to":"s113"}]},{"id":"s15","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"0:0|-","to":"s37"},{"action":"0:1|-","to":"s56"},{"action":"wait","to":"s18"}]},{"id":"s34","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s75"}]},{"id":"s53","observation":{"masks":[[0,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s113"}]},{"id":"s72","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"0:1|-","to":"s94"},{"action":"wait","to":"s75"}]},{"id":"s110","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"0:0|-","to":"s132"},{"action":"wait","to":"s113"}]},{"id":"s89","observation":{"masks":[[1,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s208"}]},{"id":"s91","observation":{"masks":[[1,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s208"}]},{"id":"s127","observation":{"masks":[[2,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s208"}]},{"id":"s129","observation":{"masks":[[2,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s208"}]},{"id":"s203","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s151"}]},{"id":"s205","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s151"}]},{"id":"s146","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"1:0|-","to":"s170"},{"action":"1:1|-","to":"s189"},{"action":"wait","to":"s151"}]},{"id":"s148","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"1:0|-","to":"s170"},{"action":"1:1|-","to":"s189"},{"action":"wait","to":"s151"}]},{"id":"s165","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s227"}]},{"id":"s184","observation":{"masks":[[3,0],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s265"}]},{"id":"s167","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s227"}]},{"id":"s186","observation":{"masks":[[3,0],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s265"}]},{"id":"s222","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"1:1|-","to":"s246"},{"action":"wait","to":"s227"}]},{"id":"s260","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"1:0|-","to":"s284"},{"action":"wait","to":"s265"}]},{"id":"s224","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"1:1|-","to":"s246"},{"action":"wait","to":"s227"}]},{"id":"s262","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"1:0|-","to":"s284"},{"action":"wait","to":"s265"}]},{"id":"s241","observation":{"masks":[[3,1],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s322"}]},{"id":"s243","observation":{"masks":[[3,1],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s322"}]},{"id":"s279","observation":{"masks":[[3,2],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s322"}]},{"id":"s281","observation":{"masks":[[3,2],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s322"}]},{"id":"s304","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s286"},{"action":"-|0:1","to":"s287"},{"action":"wait","to":"s285"}]},{"id":"s305","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s288"}]},{"id":"s306","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s290"}]},{"id":"s307","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s289"},{"action":"wait","to":"s288"}]},{"id":"s309","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s291"},{"action":"wait","to":"s290"}]},{"id":"s308","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s310","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s315","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s295"}]},{"id":"s314","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s292"}]},{"id":"s311","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s293"},{"action":"-|1:1","to":"s294"},{"action":"wait","to":"s292"}]},{"id":"s312","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s297"}]},{"id":"s313","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s299"}]},{"id":"s316","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s298"},{"action":"wait","to":"s297"}]},{"id":"s318","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s300"},{"action":"wait","to":"s299"}]},{"id":"s317","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s319","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s18","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s36"},{"action":"0:1|-","to":"s55"},{"action":"wait","to":"s17"}]},{"id":"s37","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s74"}]},{"id":"s56","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s112"}]},{"id":"s75","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s93"},{"action":"wait","to":"s74"}]},{"id":"s113","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s131"},{"action":"wait","to":"s112"}]},{"id":"s94","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s207"}]},{"id":"s132","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s207"}]},{"id":"s208","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s150"}]},{"id":"s151","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s169"},{"action":"1:1|-","to":"s188"},{"action":"wait","to":"s150"}]},{"id":"s170","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s226"}]},{"id":"s189","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s264"}]},{"id":"s227","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s245"},{"action":"wait","to":"s226"}]},{"id":"s265","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s283"},{"action":"wait","to":"s264"}]},{"id":"s246","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s321"}]},{"id":"s284","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s321"}]},{"id":"s322","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s302"}]},{"id":"s285","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s286"},{"action":"-|0:1","to":"s287"},{"action":"wait","to":"s285"}]},{"id":"s286","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s288"}]},{"id":"s287","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s290"}]},{"id":"s288","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"-|0:1","to":"s289"},{"action":"wait","to":"s288"}]},{"id":"s290","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"-|0:0","to":"s291"},{"action":"wait","to":"s290"}]},{"id":"s289","observation":{"masks":[[3,3],[1,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s291","observation":{"masks":[[3,3],[2,0]],"complete":false},"edges":[{"action":"wait","to":"s296"}]},{"id":"s296","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s295"}]},{"id":"s295","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s292"}]},{"id":"s292","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"-|1:0","to":"s293"},{"action":"-|1:1","to":"s294"},{"action":"wait","to":"s292"}]},{"id":"s293","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s297"}]},{"id":"s294","observation":{"masks":[[3,3],[3,0]],"complete":false},"edges":[{"action":"wait","to":"s299"}]},{"id":"s297","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"-|1:1","to":"s298"},{"action":"wait","to":"s297"}]},{"id":"s299","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"-|1:0","to":"s300"},{"action":"wait","to":"s299"}]},{"id":"s298","observation":{"masks":[[3,3],[3,1]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s300","observation":{"masks":[[3,3],[3,2]],"complete":false},"edges":[{"action":"wait","to":"s303"}]},{"id":"s303","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s302"}]},{"id":"s17","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s35"},{"action":"0:1|-","to":"s54"},{"action":"wait","to":"s16"}]},{"id":"s36","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s73"}]},{"id":"s55","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s111"}]},{"id":"s74","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s92"},{"action":"wait","to":"s73"}]},{"id":"s112","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s130"},{"action":"wait","to":"s111"}]},{"id":"s93","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s131","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s207","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s149"}]},{"id":"s150","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s168"},{"action":"1:1|-","to":"s187"},{"action":"wait","to":"s149"}]},{"id":"s169","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s225"}]},{"id":"s188","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s263"}]},{"id":"s226","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s244"},{"action":"wait","to":"s225"}]},{"id":"s264","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s282"},{"action":"wait","to":"s263"}]},{"id":"s245","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s283","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s321","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s301"}]},{"id":"s302","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s301"}]},{"id":"s16","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s35"},{"action":"0:1|-","to":"s54"},{"action":"wait","to":"s16"}]},{"id":"s35","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s73"}]},{"id":"s54","observation":{"masks":[[0,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s111"}]},{"id":"s73","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"0:1|-","to":"s92"},{"action":"wait","to":"s73"}]},{"id":"s111","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"0:0|-","to":"s130"},{"action":"wait","to":"s111"}]},{"id":"s92","observation":{"masks":[[1,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s130","observation":{"masks":[[2,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s206"}]},{"id":"s206","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s149"}]},{"id":"s149","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s168"},{"action":"1:1|-","to":"s187"},{"action":"wait","to":"s149"}]},{"id":"s168","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s225"}]},{"id":"s187","observation":{"masks":[[3,0],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s263"}]},{"id":"s225","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"1:1|-","to":"s244"},{"action":"wait","to":"s225"}]},{"id":"s263","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"1:0|-","to":"s282"},{"action":"wait","to":"s263"}]},{"id":"s244","observation":{"masks":[[3,1],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s282","observation":{"masks":[[3,2],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s320"}]},{"id":"s320","observation":{"masks":[[3,3],[3,3]],"complete":false},"edges":[{"action":"wait","to":"s301"}]},{"id":"s301","observation":{"masks":[[3,3],[3,3]],"complete":true},"edges":[]}],"partitions":{"oldClosedConservativeExtension":{"s0":"closed:0","s1":"closed:1","s2":"closed:2","s19":"closed:3","s20":"new:s20","s21":"new:s21","s38":"closed:4","s39":"new:s39","s40":"new:s40","s3":"closed:5","s22":"closed:10","s41":"closed:11","s5":"closed:6","s24":"closed:13","s43":"closed:14","s57":"closed:7","s58":"closed:15","s59":"closed:16","s60":"closed:22","s62":"closed:24","s95":"closed:8","s96":"closed:18","s97":"closed:19","s98":"closed:23","s100":"closed:25","s4":"closed:9","s23":"new:s23","s42":"new:s42","s61":"closed:30","s99":"closed:32","s6":"closed:12","s25":"new:s25","s44":"new:s44","s63":"closed:34","s101":"closed:36","s76":"closed:17","s77":"new:s77","s78":"new:s78","s79":"closed:31","s81":"closed:35","s80":"new:s80","s82":"new:s82","s114":"closed:20","s115":"new:s115","s116":"new:s116","s117":"closed:33","s119":"closed:37","s118":"new:s118","s120":"new:s120","s11":"closed:21","s30":"new:s30","s49":"new:s49","s68":"closed:44","s106":"closed:46","s87":"new:s87","s125":"new:s125","s190":"closed:26","s191":"new:s191","s192":"new:s192","s193":"closed:45","s195":"closed:47","s194":"new:s194","s196":"new:s196","s201":"new:s201","s10":"closed:27","s29":"closed:28","s48":"closed:29","s67":"closed:60","s105":"closed:62","s86":"closed:56","s124":"closed:59","s200":"new:s200","s133":"closed:38","s134":"closed:39","s135":"closed:40","s136":"closed:50","s138":"closed:51","s137":"closed:61","s139":"closed:63","s144":"closed:77","s143":"closed:105","s7":"closed:41","s26":"closed:28","s45":"closed:29","s64":"closed:42","s102":"closed:43","s83":"closed:56","s121":"closed:59","s197":"closed:74","s140":"closed:98","s152":"closed:48","s153":"new:s153","s154":"new:s154","s171":"closed:49","s172":"new:s172","s173":"new:s173","s155":"closed:66","s174":"closed:67","s157":"closed:68","s176":"closed:69","s156":"new:s156","s175":"new:s175","s158":"new:s158","s177":"new:s177","s163":"new:s163","s182":"new:s182","s162":"closed:106","s181":"closed:107","s159":"closed:106","s178":"closed:107","s8":"closed:52","s9":"closed:53","s27":"new:s27","s28":"new:s28","s46":"new:s46","s47":"new:s47","s65":"closed:54","s66":"closed:55","s103":"closed:57","s104":"closed:58","s84":"new:s84","s85":"new:s85","s122":"new:s122","s123":"new:s123","s198":"new:s198","s199":"new:s199","s141":"closed:99","s142":"closed:100","s160":"new:s160","s161":"new:s161","s179":"new:s179","s180":"new:s180","s209":"closed:64","s210":"closed:78","s211":"closed:79","s212":"closed:84","s214":"closed:86","s247":"closed:65","s248":"closed:81","s249":"closed:82","s250":"closed:85","s252":"closed:87","s213":"closed:109","s251":"closed:111","s215":"closed:113","s253":"closed:115","s220":"closed:128","s258":"closed:130","s219":"closed:148","s257":"closed:150","s216":"closed:124","s254":"closed:125","s217":"closed:142","s218":"closed:143","s255":"closed:145","s256":"closed:146","s12":"closed:70","s31":"closed:89","s50":"closed:90","s14":"closed:71","s33":"closed:92","s52":"closed:93","s69":"closed:72","s71":"closed:73","s107":"closed:75","s109":"closed:76","s88":"closed:95","s90":"closed:97","s126":"closed:102","s128":"closed:104","s202":"closed:119","s204":"closed:120","s145":"closed:121","s147":"closed:122","s164":"closed:137","s183":"closed:138","s166":"closed:139","s185":"closed:140","s221":"closed:154","s223":"closed:156","s259":"closed:155","s261":"closed:157","s228":"closed:80","s229":"new:s229","s230":"new:s230","s231":"closed:110","s233":"closed:114","s232":"new:s232","s234":"new:s234","s266":"closed:83","s267":"new:s267","s268":"new:s268","s269":"closed:112","s271":"closed:116","s270":"new:s270","s272":"new:s272","s239":"new:s239","s277":"new:s277","s238":"closed:144","s276":"closed:147","s235":"closed:144","s273":"closed:147","s236":"new:s236","s237":"new:s237","s274":"new:s274","s275":"new:s275","s240":"closed:163","s242":"closed:167","s278":"closed:165","s280":"closed:169","s13":"closed:88","s32":"new:s32","s51":"new:s51","s70":"closed:94","s108":"closed:101","s15":"closed:91","s34":"new:s34","s53":"new:s53","s72":"closed:96","s110":"closed:103","s89":"new:s89","s91":"new:s91","s127":"new:s127","s129":"new:s129","s203":"new:s203","s205":"new:s205","s146":"closed:135","s148":"closed:136","s165":"new:s165","s184":"new:s184","s167":"new:s167","s186":"new:s186","s222":"closed:162","s260":"closed:164","s224":"closed:166","s262":"closed:168","s241":"new:s241","s243":"new:s243","s279":"new:s279","s281":"new:s281","s304":"closed:108","s305":"new:s305","s306":"new:s306","s307":"closed:129","s309":"closed:131","s308":"new:s308","s310":"new:s310","s315":"new:s315","s314":"new:s314","s311":"closed:158","s312":"new:s312","s313":"new:s313","s316":"closed:175","s318":"closed:176","s317":"new:s317","s319":"new:s319","s18":"closed:117","s37":"new:s37","s56":"new:s56","s75":"closed:118","s113":"closed:123","s94":"new:s94","s132":"new:s132","s208":"new:s208","s151":"closed:153","s170":"new:s170","s189":"new:s189","s227":"closed:173","s265":"closed:174","s246":"new:s246","s284":"new:s284","s322":"new:s322","s285":"closed:108","s286":"closed:126","s287":"closed:127","s288":"closed:129","s290":"closed:131","s289":"closed:149","s291":"closed:151","s296":"closed:159","s295":"closed:172","s292":"closed:158","s293":"closed:170","s294":"closed:171","s297":"closed:175","s299":"closed:176","s298":"closed:179","s300":"closed:180","s303":"closed:182","s17":"closed:117","s36":"closed:132","s55":"closed:133","s74":"closed:118","s112":"closed:123","s93":"closed:134","s131":"closed:141","s207":"new:s207","s150":"closed:153","s169":"closed:160","s188":"closed:161","s226":"closed:173","s264":"closed:174","s245":"closed:177","s283":"closed:178","s321":"new:s321","s302":"closed:181","s16":"closed:117","s35":"closed:132","s54":"closed:133","s73":"closed:118","s111":"closed:123","s92":"closed:134","s130":"closed:141","s206":"closed:152","s149":"closed:153","s168":"closed:160","s187":"closed:161","s225":"closed:173","s263":"closed:174","s244":"closed:177","s282":"closed:178","s320":"closed:181","s301":"closed:183"},"openInterface":{"s0":"open:0:0:0","s1":"open:0:1:2","s2":"open:0:2:2","s19":"open:1:0:1","s20":"open:1:1:3","s21":"open:1:2:3","s38":"open:2:0:1","s39":"open:2:1:3","s40":"open:2:2:3","s3":"open:0:3:0","s22":"open:1:3:1","s41":"open:2:3:1","s5":"open:0:4:0","s24":"open:1:4:1","s43":"open:2:4:1","s57":"open:3:0:0","s58":"open:3:1:2","s59":"open:3:2:2","s60":"open:3:3:0","s62":"open:3:4:0","s95":"open:4:0:0","s96":"open:4:1:2","s97":"open:4:2:2","s98":"open:4:3:0","s100":"open:4:4:0","s4":"open:0:5:2","s23":"open:1:5:3","s42":"open:2:5:3","s61":"open:3:5:2","s99":"open:4:5:2","s6":"open:0:6:2","s25":"open:1:6:3","s44":"open:2:6:3","s63":"open:3:6:2","s101":"open:4:6:2","s76":"open:5:0:1","s77":"open:5:1:3","s78":"open:5:2:3","s79":"open:5:3:1","s81":"open:5:4:1","s80":"open:5:5:3","s82":"open:5:6:3","s114":"open:6:0:1","s115":"open:6:1:3","s116":"open:6:2:3","s117":"open:6:3:1","s119":"open:6:4:1","s118":"open:6:5:3","s120":"open:6:6:3","s11":"open:0:7:0","s30":"open:1:7:1","s49":"open:2:7:1","s68":"open:3:7:0","s106":"open:4:7:0","s87":"open:5:7:1","s125":"open:6:7:1","s190":"open:7:0:0","s191":"open:7:1:2","s192":"open:7:2:2","s193":"open:7:3:0","s195":"open:7:4:0","s194":"open:7:5:2","s196":"open:7:6:2","s201":"open:7:7:0","s10":"open:0:8:0","s29":"open:1:8:1","s48":"open:2:8:1","s67":"open:3:8:0","s105":"open:4:8:0","s86":"open:5:8:1","s124":"open:6:8:1","s200":"open:7:8:0","s133":"open:8:0:0","s134":"open:8:1:2","s135":"open:8:2:2","s136":"open:8:3:0","s138":"open:8:4:0","s137":"open:8:5:2","s139":"open:8:6:2","s144":"open:8:7:0","s143":"open:8:8:0","s7":"open:0:9:0","s26":"open:1:9:1","s45":"open:2:9:1","s64":"open:3:9:0","s102":"open:4:9:0","s83":"open:5:9:1","s121":"open:6:9:1","s197":"open:7:9:0","s140":"open:8:9:0","s152":"open:9:0:1","s153":"open:9:1:3","s154":"open:9:2:3","s171":"open:10:0:1","s172":"open:10:1:3","s173":"open:10:2:3","s155":"open:9:3:1","s174":"open:10:3:1","s157":"open:9:4:1","s176":"open:10:4:1","s156":"open:9:5:3","s175":"open:10:5:3","s158":"open:9:6:3","s177":"open:10:6:3","s163":"open:9:7:1","s182":"open:10:7:1","s162":"open:9:8:1","s181":"open:10:8:1","s159":"open:9:9:1","s178":"open:10:9:1","s8":"open:0:10:2","s9":"open:0:11:2","s27":"open:1:10:3","s28":"open:1:11:3","s46":"open:2:10:3","s47":"open:2:11:3","s65":"open:3:10:2","s66":"open:3:11:2","s103":"open:4:10:2","s104":"open:4:11:2","s84":"open:5:10:3","s85":"open:5:11:3","s122":"open:6:10:3","s123":"open:6:11:3","s198":"open:7:10:2","s199":"open:7:11:2","s141":"open:8:10:2","s142":"open:8:11:2","s160":"open:9:10:3","s161":"open:9:11:3","s179":"open:10:10:3","s180":"open:10:11:3","s209":"open:11:0:0","s210":"open:11:1:2","s211":"open:11:2:2","s212":"open:11:3:0","s214":"open:11:4:0","s247":"open:12:0:0","s248":"open:12:1:2","s249":"open:12:2:2","s250":"open:12:3:0","s252":"open:12:4:0","s213":"open:11:5:2","s251":"open:12:5:2","s215":"open:11:6:2","s253":"open:12:6:2","s220":"open:11:7:0","s258":"open:12:7:0","s219":"open:11:8:0","s257":"open:12:8:0","s216":"open:11:9:0","s254":"open:12:9:0","s217":"open:11:10:2","s218":"open:11:11:2","s255":"open:12:10:2","s256":"open:12:11:2","s12":"open:0:12:0","s31":"open:1:12:1","s50":"open:2:12:1","s14":"open:0:13:0","s33":"open:1:13:1","s52":"open:2:13:1","s69":"open:3:12:0","s71":"open:3:13:0","s107":"open:4:12:0","s109":"open:4:13:0","s88":"open:5:12:1","s90":"open:5:13:1","s126":"open:6:12:1","s128":"open:6:13:1","s202":"open:7:12:0","s204":"open:7:13:0","s145":"open:8:12:0","s147":"open:8:13:0","s164":"open:9:12:1","s183":"open:10:12:1","s166":"open:9:13:1","s185":"open:10:13:1","s221":"open:11:12:0","s223":"open:11:13:0","s259":"open:12:12:0","s261":"open:12:13:0","s228":"open:13:0:1","s229":"open:13:1:3","s230":"open:13:2:3","s231":"open:13:3:1","s233":"open:13:4:1","s232":"open:13:5:3","s234":"open:13:6:3","s266":"open:14:0:1","s267":"open:14:1:3","s268":"open:14:2:3","s269":"open:14:3:1","s271":"open:14:4:1","s270":"open:14:5:3","s272":"open:14:6:3","s239":"open:13:7:1","s277":"open:14:7:1","s238":"open:13:8:1","s276":"open:14:8:1","s235":"open:13:9:1","s273":"open:14:9:1","s236":"open:13:10:3","s237":"open:13:11:3","s274":"open:14:10:3","s275":"open:14:11:3","s240":"open:13:12:1","s242":"open:13:13:1","s278":"open:14:12:1","s280":"open:14:13:1","s13":"open:0:14:2","s32":"open:1:14:3","s51":"open:2:14:3","s70":"open:3:14:2","s108":"open:4:14:2","s15":"open:0:15:2","s34":"open:1:15:3","s53":"open:2:15:3","s72":"open:3:15:2","s110":"open:4:15:2","s89":"open:5:14:3","s91":"open:5:15:3","s127":"open:6:14:3","s129":"open:6:15:3","s203":"open:7:14:2","s205":"open:7:15:2","s146":"open:8:14:2","s148":"open:8:15:2","s165":"open:9:14:3","s184":"open:10:14:3","s167":"open:9:15:3","s186":"open:10:15:3","s222":"open:11:14:2","s260":"open:12:14:2","s224":"open:11:15:2","s262":"open:12:15:2","s241":"open:13:14:3","s243":"open:13:15:3","s279":"open:14:14:3","s281":"open:14:15:3","s304":"open:15:0:0","s305":"open:15:1:2","s306":"open:15:2:2","s307":"open:15:3:0","s309":"open:15:4:0","s308":"open:15:5:2","s310":"open:15:6:2","s315":"open:15:7:0","s314":"open:15:8:0","s311":"open:15:9:0","s312":"open:15:10:2","s313":"open:15:11:2","s316":"open:15:12:0","s318":"open:15:13:0","s317":"open:15:14:2","s319":"open:15:15:2","s18":"open:0:16:0","s37":"open:1:16:1","s56":"open:2:16:1","s75":"open:3:16:0","s113":"open:4:16:0","s94":"open:5:16:1","s132":"open:6:16:1","s208":"open:7:16:0","s151":"open:8:16:0","s170":"open:9:16:1","s189":"open:10:16:1","s227":"open:11:16:0","s265":"open:12:16:0","s246":"open:13:16:1","s284":"open:14:16:1","s322":"open:15:16:0","s285":"open:16:0:0","s286":"open:16:1:2","s287":"open:16:2:2","s288":"open:16:3:0","s290":"open:16:4:0","s289":"open:16:5:2","s291":"open:16:6:2","s296":"open:16:7:0","s295":"open:16:8:0","s292":"open:16:9:0","s293":"open:16:10:2","s294":"open:16:11:2","s297":"open:16:12:0","s299":"open:16:13:0","s298":"open:16:14:2","s300":"open:16:15:2","s303":"open:16:16:0","s17":"open:0:17:0","s36":"open:1:17:1","s55":"open:2:17:1","s74":"open:3:17:0","s112":"open:4:17:0","s93":"open:5:17:1","s131":"open:6:17:1","s207":"open:7:17:0","s150":"open:8:17:0","s169":"open:9:17:1","s188":"open:10:17:1","s226":"open:11:17:0","s264":"open:12:17:0","s245":"open:13:17:1","s283":"open:14:17:1","s321":"open:15:17:0","s302":"open:16:17:0","s16":"open:0:18:0","s35":"open:1:18:1","s54":"open:2:18:1","s73":"open:3:18:0","s111":"open:4:18:0","s92":"open:5:18:1","s130":"open:6:18:1","s206":"open:7:18:0","s149":"open:8:18:0","s168":"open:9:18:1","s187":"open:10:18:1","s225":"open:11:18:0","s263":"open:12:18:0","s244":"open:13:18:1","s282":"open:14:18:1","s320":"open:15:18:0","s301":"open:16:18:0"},"full":{"s0":"s0","s1":"s1","s2":"s2","s19":"s19","s20":"s20","s21":"s21","s38":"s38","s39":"s39","s40":"s40","s3":"s3","s22":"s22","s41":"s41","s5":"s5","s24":"s24","s43":"s43","s57":"s57","s58":"s58","s59":"s59","s60":"s60","s62":"s62","s95":"s95","s96":"s96","s97":"s97","s98":"s98","s100":"s100","s4":"s4","s23":"s23","s42":"s42","s61":"s61","s99":"s99","s6":"s6","s25":"s25","s44":"s44","s63":"s63","s101":"s101","s76":"s76","s77":"s77","s78":"s78","s79":"s79","s81":"s81","s80":"s80","s82":"s82","s114":"s114","s115":"s115","s116":"s116","s117":"s117","s119":"s119","s118":"s118","s120":"s120","s11":"s11","s30":"s30","s49":"s49","s68":"s68","s106":"s106","s87":"s87","s125":"s125","s190":"s190","s191":"s191","s192":"s192","s193":"s193","s195":"s195","s194":"s194","s196":"s196","s201":"s201","s10":"s10","s29":"s29","s48":"s48","s67":"s67","s105":"s105","s86":"s86","s124":"s124","s200":"s200","s133":"s133","s134":"s134","s135":"s135","s136":"s136","s138":"s138","s137":"s137","s139":"s139","s144":"s144","s143":"s143","s7":"s7","s26":"s26","s45":"s45","s64":"s64","s102":"s102","s83":"s83","s121":"s121","s197":"s197","s140":"s140","s152":"s152","s153":"s153","s154":"s154","s171":"s171","s172":"s172","s173":"s173","s155":"s155","s174":"s174","s157":"s157","s176":"s176","s156":"s156","s175":"s175","s158":"s158","s177":"s177","s163":"s163","s182":"s182","s162":"s162","s181":"s181","s159":"s159","s178":"s178","s8":"s8","s9":"s9","s27":"s27","s28":"s28","s46":"s46","s47":"s47","s65":"s65","s66":"s66","s103":"s103","s104":"s104","s84":"s84","s85":"s85","s122":"s122","s123":"s123","s198":"s198","s199":"s199","s141":"s141","s142":"s142","s160":"s160","s161":"s161","s179":"s179","s180":"s180","s209":"s209","s210":"s210","s211":"s211","s212":"s212","s214":"s214","s247":"s247","s248":"s248","s249":"s249","s250":"s250","s252":"s252","s213":"s213","s251":"s251","s215":"s215","s253":"s253","s220":"s220","s258":"s258","s219":"s219","s257":"s257","s216":"s216","s254":"s254","s217":"s217","s218":"s218","s255":"s255","s256":"s256","s12":"s12","s31":"s31","s50":"s50","s14":"s14","s33":"s33","s52":"s52","s69":"s69","s71":"s71","s107":"s107","s109":"s109","s88":"s88","s90":"s90","s126":"s126","s128":"s128","s202":"s202","s204":"s204","s145":"s145","s147":"s147","s164":"s164","s183":"s183","s166":"s166","s185":"s185","s221":"s221","s223":"s223","s259":"s259","s261":"s261","s228":"s228","s229":"s229","s230":"s230","s231":"s231","s233":"s233","s232":"s232","s234":"s234","s266":"s266","s267":"s267","s268":"s268","s269":"s269","s271":"s271","s270":"s270","s272":"s272","s239":"s239","s277":"s277","s238":"s238","s276":"s276","s235":"s235","s273":"s273","s236":"s236","s237":"s237","s274":"s274","s275":"s275","s240":"s240","s242":"s242","s278":"s278","s280":"s280","s13":"s13","s32":"s32","s51":"s51","s70":"s70","s108":"s108","s15":"s15","s34":"s34","s53":"s53","s72":"s72","s110":"s110","s89":"s89","s91":"s91","s127":"s127","s129":"s129","s203":"s203","s205":"s205","s146":"s146","s148":"s148","s165":"s165","s184":"s184","s167":"s167","s186":"s186","s222":"s222","s260":"s260","s224":"s224","s262":"s262","s241":"s241","s243":"s243","s279":"s279","s281":"s281","s304":"s304","s305":"s305","s306":"s306","s307":"s307","s309":"s309","s308":"s308","s310":"s310","s315":"s315","s314":"s314","s311":"s311","s312":"s312","s313":"s313","s316":"s316","s318":"s318","s317":"s317","s319":"s319","s18":"s18","s37":"s37","s56":"s56","s75":"s75","s113":"s113","s94":"s94","s132":"s132","s208":"s208","s151":"s151","s170":"s170","s189":"s189","s227":"s227","s265":"s265","s246":"s246","s284":"s284","s322":"s322","s285":"s285","s286":"s286","s287":"s287","s288":"s288","s290":"s290","s289":"s289","s291":"s291","s296":"s296","s295":"s295","s292":"s292","s293":"s293","s294":"s294","s297":"s297","s299":"s299","s298":"s298","s300":"s300","s303":"s303","s17":"s17","s36":"s36","s55":"s55","s74":"s74","s112":"s112","s93":"s93","s131":"s131","s207":"s207","s150":"s150","s169":"s169","s188":"s188","s226":"s226","s264":"s264","s245":"s245","s283":"s283","s321":"s321","s302":"s302","s16":"s16","s35":"s35","s54":"s54","s73":"s73","s111":"s111","s92":"s92","s130":"s130","s206":"s206","s149":"s149","s168":"s168","s187":"s187","s225":"s225","s263":"s263","s244":"s244","s282":"s282","s320":"s320","s301":"s301"}},"result":{"states":323,"composedStates":323,"transitions":674,"policyLifts":322,"shortest":12,"route":[{"state":0,"action":null},{"state":4,"action":"0:0|0:0"},{"state":18,"action":"wait"},{"state":40,"action":"0:1|0:1"},{"state":63,"action":"wait"},{"state":80,"action":"wait"},{"state":108,"action":"1:0|-"},{"state":152,"action":"-|1:0"},{"state":206,"action":"1:1|-"},{"state":254,"action":"-|1:1"},{"state":288,"action":"wait"},{"state":305,"action":"wait"},{"state":322,"action":"wait"}]}},{"id":"closed-B","capacity":2,"blockedB":true,"complete":true,"initial":"s0","states":[{"id":"s0","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s19"},{"action":"0:1|-","to":"s38"},{"action":"wait","to":"s0"}]},{"id":"s19","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s57"}]},{"id":"s38","observation":{"masks":[[0,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s95"}]},{"id":"s57","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"0:1|-","to":"s76"},{"action":"wait","to":"s57"}]},{"id":"s95","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"0:0|-","to":"s114"},{"action":"wait","to":"s95"}]},{"id":"s76","observation":{"masks":[[1,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s190"}]},{"id":"s114","observation":{"masks":[[2,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s190"}]},{"id":"s190","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s133"}]},{"id":"s133","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s152"},{"action":"1:1|-","to":"s171"},{"action":"wait","to":"s133"}]},{"id":"s152","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s209"}]},{"id":"s171","observation":{"masks":[[3,0],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s247"}]},{"id":"s209","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"1:1|-","to":"s228"},{"action":"wait","to":"s209"}]},{"id":"s247","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"1:0|-","to":"s266"},{"action":"wait","to":"s247"}]},{"id":"s228","observation":{"masks":[[3,1],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s304"}]},{"id":"s266","observation":{"masks":[[3,2],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s304"}]},{"id":"s304","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s285"}]},{"id":"s285","observation":{"masks":[[3,3],[0,0]],"complete":false},"edges":[{"action":"wait","to":"s285"}]}],"partitions":{"oldClosedConservativeExtension":{"s0":"closed:0","s19":"closed:3","s38":"closed:4","s57":"closed:7","s95":"closed:8","s76":"closed:17","s114":"closed:20","s190":"closed:26","s133":"closed:38","s152":"closed:48","s171":"closed:49","s209":"closed:64","s247":"closed:65","s228":"closed:80","s266":"closed:83","s304":"closed:108","s285":"closed:108"},"openInterface":{"s0":"open:0:0:0","s19":"open:1:0:1","s38":"open:2:0:1","s57":"open:3:0:0","s95":"open:4:0:0","s76":"open:5:0:1","s114":"open:6:0:1","s190":"open:7:0:0","s133":"open:8:0:0","s152":"open:9:0:1","s171":"open:10:0:1","s209":"open:11:0:0","s247":"open:12:0:0","s228":"open:13:0:1","s266":"open:14:0:1","s304":"open:15:0:0","s285":"open:16:0:0"},"full":{"s0":"s0","s19":"s19","s38":"s38","s57":"s57","s95":"s95","s76":"s76","s114":"s114","s190":"s190","s133":"s133","s152":"s152","s171":"s171","s209":"s209","s247":"s247","s228":"s228","s266":"s266","s304":"s304","s285":"s285"}},"result":{"states":17,"composedStates":17,"transitions":25,"policyLifts":0,"shortest":null,"route":[{"state":0,"action":null}]}}],"controls":{"harmlessExpansion":{"parameters":{"bricks":2,"courses":2,"duration":1,"cureA":0,"cureB":0},"result":"Capacity adds joint starts, but complete blueprint states already identify all concrete states; no old state distinction is lost."},"renaming":"A/B exchange with curing parameters exchanged preserves the reachable state family.","impossible":"Closing B access preserves semantics and makes full completion unreachable."},"witness":{"a":28,"b":42,"a2":65,"b2":82,"class":28,"states":[{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[1,0],"job":null}],"owners":1},{"fronts":[{"masks":[0,0],"cool":[0,0],"job":{"course":0,"brick":0,"remaining":1}},{"masks":[3,0],"cool":[0,0],"job":null}],"owners":1}],"originalMenus":[["wait"],["wait"]],"extendedMenus":[["wait"],["-|1:0","-|1:1","wait"]],"histories":[[{"state":0,"action":null},{"state":1,"action":"-|0:0"},{"state":5,"action":"wait"},{"state":9,"action":"-|0:1"},{"state":21,"action":"wait"},{"state":28,"action":"0:0|-"}],[{"state":0,"action":null},{"state":1,"action":"-|0:0"},{"state":5,"action":"wait"},{"state":9,"action":"-|0:1"},{"state":21,"action":"wait"},{"state":27,"action":"wait"},{"state":42,"action":"0:0|-"}]],"ids":["s29","s26"]},"defaultComparison":{"localStates":[79,81],"openClasses":[79,81],"closedStates":3883,"closedClasses":3508,"contexts":[{"id":"one-hoist","capacity":1,"states":3883,"shortest":34},{"id":"two-hoists","capacity":2,"states":6399,"shortest":22},{"id":"closed-B","capacity":2,"blockedB":true,"states":79,"shortest":null}]}}
